10 PHASES OF SWIMMING POOL CONSTRUCTION IN ADELAIDE By creating a fantastic pool in the courtyard, you add value to the house. However, creating a pool is not that simple as you think if you don't proceed systematically.

According to designers and swimming pool builder Adelaide , it is a ten-step process. Here are the ten steps.


#1 YOU NEED TO FILL SOME FORMS Once you sign the contract with a construction company, you need to fill in some documents. Nowadays, paper formalities are carried out digitally. You are shared with the details of plan and drawings, steel and concrete plans, hydraulic plans, and so on. After these finished plans the construction company apply for approval on your behalf.


#2 THE TEAM ARRIVES FOR EXCAVATION Whether it is an inground pools Adelaide or above the surface, excavation is required in all cases. The excavation team arrives at your place with the necessary tools and equipment.


#3 FIXING THE STEEL Once the excavation is done, steel fixers arrive with their machines. A crisscross steel cage is knit around the whole interior surface. Once the steel is fixed, the plumbers will arrive to carry out the pre-plumbing activities. These plumbing lines will go through the concrete and include the pool returns and suctions, solar and spa provisions and blower lines, water, and electric features, and so on.


#4 CONCRETE The standard thickness of the concrete is 175mm. The concrete is shaped by shapers using different tools. Once it sets down a little, it is essential to shell down water twice a day for one week to absorb moisture.


#5 EXTERNAL PLUMBING The plumber will run the suction and return lines, spa and blower lines, water feature lines, and heating lines, self-cleaning chlorinator lines and so on.


#6 LANDSCAPING At this stage, coping work, granite work, waterline tiling, and paving work are carried out. Expansion joints and additional paving are also carried out.


#7 FENCING You must call a certified fencing inspector to check the quality of the fence. Once it is passed, you can call the pebble inside.


#8 INNER PEBBLE The installer arrives early in the morning to spread the pebbles on the concrete bed and smooths the surface with a trowel. Once the pebbles are set, they are cleaned with the help of acid wash.


#9 TEST Thorough testing is carried out to check the functionality and operations. Rigorous testing ensures that the pool serves up to your satisfaction.


#10 HANDOVER Once everything is done, the construction company declares that the pool is open for use.

If you are looking for best inground swimming pools contractor in Adelaide then statewide pools is best option and known for award winning swimming Pool builders in Adelaide.


USEFUL LINKS  Hiring Swimming Pool Contractor in Adelaide: What To Consider?  Tips For Choosing The Best Swimming Pool Builder in Adelaide  The Facts About Above Swimming Pool Construction Adelaide  How To Select The Best Swimming Pool Builder in Adelaide?  Steps of Swimming Pool Construction in Adelaide  Steps of Swimming Pool Construction in Adelaide  10 Phases of Swimming Pool Construction in Adelaide  Know More About Fibreglass Pools Adelaide


CONTACT US Head Office :59 - 63 Saints Road,Salisbury Plains SA 5109 Phone: (08) 8283 0255 Fax: (08) 8283 0199 Email: sales@statewidepools.com.au Website - http://www.statewidepools.com.au/

Working Hours :Monday to Friday9:00am - 5:00pm Saturday10:00am - 2:00pm

Sunday12 noon - 2:30pm


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.