Architecture Portfolio | Selected Projects

Page 1

A r c h i t e c t u r e P o r t f o l i o

M a r i n a S u h a n d i n a t a | S e l e c t e d P r o

j
c t s
e
Contents 1
3 | CV
2
Education, Experience, Skills

C u r r i c u l u m V i t a e

3

Email: marinasuhandinata@gmailcom Website: issuucom/stella27m

LinkedIn: https://wwwlinkedincom/in/marinasuhandinata-7970b8163

Address: Jakarta, Indonesia

Marina Suhandinata

About Me

Recent graduate with a degree in Architecture, with experience working in a design consultant and encountered international learning experience. Creatively optimistic, adaptable, and open minded to learn new things

Experience

Architectural Intern

BLU Design Studio | July - September 2021

- Conceptualized interior designs for residential buildings, constructed detail drawings and participated in a couple of local and international competitions

Exchange Student

INHA University, South Korea | August - December 2019

- Developed a few projects within the new environment and context for a whole semester

Junior Architect

PT Kontinum Global Studio | February - June 2019

- Assisted the head of design department in giving design alternatives for mid rise building interior and facade design (Internship)

Project Manager

HIMARS Study Tour | 2018

Honors

Seminar Presenter ICEED | November 11, 2020

The 4th International Conference on Eco Engineering Development 2020

Skills

- Orchestrated a tour to Japan for the department to see architecture abroad with visits to landmarks, architectural firms and other campuses

Liaison Officer

- Accommodated a Talkshow speaker in Division of Event

Liaison Officer BNEC Asian English Olympics | 2018

HIMARS Architecture Grand Festival | 2018 - Assisted participants in Division of Debate Competition

Education

BINUS University

Bachelor of Architecture | 2016 - 2020

Stream in Digital Architecture

Certifications

SketchUp Certified User ACA Pacific | June 26, 2020

Advanced / SketchUp Pro 2019

IELTS British Council | April 9, 2019

CEFR Level: B2 / Overall Score: 6 5

4
Get in touch!
AutoCAD - SketchUp - Vray - ARCHICAD - Adobe
- Microsoft Office Word - Microsoft
-
Photoshop
Office Powerpoint

S u n t e r A g u n g W t E P l a n t

5

Background

Every day Jakarta produces garbage that reaches thousands of tons which are placed in the Bantargebang TPST or the household waste recycling center With economic development and population growth, it is no longer possible for waste to be dumped in the area Then came the Waste to Energy Power Plant that can reduce the volume of waste and generate renewable electrical energy. During the process, an incineration machine is used which completely burns the waste where the room is directly exposed to high temperatures which can cause heat to spread out of the building Therefore, this building was made which could reduce the heat transfer resulting from the combustion process so that it wont spread out

6

Location

The location of the site is closer to the coastal area which can reduce the level of pollution to the surrounding environment The locations of these places are also easy to visit with the help of the Jakarta Inner Ring Road toll road In addition, the site is close to an electric tower or Sutet in the Tanjung Priok area for electricity distribution The environment around the site is more dominant with a trade zone, a public service zone and residential zone Apart from that, there are also educational zones, park zones, farms and buildings that are owned by the government. Most of the trade and public service zones own undeveloped land. Since the formation of the project can have an impact on the surrounding environment, it is best if the building is placed away from the residential area on the site

District:TanjungPriok Sub-district:SunterAgung Zone:Publicandsocial service Area:37085,90sqm

7

The site is located on Jl Sunter Permai Raya, Sunter Agung, Tanjung Priok, North Jakarta. It occupies the zone of public and social services The site area is 37,085 90 m2 Based on the waste management map from the Environmental Board, there are still many management sites that are not yet independent from various sectors in the area. The site has a strategic location where there is the Jakarta Inner Ring Road toll road to collect waste from that location and distribute electrical energy to the nearest electrical substation

8
9
Concept The acc right ac is a par

ess on the left is used for garbage trucks and the ess is used for managers and visitors where there ing area. Every access there is an area for Security.

Area
Location :NorthJakarta ProjectType:Industrial
10
:37.085,90sqm

Landscaping

S i t e P l a n
11
This area is used to clean the garbage trucks before exiting thesite When the trucks enter the site, each of it must go through the weighingprocess This area is made for the truck drivers as a rest area when not onduty There is a area for the visitors to meet before entering the building
12
Visitors using larger vehicles candropoffatthisarea

Room Organization

The room on the plan consists of zones according to the analysis program space and has two main areas, namely for factories and managers and visitors The location of the room is based on the waste processing process where the room is needed close together and arranged linearly The rooms for the main process of processing are located in the middle and complementary rooms are located beside it On the south side there is an area for managers and visitors Especially for visitors, there is a room in the factory area to see the processing process, namely the Observation Hall room

The management area works in the Office and Laboratory rooms where there are complementary rooms such as the Pantry room, prayer room, locker, toilet, and MEP. As for visitors, when entering the building, they will be greeted at the Reception Hall room, then enter the Foyer area where there is information on the history of the waste management process In addition, visitors can also take part in a workshop which is located on the left side of the foyer room where it explains the process of processing waste at the factory Visitors can also see directly the processing process from the Observation Hall room where there is a viewing window that uses fire rated glass material to inhibit the transmitted heat from entering the room.

Waste goes following ar energy utiliz room where room The content. Aft controlled in machine or the waste is is accommo again for reu

13

s through several stages of processing and conversion to energy which changes its physical form, the re the processing stages: waste placement, waste combustion, energy recovery, flue gas cleaning, zation, and ash utilization The performance of the process in the factory area begins in the Tipping Hall e the garbage truck comes carrying garbage in the available area to place waste in the Waste Bunker room has three garbage bins where the first bin is placed for several days to reduce its moisture ter that, the garbage is transferred to the next tub with the help of an overhead crane which is n the Control Room. In this bin, the waste is mixed and lifted into a hole connected to a garbage burning incinerator. In the incineration machine the waste is burned at a temperature of 850o-900oC where s completely burned. The combustion process produces the remaining ash from the combustion which odated in the third tub in the Waste Bunker room or in the Ash Storage room and can be processed use from the Loading Zone room

14
Main Process Hall

Room Organization

The room that uses double skin is only used for The Main Process Hall and other rooms use zinc or metal sheet as the main material for the facade except for the Waste Bunker where the finishing on the walls is made simple from the origin of the wall material, namely concrete With a similar appearance for a small building mass, each building mass has a numbering and naming on its façade to make it easier for managers to access the rooms.

Double skin in the Main Process Hall room is based on heat transfer analysis and uses two types of panels from wood and aluminum material In the aluminum panels there are holes to make it easier to transmit heat. The panels form a pattern based on solar radiation analysis

North Facade South Facade
15
East Facade

In the building there are 5 structural modules Especially for the waste bunker room, it does not use side bracing because it uses structural walls of concrete but truss is still needed to lift the overhead crane Each truss in the module has a roof slope to regulate drainage when it rains and each building mass will be provided with a gutter pipe or gutter The roof of the building in the Main Process Hall mass uses a sawtooth roof for the skylights. The column in each module uses a steel 'I' shape with a size that adjusts the distance of the space

Building Structure

The building structure uses a wide span structure system with a truss system and steel as the main material.

Buildings have several masses that have different heights and spans so that each of these masses uses their respective structural modules to make it easier to support mass, loads, and their own needs, such as for a waste bunker where there is an overhead crane

16

Building Envelope

The building envelope uses a double skin with a facade panel made of two materials, namely wood and aluminum The double skin type used is the double skin corridor where there is a corridor area used for facade maintenance There are three sides of the building facade, namely the north, east and south Each side of the facade has a different panel pattern and is based on the results of heat transfer research and solar analysis

The facade begins to appear on the wall after the height of the mass of the building on the left and right The physical form is not directly parallel to the wall but has a geometric shape in which in one square shape protrudes about 05 meters at one point and there are 8 panels in the shape of a triangle

The facade has holes in aluminum panels as ventilation holes for hot air from heat transfer in the building and ventilation for the corridor area in double skin The building envelope has several important parts related to room ventilation, lighting, and completion of previous research To ventilate the Main Process Hall room using natural ventilation, there are room walls that are placed on the outer and inner edges of the column, which are interspersed with wire mesh for outside air openings This wall is made in and out of the area above the room for hot indoor air to exit the room.

17

After the columns and walls of the room, there are cross bracing and side bracing of the room where the structure for the corridor area on the double skin stands. Side bracing is covered with zinc panels on each building mass in the tread The corridor structure stands on the side bracing of the building and is used for double skin maintenance areas.

The corridor area only allows for 1 person and is equipped with railings Facade panels are raised by frames connected to the structure connected to the corridor structure

The panels on the facade, especially for aluminum panels, are made perforated for ventilation in the corridor area and for indoor air to pass through the facade In the mezzanine area, the Main Process Hall is not only connected to the corridor area on the double façade but also as access to the emergency staircase which is located outside the building

Observation Hall is located in the Main Process Hall room where the room meets directly with a heat source (waste processing machine)

Therefore, the opening or viewing window in the Observation Hall room will be using a glass material with a low conductivity level so that the heat from the machine does not move into the visitor area

18
Main Process Hall Waste Bunker Tipping Hall
19
Tipping Hall Foyer

Control Panel

Workshop

Waste Bunker

20

T h e W e a r + h o u s e

21

BackgroundHome office is a new take on housing that accommodates the lifestyle of this modern age Many people who are self employed work from home and this type of housing is more and more in demand especially in big cities. This home office is located in Kemang, South of Jakarta. This design is made for a family of three with 1 master bedroom, 1 other bedroom, each with their own bathrooms Other rooms include the living room, dining room, the kitchen, laundry room, guest bedroom, a small play room, a library, and swimming pool The house owners own a fashion boutique with a small amount of employees that works on site.

22

Site Plan

1 2 4 9
23
Site Area : 450 sqm GFA : 3 BCR : 40% Setback : 5 m (south) Maximum layers : 3

Accessibility

When entering the site there are two entrances made separated to keep the privacy of the house owners as well as giving the office users convenience by the available parking on site

Massing

There are two massing dedicated for the house and work space The office massing is made at the back because of the semi private activity in the workspace (Fashion Studio)

Office

The office area has an open working space to encourage the users to collaborate on projects The space has a second floor or mezzanine with industrial style interior

House

The house has many facilities with a focus on the swimming pool as a way to create an inner view on site as well as decreasing the outdoor heat from the afternoon sun.

24

Landscaping

Backyard

This area can be accessed through the kitchen door or the small walkway on the east side of the house To keep it a private space there's a lattice with vines

Office

The back massing on the site is where the office area is located There is also a separate entrance for the employee and a motorcycle parking area near the office door

25

House

On the front of the side of the site is where the house is located This area has a pool on the west side of the site with a balcony from the main bedroom that's facing the pool.

Car Park

The house has a car parking fit for two cars right after the main entrance with a small front garden and access to the Office area

26
1 2 4 9
27
1st Floor Plan House
1 2 4 9
Floor Plan House 28
2nd
1 2 4 9
Floor Plan
Floor Plan Office Office 29
2nd
1st

Front Elevation

30
Master Bedroom
Playroom 31
Master Bathroom Staircase
Laundry Room 32
Child Bedroom
33
Kitchen Living Room
Dining Room 34
Living Room

Meeting Room

35
Office Entrance
36 Sewing Area
Work Space

T h e B r i d g e

37

Background

This building is a renovation project from what used to be a hospital turned into an art center The idea of a new program for this relatively old building is based on the users surrounding the site which are people in the working ages and the youth The site analysis shows how there is a need of more communal space that appeals to the age groups in the site area. As a global phenomenon, Korean Pop Culture, has sparked an interest in most youth and influenced by the Korean government to spread Korean Culture by reconfiguring its own elements with Westernized ideas that familiarized it to different cultures It is made from different art platforms including music, art, fashion, movies, television, dramas, and even animation. Many of the mentioned platforms above are in the digital art realm which is why I purpose a Black Box Art Museum This project is made from my student exchange program at INHA University, South Korea

38

Location

Art Centers around the Seoul area is located mostly on the East side and Central of Seoul There are only 2 Art Centers in the West side of Seoul which is where the site is located Green parks can also be rarely found around the metropolitan area that is why this new program would implement the two needs of space into a one accommodating program Black Box Art Museum is originated from the need to accommodate digital art works, - implements adjustable lighting systems and also has space for installations or moveable walls for the interior.

39
Site Plan 40

Concept

There could be many varieties of space from the threshold form All divided the exterior and interior with a certain path or as well as connecting two spaces that would create a relationship.

w d

M

Programs

This

gallery is seen as the highest massing of them all It holds events for renewal of classical art works

the space for the general

gallery holds different installations as well

as digital

The main concept of the massing comes from the source of projection or projector as the main tool used in a black box art m T
That area creates a unique space and could make connections between two spaces of certain circulation.
display with voids for bigger installations or sculptures
The main gallery is
artwork
Main Gallery
display
This
artworks like video
Visual Gallery
41
Archive Gallery

Audio Gallery

This gallery is for shorter exhibitions It uses many monitors to play certain audios and videos

Auditorium

This space is used to showcase short movies and other types of video art with watching area for bigger audience

Podium

The podium has many facilities and it connects all of the other massing together

Green Space

The green space is located mostly on the roof of the other massing and it used to balance the interior spaces

Circulation 42
43
44
45
46
47
48

Facade Detail

The building facade has different types of screens for its exterior Each of them are different according to the various massing and kind of activity Every screen varies in the opacity percentage. The screen designs area geometric to resemble the systematic development of technology especially in the arts The different activities requires different levels of sun light and made with various percentages of opacity The denser the design the more of an illusion it creates to the user. Each of the designs is located at one massing with one main design that ties the building all together

The use of screens create an illusion to the eye and adds a more three dimensional feel to the facade It gives the building envelope more depth and has an interactive relationship to the user With different points of view the user would see changes in the facade almost as if it was moving.

49

Main Gallery

Visual Gallery

N N N 50
Archive Gallery
Audio Gallery Podium
51
52
53
54

O t h e r w o r k

55
s
56
57
58
59
60

M a r i n a S u h a n d i n a t a m a r i n a . s u h a n d i n a t a @ g m a i l . c o m S e l e c t e d P r o j e c t s | A r c h i t e c t u r e P o r t f o l i o

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.