TORONTO CONDOMINIUM JOB DETAILS: MARKET: Property Management PRODUCT: StonDeck FD
BEFORE
INSTALLATION
AREA: Mechanical Room SQUARE FOOTAGE: 700 Square Feet LOCATION: Toronto, Ontario AFTER
Stonhard Construction Solutions undertook a project to refurbish and repair coatings in a condominium mechanical room. The previous coating was failing in a number of areas, allowing water to penetrate through the structure, damaging the underlying concrete and leaking into the parking area below.
included crack treatment, patch repairs with epoxy mortar, and a StonDeck membrane that was applied to the entire surface. Finally, StonDeck Finish was used to seal the system and provide slip-resistance.
StonDeck FD is a flexible, solvent free polyurethane system with excellent crack bridging. Designed for low traffic areas, mechanical rooms and parking stalls. As part of Stonhard’s turnkey solution the existing This is a cost effective system for new construction coatings were removed and any damaged concrete and refurbishment. It cosmetically enhances and was scarified and repaired prior to application of provides lighter, safer environments. the StonDeck waterproofing system. The project
www.stonhard.ca | 800.263.3112
#5022-01/17