Step 1
Step 2
Step 3
Lower SmartBox into Load Bin
Use rubber pads under foot mounts to level the SmartBox if required
Mark Position of Base Mount Frame
Step 4
Step 5
Remove Base Mount Frame
Reposition Base Mount Frame.
Step 6 Drill the correct Hole Position. Check for Obstructions Underside Bin.
Step 7
Step 8
Step 9
Apply Tectile in new drilled Hole
Bolt down with Load Spreaders under side of Load Bin
Drill for Wire Harness Feed
Step 11
Step 12
Step 10 Slowly lower SmartBox, Connect the Wire Harness
Feed Wire Harness direct to Battery, connect with fuse.
Once in position, apply washer + split pin