NORTH HANLEY ROAD (F) RESURFACING PRELIMINARY PLANS FOR
ST. LOUIS COUNTY PROJECT NO. AR-1821
FEDERAL PROJECT NO. STP-5613(609)
PRINCIPAL ARTERIAL 5%
N/A N/A
I L I T Y S 2022 15300 17250 N/A 40 MPH 35 MPH
STANDARD SPECIFICATIONS ST. LOUIS COUNTY STANDARD DRAWINGS. AND BRIDGE CONSTRUCTION, AND BY APPLICABLE COUNTY STANDARD SPECIFICATIONS FOR ROAD PROJECT SHALL BE COVERED BY THE ST. LOUIS UNLESS OTHERWISE NOTED, ALL WORK ON THIS ANY UNDERGROUND UTILITIES AND AVOID THERETO. DETERMINE THE EXISTENCE AND EXACT LOCATION OF IT IS THE CONTRACTOR'S RESPONSIBILITY TO
i f t h t t h O
h i h
b C A
y l i i d
by d i l i
l l t h h
i b i l ity f
S
i f i t i p
J13,J14 N NOT TO SCALE N SCALE NOT TO
i
b E s t i m a t e s R e p o r t s o r o t h e r D
i
d d
f h l i g
j t d f
y p
-
HANLEY ROAD P U B L I C W O R K S T R A N S P O R T A T I O N PUBLIC WORKS TRANSPORTATION
R E S P O N S I B AR-1821 N/A H.H. I.G.
STP-5613(609) 7124B-22 ST. LOUIS, MISSOURI 63132 1050 N. LINDBERGH BLVD DESIGN DIVISION TRANSPORTATION/PUBLIC WORKS DEPARTMENT OF ST. LOUIS COUNTY, MISSOURI
-
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h DESIGNED:
C O A1 0 1 / S3 6 -
t S t e hp a n i e L e o n S t r e e t e r P E APPROVED: Acting Director Stephanie Leon Streeter, P.E. DATE:
A t i g D i
NORTH HANLEY ROAD (F) R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F ) N. HANLEY ROAD STA 1+00.00 BEGIN PROJECT STA 32+32.34 END PROJECT STA 32+32.34 STA 1+00.00 T I T L E & I N D E X S H E E T DESCRIPTION SHEET NO. 1 OF 24 C O N S T R U C T I O N N O T F O R P R E L I M I N A R Y TRAFFIC SIGNAL PLAN 24 ADA CURB RAMPS WARPING ELEVATIONS 23 CURB, SIDEWALK & RAMP PLACEMENTS 13-22 PLAN SHEETS 6-12 SPECIAL NOTES 5 TYPICAL SECTIONS 2-4 TITLE AND INDEX SHEET 1 OR PROPOSED EASEMENTS EXCEPT AS FOLLOWS: ALL PUBLIC SEWERS ARE LOCATED WITHIN DESIGNATED EXISTING RESPONSIBILITY FOR THAT SPECIFIC INFORMATION. SEWER CONTRACTOR OR OTHER SOURCES, DISCLAIM ANY HAVE BEEN PLOTTED FROM INFORMATION PROVIDED BY THE SET OF FINAL MEASUREMENT PLANS. SINCE THE WYE LOCATIONS THE RESULTS OF THOSE MEASUREMENTS ARE SHOWN ON THIS EXISTING OR PROPOSED EASEMENTS HAVE BEEN MEASURED. STRUCTURES AND SEWERS AND LOCATIONS WITH RESPECT TO THE EXISTING SEWER LENGTHS, SIZES, FLOW LINES, DEPTHS OF 9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-Title_Sheet.dgn 9/29/2022 9/29/2022 J.O. ROUGH NAD83 LAT=38.713876°±(N/+) LONG=90.319199°±(W/-) SP MO EAST N=319685± E=265724± METER ESTIMATED ROAD; NORTHEAST CORNER OF JANE AND HANLEY ROADS. "L" ON THE SOUTHWEST CORNER OF THE TOP STEP AT #4000 HANLEY BENCHMARK 9379 NGVD29 ELEV = 633.28 FTUS ROUGH NAD83 LAT=38.718233°±(N/+) LONG=90.317405°±(W/-) SP MO EAST N=320169± E=265879± METER ESTIMATED PLACE DRIVE. EAST OF NORTH HANLEY ROAD ALONG THE NORTH SIDE OF UNIVERSITY 43 FEET WEST OF THE NORTHWEST CORNER OF THE FIRST CATCH BASIN #4300 HANLEY ROAD, AT THE NORTH EDGE OF SIDEWALK AND ROUGHLY STATE DEVELOPMENT AGENCY NORTH HANLEY METROLINK STATION AT ROAD) NEAR THE SOUTHWEST CORNER OF THE PARKING LOT FOR THE BINORTH HANLEY ROAD WITH UNIVERSITY PLACE DRIVE (FORMERLY GEIGER CONTROL BOX AT THE NORTHEAST CORNER OF THE INTERSECTION OF CUT "L" ON SOUTHWEST CORNER OF CONCRETE BASE OF TRAFFIC SIGNAL NGVD29 ELEV = 633.17 FTUS BENCHMARK 9378 NAVD88 (STLC2011A) ELEV=632.83 FTUS (OR) 192.887 METER PROJECT BENCHMARKS: 3132.34 3132.34 KATHERINE AVE JANE AVE CRANBERRY LANE LINK AVE . ALVA AVE PRIVATEDRAGONW YK DR . W ELDON AVE . NATURALBRIDGERD. NORTHHANLEYRD. ALVAAVE. U N I VER SITY PL D R JENNY DRIVE I70 EASTBO U N D O FF R AM P ON RAM P EASTBOUND I70 (PRIVATE)TORIIDR . V E R A A V E CHERRY AVE
L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I 0.59 0.59
NATURAL BRIDGE ROAD
N NORTH HANLEY ROAD EXIST. R/W
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h A
h i h B I L I T Y
l l t h h
d d
by d i l i
i b i l ity f
i f i t i p
S
b E s t i m a t e s R e p o r t s o r o t h e r D
i
f h l i g
d e
i
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
y l i i d DESIGNED:
0
-
b O P U B L I C W O R K S T R A N S P O R T A T I O N
R E S P O N S I i L
S C S t
/-
-
i f t h t t h N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
EXIST. R/W 0 SCALE IN FEET 20 40 60 SCALE: 1" = 20' ON COARSE AGG BASE PCCP (MERAMEC W/STEEL 77" CORE NO 5 PCCP 81 ON COARSE AGG BASE CORE NO 1 STA 1+0000 BEGIN PROJECT EXIST MANHOLE (ATG) EXIST MANHOLE (ATG) EXIST WATER VALVE (ATG) T.S.C.L. T.S.C.L. T.S.C.L. T.S.C.L. P.S.E. P.S.E. SIDEWALK (TBR&R) AT THE UTILITY POLE PROVIDE 4 CLEAR WIDTH SIDEWALK P.S.E. P.S.E. SIDEWALK (TBR&R) AT THE UTILITY POLE PROVIDE 4 CLEAR WIDTH SIDEWALK SIDEWALK (TBR&R) AT THE UTILITY POLE PROVIDE 4 CLEAR WIDTH SIDEWALK SIDEWALK (TBR&R) AT THE UTILITY POLE PROVIDE 4'CLEAR WIDTH SIDEWALK PL PL PL PL PL PL PL PL PL M A T C H L I N E S T A 5 + 0 0 (TBR&R) EXIST INLET TOP (T.B.R.&R.) EXIST. INLET TOP EXIST GRATE INLET (ATG) OVERLAY 3" (DEPTH TRANSITION) MILL 2" AND OVERLAY 3" CONCRETE PAVEMENT REPAIRS TO BE CONSTRUCTED AT VARIOUS LOCATIONS. NOTES: EXIST WATER VALVE (ATG) 6 OF 24 L CONSTRUCTION C EXIST WATER VALVE (ATG) EXIST WATER VALVE (ATG) ( 1 O F 7 ) P L A N S H E E T 1 LOC# 14J521194 DB 17662 PG 3838 3708 NORTH HANLEY ROAD HANLEY ROAD INVESTMENTS LLC N\F NORTH HANLEY ROAD FOR CONNECTION PROJECT (J6S3417)AT ROUTE 115 AND COORDINATE WITH MODOT RESURFACING LOUIS COUNTY MAINTENANCE SIGN EXISTING SPEED LIMIT AND SAINT EXIST BUS STOP SIGN (U.I.P.) EXIST FIRE HYDRANT (UIP) EXIST GAS VALVE H A N L E Y R O A D 3 7 0 8 N O R T H H A N L E Y R O A D 3 7 4 4 N O R T H H A N L E Y R O A D 3 7 4 6 N O R T H H A N L E Y R O A D 3 7 4 8 N O R T H H A N L E Y R O A D 3 7 5 0 N O R T H H A N L E Y R O A D 3 7 2 5 N O R T H H A N L E Y R O A D 3 7 2 9 N O R T H H A N L E Y R O A D 3 7 3 3 N O R T H H A N L E Y R O A D 3 7 2 1 N O R T H B R I D G E R O A D 8 6 0 1 N A T U R A L #16 POLE #15 POLE #14 POLE #13 POLE F I B E R O P T I C F I B E R O P T I C CONC CONC CONCRETE WALK CONCRETE WALK CONCRETE WALK CONCRETE WALK CONCRETE WALK C O N C C C CONCRETE W ALK T 1+0000 2+0000 3+0000 4+0000 5+0000 0+00.00 PC 2+2630 PT
t
P E
H. H. I.G. J.O.
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-RDWY_ROW_PLAN_I20.dgn 9/29/2022
C O N C R E T E
C O N C
C O N C R E T E
C O N C R E T E C U R B
CONCRETE WALK D R I V E
C O N C
C U R B C O N C
#1 RAMP #2 RAMP #3 RAMP #4 RAMP
C U R B C C O N C R E T E
A S P H A L T A S P H A L T
l l t h h
d e
y l i i d DESIGNED:
by d i l i
b E s t i m a t e s R e p o r t s o r o t h e r D
d d
i b i l ity f
i f i t i p
i
S
i
f h l i g
y p
R E S P O N S I B I L I T Y S C A S t
O t
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
0
-
i f t h t t h i L
h i h P U B L I C W O R K S T R A N S P O R T A T I O N
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t
b o r S t hp
H. H. I.G. J.O.
P E
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
i -
n g D i r e c t /-
#9 RAMP #13 RAMP CONCRETE ROAD
#10 RAMP
CURBCONCRETE
by d i l i
l l t h h
i b i l ity f
S
i f i t i p
f h l i g d o c u m e n t s o r i n s t r u m e n t s E s t i m a t e s R e p o r t s o r o t h D
y p
i
y d f
ig
i g p j t
y a u t h o r i z e d by m y s e a l a r e d DESIGNED:
i fy t h t t h i L
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
d e
-
t i t d d t b I h N S I B I L I T Y P U B L I C W O R K S T R A N S P O R T A T I O N
R E S P O S t
C O A1 0 1 /-
P E
by p N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
H. H. I.G. J.O.
t
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB DETAILSdgn 9/29/2022
CONCRETE WALK
#11 RAMP #14 RAMP #12 RAMP #15 RAMP
d e
h b i f t h t t h /-
R-
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e -
i f i t i p O P U B L I C W O R K S T R A N S P O R T A T I O N
i DESIGNED:
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
0
y l i i d t
by d i l i S t
i
i b i l ity f N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
l l t h h i L
h i h P E
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
H. H. I.G. J.O.
CONCRETE WALK
#16 RAMP #17 RAMP
WALK CONCRETE
d e
Y S -
l l t h h P
h i h C A
i f i t i p
y l i i d I T
by d i l i N S I
S
b E s t i m a t e s R e p o r t s o r o t h e r D
i
i
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h O P U B L I C W O R K S T R A N S P O R T A T I O N
B I L P E
O t
i b i l ity f DESIGNED:
b N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
0
-
i f t h t t h i L
R E S S t
/-
H. H. I.G. J.O.
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
CURB CONCRETE
CURB CONCRETE 1 + 0 0 0 0
C O N C R E T E W A L K 4 0 0 0 0 DRIVE ASPHALT CONC
#15 POLE #13 POLE #14 POLE
#16 POLE
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h I B I L I T Y
y l i i d
l l t h h
d d
by d i l i
i b i l ity f
i f i t i p
S
b E s t i m a t e s R e p o r t s o r o t h e r D
i
f h l i g
y p
d e
i
h i h DESIGNED:
0
b O P U B L I C W O R K S T R A N S P O R T A T I O N
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
-
/-
R E S P O N S i L
S C A S t
-
H. H. I.G. J.O.
t
i f t h t t h N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
P E
DRIVE ASPHALT 6 + 0 0 0 0
#11 POLE #10 POLE #9 POLE
#12 POLE
7+47.10 PT 7+2710 PC DRIVE ASPHALT
d e
S P
i E
I h b i f t h t t h -
i b i l ity f O P U B L I C W O R K S T R A N S P O R T A T I O N
S-
O0
R /-
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e P E
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
y l i i d S t
by d i l i i L
E
l l t h h N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
h i h t
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
H. H. I.G. J.O.
11+00.00 CONC
#8 POLE #7 POLE #6 POLE #5 POLE
h i h C A
y l i i d S I B I L I T Y
l l t h h
d e
i b i l ity f
i f i t i p
i
d d
S
b E s t i m a t e s R e p o r t s o r o t h e r D
f h l i g
i
y p
i
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h O P U B L I C W O R K S T R A N S P O R T A T I O N
by d i l i DESIGNED:
0
E S P O N t
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
-
S P E
R S t
b N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
i f t h t t h i L
/-
-
H. H. I.G. J.O.
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
NORTH HANLEY ROAD
1 5 + 0 0 0 0
16+00.00 C O N C R E T
CONC CONC CONC
#4 POLE #3 POLE #2 POLE
#9 RAMP
C O NC RETE RO AD
#1 POLE
i b i l ity f I L I T Y S C A
d e
i f i t i p S I
S P
i DESIGNED:
b E s t i m a t e s R e p o r t s o r o t h e r D
l l t h h O P U B L I C W O R K S T R A N S P O R T A T I O N
d d
O N /-
B-
R E S -
i f t h t t h P E
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h S t
i
y p
i
0
by d i l i N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n
y l i i d t
h i h i L
b t
g D i r e c t o r S o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
H. H. I.G. J.O.
hp 9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
26+00.00
1 STOP BUS 2 STOP BUS 2 1 + 3 5 5 4 P T 21+0000
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h S P O N S I B I L I T Y S C A
y l i i d
l l t h h
d d
by d i l i
i b i l ity f
i
S
b E s t i m a t e s R e p o r t s o r o t h e r D
d e
i f i t i p
i
f h l i g
j t d f
i
y p
h i h DESIGNED:
0
b O P U B L I C W O R K S T R A N S P O R T A T I O N
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
-
/-
R E i L
-
S t
t
i f t h t t h N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
H. H. I.G. J.O.
P E
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022
d e
Y S C -
y l i i d I L I T
h i h A
i f i t i p
d d
by d i l i I
i b i l ity f
b E s t i m a t e s R e p o r t s o r o t h e r D
i
f h l i g
S
i
d a u t h o r i z e d by m y s e a l a r e d o c u m e n t s i n t e n d e d t o b e I h O P U B L I C W O R K S T R A N S P O R T A T I O N
B P E
N S t
b N/A J13,J14 L I C E N S E N O 0 2 9 0 9 5 P R O F E S S I O N A L E N G I N E E R A B D E L H A M I D H A D J R I A c t i n g D i r e c t o r S t hp
l l t h h DESIGNED:
i f t h t t h i L
o u e v a d R E S U R F A C I N G N O R T H H A N L E Y R O A D ( F )
0
-
R E S P O S t
/-
H. H. I.G. J.O.
9/29/2022 J:\2021\6087\Cadd\Design\Plan\AR-1821-S-RD-01-CURB_DETAILS.dgn 9/29/2022