FLOOR SOLUTIONS Four Seasons Centre for the Performing Arts Toronto, Ontario
AREA: BACKSTAGE
PRODUCTS USED: • STONCLAD GS • STONSEAL GS7
• STONKOTE GS4
The Four Seasons Centre for the Performing Arts was built specifically for
THE STONHARD SOLUTION
opera and ballet performances. It is the first building of its kind in Canada
Stonclad GS epoxy mortar system was applied as the base of the flooring,
and provides the finest level of acoustics. The Canadian Opera Company
providing superior impact, abrasion and chemical resistance.
and The National Ballet of Canada are very proud to call it their new home. Stonkote GS4 clear was applied as the sealer and Stonseal GS7 clear flat as THE CHALLENGE
the topcoat. This system provided outstanding wear and protection, improved
The backstage area required seamless floors that would be easy to maintain,
cleanability and the Stonseal GS7 clear flat achieved the desired look. As part
provide good impact and wear resistance and also hold up to heavy foot traffic. In
of the architectural design, zinc terrazzo strips were placed 4” from the wall and
addition, long-lasting aesthetics were a must.
followed along the coves.