Stella Vaas Portfolio
Building Components (VIDEO) The attached videos are showing step by step building processes of a foundation, a wall construction and a wooden trussed roof.
Multi-storey residential building
6
7
35
N
2 29 12
4 26 21
2 64 31
9 77 34
8 63 31
2.5
00 48 P
M2 M2
97 73
00 36
07 10
3607
51 24
7 99 16
33834
t en em v a
g in rk pa
ø 35
5 51 13
60 15
5 1607
d an
ea ar
00 48
1 74 19
19962
81 65
ly ul rg te a w 2 in .5 Ra K: 2 0.87 D K: B
3 71 13
: lly gu er t wa te 1 as .6 W K: 2 0.17 D K: B
æ 35
R
a re ec
ea ar al tin
dn
nd ou gr y a pl x 35
5 18 42
0 00 75
8 25 24
2.5
0 90 37
N SØ
DE A OG R RB E D
2.5 u 35
1 64 13
8
M1 M1
3
site plan
FREDRIK BAJERS GADE
6 28 16
M2 M2
M1 M1 m 35
Brin
VIA U PROJECT:
Sønderb
SUBJECT:
Site plan
DRAWN BY: Stella Va
N
Building site plan AN--1(2BY)001 Informarion about the plot: Address: Sønderbrogade 44-48 Horsens, 8700 Cadastral code: 35ø, 35x The use of property: residendtial and commercial Plot area: 2572m2 Bulilt up area: 2237m2 Max allowed built up area: 90% / 2314,8m2 Plot ratio: Plot ratio = area of the house / area of the plot * 100 Plot ratio = 2237 / 2573 * 100 = 87% Legend: Plot boundary Building boundary Neigbouring buildings 2
ng ideas to life
Terrain levels Sewer connection Rain water connection Downpipe Main entrance to the site Main entrance to the building Handicap parking Bike shed Solar panels Ventilation ducts Shafts Inclination of the roof
9
Site plan legend 1 : 200
SCHOOL OF TECHNOLOGI AND BUSINESS
HORSENS, DK
University College
brogade 44-48
DATE: 03/09/15
n
SCALE: 1 : 200
aas
CLASS: 42
AN--1(2BY)001
M1 M1
1
480
180
300
A Ø6mm inserts drilled 25mm into the concrete wall by factory 559 108
31
300
120 95
Moisture barrier 25
30mm grouting to even up the surface for prefabricated concrete wall 16 x 67mm skirting board 10mm distance between parquet and concrete wall A
30mm polystyrene insulation
1.000
A'
Radon barrier 16 x 67mm skirting board 10mm cap between parquet and concrete wall 10
30 10
Ø12mm 150x150mm reinforcement mesh 40mm spacers to support the reinforcement mesh Placed in every 200mm
10mm polystyrene insulation 1.000
30mm grouting to even out the surface for prefabricated concrete inner leaf
100
70
70
40
15
115
Air tight membrane
Ground floor (apartments)
V
V
0.735
815
Ground floor (apartments)
V
815
541
30
445
815
10 76
35
Ground floor (apartments)
260
35
125
0.555
75
55 x 108 x 220mm bricks + 12mm mortar 3 courses of bricks = 200mm
55
200
Ø6mm stainless steel wall ties Drilled 25mm into the concrete wall Placed in every 4th brick course
12
Wall ties secuing the Leca blocks
Moisture barrier Last course of Leca block cut down to 178mm to create 150mm between brickwork and ground level 10mm overhang and mastic sealant to drain off rainwater
Terrain / Office
1240
1005
8mm rendering 100 x 190 x 490mm Leca blocks 600kg/m3 +10mm mortar Curbstone and footing for curbstone
AN-X5(205 001)001
IV
Terrain / Office
IV
0
0
-0.150
150
150
Marine gravel (søsten) 232
Terrain / Office
IV
116
1635
0
Legend:
Sundolitt drain plate - fixed with water based adhesive or adhesive for polystyrene
Prefabricated concrete Beech parquet
Textile moisture membrane Brickwork Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation
Polystyrene insulation inserted on site
Concrete grouting 4 x Ø12mm reinforcement bars to strenghten the extrusion
Ø12mm reinforcement bars
Cast in-situ concrete
Ø8mm stirrups placed in every 1000mm
Leca block / areated conctere
190
Marine gravel (søsten) Sand 306
-0.501 Top soil
Rigid insulation
395
External wall construction A-A': Non load bearing facade wall -108mm brick external layer -31mm ventilation gap -300mm Kingspan Kooltherm K5 Facade Insulation (0.020 W/mK) -120mm prefabricated concrete LAC 10MPa / 2000kg/m3 Basement wall construction B-B': -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa
B
B'
Floor partition: -15mm beech parquet floor conering -60mm cast on site concrete C25MPa -100mm Kingspan Kooltherm K3 Gulvisolering (0,020 W/mK) -260mm EXPAN Sound slab deck element LAC 18MPa / 2000kg/m3
35 50mm blinding layer to strengthen the soil for the foundation
00 Foundation higher
III
-0.950
150
SCHOOL OF TECHNOLOGI AND BUSINESS
Bring ideas to life 120
190
200
440
Basement wall and external brick wall connection 1:5
300
HORSENS, DK
VIA University College 120
50
-900
391
34
200
490
PROJECT:
Sønderbrogade 44-48
DATE: 06/17/15
SUBJECT:
Basement wall and external brick wall connection
SCALE: As indicated CLASS: 42
DRAWN BY: Stella Vaas
AN-X5(205 001)001
External foundation (West) 1:5
A
31
300
120
25
2
16 x 67 mm skirting board 10mm distance between parquet and concrete wall 30mm polystyrene insulation 30mm grouting to even up the surface for prefabricated concrete wall 30 10
Ø12mm 150 x 150mm reinforcement mesh
1.000
Radon barrier
0.985
440
40mm spacers to support the reinforcement mesh Placed in every 200mm
200
120
120
110
40
115
90
70
Ø6mm stainless steel wall ties Drilled 25mm into the concrete wall Placed in every 4th brick course
Ground floor (apartments)
V
V
815
Ground floor (apartments) 815
0.735 80
Legend:
30
541
Prefabricated concrete
76
35
80
35
Beech parquet Brickwork
30mm grouting
125
Concrete grouting
10mm polystyrene insulation
Cast in-situ concrete
75
Leca block / areated conctere
Radon barrier
Marine gravel Leca 10-20 coated
55 x 108 x 220mm bricks + 12mm mortar 3 courses of bricks = 200mm
Ø12mm 150 x 150mm reinforcement mesh
200
Sand
40mm spacers to support the reinforcement mesh Placed in every 200mm
Top soil
10
Moisture barrier Rigid insulation
Basement
1235
8mm rendering 100 x 190 x 490mm Leca blocks 600kg/m3 +10mm mortar
Apartments ground slab construction: -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ø12, 150x150mm reinforcement mesh -15mm parquet floor finish
Marine gravel Curbstone and curbstone footing 0.000
Terrain / Office
IV
IV
0
Terrain / Office 0
AN-15(200)002
Textile m
Moisture
300 x 30 to lead th
150
78
210
Plastic s membra 40
External wall construction: Non load bearing facade wall -108mm brick external layer -31mm ventilation gap -300mm Kingspan Kooltherm K5 Facade Insulation (0.020 W/mK) -120mm prefabricated concrete LAC 10MPa / 2000kg/m3
150
Moisture membrane
Last course of Leca block cut down to 78mm to create 150mm distance for drainage
II
-2385 100
12
Radon membrane
150
55
Wall ties securing the Leca blocks 10mm overhang and mastic sealant to drain off the rainwater
30
Ø80mm
76 125
100
75 125
Ø12mm Accordin 6 reinfor
35
Foundation basement III
-0.950
100
21
300
200
110
80
-900
200
621
421
I
-3035
00 Foundation higher
50
III
-900
50
00 Foundation higher
300
200
200
300
200
Bring ideas to life
110
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
Sønderbrogade 44-48
DATE: 06/15/15
SUBJECT:
External foundation + facade brick wall
SCALE: As indicated CLASS: 42
DRAWN BY: Stella Vaas
200
800
200
HORSENS, DK
VIA University College
110
300
External foundation brick facade 1:5
110
80
35
50mm blinding layer to strengthen the soil for foundation
110
300
400
110
75
35
-0.600
80
Ø80mm perimeter drain pipe
75
35
400
Ø8mm stirrups placed in every 1000mm
Ø8mm s placed in
110
Ø12mm reinforcement bars 300 x 300mm gravel around the perimeter drain pipe to lead the water away from the foundation
300
-0.500
118
50
200
10
300
-0.150 300
detail drawings
Moisture membrane
AN-15(200)002
80 300
110
50mm bl
Load on facade - south
Load on facade - north
Existing neigbouring building is in close contact with the new - to be built building. The facade of the existing bulding is continuing til the basement.
V
Ground floor (apartments) 815
AN-15(200)001 Legend: Beech parquet Concrete grouting Cast in-situ concrete Prefabricated concrete
IV
Terrain / Office Leca 10-20 coated
0
Sand
Radon membrane Moisture barrier
Load on gable - south
Load on gable - north
External wall construction: Prefabricated concrete wall with the insulation mounted in the factory by the use of drilled inserts. -300mm Kingspan Kooltherm K5 Facade Insulation (0.020 W/mK) -Prefabricated concrete LAC 10MPa / 2000kg/m3 Apartments ground slab construction: -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ø12, 150x150mm reinforcement mesh -15mm parquet floor finish
III
00 Foundation higher -900
Bring ideas to life
SCHOOL OF TECHNOLOGI AND BUSINESS
HORSENS, DK
VIA University College PROJECT:
Sønderbrogade 44-48
DATE: 06/16/15
SUBJECT:
External foundation on West gable
SCALE: As indicated CLASS: 42
DRAWN BY: Stella Vaas
AN-15(200)001
Vertical load - south AN-05(200)001
II
Legend:
Basement
-2385 screwes drilled 25mm into the concrete to secure the moisture ane and insulation
Prefabricated concrete
moisture membrane
Concrete grouting
e barrier Cast in-situ concrete
00mm gravel around the perimeter drain pipe he water away from the foundation perimeter drain pipe
Leca 10-20
-2.635
Leca 10-20 coated Sand
-2.735
Rigid insulation Radon membrane Moisture membrane Basement wall construction: -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa
stirrups around the reinforcement bars, n every 1000mm
reinforcement bars ng to reinforcement calculations, cement bars are needed
blinding layer to strengthen the soil for foundation
I
Foundation basement -3035
-3.085
Basement ground slab construction: -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ø12, 150x150mm reinforcement mesh
Vertical load - north
structural analysis
Rigid insulation
11
M1 M1 15580
1
2
8111
3
4
5
6
4725
6700
500
6700
500
6700
1389
600
6600
800
1995
800 3630
800
800
800
AN-05(200)001
1105 284
621
C D
6730
Basement wall external foundattion
6355 6845
M2 M2
500
6699
6895
485
4339
6275
7875 490
800
2360
486 1510
AN-15(200)001
AN-X3(2BY)001
3
AN-05(200)002 4430
1874
10879
Internal basement wall foundation
AN-05(200)022
External foundation REI 120 wall
E 600
6600
600
6600
600
6600
600
6600
600
3850
5
34555
1
2
3
4
5
6
M1 M1
Foundation plan 1 : 100
M1 M1
1
A
Ground floor (apartments)
0.735
V
0.735
V
815
V
815
IV
0
II
II
-2385
IV
Terrain / Office 0
Terrain / Office
IV
0
1635
Terrain / Office Basement -2385
I
I
Foundation basement -3035
AN-05(200)001
Basement wall external foundation 1 : 20
00 Foundation higher
-0.900
III
-0.950
-900
400
399
-3.035
-3035
-0.500
-0.501
-2.635
Foundation basement
Ground floor (apartments)
1236
2
Basement
Ground floor (apartments)
1235
815
1635
foundation plan
800
800 10595
11837
B
12
6730
800
14545
Cross section A-A
500
Elevator shaft foundations
300
4180
4553
800 850
500
621
Section S1
AN-X3(210 0
1209
7000
300
4246 490
300
2341
621
300
4125
741 300
1880
503
500
1041
AN-15(200)002
A
300
2380
External foundation brick facade apartments
490
III
00 Foundation higher -900
00 Foundation higher
-0.900
III
-900
621
-0.95
AN-15(200)001
AN-15(200)002
External foundation REI120 wall 1 : 20
External foundation brick facade 1 : 20
7
8
9
10
8 180
8232 - S1' 616
05)001 Terrain / Office
A
IV
IV
0
Terrain / Office 0
-0.265
300 300
4230
300
6850
616 635
766
412
13274
587
-0.900
B
00 Foundation higher
III
10600
11721
-900
Office internal wall foundation
00 Foundation higher -900
Office internal wall foundation - detail 1 : 20
AN-5(200)003
6302
8299
800
III
-0.950
AN-15(200)011
External brick gable wall office foundation
AN-15(200)011
500
AN-01(200)001
5
200 6700
500
6850
616
500
6799
300
300
505
C D
300
6900
Basement
II
6900
-3.035
300
Foundation basement
I
-3.085
-3035
21506
-2385
-2.635
E 300
Basement
II
-2385
M2 M2
400
500
604
6340
Foundation basement
I
-3035
500 AN-05(200)022
7
8
9
10
Internal basement wall foundadion - detail 1 : 20
Indicating basement foundation (level -3050 mm) B Indicating apartments and office foundation (level -900 mm) Cut Cutlevel: level:
-800 mm
Foundation plan legend 1:5
Elevator shaft
-II
-3885
-II -4.135
Elevator shaft -3885
-4.135
5 815
-4.535
10
Elevator shaft foundation -4535
-I
400
Ground floor (apartments) 400
V
-4.535
-I
-4.585 500
800
-4.585
Elevator shaft foundation -4535
0.000
IV
Terrain / Office
AN-05-(200)002
Terrain / Office
IV
IV
0
Terrain / Office 0
Elevator shaft foundations - detail 1 : 25
522
0
388
900
0
0
III
50
e appartments
00 Foundation higher -900
00 Foundation higher
III
III
-900
13
-0.900
616
-0.950
00 Foundation higher
Bring ideas to life
-900
SCHOOL OF TECHNOLOGI AND BUSINESS
HORSENS, DK
VIA University College AN-5(200)003
External brick gable wall office foundation - detail 1 : 20
PROJECT:
Sønderbrogade 44-48
DATE: 06/20/15
SUBJECT:
Foundation plan
SCALE: As indicated CLASS: 42
DRAWN BY: Stella Vaas
AN-01(200)001
Single family house
16
site plan
18
cross section
19
cross section
Staircase connection with posi joist
staircase cross section
Staircase connection with deck element
20
Staircase drawing first floor
staircase detail drawings
Staircase drawing second floor
21
23
staircase mounting video
Staircase specialization (VIDEO)
M2 M2
C
B
14.549
14.534
AN-55(215)001
13.975
Roof penthouse
IX
IX
13615
Roof penthouse 13615
13.355
2764
3200
12.897
11.415
M-VI
3664
1000
1100
M-VI
3558 10.592
Penthouse / Roof apartments
250
10.623
VIII
10.342
2200
VIII
10415
Penthouse / Roof apartments 10415
AN-X5(210 05)007
9.699
9.677
2200
1085
AN-X5(210 05)003
3200
250
2949
8.994
8.758
3200
8.215
0
1100
M-V
M-V
0
1000
3559
7.392
VII
250
2nd floor
2951
7.322 7.142 1000
VII
2200
7215
2nd floor 7215
6.496
2200
1100
6.400
3200
250
2942
AN-X5(210 05)002
5.793
3200
220
1099
0
M-IV
0
1000
3559
219
AN-X5(210 05)001
AN-X5(210 05)004
4.193
VI
3.943
257
1st floor
2950
4.098
1000
VI
2200
4015
1st floor 4015
2200
1100
3.175
2.593
3200
250
2952
2.502
3707
2.343
3200
1.815
0
M-III
0
1000
1100
M-III
1.000 1.048
0.991 M-II 250
V
815
V
1000 929
0.741
0.235
250
AN-X5(205 01)001?
1100
0.245
Terrain / Office
Ground floor (apartments) 815
1109
IV
1815
IV
1385 -0.015
0
Terrain / Office 0
-0.430
3126
-0.680
3200
250
AN-15(2BY)001
2200
Ground floor (apartments)
2772
M-II
Legend:
2370
-1.385
Prefabricated concrete M-I
0
M-I
0
1705
Prefabricated staircase Cast in-situ concrete
1100
1000
Leca block / areated conctere
3927
Marine gravel (søsten)
2623
Leca 10-20 coated
AN-05(210 05)001
Basement
II
-2385
AN-X3(210 05)001
Sand 1000
II
-2.635
Basement -2385
-2.636
Top soil
AN-05(200)001 650
Rigid insulation Moisture membrane Radon membrane
Foundation basement
I
I
-3035
-3035 Roof construction: -2 x 2,5mm bitumen felt -60 mm cast in-situ concrete 25MPa -2 x 150 mm Kingspan Kooltherm K12 Isoleringsplade (0,020W/mK) plus neccessary amount of extra insulation for creating the slope on the roof -260 mm EXPAN sound slab deck element LAC 18MPa /2000kg/m3
6600 850
405
2310
Elevator shaft
Foundation basement
-II
-II
-3885
Elevator shaft -3885
650
26
5.015
M-IV
3200
cross section
5.543
Elevator shaft foundation -4535
-I
-I AN-05(200)002
Elevator shaft foundation
Basement wall construction: -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa Basement ground slab construction: -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ă˜12, 150x150mm reinforcement mesh
-4535
Cross Section S1-S1' Legend 1:5
7
6
14.464
14.536
14.012 AN-5(215)001
Roof penthouse
IX
IX
2200
Roof penthouse 13615
2762
50
3215
13615
2590
11.415
M-VI
M-VI
0
1108
0
VIII
1000
2200
250
10.593
Penthouse / Roof apartments
VIII
10415
Penthouse / Roof apartments 10415
10.343
1100
1350
1068
3185
2950
8.993
1060 8.215
M-V
1120
1500
1101
1500
M-V
0
1350
0
2nd floor
VII
1000
2200
250
7.393
VII
7215
2nd floor 7215
2950
5.793
50
1500
1120
1500
50
5.015
M-IV
M-IV
0
1000
1101
1350
0
1st floor
VI
1000
2200
250
4.193
VI
4015
1st floor 4015
3.943
1100
1350
AN-X5(210 05)005
3200
2952
2.593
Legend: 50
1500
1120
1500
50 Prefabricated concrete
1.815 Prefabricated staircase M-III
M-III
0
Cast in-situ concrete
1352
0
1060
Leca block / areated conctere Marine gravel (søsten) Leca 10-20 coated
1.000
0.990
Sand
AN-15(210 05)006
Ground floor (apartments)
M-II
V
250
M-II 1000
V
815
Top soil
Ground floor (apartments) 815
Rigid insulation
0.740 Moisture membrane
1171
IV
1815
1067
0
Terrain / Office 0
30
-0.430
50
IV
1385
1500
Roof construction: -2 x 2,5mm bitumen felt -60 mm cast in-situ concrete 25MPa -2 x 150 mm Kingspan Kooltherm K12 Isoleringsplade (0,020W/mK) plus neccessary amount of extra insulation for creating the neccessary slope for drainage -260 mm EXPAN sound slab deck element LAC 18MPa /2000kg/m3 U-Value: Requirement:0,07W/m2K Actual: 0,077 W/m2K Fire: R30 A2-s1, d0, Class T roof covering Sound: Rw>32dB
3126
Terrain / Office
1100
815
Radon membrane
1120
1500
Staircase partition wall: -180mm prefabricated concrete LAC 10MPa / 2000kg/m3 EXPAN
50
2385
Fire: REI60 A2-s1,d0 Sound: R'w > 55dB / L'n,w < 58dB -1.385
M-I
Floor partitions in apartments -15mm beech parquet floor conering -60mm cast on site concrete C25MPa -100mm Kingspan Kooltherm K3 Gulvisolering (0,020 W/mK) -260mm EXPAN Sound slab deck element LAC 18MPa / 2000kg/m3
M-I
0
1100
1705
0
Basement
II
Basement wall construction: -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa
II
1000
Basement
Foundation basement
U-Value: Requirement: 0,11 W/m2K Actual: 0,11 W/m2K
-2385
650
-2385
I
-3035
I AN-05(200)001
Foundation basement
Basement ground slab construction: -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ă&#x2DC;12, 150x150mm reinforcement mesh
-3035 AN-05(200)002
U Value: Requirement: 0,07 W/m2K Actual: 0,068 W/m2K
Cross Section S2-S2' Legend 1:5 Section S2 - S2' 1 : 20
cross section
2200
1100
1350
7.143
AN-X3(210 05)002
27
Curtain wall parapet 14.532
B Wooden wedge for creating the slope
533
2nd layer of bitumen felt overlapping the zinc flasing 100
120
3
300
5
2 3
1st layer of bitumen felt underneath the zinc flashing 13mm plywood board for ficing the bitumen felt
155
Zinc flashing 5mm reinforcement and ground mortar 2mm primer 3mm final rendering 3mm adhesive mortar and inserts drilled into the Leca-blocks to secure the insulation
120 x 190 x 290mm Leca blocks 600kg/m3 +10mm mortar 300mm Kingspan Kooltherm K5 Facade Insulation
Terrain / Office 0
150
2 x 6mm reinforcement bars to secure the cast on site concrete Cast on site concrete C25MPa
100mm Kingspan Kooltherm K5 Facade Insulation 624
28
260mm access balcony roof deck element LAC 18MPa / 2000kg/m3
IX
IX
13615
199
260 10
160
50
70
Roof penthouse
10
410
detail drawings
60
4
13.975
75
10mm elastic sealant Elastic joint (backstop) 30 x 50mm mullion 20mm mineral wool insulation 70 x 50mm mullion 160 x 70mm steel bracket for fixing the curtain wal l
External render wall - 433mm
433
PROJECT
SUBJECT
Curtain wall parapet 1:5
DRAWN B
Staircase curtain wall and
Curtain wall and basement wall connection B
24 250mm staircase landing
Self-tapping screwes Triangle steel bracket for fixing the mullion
0.235
50 x 135mm steel mullion 50 x 30mm steel mullion
Washing edge along the curtain wall
135
Checker plate
Washing edge along the concrete wall
250
41
8°
10
Blowe polyethylene insulation
-0.015 100
AN-55(215)001 234
-0.025
IV
IV
Terrain / Office
100
10
0
10mm elastic joint
-0.100 232
Elastic sealant (backstop)
Marine gravel
Legend: Sundolitt drain plate - fixed with water based adhesive or adhesive for polystyrene
Prefabricated concrete
Textile moisture membrane Cast in-situ concrete Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation
Leca block / areated conctere
8mm rendering Soft insulation 120
100 x 190 x 490 Leca blocks 600kg/m3 +10mm mortar
Rigid insulation
Roof penthouse
Legend:
Wall ties securing the Leca blocks
Moisture membrane
13615
4 x Ø12mm reinforcement to stenghten the extrusion 288
Bitumen felt
detail drawings
15°
425
Neoprene rubber 10x100mm
Roof construction: -2 x 2,5mm bitumen felt -60 mm cast in-situ concrete 25MPa -2 x 150 mm Kingspan Kooltherm K12 Isoleringsplade (0,020W/mK) plus neccessary amount of extra insulation for creating the slope on the roof -260 mm EXPAN sound slab deck element LAC 18MPa /2000kg/m3
Curtain wall: -Double layer 6mm glass panels -12mm gap between the panels Total width: 24mm
Pre
Ca
Lec
Pol
Ma
Rig
Mo
Basement -Moisture p -120mm Kin -120mm Kin -200mm ca
200
140
200
120
100
29
120
440
Bring ideas to life
SCHOOL OF TECHNOLOGI AND BUSINESS
HORSENS, DK
VIA University College
Bring ideas to life
T:
Sønderbrogade 44-48
DATE: 05/27/15
T:
Curtain wall parapet
SCALE: 1 : 5
BY: Stella Vaas
d basement wall
CLASS: 42
VIA University College
AN-55(215)001
PROJECT:
Sønderbrogade 44-48
SUBJECT:
Staircase curtain wall and basement w
Elevator shaft foundations
360 120
120
120
1
A'
Basement
II
30
76
A
Foundation basement
I
-3035 1500
C
C'
Moisture membrane Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation 30mm grouting to even up the surface for 120mm prefabricated concrete wall
120mm prefabricated concrete wall LAC 10MPa / 2000kg 10mm polystyrene insulation
Moisture barrier
Radon barrier
10
Ă&#x2DC;8mm stirrups placed in every 1000mm
30 400
110 300
75
125
50mm blinging layer to srtenghten the soil for foundation
80
Ă&#x2DC;80mm perimeter drain pipe -4.235
150
-4.135
300 x 300mm gravel around the drain pipe to lead the water away from the foundation
40
100
4 x 12mm reinforcement bars
-II
-3885
76
Elevator shaft
526
35
-4535
-I
35
Elevator shaft foundation
50
-4.535
110
detail drawings
75
125
526
150
100
-2385
200 110
80 300
110
500
200
B
440
B 200
120
120 440 Legend: 200
120
120
Prefabricated concrete
II
Concrete grouting
Basement -2385
Cast in-situ concrete Legend:
II
Basement -2385
I
-3035
Foundation basement -3035
D'
D
Ø12mm 150x150mm reinforcement mesh 40mm spacers to support the reinforcement mesh Placed in every 200mm 10mm polystyrene insulation D Ø12mm 150x150mm reinforcement mesh
D'
Radon barrier
40mm spacers to support the reinforcement mesh Placed in every 200mm Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation 10mm polystyrene insulation 30mm grouting to even upo the surface for the 200mm wall Radon barrier
g/m3
-II
Leca 10-20 coated
Concrete grouting
Sand
Cast in-situ concrete
Rigid insulation
Leca 10-20
Radon membrane
Leca 10-20 coated
Moisture membrane
Sand
-200mm cast in situ concrete wall 25MPa
Elevator shaft
Wall construction D-D': -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa
Textile moisture membrane Ø8mm stirrups around the reinforcement bars placed in every 1000mm B'
300 x 300mm gravel aroundMoisture the drainbarrier pipe to lead the water away from the foundation
-II
30
Ø80mm perimeter drain pipe Ø12mm reinforcement bars
AN-05(200)
Wall construction C-C':
30mm grouting to even upo the surface for the 200mm wall -3885 Ø12mm reinforcement bars 10
AN-05(200)002
Wall construction D-D': -Moisture proof membrane -Moisture proof membrane -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm concrete wall LAC 10MPa / 2000kg/m3 -120mm Kingspan Styrozone N300 Rprefabricated polystyrene insulation (0,031W/mK)
Textile moisture membrane Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation Moisture barrier
10
Prefabricated concrete
Rigid insulation Elevator shaft ground slab construction A-A': -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) Radon membrane -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Thermafloor TF70 insulation W/mK) Moisture (0.022 membrane -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ø12, 150x150mm reinforcement mesh Elevator shaft ground slab construction A-A': -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -75mm Kingspan Staircase ground slab construction B-B': Thermafloor TF70 insulation (0.022 W/mK) -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) cast in-situ concrete slab 25MPa with -150mm light clinker - Leca -100mm 10-20 coated 245kg/m3 (0,095W/mK) -Ø12, 150x150mm reinforcement -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) mesh -150mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -100mm cast in-situ concrete slab 25MPa with -Ø12, 150x150mm reinforcement mesh Staircase ground slab construction B-B': -75mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) Wall construction C-C': -150mm light clinker - Leca 10-20 coated 245kg/m3 (0,095W/mK) -Moisture proof membrane -75mm Kingspan Thermafloor TF70 insulation (0.022 W/mK) -150mm Thermafloor insulation (0.022 W/mK) -120mm Kingspan Styrozone N 300 Kingspan R polystyrene insulationTF70 (0,031W/mK) -100mm in-situ concrete slab(0,031W/mK) 25MPa with -120mm Kingspan Styrozone N300 Rcast polystyrene insulation -Ø12,wall 150x150mm reinforcement -120mm prefabricated concrete LAC 10MPa / 2000kg/m3mesh
Foundation basement
I
Leca 10-20
detail drawings
1750
-4.135
Elevator shaft -3885
-4.235 Ø8mm the stirrups around the reinforcement bars placed in every 1000mm 50mm blinding layer to strenghten soil for foundation -4.135
110
Ø80mm perimeter drain pipe 300
80
400
30
300 x 300mm gravel around the drain pipe to lead the water away from the foundation
-4.235
50mm blinding layer to strenghten the soil for foundation 110
35 800
B
-4535
200
35
1200
200
Elevator shaft foundation -4.585
110
200
300
-I 80
400
35
110
35
110 800
80 300
-I
110
Elevator shaft foundation -4.585 -4535
200
31
1200 110
80
110
300
Bring ideas to life
SCHOOL OF TECHNOLOGI AND BUSINESS
HORSENS, DK
VIA University College PROJECT:
Sønderbrogade 44-48
DATE: 06/18/15
SUBJECT:
Elevator shaft foundations detail
Bring ideas to life
VIA University College
DRAWN BY: Stella Vaas PROJECT: SUBJECT:
Sønderbrogade 44-48 Elevator shaft foundations detail
SCHOOL OF TECHNOLOGI AND BUSINES
SCALE: 1 : 10 CLASS: 42
AN-05(200)002
HORSENS, DK
DATE: 06/18/15 SCALE: 1 : 10
AN-05(200)002
60
B
24
Staircase level access 24mm glass door panel 60 x 180mm door frame 10mm mineral wool insulation Elastic sealant (backstop) Elastic joint 10mm steel treshold 28mm polystyrene insulation
0.245
100 x 190 x 490mm Leca blocks 600kg/m3 +10mm mortar Last Leca block is cut down to 88mm and 60mm under the grating
180
Washing edge along the door Prefabricated staircase landing 250mm
20mm grating
1570
Washing edge along the wall 147
MIN. 1500mm
Special bent profile Bent in the span of the tile
280 10
0.235
220
250
245
143
-0.015 -0.025 10
60
100
-0.100 94
10mm elastic joint
156
Elastic sealant (backstop)
32
15°
425
60mm concrete tile for supporting the grating
Concrete footing 25MPa Marine stones
Sundolitt drain plate - fixed with water based adhesive or adhesive for polystyrene Textile moisture membrane Plastic screwes drilled 25mm into the concrete to secure the moisture membrane and insulation
120
8mm rendering Wall ties securing the Leca blocks 4x Ă&#x2DC;12mm reinforcement bars to strengthen the extrustion 288
detail drawings
Neoprene rubber 10x100mm
200
140
100
200
140
100
440
24 60
Access from the balcony
250mm staircase landing 180
24mm glass door panel Washing edge along the door 60x140x210mm concrete tiles 4.203
60 x 180mm door frame
Washing edge along the wall
10mm mineral wool insulation Elastic sealant / backstop 10mm elastic joint 10mm steel treshold
Curbstone
0.245
10
Concrete footing for the curvstone C25
300mm access balcony slab
10
4.193
4.202
53
241
1st floor
AN-15(210 05)001
300
e 1:20
250
Ground slop
VI
1st floor
VI
4015
Terrain / Office
100
IV
10
100
50
4015
50
0
75
50mm mineral wool insulation
30
10mm elastic joint Elastic sealant / backstop
100 x 1100mm steel bracket dor ficing the curtain wall mullion Self tapping screwes for fixing the bracet onto the mullion 24mm curtain wall glass panel
Access to the apartments
6
Legend:
180
Prefabricated staircase Casted concrete
Staircase acces from access balcony 1:5
SCHOOL OF TECHNOLOGI AND BUSINE
Bring ideas to life
HORSENS,
VIA University College
Leca blocks / areated concrete Polyethylene insulation
PROJECT:
Sønderbrogade 44-48
DATE: 06/20/15
Marine stones
SUBJECT:
Access from the access balcony
SCALE: 1 : 5 CLASS: 42
180mm concrete Stella Vaas DRAWN BY: wall
Rigid insulation
Doorframe
Soft insulation
Washing edge
Inward opening wooden door from Velfac
Moisture membrane 250mm prefabricated concrete staircase landing,. Resting 65mm on the wall
115 x 45mm treshold 10mm mineral wool insulation
1.000
glued felt ?
100
70
10
10 45
Basement wall construction: -Moisture proof membrane 0.990 -120mm Kingspan Styrozone N 300 R polystyrene insulation (0,031W/mK) -120mm Kingspan Styrozone N300 R polystyrene insulation (0,031W/mK) -200mm cast in situ concrete wall 25MPa
15
1.000
Ground floor (apartments)
V
V
Ground floor (apartments) 815
445
815 53
0.730
detail drawings
50mm mineral wool insulation
A
AN-X5(210 05)00
33
Legend:
Bring ideas to life
260
10 x 60mm neopren rubber
SCHOOL OF TECHNOLOGI AND BUSINESS 80
VIA University College 50mm gap between staircase going and wall PROJECT:
Sønderbrogade 44-48
DATE: 06/11/15
SUBJECT:
Staircase level access
SCALE: 1 : 5
DRAWN BY: Stella Vaas
HORSENS, DK
Prefabricated concrete stairca
Beech parquet
Cast on site concrete
Wooden door
AN-15(210 05)001
Hard insulation Soft insulation
CLASS: 42
180
Floor partition: -15mm beech parquet floor conering -60mm cast on site concrete C25MPa -100mm Kingspan Kooltherm K3 Gulvisole -260mm EXPAN Sound slab deck element
Basement
Ground floor 6
6
7
6
6
7
Section S1 -S1 S1'- Copy Section S1' 2 Section Section S1 -S1 S1'- Copy S1' 2
B
B
B
B
B
433
433
440
440
AN-X3(210 --05)001 AN-X3(210 --- 05)001
B
Elevator shaft Elevator shaft 4 m² 4 m²
120
1150 1100
215
1100 1150
Section S2 - S2' Section S2 - S2'
120 510
800
95
510 1000
4220
800
912
ø1
1550
4220
1000
00 15
800
760
AN-X3(210 05)002 05)002 AN-X3(210
1000
Smoke ventilation hatch Smoke ventilation hatch 1000 x 1000mm 1000 x 1000mm
1000
ø
1600
912 1600
912
ø
00 15
760
Section S2 - S2' Section S2 - S2'
912
AN-X3(210 05)002 05)002 AN-X3(210
95
50
50
120 800
810
1750
215
UP
50
UP
ø1
50 0
1550
810
120
120
120 180
273
273
180
1750
2100
2910
635
2100
120
120
2000
Elevator shaft Elevator shaft 4 m² 4 m²
1
2000
2910
2000
635
2000
180
1400
1750
1400 1750
180
50 0
50
40
40
*
Staircase finish on apartments level Staircase finish on apartments level
6600
980
6600
980
6550
40
6550
415
40
40
40
120 120 50 200
180
AN-01(210 05)001 AN-01(210 05)001
StarcaseStarcase plan view basement plan view basement 1 : 20 1 : 20
2094 2240 40
M2 M2
D
M2 M2
D
C M2 M2
1221
1221
80
80
C
50
200
C
661
661
D
6
80
640 20 150 80
C
D
6
1500
200
200
80 150 640 20 150 80
20
150 80
20
50
M2 M2
4400
1500
180 50
80
D
M2 M2
2240
180
120 120
4120
440
M2 M2
C
2145
2145 50 200
1500
180 50
1100
640
1100
640 150 80
4120
C
4966
4966
2520
2450
2520 1500
200
1120
80 150
80 150
1060
80 150
1500 40
180 50
1120 40
1500
2520
2450 1060
180 50
2520
1985
4680
1985
1960
1960
4680
Staircase basement Staircase basement 24 m² 24 m²
440
34
415
6575
floor plans
6575
Staircase finish 1st floor Staircase finish 1st floor
*
D
4400
7
7
6
6
An-11(210 05)001 An-11(210 05)001
Staircase plan view apartments Staircase plan view apartments 1 : 20 1 : 20
Staircas 2
6
1st floor
7
6
Section S1 - S1'
7
Section S1 - S1'
AN-X3(210 05)001 AN-X3(210 05)001 Section Section S1 -S1 S1'- Copy S1' Section 2 Section S1 -S1 S1'- Copy S1' 2
7 AN-X3(210 --- 05)001 AN-X3(210 --- 05)001
7
800 514
295 514
B
1480
B
285
80 180
80 180
B
285
B
B
1949
50 25
180
50 25 Elevator shaft 4 m²
Prefabricated concre Prefabric
Elevator shaft 4 m²
1926
1949
50
1926
180
2186
50
2236
2000
2186
2000
2236
25 50
B
1480
235
826
826 50
235
AN-15(205 01)003
1136
1136
1086
120
AN-15(205 01)002AN-15(205 01)003
80 180
1480
1480
50
1480
AN-15(205 01)002
AN-15(205 01)001
50
1480
80 180
1480
50
AN-15(205 01)001 286
1480
295
865
865
800
Hard insulation Hard ins
40 980
80 180
80 180
935 180 80
UP
floor plans
980 40
7172
1120
935
1000
1455
40
1120
2240
2240
1120
1500
1500
80 661
200
200 1221
80 661
80
200
200
661
661
80
80
200
200 80 661
50
2095
2095
1500
661
1500
50 180
Staircase 1st floor 26 m²
1221
50 180
Staircase 1st floor 26 m²
40
1500
2240
2240
2240 1500
4120
50
7
7
D
80
80
C
200
200
D
M2 M2
80
D
M2 M2
C
200
M2 M2
C
80
80 200
M2 M2
C
AN-X4(205)001
200
80
C
200
AN-X4(205)001
4220
1120
UP
40
1120
4120
40
2240
se ground floor 26 m²
4120
UP 40
40 980
Smoke ventilation hatch Smoke ventilation hatch 1000 x 1000mm 1000 x 1000mm
7172
6600
7172
180 80
50
6600
UP
180 80
7172
1120
1455
935
935
1456
1000
50
1000
Section S2 - S2'
Smoke ventilation hatch Smoke ventilation hatch 1000 x 1000mm 1000 x 1000mm
4120
1000
M2 M2
D
6 AN-11(210 05)001
6 AN-11(210 05)001
Staircase plan view 1stplan floorview 1st floor Staircase 1 : 20 1 : 20
Brickwor
Staircase floor plans lege Staircase floo 1 : 20 1 : 20
1455
Section S2 - S2'
AN-X3(210 05)002 AN-X3(210 05)002
1455
1000
80 180
80 180
1000
Brickwork
2000
20
DN 2560
1000
DN 2560
2000
2000
180 80
2000
20
1120
Cast in-situ concrete Cast in-s
7
7
C M2 M2
D
D
35
Incremental low cost housing in India
I am a farm a plac veg Technical wall with all the installations pre-installed is given to each family
Bathroom and kitchen on the each side of the wall
sq.m 39 house planned for each family
There is sufficient space in the garden for vertical expansion. Each squared area is about 9 .sq.m big
Further on, the building can be expanded vertically due to flat filler slab roof and staircase planned in the up right corner
I like to perfor dances, it relaxe way I can ex
Cows are need e
We don't we ne enough
Religion is a part o We need p we can feel
I wan about m
We want hang
rm traditional es me and this xpress myself
e part of out family, we enough space for them
like hot weather eed shadow and h drinking water
an important ofour culture places where close to God
nt to learn to read and my countrys traditions and values
t to play football and g out with other kids
map for social needs
mer. I would need ce to sell the fresh getables and fruits
37
38 FLOOR PLANS
incremental housing strategies
Reused
Low embodied energy
Recyclable
Biodegradable Material selection criteria
Energy efficient Salvaged
Cost saving Non toxic
Pollution preventing
construction proposal
Locally available
39
Office building
41
office floor plans
42
7 1 8400
1
8400
2
7200
3
7200
4
6000
5
2
3
R
R
6000
R
R
R
8400
5
R
R
8400
R
E
R
7200
Stair 22 m²
6
7200
7
5
8400
6
7200
R
5400
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
E
8700
Office Ground Floor 637 m²
R
Quiet area 2 m²
Meeting Area - 6 People 18 m²
Store/wash 8 m²
58 23
R
7 1764
8700
R
R
Shaft 2 2 m²
3866
5242
1800
E
R
R
R
R
R E
Meeting Area - 6 People 13 m²
Meeting Room - 6 People 11 m²
R
UP
R
1500
R
Storage 9 m²
Meeting Area - 8 People 13 m²
5935
912
R 1812
R
R
R
R
R
R
R
R
E
R
DN
1000 1800
R
Lift 4 m²
Shaft 1 9 m²
Meeting Area - 8 People 13 m²
R
R
R
R
R
R
E
Dis. W.C./Shower 5 m²
DN
R
E
Sanitary Corridor 18 m² 1000
R
Sanitary Corridor 18 m²
Locker Room 3 m²
VOID
W.C. 3 m²
R
W.C. 2 m²
R
W.C. 2 m²
W.C. 3 m²
R
5770
Storage 9 m²
W.C. 2 m²
D
Shower 1500 + changing 6 m²
E
W.C. 3 m²
W.C. 2 m²
W.C. 2 m²
W.C. 2 m²
W.C. 3 m²
Dis. W.C./Shower 5 m²
W.C. 2 m²
W.C. 2 m²
W.C. 2 m²
Shaft 1 9 m²
W.C. 2 m²
2 m²
Dis W.C. 4 m²
W.C. 2 m²
Lift door E-30
E
Lift 4 m²
W.C. 2 m²
1800
Dis W.C./ Visitors 4 m²
D
R
R
E
C
1812
Reception 69 m²
5935
E
R
Shaft 1 9 m²
W.C. 2Storage m²
R
UP 5770
Meeting Room - 6 People 11 m²
R
Lockers 14 m² 1000
1000 W.C. 2 m²
C
R
1500
900 5242
Lift door E-30
5935
Storage 1 6 m²
Storage 2 m²
R
R D
R Technical room 15 m²
900
R
E
Meeting Room 1 11 m²
900
8700
R
Lockers 14 m²
R R
R
R
R
1500
C
R
R 8700
76 50
First Floor Office 565 m²
First Floor Office 565 m²
16620
R
Meeting Area - 6 People 14 m²
8700
B
16620
1800
B
R
1510
1.5m door to provide easy evacuation of people
11754
Gym 80 m²
11754
R
R
1510
Shower 2 m²
59 16
R
58 23
R
Shower 2 m²
R
E
W.C. 2 m²
Quiet Room 3 m²
B
Quiet area 2 m²
1800
Meeting Area - 4 People 13 m²
Quiet Room 3 m²
R
1400
4 1423
R
1800
R
Store/wash 8 m²
Meeting Area - 6 People 13 m²
R
1000
R
R
Shaft 2 2 m²
Storage 2 m²
R
E
Quiet area 2 m²
Meeting Area - 6 People 18 m²
R
Lift door E-30
R
900
R
Changing room female 15 m²
R
R
E
Quiet area 2 m²
Meeting Area - 4 People 13 m²
Quiet Room 3 m²
R R
Shaft 2 2 m²
900
Quiet Room 3 m²
900
532 3
51
62
Changing room male 12 m²
W.C. 2 m²
Meeting Area - 4 People 11 m²
Meeting Area - 6 People 13 m²
Meeting Area - 4 People 9 m²
Meeting Area - 4 People 10 m²
R A
R
R
900 10100
5400
1400
Shower 2 m²
Quiet area 3 m²
1018 6
8700
16 65
R
Quiet area 3 m²
8
6000
A 1500
Quiet area 3 m²
7
7200
8
6000
A
R
4
8400
Cleaner 2 m²
8
4
R
3
6000
8
E 1
2
5400
6
5770
2182
Ground Floor VOID Fire Plan
R
Sanitary Corridor 18 m²
Locker Room 3 m²
fire analysis plans
6000
KEY
First Floor Fire Plan
E
8400
W.C. 3 m²
W.C. 2 m²
W.C. 2 m²
W.C. 2 m²
8400
W.C. 2 m²
Shower 2 m²
Cleaner 2 m²
Fire division/section
6000
7200
7200
6000
Fire compartment
5400
Beams - plan - R 60 A2-s1,d0
1
2
3
4
5
6
7
8
Columns - R 60 A2-s1,d0
C
KEY
First Floor Fire Plan Stair 22 m²
R
R
R
R
R
R
R
R
R
R
R
R
13210
Brick wall Beams parapet Meeting Area - 4 People 11 m²
R
Fire door EI2 30-C [BD-door 30]
Columns - R 60 A2-s1,d0 Lockers 10 m²
B 8700
A
R
30 A2-s1,d0 Quiet area 3 m²
Quiet area 3 m²
Escape stairs
R
5 86 17
13210
Fire door EI2 30-C [BD-door 30] with ABDL closing system
60 A2-s1,d0
8700
Cladding wall parapet 8700
EI
- plan - R 60 A2-s1,d0
12123
C
Meeting Area - 6 People 18 m²
R
REI
12815 Roof deck top
1500
Escape path
REI
R 12815 Roof deck top
E
EI
R
Brick wall parapet
R
Fire door EI2 30-C [BD-door 30]
1510
12123
Escape 8174 Second Floor Office 714 m²
R
R
8700
R R
1510
R
E
C
Meeting Room - 6 People 12 m²
800
R R
Meeting Area 13 m²
Storage 9 m²
5935
1000
R
Meeting Area - 6 Persons 18 m²
4686
02-SecondFloor
Meeting Area - 4 People 16 m²
Second Floor Office 714 m²
R 8174
R
Meeting Area - 6 People 18 m²
Quiet Area 2 m²
R
Quiet Area 2 m²
R
R
R
R
R
R
1510
Storage 2 m²
Lift door E-30 01-First Floor
Lift 4 m²
E
Shaft 1 10 m²
W.C. 2 m²
5770
R
W.C. 2 m²
E
W.C. 2 m²
Wall covering: Cladding class K1 10 D-s2,d2 (class 2 cladding)
COVERINGS
External wall surfaces: Cladding class K1, 10 B-s1,d0 (class 1 cladding)
Ceiling covering: Cladding class K1 10 B-s1,d0 01-First 1 Floor (class cladding)
Coverings in escape routes:
Wall covering: Cladding class K1 10 B-s1,d0 (class 1 cladding)
Suspended ceilings may be constructed using materials class B-s1,d0 (class A material)
Ceiling covering: Cladding class K1 10 B-s1,d0 (class 1 cladding) Floor covering: Floor covering class Dfl-s1 (class G floor covering)
Coverings in escape routes:
W.C. 2 m²
Ceiling covering: 00-Ground Floor Cladding class K1 10 B-s1,d0 0 (class 1 cladding)
W.C. 3 m²
Cleaner 1 m²
W.C. 2 m²
W.C. 2 m²
W.C. 2 m²
Floor covering: Floor covering Foundation base class Dfl-s1 (class G floor covering) -900
R
Sanitary Corridor 19 m²
ei30
Meeting / Conference Room 42 m²
Suspended ceilings may be constructed using materials class B-s1,d0 (class A material)
Wall covering: Cladding class K1 10 B-s1,d0 (class 1 cladding)
Locker Room 4 m²
Shower 2 m²
Rescue opening
External wall surfaces: Cladding class K1, 10 B-s1,d0 (class 1 cladding)
4087
D
R
Ceiling covering: Cladding class K1 10 B-s1,d0 (class 1 cladding)
Wall covering: Cladding class K1 10 D-s2,d2 (class 2 cladding)
R
1800
R
Escape route
4087
1000
ople
E
Roof covering: Roof covering B roof (t2) (class T roof covering)
Quiet Area 2 m²
R
stairs
Escape path
17992
Rescue opening
Roof covering: Roof covering B roof (t2) (class T roof covering)
02-SecondFloor
B
Escape route
COVERINGS
Fire door EI2 30-C [BD-door 30] with ABDL closing system
R
60 A2-s1,d0 30 A2-s1,d0
Fire division/section
Fire compartment
R
A 8
A 8700
Cladding wall parapet
E
R
B 8700
Acc W.C. 4 m²
R 00-Ground Floor 0
Second Floor Fire Plan
Cross Section - Fire Analysis
Foundation base -900
Bring ideas to life VIA University College BYGGESAG: Office building - bachelor project EMNE: Fire Analysis UDFØRT AF: Stella Vaas
Cross Section - Fire Analysis Bring ideas to life VIA University College
VIA Byggeri & Engineering
BYGGESAG: Office building - bachelor project
DATO:05/03/17
EMNE: Fire Analysis
MÅL: As indicated
UDFØRT AF: Stella Vaas
KLASSE: AH7-S17
AN-X1(350)001
43
VIA Byggeri & Engin
DATO:05/03/17
MÅL: As indicated
KLASSE: AH7-S17
AN-X1(350)0
Concrete element production
Step 1
Formwork preparation. Reinforcement mesh for the outer leaf is placed
Step 2
Inserting and fixing extra reinforcement, wall ties and supporting anchors
Step 3
Pouring concrete for the outer leaf
Step 4
Inserting rigid insulation
Step 5
Reinforcement for the inner leaf is placed
Step 6
Fixing stirrups above the window, lifting anchors and connecting the supporting anchors to the inner leaf reinforcement
Step 7
Pouring concrete for inner leaf
46
production drawings
47
production drawings
Thank you!