Exam 000-669 study material Made available by Testkingprep.com
Free 000-669 Exam Preparation Questions Exam 000-669: SOA Fundamentals (2008)
For Latest 000-669 Exam Questions and study guides- visit- http://www.testkingprep.com/000-669.html
Question:1 When starting to adopt SOA, which action should be taken early to help drive acceptance and success? A. Establish the SOA strategy and project roadmap. B. Identify the first services required and ensure they are designed well, considering security and scalability. C. Roll the SOA project in as the next phase of a project under development to prove the value to the business. D. Prepare the infrastructure for SOA by establishing a development environment, testing environment and the control process to promote services. Answer: A Question:2 A business has been 'doing' SOA for a while and is becoming disillusioned with the results. They are not seeing the Return on Investment (ROI) they expected even though they have created several hundred services. What is the likely cause of this problem? A. Services are replicated based on language and geographic needs. B. Developers need better training on how to create reusable services. C. Governance processes are not in place to review and approve services. D. Scaling the environment is challenging for such large SOA implementations. Answer: C Question:3 What is a key difference between a component and a service? A. A service is deployed once and a component is deployed many times. B. A component is deployed once and a service is deployed many times. C. A component has an interface and a service implements the interface. D. A service has an interface and a component implements the interface. E. A service does not have a well-defined interface and a component does. Answer: D Question:4 Which standard describes the interface for Web services? A. WS-I B. BPEL C. SOAP D. WSDL Answer: D Question:5 What is a method for verifying the business success of an SOA solution? A. Pilot the solution and solicit feedback from stakeholders and subject matter experts. B. Implement appropriate Key Performance Indicators (KPIs) at multiple levels of the solution. C. Implement a technology think-tank integrated with the lines of business and with overall executive sponsorship. D. Implement a Center of Excellence (CoE) to provide a tight linkage with business to define services and operational characteristics at technical and business levels. Answer: B
For Latest 000-669 Exam Questions and study guides- visit- http://www.testkingprep.com/000-669.html
Question:6 Which role does XML play in an SOA design? A. XML is used to implement the UML design. B. XML schema drives the messaging payloads. C. XML is used for Web services which are required in SO A. D. XML is used to describe interfaces and message bindings. Answer: D Question:7 A dealer in rare and antique books is interested in streamlining their business process. Bottlenecks occur when dealing with inventory and shipping functions in the process. How can the dealer optimize this process? A. Create a new application to deal with the bottlenecks. B. Replace legacy systems with more advanced technology. C. Automate the manual steps so that the process is easier to monitor. D. Provide multiple paths through the process for some of the functions. Answer: D Question:8 At which two points in SOA communication are registries used? A. During discovery B. During publication C. During message transport D. During message validation E. During message transformation Answer: A, B Question:9 Why is defining appropriate Key Performance Indicators (KPIs) important for the success of an SOA? A. To provide IT performance metrics B. To determine the marketability of the SOA processes C. To justify funding for migration of the processes to SOA D. To provide feedback indicating Return on Investment (ROI) back to the business E. To enable business executives to identify impediments and bottlenecks in performance of the business processes Answer: D Question:10 Which statement is true about a business process in the context of Business Process Management (BPM)? A. It should be monitored. B. It only deals with automated tasks. C. It interacts with a single application. D. It has one primary Key Performance Indicator (KPI). Answer: A
For Latest 000-669 Exam Questions and study guides- visit- http://www.testkingprep.com/000-669.html
For Latest 000-669 Exam Questions and study guides- visit- http://www.testkingprep.com/000-669.html
For complete Exam 000-669 Training kits and Self-Paced Study Material Visit: http://www.testkingprep.com/000-669.html
http://www.testkingprep.com/
For Latest 000-669 Exam Questions and study guides- visit- http://www.testkingprep.com/000-669.html