Exam 000-370 preparation questions

Page 1

Exam 000-370 study material Made available by Testkingprep.com

Free 000-370 Exam Preparation Questions Exam 000-370: IBM Certified Specialist Software Quality

For Latest 000-370 Exam Questions and study guides- visit- http://www.testkingprep.com/000-370.html


Question:1 Effective test planning involves: A. Estimating required assets and resources, and specifying how they will be acquired. B. Developing test cases before developing the test plan, then linking the test plan to the appropriate test cases. C. Writing separate and independent test plan documents for manual and automated testing. D. Creating a non-editable copy of the test plan, such as a PDF, to make sure that the plan does not get altered during an iteration. Answer: A Question:2 In software testing, process metrics are used to show: A. The expected state of the project at a future time. B. The conformance or deviation of a project relative to an established process or standard. C. The comparison of the current version of the project to previous versions or to other similar projects. D. The project current status. Answer: B Question:3 A general guideline regarding the efficiency of test teams is: A. The larger the team, the more efficient are its members. B. The larger the team, the less efficient are its members. C. The size of the team is unrelated to the efficiency of its members. D. Functional test teams are more efficient than performance test teams. Answer: C Question:4 Exit criteria for testing must be: A. Automatable. B. Flexible. C. Measurable. D. Associated with known defects. Answer: C Question:5 The following should be considered during contingency planning: A. The failure of critical functionality. B. A key developer leaving the company at a critical time. C. Poor communication between testers and developers. D. Inadequate test coverage. Answer: B Question:6 The new version of the software being tested runs considerably slower than the previous version. The tester best course of action is to: A. Report the problem to the test manager immediately. B. Report a serviceability defect. C. Report a performance defect. D. Do nothing; this is the responsibility of the development team. Answer: C Question:7 The following is included in the external view of the design review checklist: A. The plan to recover from errors involving more than one function.

For Latest 000-370 Exam Questions and study guides- visit- http://www.testkingprep.com/000-370.html


B. Information to be presented to a certification reviewer. C. How other products or components interact with the product. D. Function interfaces but not their internal definitions. Answer: C Question:8 A developer successfully applying the principle of cohesion to object-oriented code will derive the following benefit: A. Groups of similar classes will share a common interface. B. Classes sharing a common interface will inherit from a common parent. C. Each class will have a single responsibility. D. Subtypes will be suitable for their base types. Answer: C Question:9 The test duration formula is as follows: A. test duration = total work / time available for work B. test duration = work remaining / total work C. test duration = total work - work remaining D. test duration = work completed / work remaining Answer: A Question:10 The following is a legitimate activity during a formal inspection: A. Measuring the effectiveness of the person who created the artifact under inspection. B. Identifying solutions to issues identified. C. Evaluating user documentation. D. Identifying and implementing new ways of surfacing defects. Answer: C

For Latest 000-370 Exam Questions and study guides- visit- http://www.testkingprep.com/000-370.html


For complete Exam 000-370 Training kits and Self-Paced Study Material Visit: http://www.testkingprep.com/000-370.html

http://www.testkingprep.com/

For Latest 000-370 Exam Questions and study guides- visit- http://www.testkingprep.com/000-370.html


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.