PORTFOLIO Julia Mozheyko 415-23 Lascelles Blvd Toronto ON Canada t: 647 344 3411 julia.mozheyko@ryeson.ca
EDUCATION AND TRAINING September 2009 - April 2013
Bachelor of Architectural Science, Ryerson University Toronto, Canada
Spring 2013 Eden Prairie, United States July 2012 Toronto, Canada December 2008
AutoCAD Architecture, George Brown College Toronto, Canada
November 2008
AutoCAD Rendering, George Brown College Toronto, Canada
October 2008
AutoCAD 3D, George Brown College Toronto, Canada
September 2008 Toronto, Canada September 2005 - March 2006
ESL, ESL Studio Toronto, Canada
September 1997 - May 2001
00.02
EMPLOYMENT HISTORY May 2012 - August 2012
Dutra Architects Inc. STUDENT INTERN Toronto, Canada
SeptembeJuly 2011 - Present 3D ARCHITECTURAL ILLISTRATOR AND GRAPHIC DESIGNER Jersey, Channel Islands June 2011 - November 2011 ARCHIVE ASSISTANT Toronto, Canada June 2011
September 2008 - August 2009
Habitat for Humanity VOLUNTEER Toronto, Canada In March PHOTOGRAPHER/PROPIETOR Toronto, Canada
April 2006 - August 2008 ASSISTANT Toronto, Canada October 2001 - April 2005
PVH SHOES AND ACCESSORIES DESIGNER
Mixed-use
Single family housing
Green building/ Reuse 01 The Wall
02
03
04 Cultural 05 Roman Catholic Church of the Blessed Virgin Mary
06 Extreme Kickstart
07
08
Community
Public
Personal art work
09 Free Art
00.03
01.04
01.05
02.06
02.07
03.08
03
2
51+4
7 6 5 4 3 2 1
A
B
2 C
D
E
F
11
03.10
North West Corner
03.11 03 .11
North West Corner at Night
03.12
North View
E2
F1
F
G
4A 4 3B
3A
2 BED
3
TYP. SUITE 8. 1 : 50
B
B1
1
C
A3.02
3
1 BED
2A 1 A3.01
2
1m
0m
2m
5m
4m
3m
TYP. SUITE 2. 1 : 50
B1
1
C
D
A3.02
3B
3A 1 BED PLUS DEN
3
0m
1m
2m
4m
3m
5m
TYP. SUITE 4. 1 : 50
D
1
D1
E
A3.03
E2
4A 4 3B
3A
1 BED
03.13 3
TYP. SUITE 6. 1 : 50
B
B1
1
C
D
A3.02
1 A3.01
2
1 BED PLUS DEN
1A
1
0m
1m
2m
3m
4m
5m
TYP. SUITE 1. 1 : 50
D
D1
1
E
A3.03
E2
1 A3.01
2
UP
DN
STUDIO
1A
1
TYP. SUITE 11. 1 : 50
1
A A1
B1
C
D
A3.02
4A 4 3B
3A 2 BED
3
0m
TYP. SUITE 3. 1 : 50
1m
2m
3m
4m
5m
W/C UP
UP
C D
D1
W/C
W/C
B1
D
CAFE
STORAGE
2A
B
C
2
2
B1
1A
A29
B
A1
A
1
A A1 D1 E
03.14
Gro
03.15 03 .15
6
5
2
3
PH 2
EX
4A 4
3B
Level 5 16000
Level 4 13000
D xx
Level 3 10000
1m
0m
5m
4m
3m
2m
03.16
D1
D
3
1
PH 2
A3.02
C
B1
Level 5 16000
Level 4 13000 2 d5.8
1 D5.7
Level 3 10000
0m
1m
2m
3m
4m
5m
FLASHING PERIMETER INSULATION VAPOUR BARRIER CONCRETE CAST IN-SITU CONCRETE PARAPET SUPPORTING BRACKET FIXING SCREW METAL PANEL CLADDING CANT ROOF MEMBRANE CONCRETE SLAB GRAVEL RIGID INSULATION
03.17
ANTI-GLARE BLIND SUSPENDED SOUND ABSORBING CEILING DOUBLE GLAZING SNAP CAP PARAPET DETAIL SCALE 1:10 [5]
FIXING SCREW SUPPORTING BRACKET ALLUMINUM PANEL STAINLESS STEEL RIVETS ANTIVIBRATION CLIP CAULKINF AND BACKER ROD WITH WEEP HOLES FOR DRAINAGE WEEP HOLE OVERSIZED CAP RO BE IN FLUSH WITH ALUMINUM PANEL
03.18
FLASHING COMBINED WITH ALUMINUM PANEL AIR BARRIER VAPOUR PERMEABLE BARRIER RIGID INSULATION SHEATHING STELL STUD WALL BATT INSULATION VAPOUR BARRIER GYPSUM BOARD
BASEBOARD METAL PANEL VAPOUR PERMEABLE BARRIER RIGID INSULATION SPACE FOR SLUB DEFLECTION SHEATHING CAST IN-SITU CONCRETE SLUB PARQUETTE
03
GYPSUM BOARD VAPOUR BARRIER STEEL STUD BATT INSULATION SHEATHING RIGID INSULATION VAPOUR PERMEABLE BARRIER AIR BARRIER METAL PANEL
03.20
03.21
N N
N
N
N
04.22
emissions.
04.23
04.24
04.25
1. Bedroom 2. Bathroom 3. Kitchen 4. Living Room 5. Restaurante 6. Retail 7. Community Library 8. Community Workshop 9. 10. 11. Bike Rack N
2 3
2 1
2 1
1 3
4
3
4
3
5
2
3
4
9
2 2
2
2
1 4
2 1
1
3
4
3
4
2 3
3
4
1 4
2
1
2
1
3
5 7
5
6
6
10
8
9
First Floor
Second Floor
Third Floor
2
1
2 1
4
11
2 6
2
1
Fourth Floor
04.26
Interior Wall
RADIANT FLOOR HEATING/COOLING
RADIANT FLOOR HEATING/COOLING GROUND LOOP GEOTHERMAL
EXCESS SOLD TO GRID SOLAR PANELS THERMAL COLLECTOR SOLAR PANELS THERMAL COLLECTOR
04.27 04 .27
ENERGY STORAGE
CITY
DN
Virgin Mary
Maintenance
Natural
Vernacular Local Material
05.28
Longevity
Light View
05
The sacred building is the embodiment of the tectonic and the stereotomic. In it, we experience, viscerally even,
of its earthbound elements. The sacred building, through its framework, roof and membrane, reaches skyward and and earthworks, connects with the world of mankind. The mud and earth from which we are given form and arise, is the same ground on which the sacred building stands sky that we look up to, to which we direct our inner most thoughts and prayers, is be the same sky into which the sacred building ascends, ever lighter, ever purer. Inside as well as out, every detail of the sacred building speaks to
Sunday Mass
05.30
B
UP
1. GARBAGE/RECYCLING 2. DELIVERY
UP
A
A
1
2
B
5m
0m
20m
15m
10m
25m
DN
UP
B
DN
DN
1. FELLOWSHIP HALL 2. GATHERING SPACE 3. SACRED STORAGE 4. VESTIBULE 5. MALE WASHROOM 6. FEMALE WASHROOM 7. KITCHEN 8. STORAGE 9. MECHANICAL/ ELECTRICAL ROOM 10.COMMUNITY ROOM
6
4
5
3
2 9
DN
8
DN
A
1
A
UP
9 10
7
B
5m
0m
15m
10m
20m
25m
05.31 05 .31
B
1. ALTAR 2. AMBO 3. TABERNACLE 4. BAPTISMAL FONT 5. RECONCILIATION ROOM 6. SACRISTY 7. NARTHEX 8. WORSHIP ZONE 9. CHAPEL 10.ADMINISTRATION AREA 11.RECEPTION 12.OFFICE 13.OFFICE 14.RECTORY 15.SACRED LANDSCAPE WATER FEATURE
15
3 2
8 9 1
DN
14
DN
A
10
11
7 A
4
12 6
13 5
B
0m
5m
10m
15m
25m
20m
DN DN
DN
DN
DN
0m
5m
10m
15m
20m
25m
05.32
05.33 05 .33
05.34
CURTAIN
WALL
2
BRICK-VENEER
WYTHE
BRICK
INSULATION
BRICK-VENEER INFILL GLULAM STEEL CONNECTOR
STEEL
STEEL BEAM
STRUCTURE
COLUMN
CURTAIN INSULATION
WINDOWS
2 1
WYTHE
BRICK
WYTHE
BRICK
WALL
05.35
05.36
Sacred Landscape
DN
DN
DN
DN
0m
5m
10m
Scale 1:250
15m
20m
25m
0m
5m
10m
Scale 1:250
15m
20m
25m
05.37
Entrance at Night
MECHANICAL Level
1
FRESH AIR
AIR
P1
Level
1
ROOM
WATER DASHED LINE INDICATES PIPE NOT SHOWN IN SECTION
RETURN
DASHED LINE INDICATES PLENUM/SHAFT NOT CUT IN Level
MECHANICAL
ROOM
INTAKE
SECTION
Level
P1
Mechanical Diagrams
3
2
05.38
1
1. Aluminium sheet copinge 2. 3. Top vent opening 4. interior:
1 2
6
Air space 50 mm
3
Air/Vapour retarder membrane. Double wythe brick 5. Mortar joint 10 mm 6. Sheet copper roof covering 7. Cleat 8. Laminated veneer lumber 10 mm 9. Vapour retarder 0.15 mm 10. 150 mm 11.
7
5 8
adhered to primed substrate and over
4
9
12. Mortar dropping contol 13. Weep holes @ 600 mm o.c. 14.
15
10 11 12
15.
13 14 0m
1m
2m
1
1. 2.
3
8
4 3. 4. 6.
05
8.
6
11.
11
2
1
1.
13 6 7
14 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
2 3
8
4 9
5
11 10
12
17
16
14. 15. 16. 17. 18. 19.
15
18 19
0m
1m
2m
06.40
06.41 06 .41
19.50
67.50
42.50
110.20
32.00
83.27
24.25 15.20
com
11.75
44.07
06.42
65.30
06.43
07.44
07.45
Model
07.46
In Use
K
D
C
M
B
J
K
G I
D
K
C
A B
M
J I
E F
I E F
E
A
J
H
G J
H
C G
A
E
B
F
M
07.47
I
08.48
08
Power 5V
12 LED sets
White 5mm LED
10 LEDs
White 5mm LED
10 LEDs
White 5mm LED
10 LEDs
Power 5V
LED Set 1
D 13
LED Set 2
LED Set 3
PWR
Arduino UNO
D 12 D 11
C
D 10 GND
D9
PWR
B
C
C MJE 3055T Transistor
D8
B
MJE 3055T Transistor
B
MJE 3055T Transistor
D7 A0
D6
A1
D5
E
E
D4
A2
D3
A3
D2
A4 A5
E
GND
D1
Common Ground Microphone
08.50
CNC
CNC
CNC
1
3
2
1
2
3
3
1
2
4
2
3
1
08.51
Vacuuming
Vacuuming
Assemb
.52
.53