PORTFOLIO - CV QUALIFIED ARCHITECT
STÉPHANIE MORIO
Stéphanie MORIO Qualified Architect
[ French [ 24 11 1987 [ Flat 1, 89b Regents Park Road - LONDON NW1 8UY [ +44 785 7963 429 [ moriostephanie@gmail.com
[ PROFESSIONAL EXPERIENCE ] [ 2016 ] FDA Fabrice Dusapin [PARIS, 75] October 2012 - February 2016 [Team Manager] Team managment, improvement of internal process in order to develop work efficiency. [Project Architect] Design development, technical drawings, client meetings, project coordination, contract negotiation. Mixed-use building in Paris [75] : [Stage 1 to 6] [6000 m²] [8.7 M€] - Project Architect Retails, offices and 79 housings built above railway. Artistic collaboration with Vhils, using concrete, steel and wood structure. 31 housings in Clichy [92] : [Stage 3 to 5] [2300 m²] [3.9 M€] - Project Architect Demolition and refurbishment of existing housings, located within a dense urban network, reusing existing materials. Office building in Lille [59] : [Stage 3 to 6] [7000 m²] [9.0 M€] - Project Architect Located within Euralille Area, creation of a strong identity. Secondary school in Aubervilliers [92] : [Competition] [8500 m²] [16.5 M€] - Project Architect Landscape design, secondary school for 600 students and a sport centre, coordination with 7 consultants within restricted budget. Offices and sport centre in Paris [75] : [Stage 1 to 2] [13000m²] [24.0 M€] Project Architect Mixed-use building, neighbour to the railway, design of convivial spaces and terraces. Supervision of regulations. 117 housing units in Igny [94] : [Competition] [8000 m² ] [12.0 M€] - Architect Assistant [ 2012 ] DAY ARCHITECTES Thierry Bonne & Albert Haddad [PARIS, 75] April 2012 - September 2012 [Architect Assistant] Draft drawings, preliminary design, outline scheme design, feasibility studies. BAJ in Riyadh [Saudi Arabia] : [Competition] [1000 m²] Architect Assistant New concept for AlJazira Bank, selected project, one concept adaptable for different scales, architecture as a symbol. Deesar at Riyadh [Saudi Arabia] : [Concept] [827000m²] [8.5 B$] Architect Assistant Master plan, conception, arabic culture, assistance for marketing movie, work and project in english. [ 2011 ] UNITÉ Anthony Rio [NANTES, 44] March 2011 - June 2011 [Intern - Architect Assistant] Stage 1 to 3, conception, planning submissions, detail scheme, feasibility study, construction phase. Projects: 65 housings units in Lorient [56] - Head office in Rennes [35] - Mixed-use building in Nantes [44]
[ 2010 ] LOG ARCHITECTES Julie Fernandez & Thomas Saint-Guilain [PARIS, 75] July [Intern - Architect Assistant] Stage 1 to 5, competition stage, feasibility studies.
2010 - Septembre 2010
Projects: Outside public swimmingpool in Fumel [47] - Embassy of Russia new entrance in Paris [75]
[ COMPETITIONS - PUBLICATIONS ] [ 2015 ] EUROPAN 13 - HYPERLIENS, The rhythmical structure of the City - Finalist Master pan, landscape design, temporal urbanism, located within Le Grand Paris strategy. http://europan-europe.eu/fr/ [ 2011 ] BUILD WITH STEEL - LA MACHINE URBAINE - Finalist, out of 300 projects - Exhibition at the Cité de Chaillot in Paris Idea competition for a Bridge for living. http://www.construiracier.fr/enseignement/concours/ [ 2009 ] NIUMALE - Project published in Place Publique n°11 (French Journal about urban and architectural projects) Student project about rising water levels in Maldives. http://www.revue-placepublique.fr/
[ EDUCATION ] [ 2014 ] MA ARCH. PART III [ HMONP ] with honors - ENSA Paris-Val-de-Seine [75] , France
[ 2012 ] MA ARCH. PART II [ Master ] - ENSA Nantes [44], France & CVUT Prague, Czech Republic
[ 2009 ] MA ARCH. PART I [ Licence ] - ENSA Nantes [44], France [ 2006 ] Preparatory classe in applied arts - LISAA Rennes [35], France
[ 2005 ] Scientist Baccalaureat Diploma with honors - HighSchool Saint-François-Xavier, Vannes [56], France
] ] ] ] ]
[ SKILLS ] [ [ [
] French ] English ] Spanish
[ [ [
] Sketchup ] 3DsMax ] Vray
[ [ [
] Word ] Excel ] Powerpoint
[ [ [
] AutoCad ] Revit ] ArchiCad
[ [ [
] Photoshop ] In Design ] Illustrator
[ [
] Management ] Communication
[T7A2]
Location - Paris 13 Client - SOPIC Plot - 6000 m² Program - Housings,offices,shops Budget - 8,7 M€
Studio Fabrice Dusapin Architect [Project Manager] Stage 1 to 6
A MIXED-USE BUILDING ABOVE RAILWAY Consultant - SIBAT Landscape Architect - PRAXYS Artist - VHILS Planners - SEMAPA & Gangnet Architect Construction Company - GTM [VINCI GROUP] Status - Completion 2017 Strategically located in front of the Bibliothèque Nationale de France (National library), the project answers to a balance between urban issues, infrastructural complexity and habitability, monumental scale and domestic scale. Pursuing the logic of the Avenue de France, the building is settled on its glass base bringing out the different program units. The monolithic shape ot the upper levels host housing of quality.
N
First block of the «Bivalve» master plan, the project offers two typology of facades. Their antagonistic relationship brings out various way of living and interactions with the environment.
Level 10.0 10.61
3.18
7.37
1.80
3.24
1.60
2
8.98
3.31
4.69
1
+73.40
6.10
Edicule Ascenseur
2.25
3
0.80
A
Level 4.0
5.48
B
6.00
C
8.00
7.89
D
7.89
E F
20.20
G
LIMITE DE PROPRIETE
8.00
H
1.80
8.00
I
4.40
J
LIMITE DE PROPRIETE
4.87
16.33 5.92
12.25
7.92
1.80
3.21
3.40
10.52
8.98
2
8.71
1
+56.90
+56.90
2.25
3.20
3
1.80
A
54.04
5.48
B
6.00
C
8.00
D
7.89
E F
1.80
7.89
G
8.00
H
8.00
I
4.40
J
1 2
3
4
5
6 7
© Cyrille Thomas All Rights Reserved
1 - Green roof 2 - Wooden huts on the roof 3 - Exterior facade - «double heigh» 4 - Inner facade - «pearly shell» 5 - Office floor 6 - Shops - Curtain wall 7 - Mega-beams above the rails
[T7A2] Studio Fabrice Dusapin Architect [Project Manager] Stage 1 to 6
1 2 3 4 5
6 7
8
9 10 11 12 13
Exterior Facade «double level» [Eastern, Northern and Southern Facade]
1 - Steel rain cap 2 - Overlap 3 - Vertical profiles 4 - Wooden back panel PF 1/2h 5 - Aluminium rolling shutter 6 - Wooded/aluminium frame
13
6 14
15 16 17 18
Inner Facade ÂŤpearly shellÂť [Western Facade]
7 - Double glazed 8 - Fixed frame 9 - Rain flap 10- Timber frame 11- 3-ply wood 50mm 12- Rock wool 50mm
131415161718-
Aluminium sheet Aluminium sheet metal 3mm Vents sliding shutters - fixed Rock wool 200mm Rock wool 50mm Plaster board 13/15mm
[CONNEXE] Studio Fabrice Dusapin Architect [Project Manager] Feasibility study
Location - Paris [75] Client - ICADE Plot - 14000 m² Program - Offices Budget - 25.0 M€
OFFICES ABOVE A TRAIN STATION Consultants - INGEROP «Connexe» projects are part of the «Grand Paris» as urban landmarks and new hubs. Chatillon-Montrouge station will become a multi-modal transport node offering a connection between the existing line 13, the new line 15 and the bus station. This sensitive site with great potential straddles three municipalities. Urban and architectural challenge is to design a morphology tailored to the large territory as to neighourhood environment. The aim is to offer a «landmark building», a federating project as a symbol of renewal. Building presents itself with a sensitive and non-static shape including the new metro station - its accesses and its flows - while supporting urban ambitions of Grand Paris Express projects: provide emergence, landmark and great identity. The site is split into two parts symbolizing both sides of municipalities and creating dialogue between the two entities on the common base. This urban division will offer outdoor spaces for exchange and share, creating a perspective and a strong visual connection bewteen adajcent neighbourhoods.
Level 8.0
Level 7.0
Level 3.0
Level 6.0
Level 5.0
Level 4.0
Level 1.0
Level 3.0
Level 2.0
Level 1.0
Ground level
[LA BRIQUETERIE] Studio Fabrice Dusapin Architect [Project Manager] Stage 3 to 5
Location - Clichy [92] Client - NOVIGERE Plot - 2300 m² Program - Housings Budget - 3.9 M€
31 HOUSINGS UNITS - SOCIAL HOUSING Consultant - OTE Planners - SEMERCLI Construction Company - ZUB & PICHETA Status - Completion 2016 Clichy’s territory is marked by industrial activities which appeared during the 60’s. The result is an heterogeneity of urban and architectural forms, where rural houses meet industrial halls. The project is developped arround 3 built entities: -9 floors building on street aligned on the Boulevard Victor Hugo, -2 rows of 1 floor houses, northwest and southwest oriented. The Northwest facade which is the most contrained and exposed to strong noise pollution is treated as a protective screen. Located in an old industrial area, the project is designed with existings materials such as red bricks and reuses road paving of the passageway.
Level 2.0
Ground Floor
1 2
3 4 5
6
1 - Perforated steel sheet 2 - Tubular frame 40x40mm 3 - Steel grating walkway 4 - Concrete flagstone 5 - Angle iron 6 - Galvanized steel sheet 30/10*
[EUROPAN 13] Personal Competition - FINALIST Team : L.Leyer, R. Brochard, S. Morio
Location - Vernon [27] Theme - Adaptable City Plot - 17.70 km² Program - Master planning
HYPERLIENS* - The rhythmical structure of the City [«Hyper-Links» refer to a way of organizing territory in space and time. Each hyper-link has a unique origine and they can serve various purposes. Once activated, the hyper-link offers the possibility to enter a new dimension in the project, a new location or a new territory considered as influential]. *
- Structuring the public space at different scales : tangible and intangible links. - Restore the energy balance of the city by connecting existing micro-centralities to new intensities. Hyper-Liens system is based on the “already there “. - Leave a landscape identity to the city of Vernon. - Collaborative thinking: self-organization and inhabitants pride.
ec “S th al gr “G w Th pl co pa te
Le Havre Rouen Le Havre
// Rouen
L
/// L’urbanisme temporelIn in la ville adaptable by
L’Ecomarché /// Pépinière d’entreprises The Ecomarché /// Business Incubator Bureaux partagés / Shared Offices Cours de sport asociatif / Associative sport class Formation continue / Continuous Training
champs de blé wheat fields
ar
tr La temporalité est un enjeu d’am me un élément structurant de lawv of Selon nous l’urbanisme est un uniquement sur l’espace ; elle an es rythmes cohabitant et interagis cette polyrythmie permet alors T d et leurs aménagements. W
pelouse lawn
Vernon
by
Mantes La Jolie
H Un nouveau mode d’organisat to
vi
La volonté d’adapter les territoir th sociaux apparaît comme la pre ri meilleure coordination entre emp To et rythmes urbains. th ch Ainsi, penser de façon coopéra Mantes La Jolie ape à fort intérêt artistique publics, voire des entreprises O p ages with strong artistic interest th Paris territoire, permettra de faire ém w Les écoles maternelles de Verno Ecomarché If âteaux de la Seine médiathèque Philippe Auguste, Jardin des Ramparts D6015 Promenade Pépinière d’entreprise th stles of Seine Valley Garden of Ramparts Business incubator 10 leurs plages horaires, ou encore ra p 0km leurs locaux durant les heures deIn Etape à fort intérêt artistique La Maison des Temps, implanté th Stages with strong artistic interest essayer coordonner ces au cœur d’un système une ville-monde au potentiel créatif et industriel incompara- tation qui à terme développera l’offre café / hôtel / restaurant. 2/ Vernon at thedevra heart of adeterritoriloP ble. Géographiquement, Vernon se loge au centre de cet axe Parallèlement, le projet envisage l’extension des quais afin de férents. Elle sera aussi chargée de to al system développer l’activité croisiériste. Un bassin écologique, situé sur économique d’ampleur depuis le projet du Grand Paris. L’idée Châteaux de la Seine na et privés sur ce type de démarch La Place Chantereine Castles of Seine Valley est de se raccorder à ce projet national pour ne pas être en reste, le site de l’ancienne papeterie, sensibilisera les usagers aux esde acréer débats, et de fourni The Hyper-Liens project has directdes impact on the town, démontrer que Vernon a bel et bien un rôle à jouer. Grâce à paces naturels qui les entourent : faune et flore, mais également propositions susceptibles plantes sauvages but it also involves the whole territory. Between Paris d’aider and T -Liens s’exprime à l’échelle de la ville, il se l’occupation récente du Office Plateau de L’Espace par Office l’entreprise au patrimoine fluviale. wild plants du Tourisme / Tourist du temps quotidiens. Le Havre, a lot of towns (the polarities) are connected to de
Vernon
humide tation qui à terme développera l’offre café / hôtel / restaurant. uneun ville-monde au potentiel créatif et industriel incompara- végétation Vernon a amorcé départ, et commence ent à l’échelle territoire. Entre et Le SNECMA, 2/ duVernon auPariscœur d’un système 2/ Vernon at should the heart the river Seine. Their potential attractiveness be A Maison denouveau la mobilité wetlands des quais ble. Géographiquement, se loge au centre de cet axe Parallèlement, le projet envisage l’extension économiqueVernon optimiste. ude de villes (les polarités) sont liées à la Seine à entrer dans une ère de développement exploited. The afin SeinedeAxis al willsystem become a hyper-lien with th territorial Maison des temps Un concept innovant de la g l’activité croisiériste. surthe towns around various projects économique d’ampleur depuis le projetLe du marketing Grand Paris.territorial L’idée développer - la culture comme levierUn bassin tiel attractif dont il faut se saisir. L’Axe-Seine theécologique, ability to situé gather tiv Navette /ambitieux River le sitededel’Axe l’ancienne sensibilisera les usagers aux differents esest de fluviale se raccorder à ceshuttle projet national pour être en reste,autour Dansnelepasdébat public Seine,papeterie, les arguments depending on the seasonalities and the cultural op r-lien permettant de réunir les villes autour /// Les outils d’un rayonnement The Hyper-Liens project rime has a avec direc L’urbanisme temporel paces naturels qui les entourent : faune et flore, mais également démontrer que Vernon a bel et bien un rôle à jouer. Grâce à rhythms of the year. avancés se concentrent toujours sur la question de la compéties différentes saisonnalités et les rythmes culer but de it also involves theIlwhole territo nel la discipline. vise, dans Si le projet Hyper-Liens s’exprime à l’éLoisirs chelle de la ville, il se l’occupation récente du Plateau de L’Espace au patrimoine par l’entreprise tivité territoriale. La promenade le longfluviale. des berges peut être al Le Havre, lot of towns (the polar projets, un aéchange, un dialogue SNECMA, amorcé un nouveau départ, etàcommence développe également à l’échelle du territoire. Entre et Lese rejoignent développée Vernon, mais également de ville en ville, ou du Touristes et Paris habitants de Vernon plus en aplus : l’habitant bei /// The Seine Axis: a eux-mêmes source development the riverofSeine. Their potential at (urbanistes, paysagi à entrer dans une ère de développement économique optimiste. W Havre, une multitude de villes (les polarités) sont liées à la Seine moins d’ é tape en étape. Les lieux à fort intérêt culturel foisondésire se détendre au quotidien. Le projet consiste à animer le exploited. The Seine Axis will bec une opportunité de développement etc.). marketing territorial - la culture levier Thecomme organisation of Vernon’s ce faire, une stratégie de marketing fleuve et à L’Axe-Seine structurer une véritable zone de loisirs : aménage- nent sur l’axe Seine. Pour Le et offrent un potentiel attractif dont il faut se saisir. theterritory ability is to deeply gatherinfluenced the towns so ar C’est au sein de la Maison des pl its geography: some major dividing – the rivers, /// Les lieu outils d’un rayonnement ambitieux Dans le débat public autour de l’Axe by Seine, les arguments sera mise en place. sports nautiques, de contemplation avec territorial depending onlines the differents season itoire à l’deviendra organisation marquée de ment unprofondément hyper-lien permettant réunirdes les berges, villes autour réflexions pour une meilleure p su the railway lines, the roads – separate the North from rhythms of the year. avancés ambitieux se concentrent sur la question de la compéti: des coupures majeures fluviales, ferrées et belvédères, Nous prônons un positionnement pour toujours faire de cette parcoursculpiéton au sol, animations pour enfant. d’un projet selon–les différentes saisonnalités et les rythmes be des rythmes qui s’exprimera relief plateau impacts on how usersdans nt l’espaceturels Norddeetl’année. Sud ; le relief des plateaux territoriale. La promenade le longthe desSouth; bergesthe peut êtreof the Loisirs ville un point névralgique tivité de projet d’animation culturelle. La move Seine, which one de dominantes: “larepresents polychronie obilité des usagers ; et la Seine, véritable élé- Tourisme à Vernon, mais également villearound; en ville,and ou the du river Touristes et habitants se rejoignent de ville plus en plus d’un : l’habitant souffre déficit dedéveloppée notoriété auquel il est possible de de /// TheofSeine Axis: asculpts source (1) too of the main structuring elements the territory, u territoire, qui modèle le relief et génère une Notre idée est de rendre au d’étape en :étape. Les lieuxD6015 à fort intérêt culturel foison- séquentielle des espaces” . désire se détendre au quotidien. consiste à animer le moinsenvisagées remédier. Plusieurs propositions territoire son activité d’antanLe enprojet /// L’axe Seine : une opportunité de développement the relief and creates many natural areas. This river, while (1) espaces naturels. Ce fleuve, encore perçu dans devenant un maillon clair entre Hôtel du Grand Cerf Place Chantereine Sandra Malet, Aménager lesterrito ryth Navettenent fluviale The organisation of Vernon’s sur l’axe Seine. Pour ce faire, une stratégie de marketing fleuveParis et à etstructurer véritable loisirs :d’une aménage- ladecréation Activité Culturelle pour développer l’ é conoLe Havreune - toutes deuxzone Tourist hub and leisure centre still being perceived as one of the biggest dividing lines tia mme l’une des grandes ruptures de la ville, n’en by its geography: some major divid banisme. EspaceTemps.net, 2013 ment des berges, sportsPour nautiques, de contemplation Vernon est un territoire à l’organisation profondément marquée touristique ; avec territorial sera mise en place. villes classées au Patrimoine Mondial de l’Unesco. ce faire,lieumie in the town, is actually a key asset. Vernon must realise to ns un atout décisif. Vernon doit en prendre the railway lines, the roads – sep par sa géographie : des coupures majeures – fluviales, ferrées et belvédères, prônons un positionnement ambitieux faireSeine de cette piéton s’impose. au sol, animations pour pour enfant. - une SEM fédérer lesNous initiatives et rationaliser les moyens culturelleparcours et touristique this,pour for the Valley is an ideal place for the imple- Vallée de la Seine est une zone propice à la un développement de l’offre the South; the relief of the plateau routières – séparent l’espace Nord et Sud ; le relief des plateaux ville un point névralgique de projet d’animation La But mentationculturelle. of new ideas. in order to do so, in order to cl ’idées nouvelles. Mais pour cela, pour enfin Nous proposons d’ailleurs de déplacer l’Office du tourisme dans engagés par la ville ; move around; and the river Seine, contraignant la mobilité des usagers ; et la Seine, véritable élé- Tourismedirecte avec la Seine. ville souffre d’undedéficit de notoriété il estVernon possible de to make blossom, needs the most of its location on w - un parcours urbain et paysager le long la Seine, jalonné auquel le doit profiter de sa situation sur l’Axe Seine, l’hôtel du Grand Cerf, en connexion of the main structuring elements o ment structurant du territoire, qui modèle le relief et génère une La “polychronie desis lieux” the Seine Axis and to build on everything that “alreadyouws remédier. Plusieurs : Notre idée est de pour rendrese aurendre territoire son activité d’antan ou en éphémères, œuvres existantes liées aux propositions châteaux et envisagées difLes touristes auront dorénavant le choix à d’ ce “déjà-là” disponible. the relief and many grande quantité d’espaces naturels. Ce fleuve, encore perçu dans devenant un maillon clair entre Paris et Le Havre - toutes deux - la création d’une Activité Culturelle pour at ambition de creates favoriser et natural de faci there” and available. développer l’ é conoLiens trouve sa force à l’échelle régionale et Giverny : prendre la navette la nouvelle gare routière, ou férents lieux emblématiques de la région. Hébert /// àEntrée de Vernon still being perceived as one of the l’espace urbain comme l’une des grandes ruptures de laL’îlot ville, n’en Th d’un même espace en s’appuyant ne n’est plus obstacle, mais entité à part en- choisir la navette fluviale villes mie communes touristique autour ; Patrimoine Mondial l’Unesco. Pour ce faire, projet regroupe différentes d’une volonté dontclassées l’embarquement se fait place deCe in the town, is actually a key asse Hébert’s block /// Theau Edge of Vernon demeure pas moins un atout décisif. Vernon doit enThe prendre The Hyper-Liens project draws its strength from Ces the re- pa les différentes parties. Elle est ce lien indiscutable avec des entités Chantereine, pour profiterunainsi - une SEM pour fédérer les initiatives les moyens développement de l’offre qui culturelle et touristique s’impose. réunissant personnalités politiques, investisseurs, ar- et rationaliser des vues et paysages ont collective this, for the Seine Valley is études an idea conscience. Car la Vallée de la Seine est une zone propice à la in sources available both on a local and a national scale: the ortantes entre Le Havre et Paris. Le Projet inspiré tant d’artistes et d’écrivains àmentation la multiplication de nouveaux engagés parpromenade la ville ; régionale est d’ailleurs déplacer du responsables tourisme danshôteliers. of new ideas. But in ord tistes, et Une de passage sur lesde berges du l’Office mise en chantier d’idées nouvelles. Mais pour cela, pour enfin Nous proposons bu river Seine is no longer anmentale, obstacle,en it becomes an inher” souhaite réconcilier urbain et nature, bâtir fleuve. Parvenir à transformer aux fleurs / Flowers greenhouse aménageant des vite blossom, Vernon needs to make the - un urbainfortes. et paysager le longentdepart la Seine, jalonné l’hôtel du Grand Cerf, connexion alors avec crééelaetSeine. Vernon devient uneparcours de ses étapes l’excursionniste en en touriste, mu- directe se désengourdir, elle doit profiter de sa situation sur l’Axe Seine, Serre of the town. It undeniably connects important les weekend. L’adaptat thesoirs SeineetAxis and to build on ever Maison du projet auront dorénavant le choix pour se rendre à d’œuvres existantes ou éphémères, liées aux châteaux et dif- les Les touristes s’appuyer sur tout ce “déjà-là” disponible. espaces de available. détente sportive, de pr there” and Le projet Hyper-Liens trouve sa force à l’échelle régionale et Conférences Giverny : prendre la navette à la nouvelle gare routière, ou férents lieux emblématiques de la région. nationale : la Seine n’est plus obstacle, mais entité à part en- choisir la navette fluviale dont l’embarquement se fait place Ce projet regroupe différentes communes autour d’une volonté iter sereinement avec les flux de Espace pédagogique et participatif The aux Hyper-Liens draws des its pratiquesproject divergentes tière de la ville. Elle est ce lien indiscutable avec des entités Chantereine, pour profiter ainsi des vues et paysages qui ont collective réunissant personnalités politiques, investisseurs, ar- liés sources available both on a local an and participative space économiques importantes entre Le Havre et Paris. Le Projet Educational inspiré tant d’artistes et d’écrivains de passage sur les berges du tistes, et responsables hôteliers. Une promenade régionale est poraires - seront apaisés. river Seine is no longer an obstacle “Seine Métropole” souhaite réconcilier urbain et nature, bâtir fleuve. Parvenir à transformer l’excursionniste en touriste, mu- alors créée et Vernon devient une de ses étapes fortes. ent part of the town. It undeniab
Temporal urbanism is an innovative and adaptable method of the urban renewing of Vernon: polychrony and sequential adaptability of spaces. Hyper-Liens is an ambitious vision of territorial attractiveness of the town, the Seine Axis is the support of links with the rest of the world: develop tourism and Vernon’s economy. The issue of temporality is of the utmost importance when planning a city. It is increasingly considered as a structuring element in the adaptable city. We believe that the discipline of town-planning is not only related to space; it also materializes all the ryhthms that coexist and interact in the city. Taking this multitude of rhythms into account allows us to think differently about spaces and how they are organized.
culture florale participative participative floral culture
plantation de fleurs locales planting local flowers
La “polyvalence séquentielle” des lieux selon les périodes tem
[LA MADELEINE] Studio Fabrice Dusapin Architect [Project Manager] Stage 3 to 6
Location - Lille [59] Client - PROMOGIM Plot - 7000 m² Program - Offices Budget - 9.0 M€
1
HEADQUATERS Consultants - PROJEX & ELITHIS Planners - SEM EURALILLE Status - Completion 2016 The building is located in the northern side of the ZAC Euralille 2, the project is the culmination of this business district’s conversion. The open angle creates of a public space, part of the Place du Romarin, in order to avoid immensity effect and for the two facades to open on urban perspectives.
1
On both sides of it, two wings are developped in a compact design manner outlining angles. The facade is composed of voids and plaine surfaces which give to the building a strong identity and ensure a reliable integration with its existing environment.
Section 1-1
Level 9.0
1 - Steel grating walkway 2 - Tube in galvanized steel Ă˜ 20mm 3 - Angle Bracket 10mm 4 - Tubular frame 40x40mm 5 - Steel painted aluminium sheet 3mm 6 - Edge profile - U 200x75mm 7 - Insulated panel and painted steel sheet 8 - Reinforced concrete slab
1
2 3 4 5 6 7
Š Cyrille Thomas All Rights Reserved
8
[6th COLLEGE]
Location - Aubervilliers [92] Client - CG 92 Plot - 8500 m² Program - Secondary school Budget - 16.5 M€
Studio Fabrice Dusapin Architect [Project Manager] Competiton
600 STUDENTS Consultants - GEC Ingénierie, Albert&Cie, Alternative Acoustic, Thierry Lheriteau
> Façade sur rue préserver l’intériorité du collège
> Perméabilité visuelle transparence vers le coeur d’îlot
SA
DI
SA
DI
RU E CA RN OT
RU E CA RN OT
- Transparency throught the inner space
Looking into the development of a secondary school in this urban environment raises many issues. Located in a conversion district area, the project has to allow new perspectives, for nowadays and tomorrow, with a programme focused on diversity and answering to social issues.
> Maîtrise des hauteurs épanelage et disposition du programme en relation avec son contexte > Façade sur rue préserver l’intériorité du collège > Façade sur rue E préserverRUl’intériorité du collège OT
> Répartition du programme simplicité et lisibilité
The building stems from a strong will to initiate the urban renewal of «Secteur Pont de Stains» which will be crossed by the metro extension, line 12. The building developped arround a playground becomes the central square of secondary school, thus providing protection from public space. However, a major view axis marks the main entrance from the street, accentuated by convex volumes forming the base. Inside the building, as a communal living area, the main corridor is created to act like a covered passageway.
I
SAD
- Preserving the inner life
Logements de fonction Pôle Enseignement Pôle Encadrement Pôle Vie du Collège
CARN
> Perméabil transparen > Perméabil transparen
SA RU DI E CA logements de fonction RN O sans vis-à-vis SA RU T DI E CA RN OT
M éch AISO elle NS D du E peti VILLE t ha bita t
UR
E CO
T LO
D’I
> Composition et articulation contrôle, accueil, et maîtrise des flux > Répartition du programme simplicité et lisibilité R+1 & R+2 > Répartition du programme simplicité et lisibilité
Contrôle aisé des circulations Surveillance dans les trois dimensions
> Maîtrise d épanelage > relation Maîtriseav d épanelage relation av
R+1 R+2
RUE I CA SAD RUE I CA SAD
Pôle restauration Collège Ouvert Gymnase
- Legibility for users Pôle accueil
RDC
Contrôle des entrées -loge gardien-
M éch AISO elle NS du pe M éch AISO elle NS du pe
Contrôle des flux -bureau des CPE-
Logements de fonction Pôles vie scolaire et encadrement situés à l’articulation du programme collège.
Logements de fonction Pôle Enseignement Pôle Enseignement Pôle Encadrement Pôle Encadrement Pôle Vie du Collège Pôle Vie du Collège Pôle restauration
> Composition et articulation contrôle, accueil, et maîtrise des flux > Composition et articulation contrôle, accueil, et maîtrise des flux R+1 & R+2 R+1 & R+2 Contrôle aisé des circulations Surveillance dans les trois dimensions Contrôle aisé des circulations Surveillance dans les trois dimensions
Pôle restauration Collège Ouvert Collège Ouvert Gymnase
RDC
Gymnase Pôle accueil
RDC Contrôle des entrées -loge gardien-
Pôle accueil
Contrôle des entrées Contrôle des flux -loge gardien-bureau des CPEContrôle des flux -bureau des CPE-
Pôles vie scolaire et encadrement situés à l’articulation du programme collège. Pôles vie scolaire et encadrement situés à l’articulation du programme collège.
- Staff housing
© Cyrille Thomas All Rights Reserved
R+1 R+2 R+1 R+2
Level 1.0
Ground Floor
Š Cyrille Thomas All Rights Reserved
Interior street
[ARCHIMEDE] Studio Fabrice Dusapin Architect [Project Manager] Competiton
OFFICE AND SPORT CENTRE Consultants - EGIS, PEUTZ Acoustique Plot’s location in the Impasse Gerty Archimède and its restricted form as a «U-shape» have led us to design a dense building with transparencies. The sharp caesura on the east part brings between permeability trough the new neighbourhood «Bercy-Charenton». The project’s challenge is in the programs’ interaction: as public equipment and an office building. Due to the urban regulations, the building is shaped as several volumes, offering large terraces and gardens. The building is designed like a barge tied up to the railway bank. Because of is north orientation and its gateway role, the facade is composed with high openings and polycarbonate panels which turn it into a living screen.
Location - Paris [75] Client - ICADE Plot - 13000 m² Program - Office & Gymnasium Budget - 24.0 M€
Offices Sport centre
[DEESAR] Studio DAY ARCHITECTES [Intern - Architect Assistant] Feasibility study
A NEW URBAN CODE The alternations between passage and stop-or-trace station will be the starting point of this new urbanity, this new urban concept. In this ambitious project, we will suggest a new way of living on several levels: - a perfect adaptation to local culture - a new definition of worldwild urban life - a unique and privileged interior lifestyle. As the definition of urban life is the art of living together, and recreate the city, we promote the social quality which is the foudation of human society. Water is life, and must be, through his wet plant tissue, the vital link that will unify the project. Plants will emerge and traces will spread throughout the project, allowing a new urbanity.
Location - Riyadh Client - Private Investor Plot - 827,000 m² Program - Master planning Budget - 8,5 B$
ŠMOON pour DAY architectes
[BUILD WITH STEEL] Personal Competition Team : L.Leyer, R. Brochard, S. Guineberteau, S. Morio.
LA MACHINE URBAINE - Bridge For Living Shaped by its industrial past, the Island of Nantes revealed itself as an ideal starting point to the yearly competition «Build with steel». The bridge links two key part of the city that have until now been separated by the river; the city centre and its future extension: the island. Spread on 267 m from one side of the river to the other, the bridge rise 50 m above the water. Thus the five arches are creating a new skyline, a visible symbol from the actual city centre. The «Living Machine» is mixing various equipment such as an hotel, a restaurant, shops, exhibition space, a sport centre, and housing. The «Urban machine» is a symbolic gate toward the city centre one hand, toward the estuary one the other hand.
Location - Nantes [44] Theme - Bridge for living Plot - 6500 m² Organized by - Le Moniteur
Les Machines de L’ile
Exhibition space
Hotel
Restaurant
Discovery park
Slabs
Frames
Tubular structure
Public programs
Deck
[UNITE STUDIO]
Location - Nantes [44] Duration - 4 months Team - 6 architects, 1 assistant
INTERNSHIP - Architect assistant
[ PÉRISTYLE ]
Housings, office & shops
Location - Lorient [56] Client - OTI Plot - 5000m² Budget - 9.7M€ Stage - Competition
[ MATIÈRE GRISE ]
Housings, office & nursery
Location - ZAC de la Courrouze [35] Client - GROUPE LEGENDRE Plot - 16 300m² Budget - 24.8M€ Stage - Completion in 2011
[ PARCATLANTIS ] Location - Saint Herblain [44] Client - SCI Parcatlantis Plot - 30 200m² Budget - 49.5M€ Stage - Completion in 2012
Office & hotel
[LOG ARCHITECTS]
Location - Paris [75] Duration - 3 months Team - 5 architects, 1 assistant
INTERNSHIP - Architect assistant
[ THÉÂTRE AQUATIQUE ]
Swimming pool & park
Location - Fumel [47] Client - Fumel Communauté Plot - 8000m² Budget - 1.8M€ Stage - Completion 2014
[ AMBASSADE DE RUSSIE ] Location - Paris [75] Client - Russia’s ambassador Plot - 150m² Stage - Feasability study
Rehabilitation of the entry
PROJECTS
CLIENTS
ARCHITECTS
T7A2 - PARIS STYLE 13
SOPIC PARIS
FABRICE DUSAPIN
ICADE
FABRICE DUSAPIN
NOVIGERE
FABRICE DUSAPIN
VILLE DE VERNON
Personnal Work
SOPIC PARIS
FABRICE DUSAPIN
I3F
FABRICE DUSAPIN
PROMOGIM
FABRICE DUSAPIN
CG93
FABRICE DUSAPIN
I3F
FABRICE DUSAPIN
Housing-Office-Shops
CONNEXE Office
LA BRIQUETERIE Housing
EUROPAN 13 Master plan
SANNOIS Housing-Shops
CHARENTON LE PONT Housing-Shops
LA MADELEINE Office-Shops
6th COLLEGE Secondary School-Sport Centre
IGNY - LES RUCHÈRES Housing
STAGES
STATUS
PLOT
COST
LOCATION
Stage 1 to 6
Completion 2017
6 000 m²
12 700 000 €
Paris, France
Stage 1 to 2
In Process
14 000 m²
25 000 000 €
Paris, France
Stage 3 to 5
Completion 2016
2 300 m²
3 900 000 €
Clichy, France
Competition
Finalist
17.70 km²
-
Vernon, France
Stage 1
In Process
3 900 m²
6 500 000 €
Sannois, France
Competition
Completion 2017
6 100 m²
9 250 000 €
Charenton, France
Stage 3 to 6
Completion 2016
7 000 m²
9 100 000 €
Lille, France
Competition
Results 2014
8 500 m²
16 550 000 €
Aubervilliers, France
Competition
Results 2013
8 000 m²
12 000 000 €
Igny, France
PROJECTS
CLIENTS
ARCHITECTS
GERTY ARCHIMÈDE
ICADE & Ville de Paris
FABRICE DUSAPIN
VALOPHIS - EXPANSIEL
FABRICE DUSAPIN
NOVIGERE - ALPRIM HABITATION MODERNE IMMOBILIERE DES QUAIS
FABRICE DUSAPIN
Housing
NOUVELLE CENTRALITÉ
PROMOGIM
FABRICE DUSAPIN
CG 94
FABRICE DUSAPIN
Al JAZIRA BANK
DAY ARCHITECTES
PRIVATE
DAY ARCHITECTES
Le Moniteur
Personnal Work
Office-Sport centre
LES HAUTES BORNES Housing-Shops
LA CHARTREUSE
Housing
COLLEGE LUCIE AUBRAC Secondary School
BAJ Bank
DEESAR Master plan
MACHINE URBAINE Bridge for living
Project Manager
STAGES
STATUS
PLOT
COST
LOCATION
Competition
Results 2014
13 000 m²
24 000 000 €
Paris, France
Stage 5
Completion 2015
7 400 m²
10 350 000 €
Choisy-le-Roi, France
Stage 1 to 3
-
18 575 m²
21 700 000 €
Strasbourg, France
Stage 5
Completion 2016
8 000 m²
9 000 000 €
Carrière-sous-Poissy, France
Competition
Results 2013
4 900 m²
12 500 000 €
Champigny-sur-Marne, France
Competition
-
1 000 m²
-
Riyadh, Saudi Arabia
Stage 1
In process
827 000 m²
8 500 000 000 €
Riyadh, Saudi Arabia
Competition
Finalist
6 500 m²
-
Nantes, France