2017
2022
ARCHITECTURE
PO R T FOLIO STEVIN ABRAHAM
HELLO,
STEVIN ABRAHAM, 30
th
JUNE 1999
Fun loving person, enthusiast in learning new different cultures and tradition, hardworking, always in the search of new opportunities to polish up my skill sets and evolve in the field of architecture.
2017 - 2022: Pillai College Of Architecture (B Arch)
Semester 1: 7.28 Semester 2: 8.31
Semester 5: 8.64 Semester 6: 9.14
Semester 3: 7.64 Semester 4: 7.75
Semester 7: 10.00 Semester 8: 9.00
Semester 9: 9.42 Semester 10: 9.75
2015 - 2017: Higher Secondary Education from Friend’s Junior College, Mulund(west). 2013 - 2015: Secondary Education from VPM’s International School (ICSE), Airoli
SOFTWARE SKILLS: Twinmotion Adobe Illustration MS Office
BASIC Lumion Autodesk Revit Rhino Filmora
VOLUNTEERING: 2018 2018-2020
Thane(w), India +91 8108036276 abrahamstevin@gmail.com abrahamstevin@yahoo.in
WORK EXPERIENCE:
EDUCATION:
ADVANCED Autocad Sketchup Adobe Photoshop Adobe Indesign
CONTACT INFO
ABOUT ME
An Architect, graduated from the Pillai College Of Architecture. Buildings, structures and the general sense of aesthetic that these spaces embody have peaked my interest for the longest time, propelling me to pursue the subject. My college has played a vital role in shaping me as an architect. A determined mind and a vigour to learn have been my stepping stones in this journey. The following Portfolio is a set of works collated during the time of my 5 year course and Internship.
Creativity Team- Alegria College Fest Mindscape- Festivals of ideas
Worked as a intern in MOZAIC ARCHITECTS, Goa A Trainee Architect to redevelope school interiors in ST. Gregorios Public School, Mulund(W) Work as a Freelance Architect: Interior Designing of a Diagnostic Centre in Nerul (NITYA Diagnostic Centre) Redeveloping a school canteen in ST. Gregorios Public School, Mulund(W)
COMPETIOTION & WORKSHOPS: Participated in Eco Niwas Samhita architecture Competition Installation Competition (Kinesthesia 2018) Construction Project Management & Sociology - Urban Planning Workshop by ACEDGE Ethos. Rhinoceros and Grasshopper Software workshop
LANGUAGE:
HAND SKILLS:
English Hindi Malayalam Marathi
Sketching Rendering Model Making
CONTENT
01
SOUND OF JUNK MUSEUM AND LEARNING CENTRE OF DHARAVI ROCKS
Architectural Design Studio
02
PUBLIC LIBRARY AND ADDITIONAL PROGRAMME
03
KUM-ART-ULI CENTRE
04
TENSILE STRUCTURE AND FOLDED
Architectural Design Studio
EXBITION AND WORKSHOP Architectural Design Studio
06-13
14-21
22-27
PLATES ROOF
28-33
05
SHARMA RESIDENCE
34-41
06
SITE WORK
42-45
Building Construction Technology
Internship
Freelance Architect
6
Architecture Design Portfolio 2017-2022
01
SOUND OF JUNK MUSEUM AND LEARNING CENTRE OF DHARAVI ROCKS
SEM 10
PROJECT BRIEF The idea was to study how music can be produced from waste materials and to provide a space for the low-income groups in Dharavi for them to showcase their talent. Museum is designed in order to conserve and promote reusing of junk with respect to different styles of music to create awareness for the future generations. The design approach for museum will be different from other display museums, which will accommodate an interactive exhibit area which will generate joy and happiness among users and also a space where people can learn to make musical instruments from recyclable waste materials and also to generate music from it. Location: Dharavi, Mumbai Area: 10,400 SQM
Subject: Design Dissertation Professor: Ar. Sarojini Lahot Work Type: Individual Year Completed: 2022
Architecture Design Portfolio 2017-2022
7
Better standard of living
Why Mumbai? The city of Mumbai generates around 10,000 tons of waste per day. Over 80% of waste is collected, sorted, recycled, and recovered, with over 300,000 rag-pickers feeding grassroots, small-scale recycling businesses as part of the city’s waste management system. Every day, almost 4000 tons of plastic and other recyclables come in Dharavi to be processed and treated. Why Dharavi? Dharavi is the largest slum in India and the second largest in Asia. It is located in the heart of Mumbai. Dharavi employs 250,000 individuals based for recycling and processing Mumbai’s waste, with 15,000 factories dedicated to the task. Within Dharavi, an amazing recycling machine without which Mumbai would strangle in its piled-up trash, 80% of Mumbai’s solid waste is recycled and given new life. Dharavi recycles 60 percent of Mumbai’s plastic waste. The plastic recycling sector in Dharavi alone employs between 10,000 and 12,000 people.
8
Architecture Design Portfolio 2017-2022
Recognizing us through various platforms Entertaining in various platform
Converting waste into instruments
Not enough space to practice
SITE ANALYSIS
Landuse
Climate Analysis
Natural Vegetation
Sensory
Architecture Design Portfolio 2017-2022
9
DESIGN DEVELOPEMENT
10
Architecture Design Portfolio 2017-2022
Architecture Design Portfolio 2017-2022
11
12
Architecture Design Portfolio 2017-2022
Architecture Design Portfolio 2017-2022
13
14
Architecture Design Portfolio 2017-2022
02
PUBLIC LIBRARY AND ADDITIONAL PROGRAMME SEM 6 PROJECT BRIEF The goal of the project was to understand a city’s multilayered programmatic and architectural complexity. To respond to a built architectural language according to the surrounding urban context. The idea behind the library was to design a structure that would be related to the neighborhood’s pre-existing architectural style while also standing out and resembling a significant landmark in the area. Location: Dadar, Mumbai Area: 2400 SQM
Subject: Architectural Design Professor: Ar. Abhijit Sahasrabudhe Work Type: Individual Year Completed: 2019
Architecture Design Portfolio 2017-2022
15
GROUND FLOOR PLAN • The site is designed up so that there are two ways to access it: one is from the main road, and the other is through a side pathway. • A large ramp at the entrance of the building leads to the first floor, which is the learning centre. • As we enter the main lobby, we find an elevator and a staircase leading to the upper levels. In addition, we can see an underground art exhibition from the main lobby, which is located next to the main lobby. 16
Architecture Design Portfolio 2017-2022
DESIGN DEVELOPEMENT
Providing different levels for different activities and segregating them vertically.
Shifting floor plates to create a large interactive space.
A big double-height space is created by leaving a space between the floor plates, and a ramp is positioned between the structure.
A cafe and daycare centre have been introduced which are positioned apart from the main building and connected by a passage.
The strucutre has been designed according to the climatic aspect , by considering harsh sunlight and wind.
Creating voids between the structure makes an interactive space vertically and horizontally and creating green space so there is a co-relation between the built form and nature.
Architecture Design Portfolio 2017-2022
17
ROOF PLAN
FIFTH FLOOR PLAN Teenagers Library
FOURTH FLOOR PLAN Adult Library
THIRD FLOOR PLAN Children Library + Administration
SECOND FLOOR PLAN Digital Convenience Centre
FIRST FLOOR PLAN Learning Centre Restaurant
GROUND FLOOR PLAN Day Care Centre Cafe and Restaurant Art Exhibition Main Lobby
Exploded view showing the construction details of the strucutre. 18
Architecture Design Portfolio 2017-2022
Aim was to make the space Interactive and Interesting
• Indicating different activities at different floor levels. • Shifted floor plates creates a double height space which turns into an interesting interactive space. • The floors are shifted in such a way that the above three floors being a single space do not disturb the below three floors. • Art exhibition being in underground creates a soothing environment within it.
• Openings has been provided in the south- west and north- east directions. • Harsh sunlight is from south so louver has been provided for diffuse sunlight. • Reading space has been provided in the double height space and book shelves has been provide where shadow is formed.
Architecture Design Portfolio 2017-2022
19
Top view of Library of all the floors.
20
Architecture Design Portfolio 2017-2022
View of the c
central ramp.
Entrance view of the building.
Architecture Design Portfolio 2017-2022
21
22
Architecture Design Portfolio 2017-2022
03
KUM-ART-ULI CENTRE EXBITION AND WORKSHOP
SEM 4
PROJECT BRIEF The design aim was to study and analyze the community patterns of a kumartuli community in detail and then cater them with proper infrastructural needs to the community so that their would be platform for them to earn and expose their distinct art to the tourism and also for long term preservation. Other basic aim was to understand the contextual architecture which responds to the context and its spatial arrangement from the heritage architecture around it. Location: Kumartuli, Kolkata Area: 1184 SQM Subject: Architectural Design Professor: Ar. Abhijit Sahasrabudhe Work Type: Individual Year Completed: 2018
Architecture Design Portfolio 2017-2022
23
Kolkata
24
Kumartuli
Architecture Design Portfolio 2017-2022
Proposed Site
The site is located in kumartuli, north kolkata along the Hooghly river. Kumartuli is rich in its culture and in its tradition. It has a clustered housing system. Kumartuli has narrow lanes. The lanes of Kumartuli are filled with artisans and workers making durga idols, so the visitors can see the process of making idols. The design process of art center starts with an idea of following the clustered organization pattern same as the housing pattern of Kumartuli which is clustered form. The building construction material used in the structure are locally available such the thached roof, clay tiles for roofing. Exposed bricks has been used for the wall construction. These all aspects reflects the context and the vernacular architecture of kumartuli. So one can experience the vibe of the tradition of kolkata.
Architecture Design Portfolio 2017-2022
25
Roof Covering. (mangalore tiles or Clay tiles)
Roof Framing Structure.
Exploded view showing the construction details and the density of the strucutre.
26
Architecture Design Portfolio 2017-2022
The exhibition follows the principle of symmetry. The exhibition is designed in such a way that the circulation is forcefully made through the given path.The cafe is located at the centre in order to create a nice interactive space from different sides of the structure. Looking at the architectural style of kolkata there are features like courtyard, arches, jalli railing, Louvered window, construction material and its technique. All of these feature come together to articulate the space.
View from the courtyard towards exhibition.
View from the courtyard towards cafe.
View at the entrance of the structure.
Architecture Design Portfolio 2017-2022
27
28
Architecture Design Portfolio 2017-2022
04
TENSILE STRUCTURE AND FOLDED PLATES ROOF
SEM 8
PROJECT BRIEF The exercise was an effort to understand the idea of long span structural systems in order to fully understand the behaviour of structures and the relationship between form and material. Secondly, the project showed how to use the tension and compression principles to create structural shape from the behavioural link between flexible and rigid material. The ultimate aim was to develop attention toward material size and form in relation to the selected structural principles. Project 1 Area: 1700 SQM Project 2 Area: 200 SQM Subject: Building Construction Technology Professor: Ar. Smita Dalvi Work Type: Group and Individual Year Completed: 2021
Architecture Design Portfolio 2017-2022
29
TENSILE STRUCTURE Aim: To Design a semi-open space for an outdoor food-court within a sports complex using a tensile roof system. Dimension: 23 M Radius Area: 1700 Sqm What is Tensile Structure? Tensile structure is the term usually used to refer to the construction of roofs using a membrane held in place on steel cables. Their main characteristics are the way in which they work under stress tensile, their ease of pre-fabrication, their ability to cover large spans, and their malleability.
Concept
The concept for tensile structure is inspired from the shape of a leaf, wherein two leaf form is faced opposite to each other. One of these forms are then shifted vertically creating a buffer space for entry and exit.
Types of Tensile Strucutre It is a combination of saddle and arch-supported tensile roof
View of the physical model. 30
Architecture Design Portfolio 2017-2022
A
B
GROUND FLOOR PLAN
ROOF PLAN BUILDING CONSTRUCTION | SEMESTER 9
A
DETAIL AT A
BUILDING CONSTRUCTION | SEMESTER 9
TANYA MATHUR- 28 | STENY
B
Architecture Design Portfolio 2017-2022
31
FOLDED PLATES ROOF Aim: To design for a train station concourse, using paper folding(Origami). Area: 200 Sqm
View of the physical model of the strucutre.
Exploded view showing the construction details of the strucutre. 32
Architecture Design Portfolio 2017-2022
1
SL O PE
61 2
61 2
30 1 30 1
SL O PE
61 2 61 2
41 2
30 1
61 2
10 00 41 2
41 2
B'
61 2 30 1
01
61 2 30 1
00 70
50 36
PE
30 1
61 2
61 2
30 1 30 1 61 2
A'
PE SL O
PE
O SL
SL O
PE
PE
O SL
PE
O SL
SL O
PE
PE
PE
30 1
A'
PE
O SL
O SL
O
SL
PE
PE
50 36
PE
PE
O
SL
PE
O
SL
O SL
O
SL
O SL
A
PE
O SL
A
SL O
30 1
61 2
61 2
41 2
61 2
10 00
41 2
41 2
61 2
00 70
10 00
41 2
61 2
3
50 33
30 1
50 33
61 2
61 2
61 2
1
30
30 1
61 2
61 2
50 33
30 1
30 1
61 2
61 2
41 2
50 33
B'
10 00
00 70
61 2
00 70
50 36
PE O SL
30 1
50 36
PE O SL
30 1
61 2
30
1
30
B
SL
PE
O
SL
O
PE
PE
O SL
ROOF PLAN ROOF PLAN
SL O
PE
B
ROOF LEVEL 2 735
+ 9.89 m
735
ROOF LEVEL 2 ROOF LEVEL 1 + 9.89 m + 9.00 m ROOF LEVEL 1
3710
3710
+ 9.00 m
ROOF LEVEL 9885
+ 5.29 m ROOF LEVEL
5440
5440
9885
+ 5.29 m
GROUND LEVEL 0.00 m GROUND LEVEL 0.00 m
SECTION AA' SECTION AA' ROOF LEVEL 2 735
+ 9.89 m ROOF LEVEL 1
3710
+ 9.00 m
V BEAM ROOF LEVEL
5440
9885
+ 5.29 m
GROUND LEVEL 0.00 m
FOOTING
SECTION BB' Architecture Design Portfolio 2017-2022
33
34
Architecture Design Portfolio 2017-2022
05
SHARMA RESIDENCE
SEM 8
PROJECT BRIEF The entire site of the project is in a steep slope. As the client is a Mosaic artist so they wanted their residence to have a artistic look to it. The other requirement of the client was to built their residence in a cost - effective way. So they want their entire residence should be exposed on which they can do their mosaic work. The client required a main house with a work studio and an outhose. Location: Corjuem, Goa Area: 290 SQM Subject: Internship Professor: Mozaic Architects Work Type: Individual Year Completed: 2021
Architecture Design Portfolio 2017-2022
35
36
Architecture Design Portfolio 2017-2022
Architecture Design Portfolio 2017-2022
37
GENERAL NOTES: 1. These drawings are to be read for the purpose of building construction on site. 2. This drawing is good for core and shell construction. For internal finishes refer I.D drawing 3. Drawings shall be read in conjuction with all relevant structural and associated service drawing. 4. No dimensions are to be scaled off this drawing and only printed dimensions to be read.
SURVEYED PLOT BOUNDARY
5. Any descripancies should be brought to the notice of the Architect / Consultant. 6. All dimensions are in mm unless otherwise specified
MATERIAL LEGEND
ACCESS
230 115115
230 765
1230
PB 4: (230 X 450)
1310
400 685
° 90
PB 4: (230 X 450)
765
1230
3120
300
50
°
1265
PB 10: (230 X 450)
90
230
115115
115115
PB 9: (230 X 450)
R1
1310 685
400
200 200
°
94°
115115
230
3120
PB 10: (230 X 450)
4000
50 R1
11355
400
200 200
230
PB 8: (230 X 450)
230
115115
PB 8: (230 X 450)
48° 230
115115
115 115
90 °
PB 4: (230 X 450)
41°
50 R1
° 90 94°
4000
10m WIDE ROAD
) 985
5929
12470 2310
1215
PB 1: (230 X 350)
DRAWING TITLE
SETTING OUT PLAN
DRAWN BY
F
STEVIN
CHECK BY
POOJA 31.05.2021
SOAK PIT
H
Wide
I
5797
1:100 @ 3m A2 Existing Wide RoadExisting 3m Wide Road
SCALE
1:200 @665 A3
DWG. N0.
PB 1: (230 X 350)
Road
SEPTIC TANK 1100 x 3000 x 2000
G
DATE
10m WIDE ROAD
4000
150 150
PB 6: (230 X 450)
200
200 400
90 ° PB 7: (230 X 450)
PB 6: (230 X 450) 115115
230
230
PB 4: (230 X 450) 400
200 200
115115
230
115
230 115
115115
230 765
1230 1310
1265 685
3120
48°
200 200
230
230
115 115
11355
R5 00
230
115 115
1265 2980
ACCESS 1
2980
49 12
° 90
° 90
° 90
10m WIDE ROAD
300
° 90
1 49 12
° 90
4000
1
3161
E
Road
2420
°
DATE SOAK PIT
Rnoin adgWLine idenin(10 m Ro K Jg Line (1 0mad Ro)ad )
5929
704
635
90
5638
D
5797
Existing 3m Wide Road
RUBBLE WALL
72
K
J
704
(10m
5929
°
47
5638
Line
C
8
90
C16 (400 X 230) 685
I
H
G
F
WORKING DRAWING
4969
ning
STATUS
5853
Wide
704
5929
3161
41°
B
3518
200 200
1970
REVISIONS
SEPTIC TANK DESCRIPTION 1100 x 3000 x 2000 18990
SR. NO.
400
PB 3: (230 X 450)
200 200
E
A
C12 (400 X 230)
12470
D
C
B
6
48
3160
A
C13
13
7
115 115
685
665
2310
1215
3494
8
6
230
C15 (400 X 230) 900
C14
985
2420
SUNK BY 320
C11 (400 X 230)
PB 3: (230 X 450)
PB 3: (230 X 450)
C13
GS 1 C7 H= 130 (400 X 230)
PB 2: (230 X 450)
115 285
MAIN HOUSE
C10 (400 X 230)
C9 (400 X 230)
90
5
285 115
41°
3494
18990
8
4969
5853
A
200 200
PB 2: (230 X 450)
600
C6 (400 X 230)
°
400
200 200
200 200
2718
400
°
5638
4969
Road
PB 2: (230 X 450)
400
400
16
300
0
400
3270
400
3
4
C5 (230 X 400)
60
3040
2746
41°
SOAK PIT
115 115 C8 (230 X 400)
RUBBLE WALL
115 115
R
41
7
13
18990
230
PB 2: (230 X 450)
C8 (230 X 400)
230
115115 P5 (230 X 300) 230
605
00
635
°
SEPTIC TANK 1100 x 3000 x 2000
R3
115 115
48
90
230
6
2
400
285 115
C3 (400 X 230)
115 115
230
6
90
41°
3040
600
5
1
207 P4 (400 93 X 230)
P3 (300 X 230)
C2 (400 X 230)
300
90
°
3270
150
°
C4 (230 X 400)
5
16 41
300
29
605
300
2718
300
300
8530
SUNK BY 320
300
42 0
°
2746
3421
00
R3
300
4700
300
R3
°
GS 1 H= 130
PB 1: (230 X 450)
11355
°
R5 00
3421
00
R3
8530 29
R
60
90
42
3083
RUBBLE WALL
MAIN HOUSE
00
400
C1 (400 X 230)
PB 5: (230 X 450)
0 R3 0
ACCESS
90
2573
90
°
00
300
90
UPPER FLOOR LEVEL
285 115
115 285
MAIN HOUSE
4
90 3
ACCESS
2
3
3738
34
300
185 115
P2 (300 X 230)
4
300
7
400
00
300
2805
15
300 R3
150 150
K
115 285 C1 (400 X 230)
3
685
1970
900
685
665
2310
1215
4700
300 R3
300
300
°
3738
985
J
I
H
G
F
12470
P1 (300 X 230)
3
2573
3410
2378
90
300
300
15
34
8460
3083
2805
00
3410
2378
R3
UPPER FLOOR LEVEL
300 E
D
C
2420
635
1
00
B
400
2
FFL level change
°
A
150 15
P1 (300 X 2
Floor Level / Level - Section
FFL UFFL
Detail No. with sheet refernce
AR-28
90
300
300
600
R6
Section No. with sheet refernce
1 A101 Ref
ST-01
8460
ACCESS
4670
300
7128
1
Floor Level / Level - Plan
FFL UFFL
Elevation No. with sheet refernce
1 A101 Ref
2980
R3 00
00
UPPER FLOOR LEVEL
300
SURVEYED PLOT BOUNDARY
GENERAL LEGEND
R3
115 115
00
300
300
300
600
R6
635
90
4670
300
7128
600
B
A
300
93 207
ACCESS
100mm thk. Ferrocement wall R.C.C structure
SURVEYED PLOT BOUNDARY
600
ACCESS
230mm thk. Laterite stone wall
685
900
685
1970
PL-AR-01
REVISION N0.
R-00
CLIENT
SHALLU & SHEKHAR
PB 1: (230 X 350)
PROJECT
SHARMA RESIDNCE
SCALE 1 : 200
RW1 COLUMN SETTING OUT PLAN
R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E R M I S S I O N O F T H E A R C H I T E C T.
1
SETTING OUT PLAN
RW1
1
PB 1: (230 X 350)
COLUMN SETTING OUT PLAN
1
P4 (400 X 230)
(300 X 230)
MOZAIC 1 Design Valley, Alto-Porvorim, Bardez - GOA - 403521 Tel: (+91) 832 2410471 / 2 Fax: (+91) 832 2412570 Em: architecture@mozaic.in url: www.mozaic.in
PB 1: (230 X 350)
PB 1: (230 X 350)
P2 (300 X 230)
PB 1: (230 X 350)
2980
P1 (300 X 230)
CORJUEM, GOA P3
DN
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E R M I S S I O
SCALE 1 : 200
SCALE 1 : 200 24 23
C O P Y R I G H T 2 0 21 2 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U LGB D B1:E(230 R E PXR450) O D U C E D O R D I S T R I B U T E D I N A N Y F OCROMP YOGB R IB M BE Y A NMSO O R LE LD R I NI GAHDTAS T RAEBSAESREV O NOY TT350) RO I EFVTAHBEL ED R SA YW S TI E RO I ODRU CP E D R MOIRS SDIIOS N G YH TA N 2X 0Y21 ZR A ISCT.O A ER D. P RAERX NM G W S HI T OH UO LU D TB ET HREE PP R 1: (230 450) (230 PBAN1:
1970
1
PB 1: (230 X 350)
685
GB 4: (230 X 450)
C13
GB 6: (230 X 450)
3120
635
A
2420
C9 (400 X 230)
B
C10 (400 X 230)
C
1215
C11 (400 X 230)
D
635
2420
985
1215
F
C15 (400 X 230) 685 900
665
2980 1230 11355
1310
G
GB 5: (230 X 450)
2310
7
1970
C16 (400 X 230) 685
C12 (400 X 230)
12470
GB 5: (230 X 450)
6
GB 5: (230 X 450)
C15 (400 X 230) 685 900
665
E
C14
C13
C12 X 230)
5
SUNK BY 320
2310
3
4(400
C7 (400 X 230)
GB 4: (230 X 450)
C14
GB 5: (230 X 450)
8
GB 5: (230 X 450)
GB 4: (230 X 450)
985
GS 1 H= 130
C6 (400 X 230)
GB 9: (230 X 450)
GB 4: (230 X 450)
C8 (230 X 400)
GB 8: (230 X 450)
7
RW1
GB 1: (230 X 450)
GB 5: (230 X 450)
8
P5
C11(230 X 300) (400 X 230)
C5 (230 X 400)
GB 9: (230 X 450)
13
2
1265
14
GB 6: (230 X 450)
GB 6: (230 X 450)
3120
1310
11355
15
C4 (230 X 400)
C7 (400 X 230)
SUNK BY 320
GB 4: (230 X 450)
C10 (400 X 230)
16
1265 6
C9 (400 X 230)
GS 1 H= 130
C6 (400 X 230)
GB 4: (230 X 450)
GB 7: (230 X 400)
17
GB 2: (230 X 450)
5
GB 4: (230 X
18
GB 8: (230 X 450)
4
20 19
PB 1: (230 X 350)
C3 (400 X 230) 450)
GB 9: (230 X 450)
C2 (400XX 450) 230) (230
GB 6: (230 X 450)
1230
GB 4:
C8 (230 X 400)
SUNK BY 320
21
GB 6: (230 X 450)
GS 1 H= 130
GB 1: (230 X 450)
22
GB 7: (230 X 400)
685
765
7
3
23
GB 1: (230 X 450)
C1 (400 X 230)
GB 7: (230 X 450)
6
GB 1: (230 X 450)
765
C5 (230 X 400)
685
13
1970
H
I
3120
14
RW1
P4 (400 X 230) PB 1: (230 X 350)
P3 15 (300 X 230)
24 2
P5 (230 X 300)
685
GB 10: (230 X 450)
900
K
GB 7: (230 X 400)
RW1
DN
685
J
GB 10: (230 X 450)
665 17
16
C4 (230 X 400)
C3 (400 X 230)
I
GB 10: (230 X 450)
RW1
H
G
18
PB 1: (230 X 350)
P2 (300 X 230) PB 1: (230 X 350)
PB 1: (230 X 350)
GB 6: (230 X 450)
1310
11355
1265
2980
5
2310
1215
GB 2: (230 X 450)
PB 1: (230 X 350) P1 (300 X 230)
12470
20 19
GB 10: (230 X 450)
4 1
985
21 F
GB 9: (230 X 450)
2420
E
GB 9: (230 X 450)
SUNK BY 320
D
GB 9: (230 X 450)
635
GS 1 H=C130
GB 7: PB (230 X 450) 1: (230 X 350)
B
GB 6: (230 X 450)
1230
A
C2 (400 X 230)
GB 6: (230 X 450)
3
GB 7: (230 X 400)
765
22
C1 (400 X 230)
J
K
8
C16 (400 X 230) 685
12470 A
1
38
B
SLAB BEAM LAYOUT PLAN
C
D
E
F
G
H
I
J
K
D
R
SCALE 1 : 75
Architecture Design Portfolio 2017-2022
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P
145
0
DW2400
750
650
970
650 170 155 700 3020
765
800 200
1230 1310
11355
0 50
1265 685
UFLH+102.025 m
I
J
E' 100
SEC-AR-02 SEC-AR-02
C
F'
K
7
C
4700
600
400
2470
4700
600 625
1875
2980
75 145
145
650
750
FFL +102.063 m
G
G'
H'
D SEC-AR-02
DW1 4670 8
4920
685
900
H
I
T = 270 R = 175
4360 1955
100
4670
23 22
1397
600
16
1855
C
G'
H'
LIVING 3.545 X 5.155 m
1500 3195 3695
198 100
FFL +105.05 m
1980
SEC-AR-02 F'
UFL +105.00 m
3205
75
17E'
D'
BEDROOM 3.695 X 3.23 m
100
107
750
ANY FORM OR BY ANY MEANS OR STORED IN A DATABASE OR ANY RETRIEVABLE SYS
UFL +105.00 m
18 100
W1A
3770
FFL +105.05 m
655
D2A 1390
DINING O R2.945 D I S T RXI B3.11 U T Em D IN
20
3674
2080
1147
75
21
100
V1A
SCALE 1 : 50
B
UFL +105.00 m
19 STORAGE
755
GROUND FLOOR PLAN
B'
FFL +105.038 m
DN 24
OVEN
SEC-AR-01
TOILET C' 2.14 X 2.005 m
750
A'
UFL +105.00 m
2080
FFL +105.038 m
1350 STORAGE
2140
SD4
900
100 550
610
FRE- FRIDGE FRIDGE EZER 2215
SIDE VERANDAH 4.67 X 3.41 m
100
FFL +105.05 m
K
100
KITCHEN 4.15 X 3.01 m
2925
J
C SEC-AR-02
3410
G
2410
F
2610
E
B SEC-AR-01
3115
900
D
3010
C
UFL +105.00 m
4'
685
1970
3410
665
100
DW3 3230 2730 100 1380
2310
23603270 3960
3660
1000
100
100
UFL +105.00 m
3670 4170 1215
8530
985
100
12470
900 2510
2510
FFL +105.038 m
12704710
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D
1
BW1
3460
50
0 30
B
SCALE 1 : 50
5'
50 0 875
3420 FFL +100.850 m
1370UFL +100.80 m
6
0
2200
2420
GROUND FLOOR PLAN D4
3'
2375 1500
1500
FFL +102.075 m UFL +102.025 m
145
1000
685
1970
50
635
A
2300
STUDY 4270 X 3020 mm
W1
DW1
0
2625
1
D'
100
5
3120
T = 270 R = 175
D1
685 V1
30
100
4413
2'
495
4
B
885
2740
4270
400
TOILET 100 1015 X 1875
F
3
700
500
SEC-AR-01 900
3020
SEC-AR-01 SEC-AR-01
UP
1'
1780
UFL +102.025
A
665
75
1875
C'
5 4
900
2470
FFL +102.063
4
BW1
400
1015
625
0
400 E200
B
3060
FFL +102.075 m
3420
2575
495
2310
D
2660
W1
3270
1380
SD2 12470 PANTRY 3280 X 1875 mm
W2
C
4710
400
1215
UFL +102.025 m
2
2300
230
1680
985 FFL +102.075 m
3
8
3740
770
STUDY 4270 X 3020 mm UFL +102.025 m
UFL +100.80 m
0
6
W3
2045
2145
400
FFL +100.850 m
1 STUDIO 8530 X 3420 mm
C
73
400
885
2740
4270
D1
A
SEC-A
V1
TOILET 100 1015 X 1875
2
800
8530
SEC-AR-02
8530
7
1015 75
1780
200
130
B'
T = 270 R = 175
75
800
SD1
500
1
UP
T = 270 R = 175
900
3605
3420
900
UP
3
2375
400
B
900
3060
1000
9 8
900
400 200
2660
400
2045
2145
W5
A'
3120
COMMON AREA 3020 X 5138 mm
10
100
2000
11
1950 8407
0
0
50
30
685
D1 A
370
3670
D
100 270 270 270
UFL +102.025 m
7
SEC-AR-02
12
2420
FFL +102.075 m
400
DW1
6
W2
50
0 30 3075
635
800
1265
SEC-AR-01
STAFF ROOM 4070 X 3075 mm
1380
SD2 1 PANTRY 3280 X 1875 mm
2
13
4413
A
170
5138
675 700
5
400
UFL +102.025 m
4
15 14
130
900
770
685
5
STUDIO 940 mm 8530 X 3420
75
1970
FFL +102.075 m
6
2005
750
900 4070
2080
1255
2005
75
4655
2065
975 130
3740
0 50
1310
D2
K
0 30
11355
TILE STORAGE
900
7
2850 3020
300
WARDROBE
TOILET 1990 X 2005 mm
108
V1
1705
400
750
UFL +102.025 m
75
325
3605
765 3120
3420 1147
1990
4
C' SEC-AR-01
0
7275
SEC-A
FFL +
UFL +
1018
100
100
7275
667 1850
750 1100
2180
4'
820 2520
3020
5'
W1A 1500
UFL +105.00 m
6'
200
900 2320
1850
1125
1125 3410
3660 100 1125 0 667
3'
FFL +105.05 m
200 538
3420
3230 2520 2730 100 1380
100
A
V1A
2905
BEDROOM 4.27 X 3.02 m
A
V1A 200 200
SEC-AR-01
2470
200 200
FFL +105.038 m UFL +105.00 m
2180
3645
3270
7'
BW2
8'
2905 820
100
2520
BEDROOM 4.27 X 3.02 m
FFL +105.038 m
UFL +105.00 m
D' 200 200
UFL +105.00 m 10'
W1A
2470
SEC-AR-02
C E'
F'
SEC-AR-02
G'
H'
9'
200 200 10'
3270 3645
D
1500
FFL +105.05 m
200
B
BALCONY B' X 4.12 m 8.53
650
650
4270
1018
800
100
D2A
565
3420 4120
A'
9'
100
100
3410 2520
4285
4120
200 465
4270
SD3
D SEC-AR-02
2410
100 3960
7630
TOILET 2.18 X 1.85 m
TOILET 2.18 X 1.85 m
DW3
100
2255
75
100
100
8530
D3
UFL +105.00 m
900 2320
8'
FFL +105.05 m
D1A
800
100
800
D2A
100
1200
100
2000
800
100 100 270
2610
3115
FFL +105.038 m
D2A
2155
D1A
125 515 200 515
750
UFL +105.00 m
UFL +105.00 m
2255
75
565
FFL +105.05 m
BEDROOM 3.695 X 3.23 m
1125
3005
13
BALCONY 12 8.53 X114.12 m
2275
FFL +105.05 m
SD3
75
14
BEDROOM 4.07 X 3.075 m
D2A
200 465 198 100
1100
100
LIVING 3.545 X 5.155 m
15
4070
100
300
7'
3005
100
8530
3205
655
75
75
1500 3195 3695
7630
18 16
1397
UFL +105.00 m
19
1855
3960 600
FFL +105.05 m
20
UFL +105.00 m 10'
2275
DINING
21
800
W1A
3770
100
2155
2'
200 515
4670
1200 m 2.945 X 3.11100
22
17
UFL +105.00 UFL +105.00 mm
D1A
800
2000
SIDE VERANDAH 4.67 X 3.41 m
FFL +105.05 mm FFL +105.038
SD4
1980
4360 100 550
23
1'
D1A
125 515
200 538
SEC-AR-01
75
DN 24
D3 100
3830
9' A
2140
12
100
900
OVEN
STORAGE
1500 3075
2675
6'
4120
675
SEC-AR-02
750
100
100
2080
75
D
5'
D2A 1390
107
V1A
750
UFL +105.00 m
1955
755
TOILET 2.14 X 2.005 m
4120
FFL +105.038 m
1147
2080
4'
100 270 1350 STORAGE
2140
4920
13 11
T = 270 R = 175
100
610 2925
8'
2360 3960
75
4670
14
UFL +105.00 m
FFL +105.05 m
FRE- FRIDGE FRIDGE EZER 2215
3'
1000
FFL +105.05 m
UFL +105.00 m
7'
15
3460
BEDROOM 4.07 X 3.075 m
KITCHEN 4.15 X 3.01 m
300
D4
100
100
UFL +105.00 m
900 2510
2510
2300
FFL +105.038 m
3010
A SEC-AR-01
1270
3670 4170
DW2
4070
1370
3830
2675
100 900
6'
2200
75
1500 3075
100 2625
2'
2140
3674
675
W3
2300 1'
75
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E R M I S S I O N O F T H E A R C H I T E C T.
3020
8
1690
FFL +102.063 m
1230
3
300
D SEC-AR-02
685
T = 270 R = 175
900
8530
8460
UP
SD1
130
W5
2
900
J
0 73
875
2980
3670
I
9 8
800
900
B
H
970
4
400
SEC-AR-01
2000
10
665
1950 8407
50
370
11
100
400
UFL +102.025 m
0
685
0 30
7
2310
D1
12G
F
FFL +102.075 m
1
6
12470
STAFF ROOM1215 985 4070 X 3075 mm
2420
DW1
E
100 270 270 270
3075
635
SEC-AR-01
13 D
C
800
1265
A
15 14
130
5138
675 B
900
75
4070
700
A
5
940
3
900
650 170 155
2065
4655
1310
11355
75
1
4
100
BW2
4285
B A'
1
B'
C' SEC-AR-01
C D'
E'
F'
SEC-AR-02
G'
H'
FIRST FLOOR PLAN SCALE 1 : 50
Architecture Design Portfolio 2017-2022
39
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E
ROOF LEVEL D
E
C'
E'
G
900
STAFF ROOM FFL +102.045 m UFL +102.025 m
100 thk. PCC
1806 2542
2542 1806
D3
V1
1200
2542
1080
MEZZANINE TOILET FFL +105.038 +107.520 m m FFL V1A UFL +105.000 +107.500 m m UFL
PANTRY FFL +102.045 m UFL +102.025 m
V1A V1
2542
D3
1200
TOILET FFL +105.038 m UFL +105.000 m
D3
PANTRY FFL +102.045 m UFL +102.025 m
V1
1200
TOILET FFL +102.063 m UFL +102.025 m
LVL 101.875 M COMMON AREA FFL +102.045 m UFL +102.025 m
PANTRY FFL +102.045 m UFL +102.025 m
TOILET FFL +102.063 m UFL +102.025 m
LVL 101.875 M
M thk. rubble packing LVL 101.875 200
+102.025 m
900
1200
1325
900
TOILET FFL +102.063 m UFL +102.025 m TOILET FFL +105.038 101.875mM LVL UFL +105.000 m V1 PANTRY TOILET FFL +102.045 m FFL +102.063 m UFL +102.025 m UFL +102.025 m
LVL 101.875 M
2975
Well compacted earth fill
LOWER FLOOR LEVEL
D3
2975
2975
100 thk. PCC 200 thk. rubble packing
LVL 101.875 M
+102.025 m
LIVING / DINING FFL +105.020 m UFL +105.000 m
24 23 22 DW2 21 20 LIVING / DINING 19 FFL +105.020 m 18 UFL +105.000 m 17 16 15COMMON AREA DW2 14FFL +102.045 m 13UFL +102.025 m LIVING / DINING 12 FFL +105.020 m T = 270 11 UFL +105.000 m R = 175 10 COMMON AREA 24 9 FFL +102.045 m 23 8 UFL +102.025 m 22 21 20 19 18 17COMMON AREA 16FFL +102.045 m 15UFL +102.025 m 14 13 12 11 10 9 8
V1A
900
1625
STAFF ROOM DW1 FFL +102.045 m UFL +102.025 m
900
+104.55 m
H'
1325
100 thk. PCC 200 thk. rubble packing
Well compacted earth fill
DW2
T = 270 R = 175
2975
1450 1625 900 900
STAFF ROOM FFL +102.045 m UFL +102.025 m
LVL 101.875 M
LOWER FLOOR LEVEL
1
D3
450
1625
DW1
MEZZANINE FFL +107.520 m UFLTOILET +107.500 m FFL +105.038 m D3 D3 UFL +105.000 m
1080
900 450
900450
LVL 101.875 M
+102.025 m LINTEL LEVEL 1
SCALE 1 : 75
BEDROOM FFL +105.020 m UFL +105.000 m
STAFF ROOM FFL +102.045 m UFL +102.025 m
LOWER FLOOR LEVEL LINTEL LEVEL 1 +102.025 m UPPER UPPER FLOOR FLOOR LEVEL LEVEL +104.55 m +105.00 +105.00mm LOWER FLOOR LEVEL
D3
1450
900 450
DW1
24 23
19 18 17 16 15 14 T = 270 13 R = 175 12 24 11 23 10 22 9 21 8 BEDROOM 20 FFL +105.020 19 m UFL +105.000 18 m 17 16 15 14 13 12 11 10 9 8
1625 900
W1A
LIVING / DINING FFL +105.020 m UFL +105.000 m
22 BEDROOM 21 m FFL +105.020 20 m UFL +105.000
D3 DW1
+105.00mm +105.00
SECTION AA'
T = 270 R = 175
1450
W1A
D3
DW2 BEDROOM FFL +105.020 m D3 m UFL +105.000
UPPER UPPER FLOOR FLOOR +107.54 m LEVELLEVEL +105.00mm +105.00
K
MEZZANINE FFL +107.520 m UFL +107.500 m
1325
D3
+107.35 m MEZZANINE FLOOR UPPER UPPER FLOOR FLOOR LEVEL LEVELLEVEL LINTEL LEVEL 1 +107.54mmm +105.00 +105.00 +104.55 m LINTEL LEVEL 2 LINTEL LEVEL 1 +107.35 m UPPER UPPER FLOOR FLOOR LEVEL LEVEL m +104.55
G
V1A
W1A
LINTEL LEVEL 2
E'
900
W1A
E
C'
1325
+107.54 m ROOF LEVEL LINTEL LEVEL 2 +109.46 m +107.35 m MEZZANINE FLOOR LEVEL
D
1450
+107.35 m
A
1080
A'
+109.46 m LINTEL LEVEL 2 MEZZANINE FLOOR LEVEL
1
H'
1806
MEZZANINE FLOOR LEVEL ROOF LEVEL +107.54 m
K
MEZZANINE FFL +107.520 m UFL +107.500 m
1080
A
1806
A'
+109.46 m
Well compacted earth fill
SECTION AA' SCALE 1 : 75
100 thk. PCC 200 thk. rubble packing Well compacted earth fill
SECTION AA' SCALE 1 : 75 8
SECTION ROOF LEVEL AA'
8'
7
5
2
1
1'
PUFF PANEL
+109.937 m SCALE 1 : 75
3517
8
8'
7
5
2
PUFF PANEL
3000
+109.937 m
1
PUFF PANEL JOINT
300
ROOF LEVEL
3517
3000
PUFF PANEL JOINT
300
300
3000
8
8'
7
5
1895
SPRINGING LEVEL +108.05 m ROOF LEVEL
300
602
3000
8'
300
7
5
2
1'
PUFF PANEL
602
300
3000
300
3517
18952350
D1A
3000
D1A
300
DW2
2350
SD3
PUFF PANEL JOINT
1895 1118
TERRACE FFL +104.970 m UFL +104.950 m T = 270 R = 175
D1A
D1 SD3 SD1
T = 270 R = 175
1
PORCH
2
5
1
5
20
22
24
23
200 thk. rubble packing
DINING Well compacted earth fill FFL +105.020 m UFL +105.000 m
100 thk. PCC
18
19
LVL 104.85 M 200 thk. rubble packing
D1A
21
20
22
Well compacted earth fill
DINING FFL +105.020 m UFL +105.000 m
24
23
DW2
100 thk. PCC 200 thk. rubble packing
LVL 104.85 M
Well compacted earth fill
100 thk. PCC 200 thk. rubble packing
2975
17
LVL 104.85 M
DW2100 thk. PCC
Well compacted earth fill
8
9
10
11
COMMON AREA
FFL +102.075 m UFL +102.025 m
100 thk. PCC 200 thk. rubble packing
6
16
3000
12earth fill Well compacted
7 Well compacted earth 6' fill 5
FFL +100.850 m PUFF PANEL UFL +100.800 m
3'
2
1
100 thk. PCC 200 thk. rubble packing
JOINT
LVL 100.625 M
T = 270 R = 175 COMMON AREA
FFL +102.07515 m 100 thk. PCCUFL +102.025 m 14 200 thk. rubble packing 13
SD1
4
19
21
LVL 104.85 M
DINING FFL +105.020 m UFL +105.000 m
2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D BWell E Rcompacted E P R O Dearth U C fill ED OR DISTRIBUTED IN ANY FORM OR BY ANY MEANS OR STORED IN A DATABASE OR ANY RETRIEVABLE S 3500
GROUND LEVEL
10'
8
PUFF 6' PANEL 5
7
300
+100.625 m
SECTION BB'
11
8
3
18
T = 270
Well compacted earth fill 10
FFL +100.850 m 9 UFL +100.800 m
FFL +100.850 m UFL +100.800 m
2
D1A
17 R = 175 24 16 23 15 COMMON AREA 22 14 m FFL +102.075 21 13 UFL +102.025 m 20 12 19 11 18 T10 = 270 COMMON AREA 17 9 R = 175 FFL +102.075 m 16 8 UFL +102.025 m 15 14
13 100 thk. PCC 12 200 thk. rubble packing
D1
T = 270 R = 175
19
DW2
300
1225
8
14
18
1400
2975
4
6
6
PORCH 300
+100.80 m
4
SD1
D1 5
LVL 100.625 M
PLINTH LEVEL
C O P1Y: R IGHT SCALE 75
3
3
2 SD1 1
PORCH
10'
SECTION BB'
FFL +100.850 m UFL +100.800 m
LVL 100.625 M
SCALE 1 : 75GROUND LEVEL +100.625 m ROOF LEVEL +110.61 m
3
T = 270 R = 175
GROUND LEVEL
SECTION BB'
2
LVL 100.625 M
+104.55 m GROUND LEVELPLINTH LEVEL LOWER FLOOR LEVEL +100.625 m +100.80 m +102.025 m
+100.625 m PLINTH LEVEL LOWER FLOOR LEVEL +102.025 m +100.80 m
1
UFL +104.950 m
1225
T = 270 R = 175
PORCH
6 FFL +104.970 m 1225
+105.00 m LOWER FLOOR LEVEL
PLINTH LEVEL +102.025 m LINTEL LEVEL 1 +100.80 m
5
13
D1
TERRACE
4
1225
+104.55 m
12
D1A
17
1400
1118
LOWER FLOOR LEVEL LINTEL LEVEL 1 +102.025 m UPPER FLOOR LEVEL
9
8
11
1400
+105.00 m
10
2975
TERRACE FFL +104.970 m UFL +104.950 m
2350
1118
LINTEL LEVEL 1 UPPER FLOOR +104.55 LEVEL m
15
16
21
1400
2975
2350
SD3
20
22
D1A
24
23
2350
3000
D1A
602
SD3
2350
TERRACE FFL +104.970 m UFL +104.950 m
+108.05 m UPPER FLOOR LEVEL LINTEL LEVEL 1LINTEL LEVEL 2 +105.00 m +107.35 m +104.55 m
DINING FFL +105.020 m UFL +105.000 m
300
2350
1118
3000
LINTEL LEVEL 2 UPPER FLOOR LEVEL +107.35 m +105.00 m SPRINGING LEVEL
3'
2
1
3500
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O FPUFF T HPANEL E DRAWING SHOULD BE REPRODUCED OR DISTRIBUTED IN ANY FORM OR BY ANY MEANS OR STORED IN A DATABASE OR ANY RE JOINT LEVEL
ROOF +110.61 m : 75 SPRINGING LEVEL
300
300
3000
3500 2473
BW3
+108.05 m
3000
3500
B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T OMEZZANINE F THE DRAWING SHOULD BE REPRODUCED OR DISTRIBUTED IN ANY FORM OR BY ANY MEANS OR STORED IN A DATABASE OR ANY RETRIEVABLE S FFL +107.520 m UFL +107.500 m
SPRINGING LEVEL
BW3
300
1128
SCALE 1 : 75 MEZZANINE FLOOR LEVEL
3000
PUFF PANEL
300
3000
2473
SECTION BB' C O P Y R I G H T 2 0 21
+107.54 m
1
3000
SPRINGING LEVEL
2
PUFF PANEL JOINT
1895
8
+108.05 m
SCALE 1
1'
3000
ROOF LINTELLEVEL LEVEL 2
2
1
PUFF PANEL 3517
+109.937 +107.35 mm
2
2
3000
300
LINTEL LEVEL 2 +109.937 m SPRINGING LEVEL +107.35 m +108.05 m
2
1'
300
602
1
2350
1
3000
+108.05 mC O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E LINTEL LEVEL 2
BEDROOM FFL +105.020 m UFL +105.000 m
UPPER FLOOR +107.35 LEVEL m 450
LINTEL LEVEL 1
W1
SIDE VERANDAH
100 thk. PCC FFL +105.050 m UFL +105.000 m 200 thk. rubble packing
STUDY FFL +102.045 m UFL +102.025 m
PANTRY FFL +102.045 m UFL +102.025 m
LVL 104.85
100 thk. PCC 200 thk. rubble packing
2075
450
+102.025 m
Well compacted earth fill
BW1
D1
100 thk. PCC 200 thk. rubble packing 450
LOWER FLOOR LEVEL
BEDROOM FFL +105.020 m UFL +105.000 m
TOILET FFL +105.038 m UFL +105.000 m
D1
LINTEL LEVEL 1
+100.80 m
LVL 104.85
Well compacted earth fill
BW1
+104.55 m LOWER FLOOR LEVEL
FFL +105.050 m UFL +105.000 m
SD4
450
+105.00 m
PLINTH LEVEL
1128
BEDROOM FFL +105.020 m UFL +105.000 m
UPPER FLOOR LEVEL
SIDE VERANDAH
D3
2075
+104.55 m
BEDROOM FFL +105.020 m UFL +105.000 m
2542
BW2
+105.00 m
SD4
D3
TOILET FFL +105.038 m UFL +105.000 m
900
LINTEL LEVEL 2
1450
2542
MEZZANINE FLOOR LEVEL +107.54 m
900
MEZZANINE FFL +107.520 m UFL +107.500 m
BW2
1450
3000
+107.35 m
LVL 100.625
+102.025 m GROUND LEVEL
W1
STUDY FFL +102.045 m UFL +102.025 m
PANTRY FFL +102.045 m UFL +102.025 m
Well compacted earth fill
+100.625 m PLINTH LEVEL
100 thk. PCC 200 thk. rubble packing
LVL 100.625
+100.80 m
Well compacted earth fill
GROUND LEVEL +100.625 m
1
40
SECTION CC' SCALE 1 : 75
Architecture Portfolio 2017-2022 SECTION Design CC' 1 SCALE 1 : 75
A
D
E'
G
K
H'
STAIRCASE DETAILS 1
2
5
7
8
GENERAL NOTES
ROOF LEVEL
DW2
1
2
5
7
8
1. These drawings are building construction 2. This drawing is good construction. For inte 3. Drawings shall be rea GENERAL NOTES: relevant structural an dimensions 4. Noare 1. These drawings to be readare forto t and only building construction onprinted site. dime
+109.937 m ROOF LEVEL +109.937 m
5. isAny descripancies good for core and sh 2. This drawing notice of the Architec construction. For internal finishes re be dimensions read in conjuction 3. Drawings shall 6. All are in relevant structural and associated se off t 4. No dimensions are to be scaled MATER and only printed dimensions to be re
SPRINGING LEVEL
+108.05 5.m Any descripancies should be brough notice of the Architect / Consultant.
LINTEL LEVEL 6.2 All dimensions are in mm unless oth SPRINGING LEVEL +107.35 m
= 270 = 175
MATERIAL LEGEND 230mm thk
+108.05 m LINTEL LEVEL 2
2
DW2
E
12 270 270 DW211 10 9
600
8
6
SD1
T = 270 R = 175
600
1130
873
UP
T = 270 R = 175
5
9 8
9 8
4
5
D1A
FFL +100.850 4 m 6 UFL +100.800 m3 7
600
C10 (400 X 230)
5
M.S bright rods painted in black
1SD3
30x3mm base plate for S.H.S
UFL +105.00 m
2FLOOR UPPER UPPER FLOOR LEVEL LEVEL
UPPER UPPER FLOOR FLOOR LEVEL LEVEL LINTEL LEVEL 1
+105.00 +105.00mm +104.55 m SECTION AA'
3
UP
C4 (230 X 400)
8
8
0
SD1
R1 5
+102.025 m
C14
5E
D
A
E
11
873
B
RAILING DETAIL C SCALE 1 : 20
17
10 9 8
SEC-AR-02 SECTION LOWER FLOOR LEVEL BB' 600 270 270 T = 270 270 4 R = 175 +102.025 m SCALE 1 : 50
UP
1130
A
18
13
LOWER FLOOR LEVEL
8
SR. NO.
SCALE 1 : 20
2
16
15
14
13
SCALE 1 : 50
4
940
18 17 16 15 14 13 12 11 10 9 8
12
FFL +103.445 m 11 UFL +103.425 m 10 940
9 8
13
12 COMMON AREA 11 m FFL +102.045 UFL +102.025 10 m
COMMON AREA FFL +102.045 m UFL D1A +102.025 m
SECTION BB'
6
SCALE 1 : 50
5
M.S bright rods painted in black
5
4
3
UP
1
1000
T = 270 R = 175
+105.00 +105.00mm 30x3mm base plate for S.H.S
LINTEL LEVEL 1
Rcc staircase waist slab
+104.55 m
8
8
50
8
C14
A C
D
SEC-AR-01
E
C
D
A SEC-AR-01
SCALE 1 : 5
SHARMA RESIDNCE
UPPER UPPER FLOOR FLOOR LEVEL LEVEL
20 mm IPS Flooring
2
1
8
20 mm long 6 mm dia anchor bolt
DETAIL A
Well & compacte SHALLU SHEKH
MOZAIC 1 Design Valley, 9 Alto-Porvorim, 8 CORJUEM, Bardez GOA - GOA - 40352 Tel: (+91) 832 24104 B' LINTEL LEVEL 2(+91) 832 241257 Fax: FFL +105.02 m SEC-AR-02 MOZAIC Em: architecture@mo UFL +105.00+107.35 m 1 DesignmValley, url: www.mozaic.in Alto-Porvorim, 7 Bardez - GOA - 403521 Tel: (+91) 832 2410471 / 2 SD3 Fax: (+91) 832 2412570 Em: architecture@mozaic.in url: www.mozaic.in UFL +105.00 m
3
2
RCC slab
6
CLIENT
PROJECT
R1
10mm thk MS base plate
80
FFL +100.850 m UFL +100.800 m
SHARMA RES 100 t +109.46 R-00 REVISIONm N0. 200 GOA thk. rubbl CORJUEM,
FFL +105.038 m
4
D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E R M I S S I O N O F T H E A R C H I T E C T.
80x40x4mm RHS member
REVISIONS
12
600
FIRST FLOOR PLAN
1970
SCALE 1 : 50
5
270 270 270 270 270
RAILING GROUND FLOOR PLAN DETAIL
DESC
750
MP19 Handrail -60mm x 40mm SEC-AR-01 7 7 7 as per R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E R M I S S I O N O F T H E A R C teak H I wood T E Cpolished T. C10 arch. approval C9 (400 X (400 X 230) 230) 6 Balustrade - 20 mm
1
TERRACE FFL +104.970 m UFL +104.950 m
DW2
REVI 19
12
2975
8
SEC-AR-01
20
+104.55 m
T = 270 R = 175
D
4 SCALE 1 : 50
LINTEL LEVEL 1
Rcc staircase waist slab
1000
C
C2 (400 X 230)
+105.00 +105.00mm
30x3mm base plate for S.H.S
E
FFL +105.02 m STATUS WOR SR. NO. DESCRIPTION m 270 +105.00 270 11270 UFL 940 DRAWING W1 STAIR 10 DW2 T = 270 DN SD1 TITLE 9 R = 175 FFL +102.075 m 24T = 270 8 UFL +102.025 m 600 270 270 270 STEV DRAWN BY R = 175 LIVING / DINING 23 6 FFL +105.020 m STATUS WORKING DRAW 22 POO T = 270 CHECK 5 2 BY UFL MP8 +105.000 m 2 2 R = 175 24 4 21 DRAWING DW2 21 STAIRCASE DETA 3 31.05 TITLE 23 DATE 20 20 2 FFL +100.850 m D 22 T = 270 19 UFL BY +100.800 m STEVIN 11:50 DRAWN @ 19 LIVING R = 175 21 / DINING SCALE 100 thk. PCC 1:100 @ FFL +105.020 m packing 18 18 20200 thk. rubble POOJA T = 270 CHECK BY UFL +105.000 m 19 17 R = 175 Well compacted earth fill 17 ST-A DWG. N0. 24 18 31.05.2021 16 23 DATE 16 LVL 104.85 M 17 FFL +103.445 m 940 R-00 940 REVISION N0. 22 16 UFL +103.425 m 1:50 @ A2 FFL +103.445 m 21 4 4 15 SCALE 4 1:100 @ A3 SHAL CLIENT UFL +103.425 m 20 MP13 14 15 15 19 13 PROJECT ST-AR-01 ROOF LEVEL DWG. N0. 14 14
+107.35 m
7
FFL +105.038 m
1
21
100 thk. PCC packing
Balustrade - 20 mm M.S bright rods painted in black Handrail -60mm x 40mm teak wood polished as per arch. approval B'
A'
D
C
MP2
22
earth LEVEL fill LINTEL 2
20 mm IPS Flooring Rcc staircase waist slab
2
23
E
Handrail -60mm x 40mm teak wood polished as 200 per thk. rubble arch. approval Well compacted
SEC-AR-02 Balustrade UFL +105.00 m - 20 mm 20 mm IPS Flooring
2
A'
D
LINTEL LEVEL 2
4
FFL +105.02 m
MP19
7
4 FFL +100.850 m 3 2 UFL +100.800 m 1 1970
3
24
+107.35 m
11 10
SD4
C DINING
SEC-AR-01
2975
1890
12
900
6
C9 (400 X 230)
UFL +103.425 m
270 270 270 10 11
LVL 104.85 M
FFL +103.445 m
SD3
D1A SEC-AR-01
UFL +105.000 m
MP13
13
6
+100.625 m
ROOF LEVEL +109.46 mFFL +105.020 m
15 14
GROUND LEVEL
175
270 270 270
13
SEC-AR-02
4
R = 175 PORCH
DW2
940
14
B
7
16
60015
270 270 270
LAN
17
16
12
600
19
17
4
1 T = 270
2160
SD1
20
+100.80 m
GROUND LEVEL PLINTH LEVEL +100.625 m +100.80 m
+109.46 m
2
1080
C4 (230 X 400)
22 21
74
750
940
4
2
ROOF LEVEL
18
SD1 8
R = 175 PORCH
756
18
LOWER FLOOR LEVEL PLINTH +102.025 m LEVEL
1 T = 270
LVL 100.625 M
24Well compacted earth fill 23
1350
19 8
2
756
135
(400 X 230)
MP8
2
3
R = 175
2160
2
21 20
C2 SCALE 1 : 50
270 270 270 270 270
DN
SECTION AA'
3
2
100 thk. PCC 200 T = thk. 270 rubble packing
UFL +105.00 m 940
3
F
+102.025 m 4
LVL 100.625 M
4
FFL +100.850 m UFL +100.800 m
FFL +105.02 m
SCALE 1 : 50
7
LOWER FLOOR LEVEL
m UFL +100.800 m
5
Detail No. with sheet refernce
AR-28
5
FFL UFFL
1400
SECTION AA'
3
750
00 m
5 W1
270 FFL 270 +100.850 270
6
2
270 270 270
270
Well compacted earth fill
7
270 270 270 270 270
038 m
W1
SD1
T = 270 R = 175
100 thk. PCC 200 thk. rubble packing
SEC-AR-02 SD3
Section No. with sheet refernce
ST-01
74
13
FFL +102.075 m UFL +102.025 m
7
B'
1
8
+104.55 m
270 270 270 270 270
MP2
270
750
D
C
0m
LINTEL LEVEL 1 11270 270 10 9
175175175175
E
A'
FFL Detail Elevation No. with No. with AR-28 UFFL sheet refernce sheet refernce
1 A101 Ref
1080
15
1 A101 Ref
1100
16
12
175175175175
D
C
SEC-AR-02
A'
13
750
FFL +102.075 m 14 SEC-AR-01 m UFL +102.025
SEC-AR-01
14
135
2m
15
270 270 270
Well compacted earth fill B'
17
Section No. w GENERAL sheetLEGEND refernce
ST-01
1350
18
100 thk. PCC 200 thk. rubble packing
16
GENER
Elevation No. sheet refernce
1 A101 Ref
+105.00 m +104.55 m
2975
19
UPPER FLOORLINTEL LEVEL LEVEL 1
750
17
1890
74
20
TERRACE FFL +104.970 m UFL +104.950 m
900
21
Well compacted earth fill
18
750
22
19
R.C.C structure 1 A101 Ref
2975
23
20
2975
24
100mm thk. Ferrocemen
UPPER FLOOR LEVEL +105.00 m
175
21
175
DINING
100 thk. PCC 200 thk. rubble packing
4
25 m
22
SD4
FFL +105.020 m UFL +105.000 m
LVL 104.85 M
45 m
23
TERRACE FFL +104.970 m UFL +104.950 m
SD3
D1A
230mm thk. Laterite ston
R.C.C struc
1100
UFL +103.425 m
24
1400
4
DINING
1100
FFL +103.445 m
SD4
FFL +105.020 m UFL +105.000 m
DW2 LVL 104.85 M
1400
2
100mm thk
+107.35 m
SD3
D1A
1
GROUND FLOOR PLAN RAILING DETAIL 5 SCALE 1 : 50 SCALE 1 : 20
2
E
LOWER FLOOR LEVEL +102.025 m
FIRST FLOOR PLAN SECTION BB' 4 SCALE 1 : 50 SCALE 1 : 50
C O P Y R I G H T 2 0 21 B Y M O Z A I C . A L L R I G H T S R E S E R V E D. N O P A R T O F T H E D R A W I N G S H O U L D B E R E P R O D U C E D O R D I S T R I B U T E D I N A N Y F O R M O R B Y A N Y M E A N S O R S T O R E D I N A D A T A B A S E O R A N Y R E T R I E V A B L E S Y S T E M W I T H O U T T H E P R I O R P E
Architecture Design Portfolio 2017-2022
41
42
Architecture Design Portfolio 2017-2022
06
SITE WORK INTRODUCTION In addition to my studies, I had the opportunity to work as a freelance architect on a project for an educational and diagnostic centre. In both projects I learned and implemented some creative design ideas which has helped me develop as an architect.
Subject: Freelance Architect Work Type: Group Year Completed: 2020 & 2022
Architecture Design Portfolio 2017-2022
43
St. Gregorious Public School, Mulund(w) Redesigning and Renovating Before the entire toilet and classrom space was a combined toillet for boys and girls. The client needed an extra classroom that can intake 25 students in it. So redesigning the whole space and to create two different spaces that is a toilet space and a classroom space.
Boys and Girls Toilet
The main task was to create a proper toilet space for the users at a very small space and also redesigning classroom and other spaces such as teachers room, principal offfice, corridor and computer room at a certain period of time and budget.
Corridor (Before)
Corridor (After)
Huge cupboards utilize more space in the corridor, in order to overcome the problem cabinets were created below the sitting platform. Therefore maximizing the storage and more circulation space.
44
Architecture Design Portfolio 2017-2022
Classroom
The client needed a white board and black board at the same side. so created a rotating black board which can be used as per their needs.
The client needed this room as a computer lab with maximum computers placed in it and also acting as a conference room. So designing a oval shape table where the curve ends are foldable act as a computer table as well as a conference table. At school hours the curve end can be folded for smooth circulation.
NITYA Diagnostic Centre, Nerul(E) Designing a clinic
1910 [6'-3"ft]
2860 [9'-5"ft]
1050 [3'-5"ft]
1050 [3'-5"ft]
1520 [5'ft]
230 [9"ft]
9.2 x 7.8ft
900 [2'-11"ft]
2330 [7'-8"ft]
2330 [7'-8"ft]
X RAY
3.3 x 7.8ft
The client wanted to add sonography room, X-ray room, counsulting room, pantry and 2 toilets in a small space according to their medical standards.
600 [2'ft]
2785 [9'-2"ft]
C R/ DESKTOP 1000 [3'-3"ft]
2935 [9'-8"ft]
900 [2'-11"ft]
CONSULTING ROOM
1300 [4'-3"ft]
2050 [6'-9"ft]
1970 [6'-6"ft]
CORIAN TABLE TOP
9.2 x 16.4ft
PANTRY 3.8 x 4.11ft
1125 [3'-8"ft] 1200 [3'-11"ft]
2010 [6'-7"ft]
STORAGE
2095 [6'-10"ft]
1320 [4'-4"ft]
SONOGRAPHY ROOM
HATCH WATER COOLER
1800 [5'-11"ft]
SHUTTER
625 [2'-1"ft]
2860 [9'-5"ft]
RECEPTION AND WAITING AREA 17.10 x 5.11ft
5440 [17'-10"ft]
View of the site before designing.
CORIAN TABLE TOP
Consulting Room
X-ray Room
Reception Area
Sonography Room
Lobby
Waiting Area
Architecture Design Portfolio 2017-2022
45
THANK YOU STEVIN ABRAHAM abrahamstevin@gmail.com +91 8108036276