Greenmont Murray Tuesday, October 29, 2013
Master Bathroom SCOPE OF WORK: BASELINE Remove existing finishes, flooring, wall tile, commode, shower and sink. Adjust plumbing as needed. (Electrical changes by another contractor) Install new cast iron tub. Tile and grout floor using Ditramat as substate (exact tile and grout to be determinedpriced at mid-range) Tile and grout shower walls using kerdi fabricasa waterproof substate (exact tile and grout to be determined-priced at mid-range) Install trim, prime and paint, Install commode, vanity/pedestal and all plumbing finishes
BEFORE Tuesday, October 29, 2013
KOHLER MEMOIRS
Inspiration: Traditional Style
Tuesday, October 29, 2013
Bathroom One
Tuesday, October 29, 2013
Bathroom Two
Tuesday, October 29, 2013