Stefania Palacio A- Portfolio

Page 1

STEFANIA PALACIO

PORTFOLIO

1


01/ ACOSTA’S House

PROJECTS LOCATION

02/ POLO’S

COLOMBIA , Valle del Cauca, Santiago de Cali

03/ ARBOLEDA’S

3º 27´-21 n-76º 30º 0-1003 msn Climate: Tropical Savanna Average temperature: 30º

House

BUILDING

CONTENTS

Office

2

04/ INTEGRATED URBAN PROJECT

Phase one: Eight street axis- scenic axis Phase two: Commerce and housing

COMPLEX 05/ URBAN PROJECT

Phase one: Environmental urban recovery of the Cauca River Phase two: Educational and cultural centrality Phase three: Educational centrality

3


1

3

House

YEAR: 2020 LOCATION: Dapa, Colombia COMPANY: Rodriguez Puig S.A.S WORK TIME: Design: 8 months Construction: 2 years AREA: 260m2

LOST EDGE

POOL L-0.17 GL-1.42

WALL N-0.20

6

L-0.35 GL-0.17

4

3 2

L -0.52 GL -0.17

1

7

WALL N-0.05

A

L-0.35 GL 0.05

7'

BATH

8

LAUNDRY L 0.00

B

DECK L 0.00

LIVING ROOM L 0.00 GL.1880.75

PANTRY

8'

DINNING ROOM BATH 2 DECK L+0.35

BATH 4 L+.175

KITCHEN

L-0.35 GL-0.05

C

L+.175

3 4 NA

SAU

1

5 L+.17 75 GL-.1

2

0 L 0.0 .30 +0 GL

BACK

E

RAG

STO

BEDROOM 3 L+0.35

ER OW

SH

4

8' 5

2

L+1.05

FACADE

4

1

L +0.35

BACK

3

11 L+0.35

5 L- 0.3 5 GL- 0.0

3

1 2

10

BEDROOM 2 L+0.35 L+.175

GL-.05 GARDEN

9 I

UZZ JAC

L 0.00

L 0.00 GL.1880.75

RIGTH SIDE

4

5

DECK L 0.00

FACADE

RENDER

EDGE N-0.20

EDGE L-0.17

D

Because this area in specif is a forestall area the importance of having a house that involved nature was the most relevant to the client. He wanted an opened house with massive windows so he could be connected with nature all the time.

6

5

LOST EDGE

LEFT SIDE

ACOSTA’S

FACADE

FACADE

01/

FRONT

FIRST FLOOR PLAN

BATH 3

E

6 9 10 MOUNTAIN SLOPE

CONSTRUCTION

F

11 D'

5


.80

1.0

0

0

1.8

2.2

00 102.

40

101.

101.60

GL. +1.36

0

.15 .15

.15

NT. 100.20

101.20

101.20

10

10

102.40

P14

L. -2.05 GL. 100.08

1.55

L. -1.75 GL. 100.38

10

0

0

1.4

0

103.20

SECTION

2.4

10

1.0

1.2

10

0

1.25

NT. 100.00

1.6

1-1'

0 3.2 10

L. +0.00 GL. 102.13

10

L. -0.35 NG.101.78

GL. 101.94

100.40

LG. +102.56

100.60

10

100 .80

FRONT

FACADA

10 0.2 0

102.60

102.00

103.40

CONSTRUCTIVE DETAIL

100.60

100

10 L. 0.00 GL. 102.34

P2

10

0

2.25

1.8

20 102.

10

2.0

0

0

.10 .15

100

YEAR: 2019 LOCATION: Cali, Colombia COMPANY: Rodriguez Puig S.A.S WORK TIME: Design: 6 months Construction: One year and a half AREA: 986m2

P15

100.40

P16

P18 P17

P1

102.80 103.00 103.20 103.40 103.60

.00

ENTRY

P13

.52

3.4

0

99.80

103.40

.10

101.60

RIGTH SIDE

103.60FACADE

.00

102.

102

00

102.20

102.40 102.60 102.80 103.00

103.20

.52

41 40

L. -0.98 GL. 99.40

80

.10

39

LEFT SIDE

P12

.52

37

0

.10

36

1.6

101.80

102.00

FACADE

38

10

35

0

.4

34

.62

0

33

0.8

60

10

10 1.0 0

101.

1-1'

SECTION

BACK

32

P4

P5

3.70

P11

2.8

P3

102.00 0 2.0 0 10 2.2 10 .40 2 10 .60 2 0 10

103.40

FACADE

BACK

10

103.60

Muro

103.00

103.20

103.80

10

1.

20

1 10

P6

P9 P10 Caja

P8

P7

3.15

10 31

.52

30 29

CONSTRUCTION

.10

9.95

28

98.80

98.60

99.20

99.00

99.60

99.40

99.80

100.20

100.40

100.60

101.00

VIA: 12 mts.

100.80

101.40

101.20

101.80

101.60

102.00

102.40

102.20

102.60

103.00

102.80

103.20

103.40

103.60

C A L L E 15

100.00

RENDER

L+3.70

42

.50 101.

A building designed and constructed for a real estate office. We reduce natural light using metallic blinds that captured the sun’s rays and also block the rain. This allowed us to have the windows open day and night for natural winds, reducing the use of air conditioners.

.25

CRA 108

10

Office

FIRST FLOOR PLAN 103.60

02/

ARBOLEDA’S BUILDING

.52

27 26

.10

25 24

.52 7.95

23 22

.05

L+3.70

.10

21

.52

20

.50

19

.10

18

.40

17

.52

16 15

.10

14

.52

13 12

.10

11 10

.52

9 8

2.80

.10

7

.52

6 5

.10

4 3

.175

2

.175

1

.52 .20 .10

.175 1.25

6

2.40

L 0.00

1.15

7


LONGITUDINAL SECTION 2-2’

FIRST FLOOR PLAN

NATURAL LIGHT AND GREEN WALLS

House

E

H

YEAR: 2017 LOCATION: Cali, Colombia COMPANY: Rodriguez Puig S.A.S WORK TIME: Design: 6 months Construction: 2 years AREA: 654m2

I

N

O

P

Q

1

1'

2

3

4

2-2'

B

7' 8

SECTION

03/

POLO’S

9

11 11'12

13

POOL

JACUZZI

1

BEDROOM 2

2

DECK

Q

3 4 5 6

STUDY

P

P O

HALL

RENDER

EQUIPMENT ROOM

LIVING-DINING ROOM

This house has a lot of natural light, green roofs, green walls and materials like stone. Between the spaces of the house you could always find yourself in an open space with plants or water. This project in particular was the first one having solar heaters.

1

N

N BATH 5

KITCHEN

L

M K

LIVING-DINING ROOM GYM

CONSTRUCTION

J I

I PANTRY

LAUNDRY

H

1

H

2 4

G

3

HALL

BATH 7

5

F STORAGE

BATH 4

BEDROOM 4

BEDROOM SERVICE

E

D C

B A

A

GARAGE

1

2

3

4

5

6 7

8

9

10 10'

12

13

X

8

9


04/

FIRST FLOOR PLAN

INTEGRATED URBAN PROJECT

Eight street axis- scenic axis

YEAR: 2013 LOCATION: Cali, Colombia CLASS: Integral project II WORK TIME: 4 months The project has two phases: 1. Whole group analysis at different scales 2. Personal proposal project PHASE ONE: SITE AREA: 10.293m2 Along the eighth street in the center of the city of Cali, a “scenic axis” is proposed to renew and rehabilitate the surrounding area of the sector. This street is enabled as a main picker and a connector where different institutional buildings are placed from its beginning to its end. The aim is to generate an urban dynamism in the area to return to the sector the importance of the center of Cali had in the past.

Housing Mixed housing Commerce Offices Urban equipment Recreational Religious Recreational Institutional

10

11


TOP VIEW

PHASE TWO: COMMERCE AND HOUSING AREA: 886m2 This project consists of a bazaar (commerce) on the first floor and a housing area on the following floors with the idea of densifying the urban area through the mixticity of uses. This block uses the existing gaps of the parking lots and dwellings. In addition, the facades of heritage interest are reused.

12

LOCATION ON THE EIGHT STREET

ENVIRONMENTAL PROPOSAL

13


05/

URBAN COMPLEX PROJECT

USERS

ENVIRONMENTAL PROPOSAL

TYPE OF STREETS

Environmental urban recovery of the Cauca River

YEAR: 2012 LOCATION: Cali, Colombia CLASS: Projects V: Architecture, city and region WORK TIME: 4 months

TYPE A

TYPE B

TYPE C

The project has three phases: 1. Whole group analysis at different scales 2. Proposed master plan by groups of 3 classmates: Maria Alejandra Caicedo, Maria Paula Rico and Stefania Palacio. 3. Personal proposal project PHASE ONE: SITE AREA: 17 KM CAUCA RIVER This urban complex project is located along the 17km of the Cauca River. In this complex a regional, urban, zonal and local analysis and intervention strategies are presented at different architectural scales. The aim is to finally generate a pertinent solution to the social issues of the illegal invasion in the riverside through user replacement, household proposals, public space and institutional buildings including a conservative environmental system. INSTITUTIONAL BUILDINGS

14

1. Metropolitan hospital 2. International regional center 3. High-performance sports center 4. Environmental education center 5. Educational and cultural centrality 6. River port 7. Center for intercultural studies

15


FIRST FLOOR PLAN

PHASE TWO: EDUCATIONAL AND CULTURAL CENTRALITY AREA: 45.000m2 The project proposes a new educational and cultural centrality, where the Cauca River is the environmental axis and link with the city and the region. This series of institutional buildings arises from the lack of educational and cultural public facilities in the area. On the other hand a full floodplain area was the major determinant in architectural design. PHASE THREE: EDUCATIONAL CENTRALITY AREA: 16.344m2 The educational centrality has a university area that seeks as a main character to make up for the lack of educational facilities in the city and in the area in particular. Allows the surrounding population (15.000 students) to have an improvement in their quality of life the higher educational level through academic and research programmes.

INSTITUTIONAL BUILDINGS 1. Cultural: Cultural center 2. Educational and cultural: Library 3. Educational: University

16

17


PORTFOLIO

18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.