1 minute read
32-STORY SAN ANTONIO TOWER REACHES CONSTRUCTION MILESTONE
is located in a walkable area with many retail, dining and entertainment options. elections Several attractions are also nearby, such as the Alamo and the historic village of La Villita.
According to Yardi Matrix, the project is tied to a $91 million construction loan from OZK Bank last year. The end date is 2024. The 32-story tower, designed by Page Southerland Page, broke ground in 2022. It has approximately 696,000 square feet, including 6,275 square feet of ground- floor retail space. The community has two amenities, a fitness center, and a swimming pool, as well as a six-story parking garage with 50 parking spaces.
Positioned in an Opportunity Zone at 305 Soledad St, the site is in the heart of downtown San Antonio, near Interstates 10, 35 and 37. It https://VIA.diversitycompliance.com
Yardi Matrix data shows that in 2022, San Antonio had a total of 37 properties consisting of 9,362 units. This is Rogers-O'Brien's first metro project, although the company has an extensive portfolio in Texas, including Dallas and Austin. Last year, the company was part of a team that broke ground on a 750-person student housing community in College Station, Texas.
The scope of contracting opportunities encompasses a wide variety of projects and services, including, but not limited to:
• Architecture
• Engineering
• Construction
• Facilities & Maintenance
• Goods & Services
Antonio, TX 78212
Office of Diversity & Federal Compliance 800 W. Myrtle San Antonio, TX 78212
362-2074 | ODFC@viainfo.net