IBM •000-823 Rational Quality Manager V3 Exam
Click the link below to buy full version as Low as $39
http://www.examcertify.com/000-823.html
Questions & Answers: 10
Question: 1 What are three acceptable parameters for the IBM Rational Quality Manager out-of-the-box report: Execution Status using TER count? (Choose three.) A. test plan B. test milestone C. defect logged D. test case E. build
Answer: A,B,D Question: 2 IBM Rational Quality Manager out-of-box reports are grouped under which three themes? (Choose three.) A. defects B. test case C. cost D. section manager E. lab manager
Answer: A,B,E Question: 3 What are the possible states of a test plan in its state transition model? A. draft, ready for review, reviewed, closed B. draft, under review, approved, retired C. created, under review, reviewed , retired D. created, ready for review, approved, closed
Answer: B
http://www.examcertify.com/000-N23.html
Page 2
Question: 4 RRDI supports which application server? A. Tomcat B. WAS (32-bit) C. WAS (64-bit) D. WebLogic
Answer: B Question: 5 How do you find all the test artifacts that have the same tag? (Choose three.) A. use a filter to find all test artifacts with the tagged value B. use the Tag Cloud Dashboard viewlet to find all test artifacts with the tagged value C. create a query for all test artifacts with the tagged value D. perform a search to find all test artifacts with the tagged value E. sort by the tag column on the View Test Cases/View Test Scripts views
Answer: A,C,D Question: 6 Which statement is true about connecting to an IBM Rational RequisitePro server? A. You must be a member of the IBM Rational Quality Manager (RQM) project RequisitePro. B. You must be a member of the JazzAdmins group and a member of the RQM project RequisitePro. C. You must be a member of the JazzAdmins group and have access to a Rational RequisitePro server and project areas. D. You must have a Quality Professional license.
Answer: C
http://www.examcertify.com/000-N23.html
Page 3
Question: 7 What are three valid category types in Rational Quality Manager? (Choose three.) A. subcategories B. required categories C. multivalued categories D. calculated categories E. personal categories
Answer: A,B,C Question: 8 What happens when migrating Rational ClearQuest TestManager product with associated automated tests? A. The Rational ClearQuest projects must be migrated before the automated scripts. B. You must import or refer to the automated test scripts in IBM Rational Quality Manager before migrating your Rational ClearQuest Test Manager projects. C. The order in which project versus automated script migration does not matter. D. Automated scripts are included when importing Rational ClearQuest Test Manager projects.
Answer: B Question: 9 What is the term for data collection jobs in Rational Quality Manager? A. Enable, Transmission, Load (ETL) B. Enable, Transformation, Lead (ETL) C. Extract, Transform, Load (ETL) D. Extract, Transport, Load (ETL)
Answer: C
http://www.examcertify.com/000-N23.html
Page 4
Question: 10 In a manual test script, what is the difference between an execution step and a reporting step? A. An execution step is an instruction for the tester, and a reporting step is a point in a test where the tester evaluates the behavior of the application under test. B. An execution step is an automated task, and a reporting step is a link to a library of reusable test scripts. C. An execution step is a task that the tester must perform, and a reporting step is a link to a defect or a test case. D. An execution step is a link to an automated test, and a reporting step is an instruction for the test to run a report.
Answer: A
http://www.examcertify.com/000-N23.html
Page 5
IBM •000-N23 Rational Quality Manager V3 Exam
Click the link below to buy full version as Low as $39
http://www.examcertify.com/000-N23.html
latest tests HP2-E53
70-323
E20-326
E20-885
E10-001
70-247
E20-895
HP2-E50
1Y0-A25
70-667
648-238
1Z0-520
000-271
ASC-099
3303
642-785
70-321
70-461
HP2-H19
HP2-Z22
http://www.examcertify.com/000-N23.html
Page 6