ONTARIO LEGISLATIVE BUILDING - QUEEN’S PARK JOB DETAILS: MARKET: Architectural/Commercial PRODUCT: StonFlow Commercial AREA: Kitchen DATE: 2011 SQUARE FOOTAGE: 2,700 Square Feet LOCATION: Toronto, ON

As part of the recent modernization of the historic Queen’s Park building which houses The Legislative Assembly of Ontario, Stonhard Construction Solutions was asked to provide finishes for the kitchen floor. As part of the project the old floors had been removed and new drains and grease traps were fitted. The floors that remained had back filled pits and trenches from the installation of the new equipment and were not at the proper level required to ensure the functionality of the equipment.

the floors prior to the installation of 2,700 square feet of StonFlow. To ensure that the project schedule was maintained, the entire floor area was pumped with 450 bags of StonFlow on Saturday allowing Stonhard to install epoxy mortars to provide falls to drainage on the following Monday. Other trades were able to use the floor on Sunday morning as dictated by the construction schedule.

Due to the historic and sensitive nature of this site, cleanliness was of utmost importance. Stonhard StonFlow was selected to provide a fastrack level base ensured that the installation was managed to the Client and to pre-fill pits and channels created as part of the and Contractors’ exact specifications. install of the drainage. Stonhard mechanically prepared

www.stonhard.ca | 800.263.3112

#3307-08/13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.