studio razavi architecture 06

Page 50

Status  Built

Area  450 m² (4.844 SF)

MEP engineer  2LS

Client  Zags

Date  2015

Lighting designer  Enlighten

Program  Headquarters

Photography  Connie Zhou

We had to create a design that offered both the floor plan flexibility and a more structured organization of spaces. • By locating glass partitioned offices at each corner we could take advantage of the floor plan configuration and create the desired variety and compartmentalization that was required by the tenant. • We focused on creating a lighting scheme that would weave the different parts of the floor. Because the existing & exposed structure is a rigid grid, we opted to hang our fixtures way below ceiling height to create a new datum and by opting for a bare fluorescent tube, relate the lighting scheme to both the raw exposed concrete surfaces but also to our client’s company name. This we achieved by hanging the fixtures in a criss-crossing pattern, visible from all sides as Zs, as in Zags.

50


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.