Fayetteville Center City Parks and Trails Master Plan

Page 1

CENTER CITY PARKS & TRAILS MASTER PLAN

Adopted December 2020


Acknowledgements City Staff

City Council

Doug Hewett, City Manager

Mayor Mitch Colvin

Telly Whitfield, Assistant City Manager

Mayor Pro Tem Kathy Jensen

Angel Write-Lanier, Assistant City Manager

Shakeyla Ingram (District 2)

Michael Gibson, Director, Parks and Recreation

Tisha Waddell (District 3)

Anthony Ramsey, Landscape Architect, Parks and Recreation

D.J. Haire (District 4)

Gerald Newton, Director, Development Services Taurus Freeman, Planning & Zoning Manager, Development Services

Johnny Dawkins (District 5) Christopher Davis (District 6) Larry Wright (District 7) Courtney Banks-McLaughlin (District 8) Yvonne Kinston (District 9) Stakeholders Dr. Wayne Riggins Cross Creek Linear Park Corporation Dr. Peggy Valentine, Interim Chancellor, Fayetteville State University Wesley Fountain, Director of Governmental Relations, Fayetteville State University

ii

Chapter : Acknowledgements


CONTENTS ACKNOWLEDGEMENTS ����������������������������������������������������������� ii 1 - INTRODUCTION ���������������������������������������������������������������������1 2 - VISION ������������������������������������������������������������������������������������ 3 3 - MAJOR RECOMMENDATIONS ������������������������������������������� 6 4 - IMPLEMENTATION ������������������������������������������������������������� 49 5 - DESIGN PALETTE ��������������������������������������������������������������� 55

Fayetteville Center City Parks & Trails

iii


1

INTRODUCTION The Center City Parks and Trails Plan builds on the previous work and city planning studies and provides a framework for expanding the Cross Creek Linear Park and connecting existing and planned parks in the downtown area with Fayetteville State University, surrounding neighborhoods and other key destinations. Fayetteville is blessed with a remarkable abundance of greenspace in, or adjacent to, its city centerMazarick Park, MLK Jr. Park, Rowan Park, Veteran’s Park I and II, Festival Park, and Linear Park are impressive assets. This plan, the Center City Parks and Trails Plan, allows Fayetteville to realize the full potential of these astonishing assets by connecting them and enhancing their beauty and usefulness with strategic improvements. It transforms currently disconnected greenspaces into a Center City Park System and provides an unparalleled amenity for neighborhoods, institutions and businesses in the greater downtown.

1

Chapter 1 Introduction: Previous Planning

PREVIOUS PLANNING buy-outs that have resulted in an 1. Harry F. Shaw Cross Creek Linear opportunity for new public spaces and/ Park: For more than two decades or entry features to create a signature the City, the Linear Park Corporation, gateway for Downtown Fayetteville. volunteers and benefactors have worked to create a series of parks space and trails along the banks of Cross Creek between 4. Murchison Road Corridor Study: This Festival Park and Cross Creek Cemetery. plan, completed in 2019 recommended Currently, the trail continues to Riverside extending the greenway trail in Dog Park and will eventually connect Mazarick park to Veterans Park/Airborne to the Cape Fear River and the Cape and Special Operations Museum in Fear Botanical Gardens. This plan works downtown. It also introduced the idea to build on this foundational project of utilizing flood-prone land along and public space and clarifies how to Cross Creek and Murchison Road expand the greenway and make strategic for a park or greenspaces and made improvements along the existing section. recommendations related to streetscape improvements along Murchison Road 2. Fayetteville Downtown Urban and where and how to encourage private Design Master Plan: The downtown investment in the vicinity of Fayetteville State University. plan, adopted in 2019, recommended enhancements to the Cross Creek Linear Park and extending the greenway to the 5. Veterans Park Phase 2: The relocation east and west. of Rowan Street bridge created room for 3. Rowan Street/Bragg Boulevard Realignment: The realignment of Rowan Street to align with Bragg Boulevard has created a new single point of entry on the northwest side of downtown. It also resulted in property

the second phase of Veterans Park which will be more of a natural and passive section of the park on the north side of Cross Creek. This phase will provide a counterpoint to the more formal portion of Veterans Park that exists.


TAY LOR D

SEWELL ST

CIR

ORANGE ST

ST

POPE ST

NORTH ST

MECH ANIC

AVE MAL

RIVER LANDING DR

RD DL E MID

490

BR EE ST CE

DU NN

RD

Fea rR iver Cap e

ST

ST

N BROAD

[

LO TR C K L

TR L LO CK

CEDAR CREEK RD ON RAM P

ST 245

53 U V 53 V U

COBURN ST

HAIG H ST

S RACEPA TH ST

ST

T

NC HW Y 24

S BROAD

ST

S KING ST

ST

LOCUST

0

HAYW 1 inch = 400 feet OO D ST

SAPON

Feet 980

A RD

V U 2000

PHILADELPHIA ST

DR

CURTIS LN

S EASTERN BLVD S EASTERN BLVD

ERY BRAV LN

BELL

V U

CHESTN UT ST

S KING

DR

Y CT CANDLEBERR

LO YA LT Y

TRUT H CT ST

LL TER RACE RD

CLIN TON RD

1006

S EASTER N BLVD

CAMPBELL AVE

HELPFUL DR

ON S

ST

N RACEPA TH ST

S RACEPAT

S KING ST

H ST

LEE ST

ST

ST CONF IDENC E CT

SCAR BORO UGH ST

TRU ST DR

N WATER

N EASTERN

BLVD

PEPSI LN

ST NC

T

T

CO OK

F

CA RB ON ST TON

BE LIE LN

T

NS S

SIM M

N KING

T BS

S ST

NS

HA RR IS ST ON

D

MC DA NIE LS

VE STE

T ST

S AV OU E TE ON H RA RN M P

SS

MA NN

ERON AVE

RSO

SC

DR

UP TO ST N

R ND OR TA TIO TR AN SP

CREE

T

BOW ST

LIN CO LN

WIL OLD

E

ST

UE LS

A

SAM CAM

ST

ST

ST

DE R

AV

SA M

YS EN NE D

ELL

ST

US S

AN ALEX

PR ING S OO LS SC

ST HA LL

PB ELL

CAMPBE DR KINGDOM ESTATE

E AV

BEALE

NK T DY S EN NE SK

LN

1838

N PO D SA R

LUC A

BE VIL ST N EA BL STE VD R N AL FA LF A ST

N COOL SPRING ST

WAY D

PE

CR EE CR OS S

GILL ESPI E ST

CA M

ek ts Cre Bl o un

OL ST

BURN

T KS

!

ER

UT

K PO INTE

TRL ree k

Cross C

CR PO EEK IN TR TE L

GREE N ST GREEN ST

T DIC KS

ST

ST

E NT LU VO

SO

RN HE

ON EY

T NS

LN

AN

WIN SPRI DING NG TR L

N ST UN IO

RG ES

GR ST OV RA O E M N P

AR CH ST ANDERS ON ST

T NS LDSO DO NA

ST WO RTH HOW ARDS LN

CHAS

E ST

T

S ST WIL LIAM

ST MC MIL LAN

T WS WIN SLO

BA

AVE

L ST

WEL

PENN MARK PL

BURGESS ST

E RAY AV

PIT TM A ST N

T WS WIN SLO

MAX

DUPONT ST ST

CURRIE ST

MC IVER

RO BESO N ST

RAY MO ST ND

BUTL ER ST

s Creek

ADAM

CA NA L

HOLT WILLIAMSON ST

ST

MARSH ST

ST W ORANGE

ST

BRAG G BLVD

HA LE

RAY

HILLSBORO ST

H SH UGH ELT LO ON OP H SH UGH ELTO LOO N P

AVE HILL SIDE

TO PL RIA N

VIC

MAR FOUNTAINHEAD LN WEISEGER ST

BRADFORD AVE CHEER LN

MC IVE RS T

ELL

ER

E

BR EE DR CE

LIN K ST

SCHO

R LO VA AY W

ST

TO LA R

HO OL ST

E ST

HILLSBORO ST

MURC HISON RD

Y JR

FW

KETV CT IEW

WALKE R DOWNS CIR

ML K RA JR M P FW EX Y O IT 10 N 5

MLK M ON JR FW L R K J EX RAM Y AM R IT 10 P P FW 5 EX Y IT O 1 0 FF 5

MONTICELLO AVE

MLK JR FWY ON RAM P EXIT 104 B M LK

Y

HINSDALE AVE

MLK JR FW Y OFF RAMP EXIT 104 B

MYROVER ST ASHLEY ST

MLK JR FW OFF Y RA EXIT MP 104

BRO WNS

VANSTORY

E

ES RN BA ST ST BARRETT

T

COOK ST

PO

AF DR

ST

US S

1728

RD

ST

LONGLE

WOODSIDE AVE

MCALLISTER ST

DAVIS ST CE

FT TA T S

ER

V VU U

T

POINT PL

ER

87 V U

GURLEY ST

ELD ITFI WH ST

ROBESON ST

IDAY

NIM OC KS AV

POND ST Blount

Branson Cree k

FLEDGER ST

VALLE YGAT E DR

MLK OFF JR FW EXIT RAMP Y 104 B MLK JR FW

MYRTLE ST HIGHLAND AVE

BRYAN ST

HIGHLAND AVE

BROADFOOT AVE

VALLEY RD

VA L RD LEY

R D TA VIS

ST

DR VE SA

MS

OR S

T DR POIN

!

!

MIN

FSID E DR

Cape Fear Botanical Garden

T

T ES O V MP GR N RA O

ST

DEEP CREEK

MM CO

F

IS WE

HIL LS

!

ST

E DD GLI

CAPE

Pauline Jones Elementary

SC

T

Cumberland Co. Sheriff's Office

HALL

NT ST

T NS

NS

!

!

87 V U

LN LEY HAW

!

RSO

T

24 V U

AD A PE

ON S

GR OVE

Cumberland Co. Clerk of Court

ST

Cumberland County Jail

MLK JR FW OFF RAM Y P EXIT 104

HO RE D

R

RD RLO CH EN

LA KE S

LA CY

VE SA

PIN E

LAM

K RD

IS WE

DR

BLOU

!

!

OTTIS F JONES PKWY

SE LL

BLUF

Riverside Dog Park

PLUMMERS LN

!

ST

WR US

ST

!

ST ALFRED

A LE G

Existing Sidewalk

D OO TW

SMITH

!

HAY ST

N

CEDAR CREE

ST

N LO

EE FL

ST

N YO FW 104 JR MLK P EXIT RAM

R

ST

TE

SSEL L

Wells Fargo !

US

LAS ST DOUG

CE

ES CH RO

W RU

ST

MEETING ST

!

5B I9

K REE R C A MP DA CE ON R RD

ER

CE PIER

Proposed Greenway - ALT

DR

RA NK IN

!

!!

!

LN KY LE

LN EN P ID AM MA N R O

CR EE RU K N TR L

OP ER LO

VD N BL STER N EA SS BU I 95

L

DR

DR

EY

!

ST

TR

VIEW

ST

MM CO

T

AIN DW

!

OLD ST

GR OVE

E BL

Y BA

OPEN

R

N YO 4 FW 1 0 IT K JR EX ML MP RA

LEY

D TA

!

!

W N BO O P ST AM R

AUGUSTA DR

R PE

YS

S GU AU

PHR

MET ST T

MCIVER ST ON RAMP

IE

DR

ST

ISLE

R ED OR SH

Proposed Urban Trail

SILK LN

CHESTERFIELD DR

ER

RD LAKE

RF

LD

CE

ST FORE

F OF

CROSS ST

TE ES CH

Proposed Street Retrofit

ST

R

DR

!

Probation Dept.

Saint Ann Catholic Church

!

!

!

EM

ITALY

ND BO WIL

VIEW

MM CO

LAKE

Proposed Greenway

!

Transportation & History Museum RANKIN ST

ELLIS ST

Greyhound Station

STEL LA ST

HU M

CAPITOL PEAR LN

ELLIS ST

ST

!

ALY

!

ST

OP

DR

Existing Greenway

!

IN NK RA

EY LO EY RD

Police Department FAST Transit Station

GO RH AM

Saint John's Episcopal Church

LN

!

!

GER MAN

!

ST

VALL

RE HO

VALL

Highsmith Rainey Hospital

B PE

Walgreens Post Office

!

MAIDEN

!

W

PINE

S KE LA

Active Transportation

E

Prince Charles Hotel

RA S MS RA T O EY M N P

LE RIV MIDD

Cross Creek Cemetery

T

BO

R

BIRNA

D

M DR

E

YV LN IEW

PIK RN TU

FRINK ST

AMES ST

PA RK RD N OL IVE

E NOLI A AV MAG

OLIVE RD

WOODCREST RD

RD SYLV AN

TT

City Owned Land

!

K

LO

CIT

RD

!

MAIDE N LN

Amtrak

ON S

!

MASO N ST

!

R MA NN L PE P

AR

BRANSON ST

DAVIS CT MORGAN ST

Future Ballpark

Airborne & Special Freedom Ops Museum Park

E OV GR T ON S MP RA

!

!

!

PERSHING ST

!

Social Security Administration

Fountain on Mason Street

!

County Owned Land DR

TWIN OAK

Festival Park !

!

ARSENAL AVE

LAM

!

LN

HAY ST

BRAD FORD AVE ON Y ST RAMP MCGILVAR

SIMPSON ST

MAYWOOD DR

ND TS

Cross Cree k

!

RO WA NS T

!

ST

CLARK ST

BR A

!

Lamon Street Park BB&T

Veteran's SCHW ARZK Park WAY OPF WALTER ST

IN

CH

N SO BRANST

ATHENS AVE

GALE ST

Lamon Street park

RAY AVE

ARSENAL AVE

Center City Parks and Trails Study Area

WIN TE

ST

RO WA NS T

KL AN FR

D RD

OLIVE RD

LN

DEVANE ST

MINT

SPRING ST

PARK AVE

E ST MON T

CL AR

ST

CH F PL IEL D

LIT

DR

W DOBBIN AVE

PA TE

AVE

STEDMAN ST

ELLINGTO N ST

DOBB IN

SHERWOOD DR

CLARENDON

!

24 U V

GRAY ST

ST

G DIN RL IN G T IN

CALA

LN

BAYV IEW DR

BROOK ST

TILLINGHAST ST

ST

W R SP

GROTON AVE

MA ND CT OLIN

RD

WEBB

MIN GTO NR

AV E W EL DO N

FOREST RD

HUSKE ST

ST TO N SU T

LAMB ST

LILLY DR

PUGH ST

RAEFOR

HO LL Y

WASHINGTON DR

GLENWOOD DR

WESTMONT DR

MARTINE RD

GREENL AND DR

CH ST TRE E

PE A

MARTINE RD

PEARL ST

ST UNE BETH

TT T

BR E C

AVE

RUTH FAIRWO OD CT

CALCUTT DR

FULLER ST

KELLY ST

HILL PINE NORWOOD ST

MO OR E

Rowan Park

Y JR FW MLK MP ON RA 4 B 10 EXIT

RD

W IE

LN

A LE AZAFF DR BLU

UNDERWOOD ST

ST

k Cross Cree

CANOPY LN

REXDALE ST

FONTANA ST

GE CO AVE MBE ED

WESTMONT DR

PEARL ST

GREENL AND DR

R AVE

PILOT AVE

CAPE FEA

GLENVILLE AVE

TOWNSEND ST

WO OD RO W

ST

RD

MO RG AN

BELMONT AVE ONT BELM CIR

MO OR E

T

DR

TON

BIN OB E D AVE

AV E

24 V U

RS

RAMSEY ST

SUNNYSIDE CIR

RUSH

E PARK DR

V RK PA

MIT

W ROWAN ST

E UN

NUT

MORG AN

WALTON PL E AV

SU M

HAYMOUNT CT

AL GOODVIEW LE AVE E AV E

BR

IRENE ST

CHANCE ST

CHATHAM ST

1404

!

CHANCE ST

VD G BL BRAG

V U

!

ST

ER MOCK

N VIR GINIA

GE NE R

CAROLINA AVE

AZALEA DR

S VIRGINIA AVE

AV E

TL AW NA VE

Y FW P J R AM 0 5 LK R 1 M FF IT O EX

HILLTOP AVE

E

WE S S SQ UTTO UA RE N LN

ST

ES T

!

ST

HIL LC R

AV E

Senior Center

LAMB ERT ST

RD

SYCAMORE CT

DRAKE

ST

Cr ee k

T

ID E

JORDAN ST

ss

EUFAULA ST

E AV

Cro T ES BLU

AV IDGE

ND R

FIG CT

EDWARDS

D

MS

RD

ND ST

!

DR TON HING WAS

T

LV

CUMB ERLA

Dr. Martin Luther King Jr. Park

LEROY DR

GE GEOR ST

T EN

PL GLEN

LA

RA GG

GG B

OAKR

MIL

ST

BR A

D CIR ROLLINGWOO

WIL SO NS

RO C AV K E

FO RT B

D

AN

VOGEL DR

EY ST

C ES

BR OO KS

E

LV

RO BO NS

CR

R LN

W HIT

GG B

MIL

WALL ST

WOODLAND DR

MANC HESTE R ST

ST

BR A

LE ST

ST

RAMS

STER ST

24 U V CIR

Creek

EE GR

PE

NE GA N

KO OL ER

eC ross

A RH DU

WH IS

AV E

ST

it tl

NEVIL

ST MARY

EY ST

MANCHE

FIN

DG E

ST

GE ST E ORAN

ST

LE

BYRD

WILEY ST

PLUM

RD FO AW T CR S

RO CK

QUEEN

NT DR

L

PLA FILTER

VERNON CT

TIPPERARY CT

RAMS

ST

!

JULIA ST

ALBERT ST

N GA NA MO

CAPE FEAR AVE

VE TA

PILOT AVE

N DE

RD

87 V U

M ST INGRA

LN

GENTRY ST

BOUNDARY

Mazerick Park

QUEEN ST

R

DONOVAN ST

ON

!

BL UE BE PL RRY

DR

Fayetteville State University

Glenville Water Treatment Plant

ELVIRA ST

HA RLE E

BL UE B PL ERR Y

S WINDSOR DR

!

BRIARCLIFF DR

TRL

BLVD

RID GE

U ST

ASHFORD AVE

RIVER

LEY ST

ST

INGRAM

FEAR

BUIL DERS

ELD

JR MLK FW RA Y ON MP

DR

HIS RC MU

HAVILAH RD

BRINK

N WINDSOR DR

DR

DR

BELVEDERE AVE

LIBERTY ST

AVE WN RO T BM AR YT

JR

WN RO

PEACE ST

OAKLAN D DR

COMB E G

TB

!

CAPE

EY ST

W

KIN

W

Margaret Willis Elementary

CENTRA L DR

TELE GRAP H

DO WLA WN SH A

ER

ANARINE RD CREEK SIDE RUN

E

RAMS

TH LU

R

WS HE TT MA ST

INS MULL

M AV

AVE

Y ST AUTR

YD

R CIR CHESTE N AVE ERSO MCPH

N

IN RT MA

LE CO

COLLEGE ST

IO AT TR

INGHA

ST THAD

STA

IS IN

DR

M DIU

N TIO DA UN LN FO

ST

DR

M AD

ST

DR

!

CIL UN CO

DR WEST

ST

OW

MEA DE RD

BUCK

HAWTHO RNE RD

Cross Creek Early College High School

NORTH ST

LLE

D AN

R ON CI INGT KENS

CIR

EDGE

L KE LA

GRAC

ACK E BL

DR

TH EL B DR ER T

ST

B RN KO

EDENWOOD DR

BE

N DO NG LA

CH UR CH ST

N PE ARL

RD MON MCKIM AN AR IN E RD

PL

EX

ST

ST

IRVING

S ES

T NS DO NG LA

VE RA

DR

ST

DR

E AT SL

Y

ST

R

DR

TORREY

RD LYON

ST

ER RV CA

RT

RD

L AL ND KE ST

LE CO

T OU ST

GE ID BR

BE EL TH

MC GO UG AN

IJAMS

TRINITY DR

TE CIR ELLIOT

ST

HOWELL ST

GR AC BLAC E CIR K

STUDY AREA

UC E

RO G DR ER S

SP R

DOWN ING ST

Fayetteville Center City Parks & Trails

2


2

VISION Create a world-class Center City Parks and Trails system of interconnected parks, greenspace and greenways linking public spaces and attractions, and providing a destination for visitors and residents in greater downtown Fayetteville. This plan is meant to be a blueprint for the future Center City Parks system. It focuses on enhancements of key parks, including the signature Cross Creek Linear Park and outlines how to utilize additional public lands and natural resources through programming and improvements. Goals of the plan include creating an identity and attractions, improving access and knitting together different parts of downtown and nearby neighborhoods to improve quality of life, health, and pedestrian safety. It also provides opportunities for programming and culture, beautification and improvements to the tree canopy and creating opportunities to improve the resiliency of the city and encourage revitalization.

3

Chapter 2 Vision: Goals

GOALS 1. Access & Connections: Increase access to parks and key destinations from surrounding residential and commercial areas. Improve safety, comfort, and user experience (including wayfinding) for parks near Downtown. 2. Programming & Culture: Create destinations – through a connected facility with a critical mass of programming that gives residents and visitors reasons for using the trail. Build on community asset and provide a place for gathering, education and expression. 3. Plantings & Tree Canopy: Beautifying public lands and re-establishing the urban tree canopy is paramount to improving the well being of the City’s residents. Creating an identity through the use of color and a unique plant palette can help brand the parks system. Secondary goals include increasing the amount of native plants in the landscape, re-establishing plant communities and utilizing limited, hearty, noninvasive ornamentals supporting various ecological habitats along the trail while reducing maintenance needs. 4. Opportunities: Utilize public lands for parks, improve resilience, encourage revitalization, co-location of facilities and leverage funding opportunities.


INCREASING ACCESS TO PARKS

STUDY AREA DEMOGRAPHICS

POPULATION A principle goal of the Center City Parks and Trails Plan is AREA 2019 to increase access to parks in the neighborhoods that ring Downtown Fayetteville. Demographic analysis reveals that the population living in the study area is slightly older FAYETTEVILLE 209,867 than average with lower median household income than the rest of the city. There is also a higher poverty rate STUDY AREA and minority population percentage in the Study Area 11,387 than in the rest of the city. These factors should influence accessibility decisions during the design process of parks in the area and show that investments in the Center City PARK ACCESS Parks system can help address equitable access to parks and open space.

MEDIAN HOUSEHOLD INCOME

MINORITY POPULATION

POVERTY RATE

POPULATION >65

$44,057

54.9%

19.5%

11.4%

$31,178

64.7%

23.7%

18.0%

Currently only 19% of the population within the study area lives within 1/4 mile of a park. Park access is similar for minorities and seniors in the study area (park access for these demographics is 17% and 19% respectively). All demographics would benefit from parks and trailheads described in this plan. New parks and trailheads would result in 26% of the population and the minority population and 25% of the senior population to have parks within a 1/4 mile. By linking existing public spaces with readily identifiable paths, improving neighborhood connections with sidewalks and trails, and enhancing the natural beauty of public spaces, and identifying opportunities for new parks, the plan creates a blueprint for a high-quality park system. This system can be a powerful catalyst that can increase access to parks, help connect Fayetteville State University and neighborhoods to downtown and encourage reinvestment. Fayetteville Center City Parks & Trails

4


CENTER CITY PARKS AND TRAILS: OVERALL SYSTEM CONCEPT

FAYETTEVILLE STATE UNIVERSITY

BIG CROSS CREEK GREENWAY CAPE FEAR RIVER TRAIL (EXISTING)

MLK JR. PARK EXPANSION

CAPE FEAR RIVER

FUTURE TENNIS FACILITY

GATEWAY PARK MAZARICK PARK

CROSS CREEK GREENWAY EXTENSION

ROWAN PARK

VETERANS PARK

SEGRA STADIUM

ARSENAL PARK

CROSS CREEK LINEAR PARK (EXISTING)

5

LAMON STREET PARK

BLOUNTS CREEK GREENWAY

Chapter 2 Vision: Center City Parks And Trails: Overall System Concept

DOG PARK

CROSS CREEK CEMETERY

BOTANICAL GARDENS

CAPE FEAR RIVER PARK


3

MAJOR RECOMMENDATIONS

1

EXTEND CROSS CREEK LINEAR PARK

Expansion, City Gateway, Catalyst Site/Stream Bank Park and Cape Fear River Park

Extend the Harry F. Shaw Cross Creek Linear Park ȃ Northwest Cross Creek Greenway Extension: Connect Mazarick Park to Veterans Park ȃ FSU Connection (Student and Senior Center Site) ȃ Connect trail through Veterans Park Phase 2 ȃ Cape Fear River Trail Connection Access Improvements

4

3

ȃ Blounts Creek Greenway

ENHANCE EXISTING PARKS

ȃ Big Cross Creek Greenway

Make strategic improvements to the Harry F. Shaw Cross Creek Linear Park and other existing parks in the Center City ȃ Maintenance, planting and programming recommendations for the Cross Creek Linear Park, Mazarick Park and MLK Jr. Park Utilize Center City Parks and Trails as a cultural space for art related programming

NEW PARKS AND PUBLIC SPACES Utilize existing publicly owned lands for new parks to fill programming gaps and make the Center City Parks system a destination for residents and visitors

Make key pedestrian and bicycle improvements to connect nearby neighborhoods to existing and planned public space Greenway and Trail Connections ȃ Cape Fear River Trail Connection

ȃ Trailhead and parking improvements

2

NEW NEIGHBORHOOD CONNECTIONS

• Capitalize on redevelopment opportunities near the trail

5

WAYFINDING AND BRANDING Augment existing “you are here” signage with orientation signage including directional and confirmational signage Develop an overall trails branding scheme with sub-brand for individual trails Standardize trail design and furnishings

ȃ Recommendations and concepts for MLK Jr. Park Fayetteville Center City Parks & Trails

6


EXTEND CROSS CREEK LINEAR PARK The Harry F. Shaw Cross Creek Linear Park is a 2.5 mile urban trail and greenway that weaves along Cross Creek through downtown Fayetteville from Festival Park to the Cross Creek Cemetery and then north and east to Riverside Dog Park. The trail connects historic sites, plazas, and areas of natural beauty. The existing trail provides a threaded path that connects green spaces perfect for walking, picnics and site seeing. Extending the trail northwest to Fayetteville State University (FSU) and Mazarick Park will provide a safe and convenient way for nearby neighborhoods and FSU students to access the greenway and travel downtown. Priority projects are listed below and described in more detail in the table on page 8. See page 9 for cross section recommendations. PRIORITY PROJECTS 1A: Northwest Cross Creek Greenway Extension Part A (Mazarick Park to Murchison Road) - Connect Mazarick Park to Murchison Road with a greenway or urban trail section 1B: Northwest Cross Creek Greenway Extension Part B (Murchison Road to Veterans Park) - Connect Murchison Road to Veterans Park with a greenway or urban trail section 1C: Fayetteville State University Connection - Connect the planned Cross Creek Greenway to the planned Student and Senior Center Site located at the corner of Murchison Road and Filter Plant Drive 1D: Veterans Park Phase 2 and Hillsboro Street Segment Accommodate greenway/trail through Veterans Park Phase 2 and convert one travel lane along Hillsboro Street to trail section 1E: Hay Street Connection - Add signage along Hay Street

7

Chapter 3 Major Recommendations: Extend Cross Creek Linear Park

PRIORITY GREENWAY PROJECTS KEY MAP

1C 1A 1B 1D 1E ARSENAL PARK


PRIORITY GREENWAY AND TRAIL PROJECTS SEGMENT NUMBER

NAME

LENGTH

TRAIL TYPE

COST ESTIMATE*

1A

Mazarick to Murchison Road

0.75 Miles

Urban Trail and Greenway

$850,0001

1B

Murchison Road to Veterans Park

0.5 Miles

Urban Trail and Greenway

$520,0002

1C

FSU Connection

0.13 Miles

Urban Trail or Greenway

Alignment and Crossing Study Needed

1D

Veterans Park Phase 2 and Hillsboro Street Segment

0.4 Miles

Greenway and Street Retrofit

$290,0003

1E

Hay Street Connection

0.16 Miles

Urban Trail (existing), only addition of signage and pavement markings

$5,000

Total

1.94 Miles

N/A

$1.665 Million

* Estimate includes construction and design only, does not include R/W, amenities, furnishings or construction oversight Segment 1A estimate includes main trail only and does not include additional sidewalks or paths, furnishings or programming in MLK Jr. Park or part of an MLK Jr. Park Expansion

1

Segment 1B estimate includes main trail only and does not include additional sidewalks or paths, furnishings or programming in Streambank Park or Gateway Park

2

Portions of Segment 1D may be funded as part of Veterans Park

3

Fayetteville Center City Parks & Trails

8


TRAIL STANDARDS

Urban Trail

Greenway

Natural Surface Path

The Urban Trail standard should be utilized in plazas and near roadways. The ideal cross section is a 10-12-foot-wide concrete surface with intermittent brick bands. If located beside a road an 8ft planting strip is recommended to separate trail uses from the roadway.

The Greenway trail standard should be used away from roadways and through more natural settings. The standard includes a 10-foot-wide asphalt path with concrete banding on the outside edges. The asphalt should be a minimum of 2” thick with an aggregate base course. The trail should have a 2-6ft shoulder with adequate side and overhead clearance.

A Natural Surface Path standard can be used in more environmentally sensitive areas, such as along the Cape Fear River. This standard should be made of crushed stone or screenings. Trail width should be 8-10 feet. Cross slopes should be a maximum of 2 percent. Positive drainage should be maintained and stormwater features should be incorporated into trail design to minimize erosion.

This is similar to the existing section in the Cross Creek Linear Park downtown, however the existing sections are more narrow. Existing sections of the primary path through the Linear Park could be widened to allow for bicycle users to be accommodated along with joggers and walkers.

9

Directional striping may be needed on sections with anticipated heavy usage volumes.

Chapter 3 Major Recommendations: Extend Cross Creek Linear Park


FAYETTEVILLE STATE UNIVERSITY CONNECTION The main spine of the Cross Creek Greenway to Mazarick Park should be routed on the east side of Cross Creek through the planned Student Health and Senior Center site. Ample room exists for the trail, a trailhead and parking on the site. The main trail would cross Filter Plant Planned Student Drive and extend along an old road bed to Washington Drive, then cross into Dr. Martin Luther King Jr. Park and continue to Murchison Road. EXISTING Structures such as the proposed gateway seating and new FSU signs SIDEWALK POTENTIAL TRAILHEAD need to coordinate with proposed campus buildings.

Health and Senior Center IMPROVED CROSSING

AND PARKING

Recommendations: Consider changing the name of Filter Plant Drive to Bronco Way or FSU Way TO MAZARICK PARK Design and construct the trail as a greenway through the Student Health and Senior Center site Improve crossings on Filter Plant Drive and Washington Drive Incorporate trail parking and a trailhead into the designs of the Student Health and Senior Center Site Accommodate the planned Big Cross Creek Greenway along Washington Drive or an alternative alignment Improve the crossing at Murchison Road for pedestrians ȃ This could be a standalone project or be accomplished in tandem with a reconfiguration of Murchison Road to a 2-3 lane facility with a median and pedestrian refuges as recommended in the Murchison Road CROSS CREEK GREENWAY (PROPOSED) Study. Consider signage at the trailhead parking for the greenway and potential FSU signage welcoming people to the campus

BIG CROSS CREEK GREENWAY (FUTURE)

ALTERNATIVE ALIGNMENT OF CROSS CREEK GREENWAY ON OLD ROAD BED

Fayetteville Center City Parks & Trails

10


PERSPECTIVE OF PROPOSED TRAILHEAD ON FUTURE FAYETTEVILLE STATE STUDENT CENTER SITE

11

Chapter 3 Major Recommendations: Extend Cross Creek Linear Park


Page intentionally left blank

Fayetteville Center City Parks & Trails

12


HILLSBORO STREET RETROFIT Providing a direct link for pedestrians and bicyclists between the planned Cross Creek Greenway and Veterans Park to Hay Street is recommended. The Hillsboro Street corridor is the most direct connection. Converting the two-way road to a one-way road and retaining southbound movement is recommended. Recommendations Minimum path tread width: eight feet, generally ten feet but additional shy distance between bollards and fencing Typical shoulder width of trail: two feet Minimum setback from edge of roadway to edge of tread: two feet (with barrier) Minimum setback from railroad track centerline to obstructions or edge of trail tread: eight and a half feet Typical setback from edge of tread to obstructions, buildings, fencing: Typically three feet, two feet shown Existing Hillsboro Street Buffer area for vertical post: 1.5 ft - 3 ft preferred, two feet shown Vertical Post Spacing: Typically 10-40 feet, 15 feet recommended over 400 ft (approximately 26 posts) Fencing: can range between 36 and 48 inches, with 42 inches standard, approximately 400 feet is needed. Since fencing length is under 400 feet, no breaks or openings should be required for maintenance or emergency access Minimum alley standards for Fayetteville are 14 feet for emergency access – the design shows 13 feet but additional shy distance from the bollards makes the travel way approximately 14 feet. Additionally, the bollards are mountable and can be replaced if emergency encroachment is necessary. Design should be coordinated with railroad maintenance personnel, fire/emergency personnel and engineering infrastructure department

13

Chapter 3 Major Recommendations: Extend Cross Creek Linear Park

Sources: ȃ Rails-with-Trails: Lessons Learned, U.S. Department of Transportation, August 2002. ȃ Urban Bikeway Design Guide, NACTO, 2012. ȃ Separated Bike Lane Planning and Design Guideline, U.S. Department of Transportation, FHWA, 2015. ȃ Fayetteville Code of Ordinances, Development Standards


HILLSBORO STREET RETROFIT CONCEPT

The Hillsboro Street retrofit will allow veterans park and the cross creek greenway to be connected to Hay Street and festival park. Alternatives were studies that include a sidewalk connection along Rowan Street and a bridge or tunnel under the railroad tracks. The Rowan Street sidewalk is not an ideal connection for bicycles or pedestrians and a tunnel or bridge was too cost prohibitive.

Fayetteville Center City Parks & Trails

14


ACCESS IMPROVEMENTS Increased opportunities for parking, trailheads indication signage and other access improvements will make it easier for residents and visitors to find and use the parks and greenways along the system. Opportunities for new or enhanced trailheads are shown in the downtown area where public options for accessing the trail are currently limited. Enhanced signage is recommended at all trailheads. TRAILHEAD OPPORTUNITIES Mazarick Park - It is recommended that the Tennis Center area have a formalized connection with the trail and shared parking for recreational users. Senior Center - A redevelopment project presents an opportunity to coordinate a trailhead with access to the trail. Ensuring access and design for individuals with mobility impairments is critical. Rowan Park Connector - An opportunity exists on a buy-out site, however the crossing of Bragg Blvd presents a barrier to users who wish to access the rest of the system and downtown. Catalyst Site - The southern portion of this site could provide parking for recreation and trail use. Riverside Park - The only existing trailhead with formalized parking and signage for accessing the trail Cape Fear River Trail - An area along the river near the Fayetteville Police Training Academy presents an opportunity to provide parking and access for trail users along the new section of trail Arsenal Park - Opportunity for a trailhead and parking

15

Chapter 3 Major Recommendations: Access Improvements

TRAILHEAD SEARCH AREAS Mason Street/Ray Avenue - Limited opportunities exist for public parking in the downtown area although a number of private options exist. Identifying 10-15 spaces in the area around Mason St and Ray Ave can assist with access to trails, parks and historical assets in this area. N Kennedy Street/Adams Street - When planning and designing the Blounts Creek trail and neighborhood connection, it is recommended to look for opportunities to add parking and a trailhead for the neighborhoods who wish to access the trails from the south and east. FORMALIZE PARKING AND ACCESS Washington Drive/Dr. Martin Luther King Jr. Park - Mark the spaces along Washington Dr to assist with identification of parking for park and trail use. N Cool Springs Street - New paint for spaces and signage Gale Street - Signage for trail access already exists here; formalize parking spaces for trail use. Lamon Street - Signage for trail access already exists here; formalize several parking spaces along Lamon St for trail use. Limit parking at the stub end of the roadway to ensure the trailhead access is not visually or physically blocked by parked vehicles.


TRAILHEADS, PARKING AND ACCESS IMPROVEMENTS MAZARICK PARK

EXISTING AND PLANNED CROSS CREEK LINEAR PARK

GE C AV OMB E E

Proposed parking and trail acces from Tennis Center

ED

SENIOR CENTER

AND S

T

D NR

CATALYST SITE ST

ST

BR

ST ANN

TH VE

SON

T

T

StudyEfuture trailhead R S SEL Linear for Cross UCreek L ST Park with 10-15 parking spaces. Some existing on-street spaces.

S ST

Study future trailhead for Blounts Creek Trail connection

GS PRIN LS OO

CAM

PBE

OL

DW

LL A VE

LUC

AS

Street improvement to formalize on-street parking and trail crossing.

N KENNEDY ST/ADAM ST

ST

GILL ESPIE

ST

WIL LIAM

NT ST

TH

ST

MASON ST/RAY AVE

ELL S

SC

WS SLO

BLOU

ST

N COOL SPRINGS ST

T

WIN

ESO RO B RS T IVE MC

ONand parking ST

ST

USS

TH

Existing trailhead

LAM

GRO

PER WR

Proposed trailhead and parking

D

HAY

NS

BRADFORD AVE

On-street parking opportunities

TH DET S OUR DATMORM AREAGE A

GREE N

TH Y ST

RIVERSIDE PARK

ST

TH

MCGILVAR

HAY ST

ST

AVE

Trailhead opportunity ARSENAL AVE

ON

RAY

RO ST

HILLSBO

ARSENAL PARK

CAPE FEAR RIVER TRAIL

LAM

Parking planned with project WOODSIDE AVE

Existing Parking at Rowan Park, future trailhead opportunity at buy-out site

ST

TRAILHEAD OPPORTUNITY

NN R

TH

ORE

VETERANS PARK PHASE II

TH

ST

ROWAN PARK CONNECTOR

MO

Formalize spaces in gravel parking area for trail use

DU

TH

HILLSBORO ST

W ROWAN ST

GALE ST

Future trailhead and parking on southern end

BS

R UNE

Y RAMSE

Delineate On-Street parking along Washington

ONE-WAY STREET CONVERSION & GREENWAY CONNECTOR

D

DR. MARTIN LUTHER KING JR. PARK

EXISTING SIDEWALK

DEEP CREEK RD

BERL

S BROAD

CUM

ISO

LV D

ALT GREENWAY ROUTE

NR

GB

LAMON ST Delineate on-street parking spaces and restrict parking at trailhead entrance

ILM ING TO

AMES ST

AG

H RC MU

BR

DR

T

TH ANT

R PL

FILTE

FUTURE GREENWAY / MULTI-USE CONNECTOR

Proposed parking and trailhead. Coordinate with site planning.

ST

Fayetteville Center City Fayetteville Center CityParks Parks&&Trails Trails

16


ENHANCE EXISTING PARKS The Harry F. Shaw Cross Creek Linear Park is an incredible amenity for downtown Fayetteville. A primary task of the Center City Parks and Trail plan is to identify potential enhancements along the existing trail. A trail and park audit was conducted in the spring of 2020 to understand the usage, access and condition of assets within the Harry F. Shaw Cross Creek Linear Park. Additional site visits were made to Mazarick Park, MLK Jr. Park and Rowan Park to understand recent improvements and future opportunities. Findings and recommendations are included on the following pages. BEFORE AFTER

The addition of plantings along the cross creek linear park can help delineate public and private space and screen parking lots and other unsightly views. Low-growing evergreens, perennials and ornamental grasses can help screen objects while providing some transparency for safety purposes

17

Chapter 3 Major Recommendations: Enhance Existing Parks


TRAIL AND PARK AUDIT FINDINGS FOR HARRY F. SHAW CROSS CREEK LINEAR PARK Trail Width: ȃ The trail width is generally very narrow for the urban section of the trail, between 4-6’ generally, which includes some sidewalk connectors. Minimum trail width is generally recommended at 10’ with greater widths of up to 15’ for higher volume and urban sections. User Experience: ȃ The trail is not easy to follow through the urban section as it lacks directional signage and crosswalks. A street crossing improvement should be considered at Green St that adds clarity to how the trail passes between Art Park and the Cross Creek Linear Park Fountain. The trail could benefit from directional and confirmation signage and/or markings. ȃ Trailheads are not obvious to find, especially where sidewalk connectors are used. In the downtown area it is unclear if Festival Park parking can be used for trail access. Lamon St access is blocked by parked vehicles and there are no clearly delineated parking spaces or signage for trail users. Gale St access has signage but lacks delineated parking. It is unclear if Cape Fear Botanical Garden is a part of the trail network. Riverside Dog Park appears as a clear bookend to the existing trail. ȃ There is some consistency between surface materials and colors. More consistency is needed in furnishings and structures. Safety and Accessibility:

ȃ The accessible section of trail between Ann St and N Cool Springs St is not signed or included in mapping. ȃ The section of trail that has been disrupted by hurricane damage has extensive surface issues, including cracking and tripping hazards. A street crossing improvement should be considered at Green St that adds clarity showing how the trail passes between Art Park and the Cross Creek Linear Park Fountain. ȃ Most trail access is formal – only one informal access has been “created” by the Cross Creek Cemetery. ȃ The ADA accessible route adjacent to Meeting St is not signed or marked. ȃ Crosswalks needed at key street crossings with Ray Ave and N Cool Spring St. Maintenance: ȃ Most maintenance issues are minor repairs that include: • Board replacements • Asphalt surface repair • Replacement of informational signs needed • Water fountain at Riverside Dog Park is broken • General maintenance such as pruning, pressure washing or sweeping ȃ There are large sections of asphalt repair needed near the storm damage areas.

ȃ The section of the trail between Festival Park and Ray Ave has a short sidewalk adjacent to a roadway and lacks delineation, such as a curb or fence.

Fayetteville Center City Parks & Trails

18


TRAIL AND PARK AUDIT FINDINGS FOR HARRY F. SHAW CROSS CREEK LINEAR PARK

19

Chapter 3 Major Recommendations: Enhance Existing Parks


STRATEGIC IMPROVEMENTS TO THE HARRY F. SHAW CROSS CREEK LINEAR PARK Downtown (Hay Street to Cool Springs Street) ȃ Study potential widening of spine route through the Linear Park. Minimum trail width is recommended to be 10-12’ to accommodate bicycle and pedestrian travel ȃ Festival Park improvements including tree plantings and installation of stone stairs to address erosion and provide access to Cross Creek ȃ Install crosswalks at key street crossings with Ray Ave and N Cool Spring St. ȃ Plantings and furnishings • Screening of unsightly parking lots and dilapidated buildings • Addition of color through perennials, flowering shrubs and trees along trail and at key entry areas • Selective vegetation maintenance to improve sight lines • Planting of canopy trees where space allows • See Design Palette on page 55 for more information ȃ Study a potential trailhead with parking between Ray Avenue and Mason Street ȃ Wayfinding improvements (see page 43)

Stone or concrete stairs would provide a more visually appealing and functional alternative to riprap in areas of erosion and in areas of the trail where access to cross creek would be beneficial

Fayetteville Center City Parks & Trails

20


DOWNTOWN SECTION - CONCEPT

CROSSING SAFETY IMPROVEMENT

PLANTINGS

ARCH ST

FESTIVAL PARK

RAY AVE

CANOPY TREES

SCREENING

MASON ST

MASONIC LODGE PLANTINGS

ART OPPORTUNITY

MA

ART/ PROGRAMMING

21

Chapter 3 Major Recommendations: Enhance Existing Parks

WAYFINDING

N IDE

LAN

E

ART PARK


DOWNTOWN SECTION - RECOMMENDATIONS

SAFETY & ACCESS IMPROVEMENTS Ray Ave crossing improvement Study locations for trailhead and parking near Mason St/Ray Ave Wayfinding enhancements

PROGRAMMING OPPORTUNITIES/PRECEDENTS

ȃ Hay Street ȃ Near library (both sides of creek) ȃ Maiden Lane PROGRAMMING Esplanade

ENHANCED CROSSWALK (PAINT)

ART PRECEDENT FOR ESPLANADE

TIERED STEPS/HARDENED STREAM BANK

ART WALL/PROGRAMMING NEAR ART PARK

ȃ Public art opportunity on west side of Esplanade Festival park ȃ Stairs to facilitate creek access and bank stabilization PLANTINGS & SCREENING Entryway plantings Riparian plantings and canopy trees in Festival Park Screening ȃ Delineation of public/private space near Masonic Lodge ȃ Screening of parking lots ȃ Screening via plantings or fence near Maiden Lane property

Fayetteville Center City Parks & Trails

22


STRATEGIC IMPROVEMENTS TO THE HARRY F. SHAW CROSS CREEK LINEAR PARK Cross Creek Cemetery, Rowan Street and Lamon Street Area ȃ Replace boardwalk and repair asphalt section damaged by hurricane ȃ Consider a temporary reroute of the trail ȃ Study creek access under Rowan Street bridge • Study future Blounts Creek Greenway connection. This could include a multi-use path section and on-street parking along Hawley Lane and a future trailhead near N Kennedy Street and Adam Street ȃ Consider installation of stone or concrete stairs to Cross Creek at base of stairs near Lamon Street ȃ Wayfinding improvements (see page 43) Eastern Section (Lamon Street to Riverside Dog Park) ȃ Consider plantings to screen the Wastewater Treatment Plant • Meadow plantings could include native grasses and perennials with evergreens in the background • See the Design Section for more information ȃ Consider keeping trail open and rerouting along roadways until the stairs near Lamon Street are repaired ȃ Drainage improvements needed near Riverside Dog Park ȃ Study extension of trail north of dog park to Botanical Gardens

23

Chapter 3 Major Recommendations: Enhance Existing Parks

Meadow/prairie plantings could add visual interest in the vicinity of the wastewater treatment plant. Evergreen trees and shrubs in the background, higher on the slope could provide strategic screening


EAST SECTION - CONCEPT

EVERGREEN TREES FOR SCREENING

EXTEND TRAIL TO BOTANICAL GARDENS

N EA ST ER N BLVD

WASTEWATER TREATMENT PLANT

DRAINAGE IMPROVEMENTS MEADOW PLANTINGS

PLAYGROUND OR PROGRAMMING ENTRY PLANTINGS

Fayetteville Center City Parks & Trails

24


EAST SECTION - RECOMMENDATIONS

SAFETY & ACCESS IMPROVEMENTS Pave beginning of trail Grading and piping of stormwater from interior of trail Update signage and open trail (reroute until hurricane damage is repaired) Extend trail east to Cape Fear River Trail and eventually to Botanical Gardens PROGRAMMING & FACILITIES Repair/replace water fountain Addition of nature play area and/or shelter PLANTINGS & SCREENING Meadow planting with flowering perennial seed mix and cluster plantings of native grasses Seasonal sunflower planting Intermittent conifer specimen tree groupings to add visual backdrop and screen wastewater treatment facility

PROGRAMMING OPPORTUNITIES/PRECEDENTS

PLANTED MEADOW

NATURE PLAYGROUND

DOG PARK

GREEN STORMWATER FEATURE/WETLAND MULTI-USE PATH BESIDE ROAD

25

Chapter 3 Major Recommendations: Enhance Existing Parks


STRATEGIC IMPROVEMENTS TO MLK JR. PARK AND MAZARICK PARK Many of the recommendations from the Murchison Road/Bragg Boulevard Area Study remain relevant. These recommendations are included below along with updates and additional recommendations related to maintenance and how new and improved public spaces should relate to the Cross Creek Greenway extension and the planned FSU Health and Wellness Center. Mazarick Park ȃ Extend the greenway trail in Mazarick Park along the north side of Filter Plant Drive to the planned FSU Health and Wellness Center, south to MLK Jr. Park, then on toward to Veterans Park /Airborne and Special Operations Museum and Hay Street in downtown

MLK Jr. Park ȃ Study and fund enhancements to west bank of the creek including canopy trees, benches and furnishings, a new section of greenway, stream restoration, plantings, benches, and one or more covered picnic areas. ȃ Maintenance priorities include power-washing of concrete, turf repair and drainage improvements ȃ Study potential enhancements, cost estimates and phasing for unimproved land east of the creek.

ȃ Further study the expansion of Mazarick Park towards Bragg Boulevard and Filter Plant Drive with a tennis tournament facility accessible from the major road ȃ Establish a trailhead as part of the planned tennis facility along Filter Plant Drive ȃ Consider renaming Filter Plant Drive to FSU Way or Bronco Way and the realignment of Filter Plant Drive to a safer location with Bragg Boulevard to create a better gateway to FSU and allow Mazarick park to have a presence on Bragg Boulevard and/or Filter Plant Drive ȃ Explore a bridge connection between Lyon Street and Thelbert Drive across Little Cross Creek upstream from Glenville Lake ȃ Prioritize maintenance along the edges of Mazarick Park • Selective canopy enhancement activities and limbing could help open up views into the park and to the greenway • Removal of invasive species and the planting of native, flowering understory shrubs is also recommended. Dr. Martin Luther King Jr. Park Fayetteville Center City Parks & Trails

26


ART OPPORTUNITIES Increasing art installations, temporary and permanent, in and around the existing and planned Linear Park and future public spaces can help create a sense of place, enhance identity, and provide opportunities for cultural expression.

11. Art opportunity at new trailhead at planned tennis facility to tie to greenway/FSU. 22. Art opportunity at new trailhead on planned Student Health and Senior Center. 33. Art opportunity at FSU Gateway Feature. 44. Art opportunity in MLK Jr. Park Expansion. ȃ Consider a statue or sculpture of a local leader, associated with FSU, HBCUs or the city, church or local neighborhoods. This addition would link FSU and MLK Jr. Park

The Charlotte Trail of History features a statue of Thaddeus Tate, a local, prominent, African American entrepreneur.

together. 55. Introduce art and enhance the gateway at the view terminus from the intersection of Bruner Street and Murchison Road. 66. Art/gateway opportunity at intersection of Murchison Road and Bragg Blvd. ȃ There are art opportunities on all four corners, with priority at southwest corner to maximize the view from Rowan Street Bridge. 77. Art/programming opportunity at a key location on 27

Chapter 3 Major Recommendations: Enhance Existing Parks

the west side of Esplanade. 8 Create an enhanced crosswalk with painted mural. ȃ An enhanced crosswalk not only adds art to the streetscape, but could have a traffic calming effect. 9 Mural/wall art opportunity. ȃ Soften large expanses of blank wall area by introducing iconic wall art or mural Art opportunity at the new trailhead for 10 proposed Blounts Creek Greenway. Art opportunity associated with signage 11 and boardwalk improvements near Lamon Street. 12 Art opportunity near Dog Park.

BEFORE

AFTER

ȃ This could take on many forms thanks to the large area around the park, such as a sculpture, play art or art bench. Art opportunity in proposed Cape Fear River Park. 13 ȃ An art installation could help activate the Park and create a sense of place for the Eastern terminus of the linear park.


ART OPPORTUNITIES MAP

1

2

3 4 5 6 7

10

8

12

9 11 13

Fayetteville Center City Parks & Trails

28


NEW PARKS AND PUBLIC SPACES There are 1200 acres of publicly owned lands in the Center City study area (including properties owned by the City of Fayetteville and Cumberland County). Only a portion of these properties are developed as parks. A subset of these properties were studied as part of this plan. A number of these properties present opportunities for new parks. These opportunities are described in this section of the plan. Six primary opportunities are recommended as new parks, to fill programming gaps and make the Center City Parks system a destination for residents and visitors.

NEW PARKS AND PUBLIC SPACES KEY MAP

NEW PARK OPPORTUNITIES Utilize existing publicly owned lands for new parks to fill programming gaps and make the Center City Parks system a destination for residents and visitors

A

ȃ MLK Jr. Park Expansion ȃ City Gateway ȃ Catalyst Site/Stream Bank Park

B

ȃ Veterans Park Phase 2 ȃ Blounts Creek Greenway

C

ȃ Cape Fear River Park ARSENAL PARK

D E

29

Chapter 3 Major Recommendations: New Parks And Public Spaces


NEW PARKS AND PUBLIC SPACES

A

FSU CONNECTION AND MLK Jr. Park

B

CITY GATEWAY ENHANCEMENTS

FSU Student Wellness Center and Senior Center Dr. Martin Luther King Jr. Park enhancement and expansion

Murchison Road multi-use path and streetscape improvements Catalyst Site and Stream Bank Park City Gateway Park Connection to Veterans Park

C

VETERANS PARK PHASE 2

D

BLOUNTS CREEK GREENWAY

E

CAPE FEAR RIVER PARK

Accommodate trail through Veterans Park Phase 2 Hillsboro Street Trail Retrofit

Study the feasibility of connecting the existing Blounts Creek Greenway with the Cross Creek Linear Park in the vicinity of Rowan Street

New park adjacent to the Cape Fear River Person Street improvements to connect to Downtown

Fayetteville Center City Parks & Trails

30


G TO N

MLK JR. PARK EXPANSION

WA S H IN

FUTURE STUDENT WELLNESS CENTER/ SENIOR CENTER

DRIVE

MARTIN LUTHER KING JR PARK ENHANCEMENT AND EXPANSION

MLK JR. PARK

REE E ST

NEW TRAIL

BLU

ADDITION OF ON-STREET PARKING

T

TO MAZARICK PARK

TRAIL CROSSING

NEW DEVELOPMENT

31

Chapter 3 Major Recommendations: New Parks And Public Spaces

PICNIC SHELTERS


MLK JR. PARK AREA- RECOMMENDATIONS SAFETY & ACCESS IMPROVEMENTS Enhanced trail crossings along Washington Drive and Blue Street

PROGRAMMING OPPORTUNITIES/PRECEDENTS

ȃ Signage and painted crosswalk with curb extensions to reduce crossing distance ȃ Potential for pedestrian caution signals (HAWK) Stripe Washington for on-street parking and add ADA spaces and ramps at key locations to access future programming enhancements PROGRAMMING & PLANTINGS Existing plantings include Flowering cherries around MLK Jr. Park monument Introduce active programming features in MLK Jr. Park Expansion Plantings around entry points or key features (i.e. future monument and along roads or at key junctures) Street trees along Washington Drive and Blue Street Introduce color/pollinator plantings near Blue Street trail crossing SCREENING/MAINTENANCE Selective limbing and canopy enhancement along Cross Creek to improve visibility

CHERRY TREE IN BLOOM

SHELTER

PLAYGROUND

GREENWAY/PATH IN THE WOODS

Fayetteville Center City Parks & Trails

32


CITY GATEWAY - EARLY IMPLEMENTATION Below are steps for design implementation of landscape and hardscape design for the City Gateway area. 1. Identify area to be planted or designed. 2. Determine Plant Ecosystem ȃ Use the CCPT Design Palette to determine which plant communities occur on site and plant suggestions ȃ Identify which plants to consider from the palette • Canopy, Street & Flowering Trees (2-3) Oak Species – Street/Shade Pine Species – Street or Otherwise Dogwood, Cherry or Redbud - Flowering

• Shrubs (2) 4-6’ Tall – Screening/Flowering 3’ Tall – Flowering/multiple seasons of interest

• Grasses (2) 4-6’ Tall – Multiple seasons of interest 2-3’ Tall - Multiple seasons of interest

• Perennials (2)

4. Create schematic design for public spaces and identify locations for plant material or hardscape that won’t be impacted by any future development plans 5. Prepare site with the removal of invasive species and analysis of the location’s constructibility (is there rock, grading and drainage issues; poor soils) etc. 6. Decide if shade, screening, safety, or other functional needs are required for what you are trying to achieve. 7. Survey, detailed design and coordination ȃ Coordination with designer, contractor, engineers, soil scientists, and/or ecologists on specific construction and installation needs including how to mitigate conflicts with the built or natural environments (i.e. utilities, stormwater, floodplain, etc.) 8. Construct Design with Contractor oversight

3-5’ Tall – Flowering/multiple seasons of interest 2-3’ Tall – Flowering/multiple seasons of interest

ȃ Research additional plants if needed 3. Research and coordinate with any local or state agencies on any permitting items that need to be addressed

33

Chapter 3 Major Recommendations: New Parks And Public Spaces


PLANTING SUGGESTIONS FOR CITY GATEWAY (Urban Garden, Traditional Meadow & Piedmont Forest plant communities)

Quercus alba

Nyssa sylvatica

Juniperus virginiana

LARGE TREES

Cornus florida

Magnolia x soulangeana

FLOWERING TREES

Wax myrtle

Azalea grandiflora

SHRUBS

Indian grass

Splitbeard bluestem

Wavy hair grass

GRASSES

Purple coneflower

Blazing star

Iron weed

Maryland golden aster

Mistflower

PERENNIALS

Fayetteville Center City Parks & Trails

34


CATALYST SITE AND STREAM BANK PARK - CONCEPT

CONNECTION UNDER ROWAN STREET TO VETERANS PARK PHASE 2

NEW DEVELOPMENT

BR

UN

ER

ST

SOCCER/MULTIPURPOSE FIELD

ART/GATEWAY OPPORTUNITY

MU TRAIL CROSSING

RC

HIS

ON

RD R

STORMWATER DETENTION

BENCH WETLANDS

YOGA LAWN/ COMMON GREEN BR

35

Chapter 3 Major Recommendations: New Parks And Public Spaces

A

B GG

D LV

AN OW

ST


CATALYST SITE AND STREAM BANK PARK- RECOMMENDATIONS SAFETY & ACCESS IMPROVEMENTS Murchison Boulevard crossing improvement

PROGRAMMING OPPORTUNITIES/PRECEDENTS

ȃ Potentially implemented with streetscape upgrade /lane reallocation (convert 4 lane to 2-3 lane) ȃ Could include median/pedestrian refuge Trailhead and parking on catalyst site and/or beside Cross Creek Bruner Street sidewalks Connection under Rowan Street near railroad to Veterans Park Phase II

PLANTED MEADOW PLANTED MEADOW

PROGRAMMING & PLANTINGS Flowering trees and/or ornamental plantings at key entries Shelter and/or way-station facility Soccer field or multi-purpose field Entry feature and Common green Addition of canopy trees and street trees Bench wetlands along Cross Creek to restore creek and floodplain

ENTRY FEATURE

SOCCER/SPORTS FIELD

SCREENING & MAINTENANCE Understory and meadow plantings to reduce lawn maintenance and use of mulch MULTI-USE LAWN/YOGA GREEN

GREEN STORMWATER FEATURE/WETLAND BENCH

Fayetteville Center City Parks & Trails

36


STREAM BANK PARK - PERSPECTIVE VIEW FROM CORNER OF MURCHISON ROAD AND BRAGG BOULEVARD

37

Chapter 3 Major Recommendations: New Parks And Public Spaces


CITY GATEWAY - CONCEPT AND RECOMMENDATIONS SAFETY & ACCESS IMPROVEMENTS Landing area/plaza at the corner of Bragg Blvd and Rowan St Improved visibility and access to Rowan Park PROGRAMMING & PLANTINGS Street/canopy tress along Bragg Blvd edge Multi-purpose lawn Gateway/entry feature or statue

R

AN OW

ST

SCREENING & MAINTENANCE Understory and grass/meadow plantings to reduce VD BL lawn and use of mulch G AG BR Potential screening of Slow Joe Customs building, depending on future use

Fayetteville Center City Parks & Trails

38


NEIGHBORHOOD CONNECTIONS Improving connections between neighborhoods and existing and planned parks CONNECTOR TRAILS can help improve access to greenspace and provide alternative transportation Person St or Russel St (See Sandhills Regional Bike options. Facility improvements are recommended to reduce barriers and Plan) t0 connect to future Cape Fear River Trail improve access to the Cross Creek Linear Park and greater greenway network. Cape Fear River Trail Extension (See Sandhills Regional Improvements include buffered bike lanes, filling sidewalk gaps, retrofitting Bike Plan) trail to Arnette Park existing streetscapes, adding trail connectors and improving intersections. Many of these improvements have been called out in previous planning efforts. Blounts Creek Greenway Lucas St to connect to Blounts Creek Greenway Key facility improvements are called out on the following page along with reference information. Hay Street Trail (part of street retrofit) and connection to Arsenal Park BICYCLING ENHANCEMENTS INTERSECTION IMPROVEMENTS Russell St (See Downtown Fayetteville Circulation cut sheet; Sandhills Design Upgrade for all intersections: Stamped concrete or Regional Bike Plan, Downtown Plan) Roadway Reconfiguration to include preferred treatment applied to all intersections; will also buffered bike lanes assist with wayfinding Robeson St (See Downtown Plan) Green St (See Downtown Plan): buffered bike lanes Wayfinding Upgrades for all intersections: Use of Ray Ave (See Downtown Plan): buffered bike lanes medallions to indicate trail direction; use of directional GAPS IN THE PEDESTRIAN NETWORK Cumberland St, Ames St, Rowan St, Broad St, Williams St, Bruner St, B St, Lamon St - sidewalk gap to B St; wayfinding signage at cemetery (with trail detour signage) COMPLETE STREETS/STREET RETROFITS Murchison Rd (See Murchison Rd Corridor Study) Hay St (See Downtown Plan) - high priority street retrofit to utilize excess capacity Gillespie and Winslow St (See Downtown Fayetteville Circulation cut sheet; Sandhills Regional Bike Plan, Downtown Plan) Roadway reconfiguration to include buffered bike lanes, on street parking, planting strips and street trees Ramsey St (See Sandhills Regional Bike Plan, Ramsey Street Corridor Plan) 39

Chapter 3 Major Recommendations: Neighborhood Connections

signage at signalized intersections. Murchison Rd - Signalized at Edgecombe Ave Filter Plant Dr - RRFB Washington Dr - Mid-block Murchison Rd (with redevelopment of parcel at opportunity site) Bruner St - Unsignalized Ray Ave - Unsignalized Green St - Signalized Ann St - Unsignalized Meeting St - Unsignalized N Cool Spring St - Unsignalized crossing, accessibility improvements


NEIGHBORHOOD AND PLANNED GREENWAY CONNECTIONS

ED

GE C AV OMB E E

BIG CROSS CREEK GREENWAY

!

MAZARICK PARK

!

T DR

FILT

AG

! H RC MU

BR

AMES ST

LAN ER P

GB

CUM

BERL

AND S

T

D NR

ISO

LV D

!

Y RAMSE

! ST

ST

NER

BRU

!

ORE

ST

LAM

ROWAN PARK

VE

!

ST

ST

BS ELL

ST GS

D NR TO ILM ING DW OL

BLOUNTS CREEK TRAIL ST

!

IMPROVE INTERSECTION TO INCRESE SAFETY FOR BICYCLISTS AND PEDESTRIANS RETROFIT STREETS FOR BICYCLING CONNECTORS

PRIN LS OO LL A VE

SC

PBE

AS

NN R

S BROAD

ST GILL ESPIE CAM

LUC

D

ST

ST

WIL LIAM S ST

EXISTING SIDEWALK

T

T

T USS

NT ST

ALT GREENWAY ROUTE

ST

ELL S

ER

BLOU

FUTURE GREENWAY / MULTI-USE CONNECTOR

CAPE FEAR BOTANICAL GARDEN

! SON

USS

EXISTING AND PLANNED CROSS CREEK LINEAR PARK

CAPE FEAR RIVER TRAIL

ST

!

!

T

SLO WS

ON

GRO

PER WR

WIN

NS ESO RO B T RS

LAM

DU

Y ST

IVE

DET S OUR DATMORM AREAGE A

ST

HAY

MCGILVAR

MC

WASTEWATER TREATMENT PLANT

ST ANN

RAY

SEGRA STADIUM

ARSENAL PARK

BRADFORD AVE

ST

GREE N

ARSENAL AVE

CROSS CREEK CEMETERY

!

RO ST

FREEDOM MEMORIAL PARK

AVE

ON

HILLSBO

WOODSIDE AVE

ROWAN PARK CONNECTOR

MO

DEEP CREEK RD

HILLSBORO ST

W ROWAN ST

FILL THE SIDEWAK GAPS AND ENHANCE KEY PEDESTRIAN CONNECTORS INCREASE COMFORT FOR BICYCLING AND WALKING ON ARTERIAL CONNECTORS TO DOWNTOWN CONVERT TO ONE-WAY STREET AND ADD SEPARATED ON-STREET GREENWAY CONNECTOR

Fayetteville Center City Parks & Trails

40


DEVELOPMENT OPPORTUNITIES Targeted infill and redevelopment can help activate public spaces in the Center City. Below and on the map on the subsequent page are key development opportunities adjacent to existing or planned public spaces. 1. 1 Infill and redevelopment should be encouraged on the blocks west of Murchison Road, across from FSU. Additional student housing, retail, and other goods and services could help transform Murchison Road into the university’s “Main Street.” See the Murchison Road/Bragg Boulevard Area Study for detailed recommendations. 2. Potential redevelopment or infill of property 2

across from MLK Jr. Park. Coordinate with Cumberland County on future uses of the site. Multi-family could help accommodate housing needs near FSU and help activate MLK Jr. Park.

3. Potential reuse of part of the old Senior Center 3

site for development. Once the senior center is relocated to the new site, this property could be considered to be sold to private development. Proceeds from selling part of this City property could help fund park improvements or affordable housing units here or elsewhere along the corridor.

4. The majority of the portion of the Catalyst Site 4

north of Bruner Street is located outside of the 100 year floodplain. This site could accommodate student,graduate, or faculty housing.

41

Chapter 3 Major Recommendations: Neighborhood Connections

55. Redevelopment on the north side of Cross Creek, outside of the floodplain could help expand residential options and build the job base near downtown.

66. The Downtown Urban Design Plan called for

infill and redevelopment to create a residential neighborhood on the east side of downtown along the edge of Blounts Creek. A Downtown Tier 2 district is recommended to allow for a variety of urban residential options.


DEVELOPMENT OPPORTUNITIES MAP

1

2 3

4

5

6

Fayetteville Center City Parks & Trails

42


WAYFINDING AND BRANDING Refining the wayfinding system for the City of Fayetteville’s Center City Parks and Trails must consider the complexity of the trail network, the variety of facilities and various contexts across the linear park system, as well as the various types of signage that is already in place. The system also needs to anticipate the changes that facilities and the trail network will undergo in the future. As part of this plan, on-site surveys were conducted to examine the facility as well as audit the existing signage and points of access where new signage is necessary. Current wayfinding methods in use at various networks of parks and trails in urban environments and cities around the country were also studied. The primary purpose of a wayfinding system is to move the public through a system of varying paths (i.e. trails, greenways, roadways, sidewalks, etc.) and environments (i.e. parks, plazas, urban areas, etc.) using a concise and comprehensive family of directional, informational, and confirmational messages. There are three dominant methods for organizing wayfinding information along trails: 1) color-coding based on function; 2) using the names of parks and nearby attractions as wayfinding destinations; and 3) organizing information into hierarchies of destinations or messages and display types. There are various advantages and disadvantages to each; however, the hierarchical approach is typically best to meet the demands of multiple messages and is strongly recommended for implementation along the

43

Chapter 3 Major Recommendations: Wayfinding And Branding

Cross Creak Linear Park trail network as well as neighboring facilities that people will use to access the trail. Consistent use of standard terminology within the wayfinding system will simplify the process of making the transition from the park facilities to the trail network (and vice versa) for users. It is important for this sign system to adhere to a basic guideline of copy styles and sizes, consistent terminology, recognizable and universally acceptable symbols and uniform colors for standard functions. Colors should be chosen to compliment the City of Fayetteville’s brand but also to contrast against the backgrounds of both the natural and urban environment while keeping in mind ADA guidelines for colorblind users. Whenever possible, message content must be presented in layman’s language, equally understood by both the seasoned trail user and the firsttime guest. Wayfinding and Branding Recommendations: Augment existing “you are here” signage with orientation signage including directional and confirmational signage Develop an overall trails wayfinding and branding scheme with sub-brand for individual trails ȃ Preliminary recommendations for wayfinding signage are included in this plan. These recommendations should influence the design of signage along the northwest Cross Creek Greenway extension ȃ A more comprehensive wayfinding plan may be beneficial prior to incremental changes to signage for existing parks and trails and determining wayfinding associated with future trail connections


EXISTING SIGNAGE AND LOGO Proposed leaf to be extracted for the medallion is highlighted

Y F. S H R AW AR

O

S

S

Locational Signage

COLOR A bright blue was chosen to compliment the City of Fayetteville’s dark blue primary color and the existing green of the linear park logo while offering high visibility and strong contrast against the background and other competing elements. Pantone 115-7 C RGB: 0 166 226 Hex: 00A6E2 CMYK: 83 0 0 0

Pantone 157-8 C RGB: 154 190 38 Hex: 9ABE26 CMYK: 48 0 100 0

PA

CR

RK

H

Primary Signage

MEDALLION CONCEPT A simple circular medallion is recommended that compliments the existing logo. The medallion would be used to highlight the trail on both directional signage and on the pathway itself.

CR

EEK LINE

AR

TYPEFACE Helvetica Rounded LT Std was chosen based on precedents from the National Park Service and the Frome Bikeway. ABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwxyz 0123456789

Fayetteville Center City Parks & Trails

44


ROAD MEDALLION CONCEPT Example of the one-way conversion on Hillsboro Street, using a logo medallion to mark the path. Intersection of Hillsboro and Hay Street.

H

A

RR

Y F. S H

AW

DIRECTIONAL SIGNAGE CONCEPT Example of messaging for directional signs that would be placed on Hay Street prior to intersection with Hillsboro to aid cyclists and pedestrians in navigation. Eastbound AR

R Y F. S H A W

H

AR

R Y F. S H A W

EEK LINE

AR

K AR

S

P

K

AR P

AR P

CR

S

S

O

AR

CR

EEK LINE

S

S

CR

O

O

S

CR

CR

K

H

Westbound

CR

EEK LINE

AR

Airborne & Special Ops Museum

Amtrak Train Station

NC Veterans Park

Segra Stadium

Freedom Memorial Park

Festival Park

Greyhound Bus Station

Downtown District

PRECEDENT IMAGERY Direction signs are mounted to existing light fixtures and simple circular logo medallions are used to mark the path.

45

Chapter 3 Major Recommendations: Wayfinding And Branding


LARGE WAYFINDING SIGN CONCEPTS These larger wayfinding signs could be constructed of wooden or metal posts with a metal printed sign. Changing the angle of the posts is a cost-effective way to create a more unique and engaging sign.

SPUR TRAIL MEDALLIONS AND MILE MARKERS WITH WAYFINDING Alternate medallions could be designed to designate other trails that the Cross Creek Linear Park connects to. These symbols should complement the CCLP medallion and contrast in color.

MILE

2.3 River Trail

AR

S

S

PA

RK

CR

O

PE CA

R Y F. S H A W

H

Cape Fear

CR

E EK LI NE

AR

FEA

Cape Fear Botanical Garden

5

R

Blounts Creek Trail

4 Festival 3.2 Park

Veterans Park

3 Segra Stadium Festival Park Blounts Creek Trail

RI

VER

TR

L AI

O N C O W AY BR

You Are Here

2.3

Cape Fear Botanical Garden

2

K

K LINEAR PAR

CROSS CREE

Cape Fear River Trail

Rowan Park Connector

Big Cross Creek 1.4 Trail

1.2 Mazarick Park

COMBINATION MILE MARKER AND MAP Combination mile marker, trail map, and wayfinding sign. Precedent: Denver C-470 Trail.

Cross Creek

Fayetteville Center City Parks & Trails

Bronco Way

1 Linear Park

46


Existing Signage

! (

! ( ! (

Proposed Greenway

! (! ( !

ST

!

ek

YA VE

B AY

NE LO

ST

T YS ED

RS

ON

NN

PE

ST

! ( !

! (

! ( ! ( S !

CH OO

L

AR C ross C reek

N KING ST

!

! ( !

! ( !

! ( ! ( !

! ( !

MA S

ON

ST

GON MA IDE RLHN AM 1 inch = 667 feet

N ST

!

And Branding

RA YA VE S S

BU LIN K

! (

N I9

5 OR

TERN B LV D

Y

ST

T KS

IE S T

GILL

E SP

Chapter 3 Major Recommendations:

W PK F JO NE S Wayfinding

I FA 95 B

AL

FA L MIN

! ( ! ( ! (

! (

! ( ! ( ! (

T

! (

LE

T

ST

ST HAW

!

OT TIS

H IL LS

EPATH S

ON ST

!

!

Y LN

DS NA L

ST

TRL

! ( !

T

ST E LL XW

ES T

!

! (

! (

!

OV

!

!

! (

NS T

ST

! (

GR

C ro ss Creek ! (! (

!

!

!

!

WA

T

N COOL SPRING ST

GR E !

!

! (

MA

NM A R

(! ( !! (

! (

!

!

MEETING ST ! (

DO

47

LL

PE N

SS T LIA M W IL

SE

T

!

! (! (

ST

US

IN S

!!

!

!

!

W

WR

NKL

!

! ( ! (

( ! (! ! ( ! ( ! ( ! ( ! ( !

! ( ! ( ! (! (! (( ! ( !

! (

! (

BO

FR A

OLD ST

T

K PL

PIT

TM

HA YS

ANDERSON ST

BURGESS ST

AN

ST

! ! (

!

eek Cr

MAIDEN LN

s nt

EN S T

!

( !

C ro ss Creek ! (! ( !

ou

! ( ! ( ! (

Bl

!

NS T

ION

! (

RO

IL S

A LY

BE V

AM

WA

UN

ST

CH

RH

AR

ON

RO

RA YA VE

! ( ! ( !

BS

! (

LE

K PO INTE

ION MA S

!

CRE E

! (

BB

MA

BA

ST

CH AR

UN

GO

!

PE

T

!

! (

L TR W IN DIN ING G S PR

! ( ! ( ! (

TRL

T NS AN

LN ES

! ( ! ( !

! ( !

ST

!

RG

RA YA VE

! (

ES T

ES T

EY ST

!

! (

CHATHA M S

Cross Creek ! (! (

OR

T

ST

OR

RAM S

NS T

MO

MO

Storm Damage

! (

NORTH ST

GA LE ST

WE B B

!

ON

IC ST

!

!

( !

M EC

! (

! (

LA M

WA

UNDERW OOD ST

Greenway Detour

Cross C re

RO

ORANGE ST

Greenway Access

M EC

Confirmation

Confirmation

CHATHA M S

CHATHA M ST

!

Existing Greenway

S ST

! (

Directional

Directional

HA N

!

US

!

Primary

FRINK ST

HILLS BORO ST

! (

T

IC ST

M EC ES T

CHANC E S

Informational

HA N

! (

EY ST

OR

! ! (

GRAY ST

T

Alignment in Development

Primary

Proposed Signage & Wayfinding ! (!

RAM S

MO

! ! (

Primary

ORANGE ST

ST

Storm Damage

HILLS BORO ST

! (

Confirmation

!

! (

Proposed Greenway

WE B B

NORTH ST

Directional

!

IC ST

! (

TILLINGHAST ST

Greenway Detour

HA N

Primary

! (

Greenway Access

FRINK ST

Existing Greenway

CHANC E S

Informational

Proposed Signage &(Working) Wayfinding Greenways

Existing Signage MARSH ST

Informational

Primary

! (

IRENE ST

POPE ST

Alignment in Development

ORANGE ST

! ! (

Primary

FRINK ST

HILLSBORO ST

SIGNAGE & WAYFINDING Existing Signage Greenways (Working) A sign audit was conducted along the existing Cross Creek ! ( Linear Park. Existing signage types are noted along with CHANCE ST ! ( proposed primary, directional and conformational signage Proposed Signage & Wayfinding locations. UNDERW OOD ST

Green


TRAIL DESIGN, PLANTINGS AND FURNISHINGS A variety of paving, light fixtures, furnishing and planting design approaches can be seen in parks and along the existing Harry F. Shaw Cross Creek Linear Park. It is recommended to standardize the approach to trail design as well as materials including paving, lighting, furnishings and planting design in order to help create an identity for the Center City Parks and Trails system that is readily recognizable to residents and visitors. Detailed recommendations for standardizing these trail elements are included in Chapter 5, the Design Palette. Highlights of recommendations include: Standardize the use of hardscape materials and lighting fixtures

CENTER CITY PARKS & TRAILS MASTER PLAN Design Palette

PAVING

LIGHTING

FURNISHINGS

PLANTING DESIGN

ȃ Coordinate the use of poured concrete, brick and other surface materials to match existing trail segments and compliment the history of the City ȃ Plan for safety and aesthetics when selecting lighting fixtures Standardize the use of furnishings throughout the system ȃ Functionality, cost and maintenance should be factored in to furnishings in public spaces and suggestions for private, trail-side establishments Tell a plant story ȃ Tell a story of place through plant selection and use of colors ȃ Journey through restored, remnant ecosystems from the piedmont to the coastal plain in 3 miles along the trail ȃ Increase tree canopy ȃ Employ selective tree “limbing” to improve safety and canopy enhancement in Mazarick Park and along Cross Creek Utilize guiding principles and aesthetic and function recommendations for gateways, fences, railings, stairs and walls

Fayetteville Center City Parks & Trails

48


4

IMPLEMENTATION The implementation chapter gives details on how to move from the master planning phase of the project into design, construction and beyond. The Center City Parks and Trail Plan document serves as a guide to policies and decision making processes to help advance the vision and goals for the development and construction of the trail. The plan creates a framework for the next phase of the project. This document does not take the place of detailed and accurate design and construction drawings for the trail or contextual spaces. Much information still needs to be gathered and utilized to develop such drawings. In addition, stakeholder outreach and public involvement should help to inform the final design and programming of public spaces.

49

Chapter 4 Implementation: Wayfinding And Branding


NEXT STEPS Coordination and corridor preparation Develop a capital improvements plan for the corridor Develop a fundraising campaign in coordination with stakeholders and nonprofits Conduct public engagement activities to refine designs, determine programming and implementation priorities Develop RFPs for the design and construction drawings needed to construct various trail and park projects with the use of this document as a guide Establish final construction costs for various phases of the corridor projects Develop an Operations and Maintenance Plan and Program Execute construction of various trail and park projects

MEASURES OF SUCCESS Tracking implementation of the Center City Parks and Trails Plan should be a priority. The City Council and City of Fayetteville staff should evaluate progress toward these action items and the goals of the plan on an annual basis. Quantitative statistics and a qualitative discussion of progress on should include: Linear feet of greenway designed and constructed Access to parks # or square feet of public space improvements # or square feet of plantings or trees added to public land Fayetteville Center City Parks & Trails

50


ACTION ITEMS PHASE/TASK

SUBTASK

Coordination and Stakeholder Engagement Coordinate with FSU on Student Wellness and Senior Center Site

Refine design of site to locate trailhead on site and greenway connection between FSU, Filter Plant Drive, and Washington Drive.

Rename Filter Plant Drive Rename to Bronco Way or FSU Way Coordinate with NCDOT on crossing of Murchison Road, potential streetscape redesign and intermediate pedestrian crossing improvements Coordinate with NCDOT to finalize trail crossing on Murchison Road in the vicinity of Bruner Street

FSU and City*

2021

FSU, City, NCDOT

2021 2021

FSU, City*, NCDOT

2021

Work with Fayetteville State University and other stakeholders to refine plans for new development and parks spaces along Murchison Road

FSU and City*

2022

Coordinate plans for connections and design compatibility with other trail networks and their organizations

City and Key Stakeholders

2022

Cape Fear River Trail

City Departments, Cumberland County, and Stakeholders

2021

Big Cross Creek Greenway

City, NCDOT, FSU

2021

Blounts Creek Greenway

City, NCDOT, and Neighborhood Stakeholders

2022

Conduct stakeholder outreach along the planned greenway corridor and in neighborhoods near proposed new parks to refine plans, determine design and programming of public spaces and prioritize improvements

City*

2021

Prepare the corridor by conducting an inventory of heritage trees, selective limbing, canopy enhancement (tree planting) and removal of invasive species

City*

2021

City*, NCDOT, and Stakeholders

2021

City*, NCDOT, FSU

2021

City and Non-profits

2021-2022

Coordinate plans for connections and design compatibility with other trail networks and their organizations

Early Implementation Conceptual design for planting improvements and phasing Develop a design package needed for construction that includes: City Gateway Site Phase 1 art opportunities, programming, materials, lighting, plantings and furnishings Funding Program & Construction

*City of Fayetteville to lead, may require external consultants to assist with design, engineering and/or CE tasks. 51

Chapter 4 Implementation: Action Items


PHASE/TASK

SUBTASK

Greenways Wayfinding Plan

Cross Creek Greenway Extension

Refine wayfinding and branding recommendations from the CCPT Plan

City and Consultants

2022

Segment 1A | Mazarick Park to Murchison Road

FSU and City*

Segment 1B | Murchison Road to Veterans Park

City*

2021-Design & ROW

Segment 1C | FSU Connection

FSU and City*

2022-Funding & Construction

Segment 1D | Veterans Park Phase 2 and Hillsboro Street Segment

City*, NCDOT, and CSX

2022-Design & ROW

City*

2023-Funding & Construction

Phasing Plan and Design

City* and Linear Park Corporation

2021-2022

Funding Program & Construction

City and Non-profits

2021-2022

Update and formalize maintenance plan for the Cross Creek Linear Park and associated public spaces

City* and Linear Park Corporation

2023

Feasibility Study to refine preferred connection to Cross Creek Linear Park

City* and Linear Park Corporation

2023

Design and Construction Drawings

City*

2024

Funding Program & Construction

City*

2025

Segment 1E | Hay Street Connection

Cross Creek Linear Park Improvements

Blounts Creek Greenway

Coordinate PPP with Botanical Gardens Cape Fear River Trail from Design and Construction Drawings Botanical Gardens to Joint Funding Program with Botanical Gardens Cape Fear River Park Construction

City* and Botanical Gardens City* and Botanical Gardens

2021 2021-2022 2022-2023 2024

*City of Fayetteville to lead, may require external consultants to assist with design, engineering and/or CE tasks.

Fayetteville Center City Parks & Trails

52


PHASE/TASK

SUBTASK

Park Improvements Conceptual Design Veteran’s Park Phase II

Identify Program elements

Identify Program elements

Catalyst Site

Stream Bank Park

City Gateway Site Phase 2

City*

Design and Construction Drawings per phase Funding Program & Construction

Dr. Martin Luther King Jr. Park

2020

Design and Construction Drawings per phase

2020 City* and Non-profits City* and community representatives

2021 2021-2022

Funding Program & Construction

City* and Non-profits

2023

Adjacent Site Public Private Partnership (PPP) Opportunity; City to coordinate with Cumberland County

City*, County, and Stakeholders

2021-2022

MOU/Letter of Interest from FSU for partnership for recreation and housing on Catalyst Site

FSU, City and Stakeholders

2021

Identify Program elements

City* and FSU

2021

Rezoning with additional public stakeholder engagement

2022

Design and Construction Drawings per phase

2022

Funding Program & Construction

2022-2023

Additional public stakeholder engagement

2022

Identify Program elements

City*

2022

Design and Construction Drawings per phase

2023

Funding Program & Construction

2025

Schematic design of future improvements to City Gateway Site Construction Drawings Funding Program & Construction

City* City* and Non-profits

*City of Fayetteville to lead, may require external consultants to assist with design, engineering and/or CE tasks. 53

2020

Chapter 4 Implementation: Action Items

2023 2023 2025


PHASE/TASK

SUBTASK

Conceptual Design Cape Fear River Park

Rowan Park Improvements

Identify Program elements

2021 2021

City*

Design and Construction Drawings per phase

2022

Funding Program & Construction

City* and Non-profits

2025

Design and Construction Drawings per phase

City*

2023

Funding Program & Construction

City* and Non-profits

2025

Other Corridor Improvements 2021

Art Opportunities

Coordinate with local artists, Cool Springs Downtown District and City, Linear Park Corporation, Cool the City of Fayetteville Linear Park Corporation to raise funds and Springs Downtown District and Non-profits establish a grant process for art in the Center City Parks system.

Tree Plantings

Plant trees on public lands and in right-of-way where there are no City* and Non-profits existing or future programming conflicts

2021-2026

Coordinate with NCDOT on all other street crossings and safety precautions at the crossings

2022

Coordinate with NCDOT on sidewalk connections and Bike Lane upgrades on recommended streets

City*, FAMPO, NCDOT, FSU and other Stakeholders

Coordinate with Public Works and NCDOT on ROW widths to accommodate additional street tree plantings Neighborhood Connections

2022 2021-2022

Coordinate with NCDOT on street signage and markings

City* and NCDOT

2021-2022

Coordinate with landowners on potential trailhead parking lot improvements

City*

2021-2022

Design and Construction Drawings for street and sidewalk improvement projects

City* and NCDOT

2022-2026

ROW needs

City and NCDOT

2021-2022

Funding Program & Construction

City, FAMPO and NCDOT

2022-2026

*City of Fayetteville to lead, may require external consultants to assist with design, engineering and/or CE tasks.

Fayetteville Center City Parks & Trails

54


CENTER CITY PARKS & TRAILS MASTER PLAN

Design Palette

Fayetteville Center City Parks & Trails

55


5

DESIGN PALETTE The following Design Palette should be utilized by City staff and contractors to coordinate the selection and design of materials, furnishings, plantings and other elements within the Center City Parks system. Existing materials and conditions within the corridor were evaluated and leveraged to create a palette of hardscape materials, lighting fixtures, furnishings, plantings and other elements that can help define the “brand” of the parks, trails and public spaces near Downtown Fayetteville.

56

Chapter 5 Design Palette:


MATERIALS

PAVING

LIGHTING

FURNISHINGS

PLANTING DESIGN

Fayetteville Center City Parks & Trails

57


HARDSCAPE Wood

Poured Concrete

Brick

58

Chapter 5 Design Palette: Hardscape


Concrete Pavers

APPLICATION AND USE

A hierarchy of application and detail along with a designed pattern that compliments the corridor as well as individual park spaces should drive how connections are made and outdoor spaces are enlivened. NEED AND FUNCTION Support a hierarchy of pathway design based on connectivity and use Gravels & Grit

Material elements compliment the history of Fayetteville and the modern elements of the park spaces being created A palette of materials should be selected to provide a common theme for the corridor yet allow variation in other designed spaces LOCATION AND VISIBILITY Corridor trail, walkways, patios, walls, fountains, signage, plazas, and crosswalks

Grass Banding

Distinguish uses between public and private spaces. Emphasize at grade crossings, support high-use areas, and help differentiate between vehicles, pedestrians, and bicycle travel lanes Fayetteville Center City Parks & Trails

59


LIGHTING Architectural Lighting

Lamp Posts

60

Chapter 5 Design Palette: Lighting


Landscape Lighting

Pathway Lighting

APPLICATION AND USE

Lighting elements help enliven places at night when other designed elements are not as visible. A hierarchy of lighting ideas should be developed for the corridor leading you through spaces and to places while keeping you safe. Softscape lighting may be used in certain locations to make some areas of the corridor worth visiting at night. NEED AND FUNCTION Lighting should be designed and located based on safety needs and aesthetic purposes Key lighting element can be used as a repetitive fixture(s) throughout the corridor Artistic lighting can be a focal point for park spaces and define their location Have elements to hang festival lighting for events LOCATION AND VISIBILITY Public walkways and parking areas will need lamp post lighting with some bollards for egress Accent lighting can be used for trees, entrances or in areas where visible plantings will want to be displayed at night Lighting in public Right-of-Ways will need to be coordinated Businesses can utilize similar lighting options that fit within the area of the corridor to help drive their business Fayetteville Center City Parks & Trails

61


FURNISHINGS Benches

APPLICATION AND USE

A palette of furnishings should be developed for the public realm with more flexibility given to various options for private use. NEED AND FUNCTION For the corridor and park spaces, connections, benches, litter and recycling furnishings will be desired Private businesses will want their own furnishings but should relate to the sections of the corridors style Large public gathering spaces may need furnishings based on the design and use of the spaces Custom built-in benches can serve as a supportive alternative to pre-fabricated furnishings LOCATION AND VISIBILITY Seating will want to be visible and convenient for walkways and public spaces. Restaurants and bars will want to make their seating areas visible to attract business

62

Chapter 5 Design Palette: Furnishings

Change to concrete seat wall (cheaper and less maintenance)..


Bicycle Racks

Tables, Umbrellas and Chairs

Litter and Recycling

Fayetteville Center City Parks & Trails

63


Plants in the Landscape OVERVIEW AND APPROACH

PLANTING DESIGN STRATEGIES

The Center City Parks and Trail Plan (CCPT) is a linear trail that takes you from Mazarick Park to the Cape Fear River. This trail traverses from the Piedmont to the Coastal Plain in three miles, where users will experience a series of plant communities as they travel to multiple parks and destinations. The steps for planting design are as follows: 1. Research to identify the plant communities present or recommended. 2. Identify the intended use of designed spaces and the locations of plants to be used to reinforce corridor goals of visibility, entrances, connections, and wayfinding for ‘branding’ the identity of certain park spaces. 3. Select specific plants for these applications based on the plant community and designed use. Perform necessary soil amendments and other preparation during installation. 4. Monitor and maintain the plantings regularly and modify future selections based on performance.

The planting approach outlined provides a process for the use of plants in the landscape that will support native ecosystems, wayfinding, and designed spaces found throughout the Center City Parks and Trails system. This approach will help guide the research, design, installation, and management by both public and private sector partners working on future improvements to the system. 64

PLANTING APPROACH 1. Research 2. Design & Application 3. Installation 4. Planting Management

Chapter 5 Design Palette: Plants In The Landscape

Planting design for the corridor is based on many factors. A plant’s color, texture, size, seasonality and maintenance needs should be considered. The planting design approach should illustrate placing plants in a manner that develops micro-ecosystems in the landscape for the benefit of plant health. This is done by layering plants around each other allowing soils to stay moist, shade to be provided and animal/ insect habitats to thrive. The design of these plant communities can be more natural looking through a variety of plants or more manicured with less of a variety depending on the design intent. The application of plants and certain palettes will pertain to the location and use within the landscape. Plant palettes are developed for each plant community described later in this chapter or for specific design approaches along the corridor.

PLANTING DESIGN PRINCIPLES 1. Color 2. Seasonality 3. Texture 4. Size 5. Contrast 6. Balance 7. Hierarchy 8. Repetition 9. Proportion 10. Pattern


COLOR & SEASONALITY

Throughout the trail system, plant color will be used to accentuate aspects of the trail during each season. Color will be used to enhance entrances, specific borders and areas of activity where visibility is increased. Certain colors may be used as ‘focal’ species that help users identify that they are on the right trail as they move through various parks, spaces and destinations. Selecting a diverse color palette is a critical step of enhancing the aesthetic qualities of the trail. The seasonality of a plant is the way that a plant changes and grows through the year’s seasons. While varying from species to species, qualities such as multiple bloom times throughout the year, fall color, spring flowers, summer scents, and other seasonal characteristics such as berry or fruit production, can add interest and increase biodiversity in the built and natural landscape. Planting strategies should take into consideration the seasonal characteristics of each species prior to its inclusion in the landscape. TEXTURE

Within the trail corridor, a rich and diverse palette of plant shape and textures should be applied. Techniques for varying textures within the landscape include adding detail at areas of high activity, clustering plantings to exaggerate the texture of an individual plant, or using physical characteristics of the plant as a deterrent to access. When considering plant selection and overall planting strategies for the trail corridor, including a diverse textural palette of planting selections will provide a unique user experience. SIZE

Consideration of mature plant size should always be considered during the plant selection process. Combining design elements such as texture, size, and seasonality can have a large impact on the aesthetic functionality of a given space. Ensuring that plant selections have enough space to thrive is an important part of the strategy. OTHER DESIGN PRINCIPALS

There are other design principles that will guide the development of planting strategies within the corridor, including perspective, contrast, balance, hierarchy, repetition, proportion, pattern, and unity - among others. These different strategies should all be fully explored within the overall and specific planting decisions for the corridor enhancement. Each principle offers a unique perspective when considered along with specific plant species or groupings of species. Ensuring that these design guiding principles are considered within the landscape overall strategy will have a positive affect on how the corridor is enjoyed and appreciated by visitors.

Fayetteville Center City Parks & Trails

65


VIEW ENHANCEMENT

MANAGEMENT

The planting strategy of spaces along the trail corridor should strive to highlight viewshed opportunities, improve pedestrian nodes, entryways, and common spaces, and enhance the user experience. When practical, attempt to screen the view of undesirable visual elements such as parking, fencing, or trash collection from the corridor’s public open spaces and walkways.

Plant management is important for the ongoing success of the plants. Often times, plants are neglected once installed or when improper use of the design cause plants to be stressed and die. Best Management Practices (BMPs) will want to be utilized for the care and protection of the city’s investment. It will be important that the city’s horticulturalist and design professionals stay involved in the health of the designs to see how well these plants succeed and decide if changes need to be made for replacements. Any plants to be replaced or the design to be adjusted should be done in support of the design intent and continuity can be carried forward. This will also have to be measured against more substantial design changes to support a new set of needs for these spaces. Proper planting technique, cost management and appropriate maintenance guidelines are key to proper plant management. Where invasive plants are removed or understory brush is cleared, the native habitat will need to restored and ongoing maintenance will need to be done in order to make sure those invasive plants or nuisance brush do not re-establish. The design of planting beds will need to be done in such a way that reduces the need for mulch and weeding. Spacing plants, layering close together and providing diversity in the beds allow for micro-ecosystems to develop where each plant plays a role. Watering needs can be reduced, mulch needs can be minimized, removing noxious plants can be minimized and pests can be kept at a minimum through proper planting techniques.

INSTALLATION

Plant installation methods will pertain to those plants being selected for their specific use within the landscape. Correct techniques for proper soils, handling, and planting bed preparation will need to be included in the specifications and drawings for construction. This will help ensure the success of the design and that the financial investment is not wasted. BOTANIC & CULTURAL HISTORY

The trail connects and identifies a number of historical moments along the corridor. Many of these historical activities have taken advantage of the local geography and changed the native habitat from what it once was. The planting palette of each plant community will look to support respected historical features that are to be saved while re-establishing native plant material in these ecosystems.

Most plants thrive when planted in spaces to allow their full form to be grown. Pruning of shrubs and trees can often be expensive and proper spacing of plants while allowing their full form to grow is ideal. The designs of spaces throughout the trail corridor should focus on allowing plants and beds to be created with less pruning, weeding and mulching in mind.

66

Chapter 5 Design Palette: Overview And Approach


RESTORATION & PROTECTED AREAS

MIYAWAKI METHOD

Restoration of destabilized features of the landscape is needed in various locations throughout the corridor. Cross Creek and it’s tributaries have at various times over-flowed their banks due to an increase in stormwater surge from impervious surfaces and large storm events. These incidents have eroded the stream banks and damaged property along the creek. Bank stabilization will need to be utilized to restore these areas to structurally sound conditions. Through design and appropriate maintenance, plants within the Streambank plant community will be part of the solution to bank restoration. In some locations, the stream bank will be armored with other material to allow for plants to grow or visitors to engage the water. Promoting a delicate balance between engaging with the water and protecting it from impact will be a challenge in all areas of the Cross Creek corridor. It is likely that these and several other locations within the corridor will be protected waterways and lands. It is important to research all local, state, and federal guidelines regarding protected areas. When applicable, ensure and promote a minimum disruption to the natural environment within each of these areas.

When utilizing the Miyawaki Method, a plant list of native species is developed within four categories: main tree species, sub-species, shrubs, and ground-cover. Fifteen to thirty native species are included. The density of the seedling plantings is much greater than typical landscape installations, to ensure competition for resources, which mimics an area’s natural ecosystem. This method of constructing woodlands can be applied to underutilized or leftover vegetative spaces bordering the trail’s corridor, as they will eventually become naturalized woodlands. Within the overall corridor, there will be many locations where it is determined that the best design strategy to enhance the corridor’s ecological impact is the continued protection of forested woodland areas. These areas will continue to increase the biodiversity, habitat, and ecosystems for the corridor’s natural inhabitants.

REFORESTATION

When the reforestation of an area is planned, it should consider utilizing the Miyawaki Method. This is a system for planting forests, using densely planted native seedlings at installation to increase biodiversity and enhance functionality of a restored ecosystem.

INVASIVE SPECIES REMOVAL

The removal of nuisance plants and invasive plants is an often an overlooked step in the maintenance of native landscapes. Oftentimes, invasive plant species will take over a neglected landscape; these plant species crowd out and kill native plants, limiting resources for the local plants and animals. Taking pro-active measures to monitor, remove, and maintain the population of invasive plant species is a critical component of open space vegetative management.

Fayetteville Center City Parks & Trails

67


PLACE OF INTEREST

NODES

Along the entirety of the trail corridor are many places of interest. These places vary, and include prominent locations such as parks, natural features, plazas, historical landmarks, and parking locations for trail visitors. These locations will drive both pedestrian and vehicular traffic to the trail, and should be properly framed with landscape elements using the previously described landscape design considerations.

A trail corridor should have many crossings, intersections, and adjacent activities or places which will interact with the trail either directly or indirectly. Each of these places is considered a node, or a specific area where users are anticipated to meet or cross paths. Identifying and enhancing the landscape at the most important nodes along the trail will help to create a sense of continuity through the trail system, and inform the user that they are entering an important space. By identifying the major neighborhood connections, probable access points, and existing nodes, the planting plan can utilize previously described strategies to enhance the user experience. As seen in the accompanying map, there are a variety of nodes along the trail which should be addressed. Levels of enhancement should be prioritized to ensure that the nodes with the greatest anticipated levels of use should be addressed first. At all nodes, intersections, and crossings within the corridor, planting strategy should consider and default to the overall enhancement of safety for users of the trail system. The planting strategy should seek to reduce or mitigate the effect on pedestrian visibility of the trail and its associated features.

PARKS AND NATURAL FEATURES

There are many parks, open spaces, and natural landscapes within or adjacent to the trail corridor. Arrival to these places of interest should be accented within the plant palette. Use of color and seasonality, size, and texture should be used to indicate entry. While these locations will draw visitors and elements of urban life to the corridor, it is important that planting design remain organic in its overall design, mimicking the natural environment. However, in some cases limbing may be advisable to improve sight lines and safety. PLAZAS, HISTORICAL MARKERS, AND PARKING

As the trail winds into the urban environment, there are more formal landscapes and places of interest for visitors to see, such as historical markers and open plazas. A planting design in these spaces should consider opportunities to soften the aesthetic of the urban environment. Responding to the hardscape design with a diverse textural palette will create contrast, and bring attention to desired focal points. Enhanced landscape areas in the urban condition are a desired feature by visitors, and will improve the overall experience. Within parking lots, allowing access to the trail, planting design should consider use of canopy trees, to mitigate the heat island effect. Other plantings which conceal vehicles or enhance trail entry points should also be considered. 68

Chapter 5 Design Palette: Overview And Approach

TEACHING OPPORTUNITIES

Within the corridor, the existing and proposed natural systems, historical markers, and other places and features of interest offer significant storytelling and learning opportunities for users. Plant tags and plaques with descriptions are great ways to learn about the local plant communities and their ecosystems creating opportunities for kids and adults to interact while immersed in the natural environment. Utilizing the area’s natural history as a guide, a series of panels to learn about the area’s diverse and historical botanic features should be developed.


PLANTING OPPORTUNITIES MAP FAYETTEVILLE STATE UNIVERSITY rch Mu

COUNTY SOCIAL SERVICES

D

. ST O K RHO N I O FR HB G EI

EL

d.

ILL

V EN

nR iso

GL

MAZARICK PARK

AK E MURCHISON RD. COMM.

N

C

! !

A

UNITED GOSPEL FELLOWSHIP DR. MARTIN LUTHER KING JR. PARK BLUE ST. APTS.

TERESA BERRIEN ELEMENTARY SCHOOL

GATEWAY PARK

CROSS CREEK CEMETERY F

!

CROSS CREEK CEMETERY

E

Bu s. 4 01

LAMON ST. PARK NEW PARK REDEVELOPMENT

A

UNDEVELOPED LAND

E

SERVICE SOURCE EMP.

Oak Ridge Ave.

P

!

!

! R

NC VETERANS PARK

W. Rowan St. FESTIVAL PARK

I

!

R

NEW PARK ROWAN PARK

V

Hay St.

RAINEY HOSPITAL RAINEY HOSPITAL

n St .

PUBLIC PARKING FAYETTEVILLE BALL PARK

Cam p

bell

Upgraded Plantings @ Trail Connections

!

BROOKSIDE CEMETERY

95 s. Bu

BROOKSIDE GATEWAY

FAST PROPERTY

! !

B ST . GHB ORH

NEI

FTCC

BUS STATION

Secondary Trails(Proposed or Existing) Points of Interest

!

Pers o

Rob

LEGEND Tree Canopy Improvement Areas

St.

!

eso n

ARSENAL PARK

Proposed Trail

Blvd

Ann

FREEDOM MEMORIAL PARK

/ Br agg

St.

NEIGHBORHOOD

y. 24

AIRBORNE & SPECIAL OPS PARK

OO

D

R

HAYMOUNT

E

Hw

CAPE FEAR BOTANICAL GARDENS

FOOD LION SHOPPING CENTER

Ave . RIVERSIDE PARK

PUBLIC PARKING CROSS CREEK PARK

Imp. Trail Crossings w/ Upgraded Plantings

CUMBERLAND COUNTY TAX & SHERIFF OFF.

Public Parking

CROSS CREEK ST.

Neighborhood Connections

NEIGHBORHOOD

FIRE STATION & PARK E. RUSSELL & OLD WILMINGTON RDS

ZION CHURCH PARK

OLD WILMINGTON RD. NEIGHBORHOOD

Fayetteville Center City Parks & Trails

N

69


TREE CANOPY

URBAN SPACE CANOPY ENHANCEMENT

Fayetteville’s urban canopy has been altered significantly throughout it’s history, with an ever increasing loss of large trees within the urban core. Like many other towns and cities across the country that continue to grow, Fayetteville’s increase in land development has the potential to continue to reduce this canopy and the habitats that exist below them, unless various mitigation strategies are put in place. This prolonged reduction in tree canopy area has a number of negative effects for people living in urban areas. A reduction of this important habitat diminishes animal and insect diversity, negatively impacting the local environment. Psychologically, trees offer a place to relax, and provide relief from the heat in parks or streetscapes. A loss in tree canopy reduces shade, and increases temperatures in the downtown area through the heat island effect. A reduction in tree canopy also reduces the amount of stormwater that can be absorbed naturally, increasing run-off volume, causing negative downstream events such as bank destabilization, flash flooding, and an increase in pollutants. Reviewing Fayetteville’s development ordinances to ensure that natural resource protection, planting requirements, and other guidelines and techniques to enhance tree canopy in the urban core are included will positively impact residents and visitors. Re-establishing this canopy should follow an approach and set of methodologies to increase resiliency over time. These approaches will be applied to the entire corridor and areas bordering the corridor

There are several techniques that can be utilized throughout the corridor to enhance the growth and development of the urban tree canopy. These include technologies such as below-ground structures which allow tree roots to freely navigate a typically compacted soil environment, or the ability of permeable pavers to increase groundwater recharge to perimeter plantings in large plazas or walkways. These and other techniques, such as bioswales in parking islands, will allow tree canopies to thrive and prosper in the harsh urban environment, as well as providing an enhanced aesthetic quality for trail visitors and daily users.

Recommendations: Support native tree species that are adapted for the local climate Use urban tree structures in sidewalks for tree root growth and increased canopy health Increase pervious areas by removal of concrete and utilization of permeable paving, where possible, for groundwater recharge and local plant needs Encourage tree canopy growth and additions in under planted areas, such as urban settings Allow understory plants to thrive to create micro-climates 70

Chapter 5 Design Palette: Overview And Approach

OPEN SPACE CANOPY ENHANCEMENT

Within the aforementioned open spaces, parks, and natural areas of the corridor, taking steps to enhance or prioritize tree canopy will have an immediate impact on overall landscape quality. Tree canopies of these types of spaces enhance aesthetic qualities, increase habitat and biodiversity, and help reduce temperatures in local waterways. These are all important qualities for increasing biodiversity within a local ecosystem, and should be prioritized as such. Specific instances where a human intervention on the natural system would be required include stream bank re-establishment, reforestation, canopy improvement, and stormwater control. Within the corridor, there are many locations where these interventions would be expected as part of a corridor landscape enhancement strategy.


Fayetteville Center City Parks & Trails

71


PLANTING SELECTION

PLANT RESEARCH AND SELECTION

There are five general plant communities that the corridor trail travels through. In each one of these communities, elements of the native ecosystem will be reestablished where remnants or ideal conditions exist, through the use of plants and materials. Plant palettes that provide color, shade, texture and detail will be curated to help establish the new plantings within each plant community. Previously described design strategies will be implemented within each of the unique landscape zones; some of the planting designs may be more formal (Urban Gardens) than others (Native Stream bank). Strategies such as color, texture, and size will also be layered considerations. An overall goal of each plant community is to promote restoration, reduce maintenance and help build the brand of the parks and trails near Downtown. There are many benefits of using a mostly native plant list in these plant communities, including habitat diversification, aesthetic enhancement, promotion of forest regeneration and reduced maintenance and irrigation needs. Linking the different overall plant communities within the trail corridor will be important to create a sense of continuity trail users. In addition this strategy, if pursued can create a connected botanical reserve that is an accessible amenity.

NATIVE STREAM BANK

72

PLANT COMMUNITIES 1. Native Streambank 2. Urban Garden 3. Piedmont Forest 4. Coastal Plain Woods 5. Traditional Meadow

URBAN GARDEN

Chapter 5 Design Palette: Planting Selection

Plant research is important in developing a palette of plants that work for various needs found along the corridor. These plants may need to respond to compacted urban soil, natural events that can alter the landscape, and high use areas, while providing visual interest and environmental benefits. In both the evaluation and selection phases of plant list development, understanding each species’ role in the local ecology, as well as potential disruptions to local systems or processes, should be noted and examined. Experimentation and monitoring is crucial to the evolution of the palette. The list should be updated when new plants have demonstrated benefits.

PIEDMONT FOREST

COASTAL PLAIN WOODS

TRADITIONAL MEADOW


PLANT COMMUNITIES MAP

GL

Many of the plant communities shown on the map overlap and will continue to commingle in potentially greater areas as they re-establish and spread throughout the corridor.

LE

VIL

EN

MAZARICK PARK

KE

LA

C

SENIOR CENTER

A P

DR. MARTIN LUTHER KING JR. PARK

E

GATEWAY PARK F

01

E

s. 4 Bu

A

TOWN FIELD PARK

R

UPPER CROSS CREEK PARK

NC VETERANS PARK FREEDOM PARK

LAMON ST. PARK

R

FESTIVAL PARK

y. 24

5

BROOKSIDE GATEWAY

9 s.

Bu

CAPE FEAR BOTANICAL GARDENS

n St . R ob eso

R

BROOKSIDE CEMETERY

FREEDOM MEMORIAL PARK

ARSENAL PARK

E

Hw

V

WASTE WATER TREATMENT PLANT

CROSS CREEK CEMETERY AIRBORNE & SPECIAL OPS PARK

I

ROWAN PARK

Pers o

n St .

LEGEND Current Trail

FAYETTEVILLE BALL PARK

Proposed Trail

RIVERSIDE PARK

Alternate Route Urban Garden Native Streambank

CROSS CREEK PARK ZION CHURCH PARK

Piedmont Forest Coastal Plain Woods Traditional Meadow

N

Fayetteville Center City Parks & Trails

73


URBAN GARDEN Fragrant Tea Olive

A lush set of native and hardy plants providing detail and interest for this high trafficked environment. This palette of plants is identified with a number of desirable characteristics in color, texture and multiple seasons of interests. Plants are utilized for screening, massing, streetscapes, shade and located in visible locations.

Live Oak

74

Chapter 5 Design Palette: Urban Garden

Pachysandra

Virginia Sweetspire

Piedmont Azalea

American Holly

Cherry


PLANT LIST

Gardenia

Flowering Dogwood

Sedges Purple Coneflower

Hosta

Live Oak American Holly Southern Magnolia Saucer Magnolia Flowering Cherry Piedmont Azalea Oak Leaf Hydrangea Cape Jasmine (Gardenia) Fragrant Tea Olive Sweet Pepperbush Forsythia Virginia Sweetspire Plantain Lily (Hosta) Daylily Purple Coneflower Black-eyed Susans Creeping Liriope Sedges Saucer Magnolia

Sweet Pepperbush Daylily

Forsythia

Creeping Liriope

Fayetteville Center City Parks & Trails

75


NATIVE STREAM BANK

Silky Dogwood

The native streambank where the piedmont and coastal plain regions meet is an important ecosystem due to the transitional make-up of the soils, plants and animals that reside here. This is the case for Cross Creek’s course through Fayetteville. Plants along this corridor will acknowledge both ecologies and may be located specific to the terrain and soils found where riparian habitats are being restored. It will also be important that plants are utilized with structural elements to support stream bank restoration for flood and erosion control.

Juncus

76

Chapter 5 Design Palette: Native Stream Bank

Native Sedges

Virginia Sweetspire

Tulip Poplar


PLANT LIST

River Birch

Laurel Oak

Hornbeam

River Birch American Hornbeam Sweetgum Tulip Poplar Laurel Oak American Elm Virginia Witch-hazel Pawpaw Silky Dogwood Swamp Azalea Sweet Pepperbush Virginia Sweetspire Dwarf Fothergilla Blue Cardinal Flower Switchgrass

Swamp Azalea

Blue Lobelia

Dwarf Fothergilla

Fayetteville Center City Parks & Trails

77


PIEDMONT FOREST

Deerberry

Characterized by Loblolly Pines, Hickory, Beaches, Poplar and Oak tree species, this plant community is established in more rocky and clay soils. Large shade trees cover a variety of understory trees and shrubs with ferns and various shade loving ground covers. A variety of animals inhabit this plant community including deer, coyotes, owls, cardinals, canadian geese, bats, foxes, racoons, gray squirrels, rabbits, mice, copperheads, and black snakes.

Highbush Blueberry

78

Chapter 5 Design Palette: Piedmont Forest

Spicebush

Oak Variety


PLANT LIST

Sourwood Loblolly Pine

Arrowwood Viburnum

Flowering Dogwood Longleaf Pine Loblolly Pine Sourwood Hickory American Beech Sugar Maple White Oak Black Oak Ironwood Redbud American Holly Virginia Sweetspire Deerberry Arrowwood Viburnum Tickseed Ferns Beautybush

Redbud

Sugar Maple

Ferns

Fayetteville Center City Parks & Trails

Tickseed

79


COASTAL PLAIN WOODS

Carolina Wiregrass

Coastal Plain woodlands is characterized by sandy soils and drought tolerant plants. Short leaf pine and oaks make up much of the tree canopy with a number of grasses and shrubs living amongst the understory. Areas of this forest could be found along the lower portion of Cross Creek in the plan.

Poverty Oak Grass

80

Chapter 5 Design Palette: Coastal Plain Woods

Curlyhead

Hawkweed

White Oak


PLANT LIST

Queen Anne’s Lace

Turkey Oak

Broomsedge

Asters

Little Blue Stem

Short Leaf Pine

Wax Myrtle

Shortleaf Pine Live Oak White Oak Turkey Oak Pignut Hickory Eastern Red Cedar Yaupon Holly Wax Myrtle Asters Queen Anne’s Lace Hawksweed Curlyhead Rattlesnakeweed Little Blue Stem Broomsedge Poverty Oat Grass Carolina Wiregrass

Eastern Red Cedar

Fayetteville Center City Parks & Trails

81


TRANSITIONAL MEADOW

Orange Coneflower

The Transitional Meadow represents those native grasslands found in this portion of the state. Grasses and wildflowers could cover large open areas providing a color and food for pollinator species. These grasslands and meadows are relatively low maintenance and cost effective compared to other planting strategies.

Pink Muhley Grass 82

Chapter 5 Design Palette: Transitional Meadow

Carex Sedge

Indian Grass

Ironweed

Blazing Star

Mistflower


PLANT LIST

Summer Achillea

Narrow Leaf Sunflower

Wavy Hair Grass

Inland Sea Oats

Purple Small Reed Grass

Flowering Spurge

Green Silkyscale

Reed Grasses

Maryland Golden Aster

New England Aster

Orange Coneflower Wild Lupine Blazing Star Narrowleaf Sunflower Maryland Golden Aster New England Aster Mistflower Ironweed Flowering Spurge Purple Lovegrass Switchgrass Split Beard Bluestem Little Bluestem Indiangrass Pink Muhly Grass Wavy Hair Grass Green Silkyscale Purple Small Reed Grass

Splitbeard Bluestem

Fayetteville Center City Parks & Trails

83


ELEMENTS

ENTRANCES/GATEWAYS

84

Chapter 5 Design Palette: Elements

FENCES/RAILINGS

STAIRS

WALLS/BARRIERS


Fayetteville Center City Parks & Trails

85


ENTRANCES/GATEWAYS

APPLICATION AND USE

Guiding principles identifying the location and need to support people’s ability to access the greenway AESTHETIC AND FUNCTION Size of entrance monument and use of materials reflect the location and use of that entrance Reflects the materials used in the specific design of that portion of the corridor or design spaces LOCATION AND VISIBILITY Support visibility and wayfinding for where you are on the trail Identify the spaces along the trail or entry points Provides visibility of the trail to surrounding districts Parking assessment would be helpful in supporting the importance of the trailhead

86

Chapter 5 Design Palette: Entrances/gateways


FENCES/RAILINGS APPLICATION AND USE

Guiding principles of the use of railings and fences for barriers and safety along the trail. These principles are to inform the appropriate selection and application associated with the design components throughout the corridor section. NEED AND FUNCTION Use of local materials to be integrated into the design of the corridor and specific spaces. Crafting of the fences with local materials can be done by local businesses and artists supporting the local economy Support the need for rest and relaxation, social connections, visibility, storage, and maintenance Provide options to enjoy the activities happening along the trail LOCATION AND VISIBILITY Fences and railings will be located in areas of high use where safety protection is needed. They will be used in a manner to subtly separate various uses of traffic or designed spaces not to be walked upon

Fayetteville Center City Parks & Trails

87


STAIRS

APPLICATION AND USE

More of a function of where needed, stairs should be utilized to accommodate quick grade transitions in a safe manor minimizing landscape disturbance. EGRESS AND SAFETY Use in steep grade transitions Elevated in locations where ground and plant material may not want to be disturbed or where flooding may occur Use of materials should be consistent with the family of materials for the corridor unless specific for a certain designed space Railings may be needed in certain locations This does not remove the need for an ADA accessible route SUSTAINABILITY Use of local materials will support the design of the corridor reflecting the region Design and construction should be done for longevity and reduction in maintenance needs 88

Chapter 5 Design Palette: Stairs


WALLS/BARRIERS APPLICATION AND USE

Guiding principles for design of the trail should guide the need for walls and the use of materials for construction. NEED AND FUNCTION Where grades can not be sloped without major impact, walls would be needed To reinforce stream banks and bridge abutments To separate spaces and provide enclosure LOCATION AND VISIBILITY To be used where needed Where visibility is reduced, safety lighting should be included Walls could be created by artists or used as a medium to express ideas such as murals or large chalk etchings

Fayetteville Center City Parks & Trails

89



DECEMBER 2020

CENTER CITY PARKS & TRAILS MASTER PLAN Fayetteville, North Carolina 91