PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
ARCHITECTURAL PORTFOLIO SAMPLES 2021 +44 (0) 7807702626 London UK. Esul@live.com British (born and raised) Full UK Driving License and Personal Vehicle. Please consider the environment before printing.
ARCHITECT \ ARB RIBA
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Sulaiman Quereshi
WORK EXPERIENCE APRIL 2021 - Present
+44 (0) 7807702626 London UK.
Sulaiman Quereshi
British (born and raised)
Full UK Driving License and Personal Car. Please consider the environment before printing.
Curriculum Vitae COMPETENCIES Urban Planning Commercial, Hospitality and Residential Design. BIM. Architecture & Design. Participatory Planning. Environmental and ecological Planning. Construction Monitoring. Project Leadership. Sustainable Design. Coordination. Professional Communication. Construction Detailing. Conservation and Heritage Design. Onsite Monitoring. Networking.
TECHNICAL SKILLS Adobe Photoshop. Adobe illustrator. Adobe InDesign. Adobe Photoshop Lightroom. Autodesk Autocad. Rhinoceros 3D. Autodesk Revit. Autodesk BIM 360 Sketch up 3D. Eco-tect Analysis. Maxwell Studio 2 & render. Safeira Energy Analysis. Microsoft OFFICE suite. NBS Chorus
As an ARB / RIBA qualified Architect with a strong track record of professional Commercial, Hospitality, Residential and sustainable design, I now seek to further my career with an ambitious workplace. I have gained exposure over all the RIBA stages, and successfully worked on projects internationally. I bring genuine passion for sustainabillity, design flare, technical abillity and excellent communication skill towards the prole.
EDUCATION 2020
Excitech Training Course Revit Architecture Fundamentals
2020
Construction Skills Certification Scheme (CSCS)
2017 - 2019 The Bartlett School Of Architecture Examination In Professional Practice In
Architecture - RIBA Part III University College London
RIBA / ARB accreditation received with Commendation. Case Study - Pendley Manor Grade II listed Conservation project. Analysis of Stage 5 and 6 through traditional procurement and switch of contractors. 2015 - 2017 Master of Architecture (M.Arch) RIBA Part II
Manchester School of Architecture - Manchester University Thesis: Urban Agriculture as a Model for Reform: An Analysis of Urban Food Cultures in a Globalised Economy. Y6 - MSAp - Proposal for sustainable Agrarian and Economic Transitions in Rural Portugal. Y5 - Atelier USE - Supporting the social integration of refugee communities through spatial intervention & closed loop urban food systems NOSTOS workshop- Using urban rooftop farming of a hotel to host refugees, the programme provided socio-economics incentives for the people of concern. 2016
CWS Caribbean Winter School 2016 - Participatory workshop
Universidad Tecnólogica de La Habana “Jose Antonio Echeverría”, CUJAE Grade A with 10 ECTS Credits. Urban Master Plan for deprived ex-soviet region in Havana. 2010 2013
Bachelor of Architecture (B.Aarch) - RIBA Part I CASS school of Architecture - London Metropolitan University Dissertation: British colonial India, Indo-Saracenic Architecture of Ajmer. Y3 - Eco Agriculture Village- Agra Taj Ganj slum DEWATS redevelopment Y2 - Archaeologist Centre Mani, Greece. Y1 - Columbian Market regeneration Seven Sisters, London.
ARCHITECT | ADP ARCHITECTURE University of Hertforshire, London UK - State of the Art Engineering department. - Project Architect - Stages 4-5 (5 Months) -Autocad / REVIT / BIM360 / NBS Chorus / Adobe Suite -Developing stage 4A /4B package. - Lead Architect for Facade package to be Co-ordinated structures services, detail design and planning discharges.
Esul@live.com
ARCHITECT \ ARB RIBA
Hyatt Black Lion House, London - Office to Hotel Conversion. - Architectural Assistant. - stages 3-4. 2 months - Autocad / REVIT / Adobe Suite -BIM submissions for tender packages. -Developed strategy for scaffolding and hording.
AUG 2017 - APRIL 2021
ARCHITECT | DEXTER MOREN ASSOCIATES UK
1a Bath Road. New Build Greenbelt Hotel. - Architect, - Stages 1-2. 7 months - Autocad / adobe suite / sketchup/rhino. -Developed documentation for LPA planning submissions, as addendums. SEP 2014 - SEP 2015
Camden Lifestyle Hotels Bayhem Street, London UK - New build 83 room hotel. - Architect - Stages 2-4 (5 Months) -Autocad / REVIT / Adobe Suite -Developed planning application package, inlc visuals, drawings. -Co-ordinated services, detail design and visualisation packages.
Empire City Mall Shop frontage, Kuala Lumpur. - Designed commercial shop renting spaces, providing design concept visualisation. -Implemented way-finding strategy that incorporated accessibility. OUG Mall Development , Kuala Lumpur - Rooftop Forest Cultural Quarter. - Architectural Designer - Stages 0-3. - REVIT / Rhino 3d / Adobe Suite / Auto-cad - Designed sustainability strategy for the development. - Designed concepts for mall open USPs. - Developed Corporate Social Responsibility strategy for the provision of a public green-space through replanting of tree
Mecure Bloomsbury, London. Conservation Scheme Grade II listed 114 room Hotel refurbishment and Extension. - Architect - Stages 3-4 (8 Months) - Autocad / Adobe Suite - Coordinated and developed tender package. Unisys, Wembley - Tower Refurbishment and New Build Residential masterplan. - Architectural Assistant - Stage 0-2. (3 months) - Sketchup / Autocad / Adobe Suite. - Developed urban master planning and concept facade designs. -Designed typical residential apartment layouts to standard. Pendley Manor, Tring, London UK - Conservation Lead Grade II Listed 86 Room Boutique Hotel Refurbishment and Extension. 16 months. - Architect -Stages 2-3, 5-6 15 months. - Autocad / Adobe Suite / Visualiser. - On-sight monitoring, planning of construction with hotel operation. - Developed tender / construction packages, sketches, authority submissions - Coordinated RFIs, interior design queries, and technical queries. - Liaised with local authorities and heritage bodies, satisfying sensitive conservation accreditation. Hobson House Cambridge - Grade II Listed Building Boutique 57 Room Hotel Conversion - Project Lead - Stages 0-2. 15 months. -Autocad / Sketchup / Adobe Suite - Developed concept into design packages achieving full planning permission and Listed Building Consent. Consistent site monitoring - Council Submission drawing packages and fenestration design. - Preparation CABE design review, pre-application and client presentation documents. Premier In New Marlborough Yard. New Build 274 Room Hotel. - Architectural Assistant - Stages 5-6. (2 months) - REVIT / Autocad. -Regular Site coordinating packages to on-site resolution. - Sketch design for construction resolution.
ARCHITECTURAL DESIGNER | HL DESIGN GROUP SDN. BHD. KUALA LUMPUR.
Menara Haw, Kuala Lumpur. Office Tower refurbishment and Landscaping - Project Lead - Stages 3-7 / 7 months - Autocad / Adobe Suite. - Co-ordinated landscaping and office tower facade refurbishment. Including planning tender and construction packages. - Responded to RFIs, Sketch Design, DCAs, interior design queries, and technical queries. Client facing and on-site experience. SEP 2013 - JUL 2014
Programme Managment Intern | UNHABITAT Housing & Slum Upgrading Branch | Nairobi. Global Housing Strategy GHS 2025. -Administered Branch tasks and responsibilities, including taking part in meetings, project reviews and design implementation. -Attendance as representative of UNHABITAT at CPR meetings. UNV/UN-Habitat Joint Partnership Mathare Project. -Participated in regenerating the Mathare Slums of Nairobi. -Aided community development and urban infrastructure planning. - Assisted in the designing and implementing of fire safety strategy. - Improved stakeholder coordination through the facilitation of meetings and regular field monitoring. Urban Revitalisation of Mass Housing International Competition. -Managed the UNHABITAIT International Mass Housing Competition -Contributed To the implementation and promotional design. Created samples, logos and plans for competition submittal. -Managed the data base in coordination with application, technical teams and panelists.
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi
ARCHITECT \ ARB RIBA
2
Facade Intersection Detail North / South CW
1:5
2
External rainwater drainage - Core
REVISION
1:5
External rainwater drainage - Perforated Rainscreen 1:5
1
TIME ON PROJECT
ADP ARCHITECTS
7 MONTHS
TYPE
EMPLOYER
As part of an investment into the University of Hertfordshire’s educational facilities, the SPECS engineering building encases state of the Art engineering workshops, studios and equipment for the exploration of science. The £60M project came with a complex brief of subject-specific requirements, numerous stakeholders and specialists input to reach fruition. The project boasted a BIM 360 BIM Level 3 platform for real-time coordination, which I become absorbed into successfully.
ARCHITECT
AUTOCAD ADOBE SUITE REVIT BIM 360 NBS CHORUS
STAGES
SOFTWARE
EDUCATION
ROLE
I lead the coordination and tender delivery of the Facades Package. The technical and comprehensive delivery required constant liaison with specialist consultants, suppliers and client team to produce a safe and detailed envelope. The facade is comprised of a unique perforated metal cladding and also GRC corrugated brick systems. The facade itself celebrated the nature of the sites engineering lineage, whilst commemorating the future of engineering brilliance.
STAGES 4+
HERTFORDSHIRE UK
UOH SPECS
3
GRC corrugated cladding to Perforated cladding Detail Plan
DATE
DESCR
CHECK ALL DIMENSIONS AND VERIFY ON SI
Th 15 Lo SE T E ww
JOB TITLE:
University of Hertfords SPECS BUILDING DRAWING TITLE:
EXTERNAL RAINWA DETAIL SCALE:
As indicated JOB CODE:
DRAWING NUMBER:
001234
P120-ADP-EF_25_10-X
Sulaiman Quereshi
Copyright: All rights reserved. This drawing must not be reproduced without permission.
Copyright: All rights reserved. This drawing must not be reproduced without permission.
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES
NOTES
Key:
Key:
ARCHITECTURAL PORTFOLIO 2021 07.2
FOH Areas
FOH Areas
BOH Areas
DOWNING PLACE ENTRANCE
BOH Areas
Courtyard
Courtyard Guestrooms
Guestrooms
ARCHITECT \ ARB RIBA
Existing Structure
Existing Structure RWDP
Ext
Stationary 2.6 m²
IT / COMS 9.2 m²
BOH Store 2.9 m²
Plant
Incoming Services
BOH Store 4.9 m² RWDP
CH+14.5
Limited Access Area
FFL +12.05
Chimney base TBC
Plant 26.7 m2
CH+15.03
FFL +11.60
CH+11.85
Linen 38.3 m2
Cycle 14.3 m² 16 Nos
CH+15.03
FFL +11.90
Lift
Staff Locker W/C 13.2 m²
Refuse 16.8 m²
Ladder up
Maintenance Store 5.4 m2
Ladder Down 06 19.2 m²
Staff 16.5 m²
05 28.9 m²
W/C 01 17.2 m²
HK Office 5.2 m²
01 19.4 m²
RWDP
External Courtyard
FFL +12.000
Servery 8.3 m²
Tea Room 187.5 m²
Maintenance Access only 25.25 m2
Total rooms Ground Floor: 14 Accessible Rooms: 2
07 28.6 sqm
P0 rev
ISSUED FOR PLANNING amendments
29.10.18 date
11 17.1 m²
FFL 11.50 +0.10
FFL +12.05
10 Accessible 23.4 m²
12 Accessible 21.4 m²
13 15.0 m²
Office GM 6.9 sqm 5.1 sqm
14 22.1 m²
CH+15.60
Lift FFL 11.90 CL 14.75 +0.10
09 16.5 m²
W/C 02 3.8 m²
CH+14.89
07.3
Reception/Lounge 67.5 sqm
DRILL HALL ELEVATION NORTH WING
Luggage 5.8 m²
P0 rev
SQ by
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
Hobson House St Andrew's Street, Cambridge CB2 3AS client
client
Henley Homes
Henley Homes
drawing title
drawing title
Ground Floor Part Retention Red Brick
Basement Level Part Retention
drawing status
drawing status
Located in the Heart of Cmabride’s city centre, the hotel will serve the city’s demand for both transient and extended stay boutique accomodation. The design-led and technologyP0 orientated suite encouraged THE PROPOSAL the brands bespoke FF&E to offord guests flexibillity and independance. From exensive preapplications, CABE design reviews and public consultation, the final product extended a lease of life for Hobson House.
Scale 1:100 0
1
5
07
10
checked by
1:100 @ A1 1:200 @ A3
12.09.18
SQ
PW
job no.
drawing no.
1385
A-100-050
Scale 1:100
07.5
revision
0
1
Henley’s plans will see Hobson House be restored and given a new life as a 57-room boutique hotel and tea room, with key features of the historic former police and fire station preserved, restored and opened up to the public. The hotel will fully utilise the existing spaces within Hobson House, taking into the interior the existing external drill hall and extending the rear to incorporate the historic Constables House.
Through a constant refinement within the design process, see previous section, the massing for the new build elements, mainly to the rear at Downing Place, have developed to become an appropriate addition to the heritage asset.
5
10
DETAILS
STAGES
NEW BUILD ELEMENT
Timber frame scribed into archway
07.1
Fire Rated Internal Glazing Fire Rated Glazing Panel
ST ANDREWS STREET FRONTAGE
Dexter Moren Associates architecture interior design urban design creative media Concrete Slab
AUTOCAD ADOBE SUITE SKETCHUP/RHINO
Fire Rated Internal Glazing
Concrete Slab
HOBSON HOUSE, CAMBRIDGE Design and Access Statement November 2018
Fire Rated Internal Glazing
EMPLOYER
DEXTER MOREN ASSOCIATES 30.00m
Dexter Moren Associates architecture interior design urban design creative media
Arch Window to Slab treatment (1:20)
25.00m
HOBSON HOUSE, CAMBRIDGE Design and Access Statement November 2018
82
Arch Window to Slab treatment (1:20)
[ A bove] Fire station door proposal precedent NOTES
1. GRID AND LEVELS RELATED TO ORDNANCE SURVEY GPS NETWORK
Dexter Moren Associates architecture interior design urban design creative media
20.00m
20.00m
2. ALL LEVELS ON KERB LINES ARE CHANNEL LEVELS UNLESS NOTED OTHERWISE. 3. SERVICE ROUTES HAVE BEEN IDENTIFIED BY LIFTING OF INSPECTION COVERS & VISUAL INSPECTION FROM THE SURFACES. 4. FOR SAFETY REASONS, DRAINAGE PIPE SIZES HAVE BEEN DETERMINED FROM THE SURFACE AND SHOULD BE TREATED AS APPROXIMATE ONLY.
DP St Andrew's St
PORTLAND STONE
PORTLAND STONE
5. DRAINAGE PIPE SIZES ARE DIAMETERS AND ARE SHOWN IN MILLIMETERS.
DP
6. TREE SPECIES SHOULD BE CHECKED BY AN ARBORIST IF CRITICAL.
POLICE
15.00m
15.00m
Revisions
A B C
WOOD
WOOD
PLINTH
PORTLAND STONE PLINTH
PLINTH
Demolish Retain and restore
Drawing No: SJG2265 Surveyed By:JJ Client:-
HOBSON HOUSE, CAMBRIDGE Design and Access Statement November 2018
Fire Rated Internal Glazing Light Panel
Fire Rated Internal Glazing
TILES
P0
Timber frame scribed into archway
Finally, the majority of the retained windows within the building will require a secondary glazing system to enhance thermal and acoustic properties. The proposal is for this to sit within the existing stone mullions and to have a lightweight dark bronze frame. This proposal will alleviate any intervention to the historic glazing whilst providing a suitable solution.
SOFTWARE
TILES
A-100-051
Within the process of converting the existing building into its new use, various new elements will be required to ensure the building maintains quality and safety standards. The following three pages touch07.5 on key EXISTING DRILL HALL fabric. areas where new elements will interact with the existing
14 MONTHS
TILES
1385
revision
WALL EXTENDED
TIME ON PROJECT
25.00m
PW
Secondly, to the North of the Drill Hall are five smaller arches with stone surrounds. As part of the proposal a two storey extension will be constructed behind these, the central floor of which will be visible from the proposed Tea Room. To minimise the impact of this floor it is proposed to set it back and in-fill the void with horizontal glazing which will alleviate its visual impact.
TYPE
H
checked by
SQ
drawing no.
TEA ROOM ARCHED WINDOW GLAZING DETAILS
ROLE
30.00m
drawn by
29.10.18
job no.
Firstly, among the key features of the proposed building, the large archways within the Drill Hall are proposed to be glazed to accommodate the Tea Room as an internal space and therefore require a sensitive approach to their details to ensure no damage to incurred to the existing fabric.
PROJECT LEAD
4
date
1:100 @ A1 1:200 @ A3
EXISTING WALL
The extensions on the north and south wings resolve the lack of connectivity between the historic and new build elements, giving level access from the new lifts and assisting with servicing the Boutique Hotel offering.
GRADE II LISTED BOUTIQUE HOTEL
scale
Dexter Moren Associates architecture interior design urban design creative media
The historic division of site split the street frontage into three and our proposal continues this allowing the Constable’s House to site centrally. The proposed buildings to either side vary in height from three and a half stories to the south down to two and a half stories to the north, where the streetscape steps down to the neighbouring heritage asset. The composition is capped with a mansard roof that sets back against the historic neighbouring property to the north and reflects its more domestic feel.
STAGES 1-3
PLANNING
CHIMNEY RETAINED
Ground Floor Plan
DOWNING PLACE
Basement Plan
drawn by
t: 020 7267 4440 f: 020 7267 6044
project
project
Hobson House St Andrew's Street, Cambridge CB2 3AS
date
SQ by
architecture
architecture
scale
29.10.18 date
57d jamestown road london nw1 7db UK
t: 020 7267 4440 f: 020 7267 6044
FEASIBILITY
ISSUED FOR PLANNING amendments
RWDP
57d jamestown road london nw1 7db UK
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
CH+14.720
FFL +12.05
Total rooms Basement: 0
From initial sketches into a long stretched planning submission and listed building concent, I lead the project to achieve unanimous planning approval. The grade II listed Hobson House, was a former police station, and now to be converted from council office space into a highend boutique hotel. The contemporary vernacular design celebrates various historic features including the exterior facade, ornate staircase and entrance hall and stain-glass windows. A former drill yard will become a fine dining restaurant.
RWDP
RWDP
08 17.4 m²
FFL +12.05
BOH 26.3 m²
RWDP
Lift Pit
FFL +12.05
Entrance Vestibule 19.6 sqm RWDP
FFL +11.60
Hobson House
CH+15.73
VOID
VOID
Hatch Entry
CAMBRIDGE, UK.
Plant
02 18.1 m2
04 17.5 m²
FFL 11.60 +0.10
FFL +09.78
Plant 11.6 m2
FFL +09.48
Lift
Limited Access Area
03 19.9 m2
RWDP
Drawn By:JJ
Checked By:SJ
Henley Homes
Revision
Sheet Size A1
Date 12/01/2018
Scale:-
Sheet 1/1
1:100
HOBSON HOUSE, CAMBRIDGE Design and Access Statement November 2018
84
74
69
Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
ARCHITECTURAL PORTFOLIO 2021
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
Sulaiman Quereshi
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES Existing building information has been taken from Maltby Land survey drawings received 05/05/15. Drawings to be read in conjunction with Structural Engineers details and specifications and Fire Strategy drawings.
Roof Access Hatch. PPC finish Ral 9005. Roof Cowl. Finish Ral 9005. Mansafe fall and arest system. PPC finish Ral 9005. Cable stainless steel. Refer to Structural Engineers details and specifications for existing structure retained.
Centre pivot velux conservation with lockable restrictions. PPC finish Ral 9005.
B
ARCHITECT \ ARB RIBA
550 001
1950
2403
14 100
555
486
Corridor
Existing rafters and tiles.
Corridor
2735
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
Room 222
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
Void
Key Plan
Toilet to be close coupled unit. Partial works completed in this area.
2280
2810
2350
Drawing based on the original scheme.
2280
2709
3110
1500
Where works have been partially completed, onus is with the contractor to ensure that the works completed to date are as per DMA drawings and specifications.
Standard Wardrobe and minibar units (unless stated on drawing):
All works are to be validated by the appointed contractor prior to further construction
1500works taking place.
1200 First Floor +135.56
Room 130
WC
HARCOURT
MANOR
Room 129
WC
Corridor
-Mini-bar and Wardrobe Unit 1500mm approx No works to be carried out in this area.
2350
100
550 2280
108
449
Floor Lamp
Side Table
Easy Chair
Side Table
1600
1350 x 2000 Small Double Bed
TV
2160
1350 x 2000 Small Double Bed
Bedside Lamp
& Bedside Reading Light
Bench
TV
Easy Chair
Easy Chair
Floor Lamp
Side Table
2480
Floor Lamp
129
409 2200
TV
550
2480
Bedside Lamp & Bedside Reading Light
1600
Side Table
Task Lamp
Desk/Dining
1600
Chaise Longue
Full Length & Full Width curtains & sheers
Wardrobe TCMF & Minibar
TCMF & Minibar
Wardrobe
Basin Shelf/Box Toiletries Shelf
Heated Towel Rail
℄
℄ WC
WC
1800
ALL SERVICES TO BE CONFIRMED BY SERVICES ENGINEER/MAIN CONTRACTOR ALL BACK OF HOUSE SPECIFICATIONS BY OTHERS.
Where works have been partially completed, onus is with the contractor to ensure that the works completed to date are as per DMA drawings and specifications.
1800
1800 Bedside Table Lamp
1350
1350
1600
Bedside Table Lamp
Bedside Table Bedside Table
700
All works are to be validated by the appointed contractor prior to further construction works taking place.
03
-
Pelmets revised inline with onsite review.
-
Rooms 108 & 109 to receive blinds in lieu of curtains, as confirmed by client.
rooms 110, 111 to have 1800mm beds in lieu of four poster beds. CB to confirm headboard size from site measure.
C4 Rooms 110 & 111 bed revision C3 Guest room pelmets revised C2 FCU requirments required wall build out in 110 111 C0 Issued for construction
31.07.19 13.06.19 05.05.19 17.03.19
SQ SQ SQ SQ
rev amendments
date
by
CG
450
450
750 450
LT
150
XXX
Painted skirting
Elevation B 1:20
CASEGOOD
TB
XXX IRONMONGERY XXX
SFG XXX
XXX
drawing status
TABLE
UPH XXX UPHOLSTERY
LIGHTING
WT
SOFT FURNISHINGS
ART XXX
ARTWORK
SEATING
AC
ACCESSORIES
SG
XXX
SW
XXX
SANITARYWARE
XXX
XXX
WINDOW TREATMENT
DRAWING LEGEND BB
0412/500
0412/102
Elevation & Dwg Location
PA - AA
Section & Dwg Location
Detail & Dwg Location
CH/000
00
FF&E Code
A
BB
0412/102
01
00-00
Setting Out Point
Ceiling Height
Furniture fitted from floor up to high ceiling level
LOW LEVEL ELECTRICS Cornice to match existing. PT
PT
Cornice to match existing. PT 04
PT
03
Sheer Make Up WT 303 Sheer Fabric
WTF 303A Curtain Make Up WT 302 Curtain Fabric WTF 302A
AC
AC Control
PT
CG
WT 303
CGF 204A Headboard Piping 1
WTF 303A
CGF 204B
WT 302 Curtain Fabric
PT LT LT
03
CG
SGF 503A
205
Cushion SFG 300 Cushion Upholstery SFGF300A
Painted skirting Painted skirting PT
450
450
Bed Frame & Base
02
BDS PT
02
01 02
Painted skirting Single socket & telephone
Elevation C
05
1:20
Elevation D 1:20 Copyright: All rights reserved. This drawing must not be reproduced without permission.
2
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
2 X 15mm SoundBloc
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES Acoustic sealant
To be read in conjunction with Partition Wall Type Drawings and Fire Strategy Drawings. All new walls to extend from SSL to soffit structure.
100mm Isover APR insulation
All plasterboards and battens where required to be cut to the profile of the soffit/concrete deck and acoustic intomescent seal requred to all sides.
60mm I stud framework with CoreBoard between studs shaftside, secured by retaining channel.
Noggins/pattresses to be incorporated where required for hanging furniture.
Gyproc Coreboard.
Corridor
1 X 15mm Gyproc Fireline.
Roof void
2 X 15mm Soundbloc to one side only.
Riser
All to be skim finished. Drawing based on the original scheme. Where works have been partially completed, onus is with the contractor to ensure that the works completed to date are as per DMA drawings and specifications.
Resiliant bar to one side only.
130
Guestroom
All works are to be validated by the appointed contractor prior to further construction works taking place. Fire breaks required for fire rated wall types gaps and penetrations. Notes Speicfic to C3:
100x50mm timber studs as per Structural Engineer's details and specifications
140
02
WALL TYPE 17 1:5
01
WALL TYPE 18 1:5
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
t: 020 7267 4440 f: 020 7267 6044
interiors project
Pendley Manor Hotel client
150
New Socket & Light Switch Bed Side Table CG
503
Armchair Upholstery
290
150
03
SG
290
1175
1300
PT
For door details refer to Architect's drawings number: A 500 020
205
Armchair
75
02
AA FJ FJ MA FJ LF FJ
by
57d jamestown road london nw1 7db UK
01
ID 404 010
704
Bed Side Table
Bathroom Door Leaf Finish
16.11.17 07.04.16 31.03.16 18.03.16 03.12.15 21.10.15 24.07.15
date
03 705
Table Lamp
704
Bathroom Door Frame Finish PT
For Tender For Contract MUR Code Updates Drawings updated following agreed changes as client approval Issued for Tender Issued for Contract Issued for Tender
Reading Light
705
Table Lamp LT
T6 T5 T4 T3 T2 T1 T0
rev amendments
Wall paint
WTF 302A Reading Light LT
204
Headboard Upholstery
Sheer Fabric
90
PT
WC light switch & switched spur to heated towel rail
EXISTING AND NEW SOCKETS
SWITCH
03
Headboard
Sheer Make Up
Curtain Make Up
Wall paint
250
KEY CARD
AC A/C CONTROLLER
Picture rail paint finish
03
Pelmet detail refer to drawing number: ID 251-004 Detail 2 F.C.L 2230 mm minimum
C
F.C.L 3160 mm minimum
04
Picture rail paint finish
Corridor
project
Pendley Manor Hotel
First Floor Existing Proposed Furniture Layout FF&E CODES IM
Painted skirting PT 02
03
Plaster / Skim finish.
t: 020 7267 4440 f: 020 7267 6044
drawing title
C
475
Double Socket Outlet & Data
140mm blockwork wall, layed to Structural Engineer's details and specifications.
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
client
Cleaner Socket
Painted skirting PT 02
F.C.L 3160 mm minimum
57d jamestown road london nw1 7db UK
Mandeville Hotel
For door details refer to Architect's drawings number: A 500 020
1:20
1100
Walls built out inline with FCU requirements within rooms 110 and 111. Notes specific to C3 revision:
200
1100
1500
HARCOURT
MANOR
Grid Lines
2 X 15mm soundbloc (Moisture Resistant in bathroom areas)
C1
Pelmet outer face to be set out 320mm from the inner face of the window as per DMA drawing ID 251 003, unless shown as full width on GA Layout.
architecture
Drawing based on the original scheme.
Finishes Code
48mm I stud framework.
Heated Towel Rail Shower 1700 x 750
700
RAD
1600
℄ WC
583
REFER TO ARCHITECTURAL DRAWINGS FOR FURTHER FLOOR, WALL, CEILING AND DOOR INFORMATION.
9.
17. ALL EXISTING WALLS AND CEILING TO BE MADE GOOD TO RECEIVE NEW PAINT FINISHES, TWO COATS MINIMUM.
207
1215
Elevation A
1:5
Rack
Side Table
CG
Desk Chair SG 504
02
WALL TYPE 16
Desk/Dining
BRAND, CLIENT & OPERATOR TO CONFIRM INFORMATION MEETS BRAND STANDARDS AND EXPECTED GUIDELINES AS WELL AS EQUIPMENT REQUIREMENTS.
8.
Entrance Room Door Leaf Finish PT 03
Desk CG 206
Painted skirting
01
Full Length Mirror
Floor Lamp
6.
7.
Entrance Room Door Frame Finish PT 02
208
Wardrobe
Guestroom
Shower 1700 x 750
TCMF & Minibar Shelf/Box
Wardrobe Shower 1700 x 750
Site Measure Reqd
Heated Towel Rail
Wardrobe
Shelf/Box
TCMF & Minibar
RAD Robe Hooks
Chaise Longue
Floor Lamp
WTF 303A
Key Card
1
Shelf/Box
℄
Sofa Bed
ALL SHOP DRAWINGS TO BE APPROVED BY INTERIOR DESIGNER PRIOR TO MANUFACTURE. DRAWINGS TO BE READ IN CONJUNCTION WITH INTERIOR DESIGN FF&E AND FINISHES SCHEDULES.
F.C.L 2230 mm minimum
Wardrobe
Mirror CG 209 Desk Lamp LT 706
CG 207 Minibar AC 800
0.5
-
Bedside Lamp & Bedside Reading Light
700
WC
Basin
Bedside Lamp & Bedside Reading Light
Sheer Fabric
PT
01
ID 404 011
03
Tea & Coffee Cupboard
0
Toiletries Shelf
773
℄
Heated Towel Rail
Bedside Lamp & Bedside Reading Light
Side Table
275
Curtain Make Up WT 302
01
EMPLOYER
Basin
WC
Bedside Lamp & Bedside Reading Light
ALL DIMENSIONS TO BE CONFIRMED ON SITE PRIOR TO MANUFACTURE. ALL SAMPLES MUST BE APPROVED BY INTERIOR DESIGNER PRIOR TO MANUFACTURE.
4. 5.
16. DESIGN PACKAGE SUBJECT TO ACOUSTIC REVIEW
PT
WTF 302A Wall paint
04
drawing no. works taking place. revision construction
A 120 001 Notes specific to C2 revision:
DRAWINGS SHOW INTERIOR DESIGN INTENT ONLY.
2. 3.
15. ALL CEILING FIXTURES REQUIREMENTS (INCLUDING WINDOW FURNISHINGS, BLACK OUT REQUIREMENTS, PELMETS, DROP DOWN SCREENS ETC.) ARE TO BE CO-ORDINATED AND CONTAINED WITHIN THE CEILING STRUCTURE ALLOWANCES.
Wall paint
WT 303 550
ID 404 013
PT
job no.
1264
14. OPERATOR AND MEP CONSULTANT TO DETERMINE SPECIFICATION OF ALL AUDIOVISUAL FITTINGS WITHIN THE CEILING. LOCATION TO BE DETERMINED BY OPERATOR, AV, MEP CONSULTANT AND APPROVED BY INTERIOR DESIGNER.
03
PT
03
Curtain Fabric
10
Drawings based on original scheme, works completed to date have been highlighted and are not included within this Tender.
FOR CONSTRUCTION Where works have been partially completed, onus is with the contractor to date ensure that the works completedchecked to datebyare as per DMA drawings drawn by and specifications. 1:50 @ A1 16.05.16 DD EC 1:100 @ A3 All works are to be validated by the appointed contractor prior to further
1800 x 2000 King Size Bed
1800
Robe Hooks
Shelf/Box
Toiletries Shelf
700
Bedside Lamp
& Bedside Reading Light
Full Length Mirror
Wardrobe
Bedside Lamp & Bedside Reading Light
01
ID 404 012
CLine Bed and TV Unit
Scale 1:100
Wardrobe
Full Length Mirror
Shower 1700 x 750
Task Lamp
Eq.
01
ID 404 011
02
Desk/Dining
250
PT
Sheer Make Up
Socket & TV outlet New CATS TV
PT
18
drawing title
No works to Section be carried AA out in this area. Harcourt Proposed
13. REFER TO KITCHEN CONSULTANT PACKAGE FOR FURTHER INFORMATION ON BAR & KITCHENS.
F.C.L 3160 mm minimum
04
Picture rail paint finish
Pelmet detail refer to drawing number: ID 251-004 Detail 2
01
TYPE
TCMF & Minibar
Robe Hooks
Bench
ID 251-003
ID 404 014
CG
Folding Luggage Rack
Wardrobe
℄
Folding Luggage Rack
1.
02
Eq.
Wall paint PT 03
client
MandevilleTotal Hotel
12. REFER TO LIGHTING INFORMATION BY ARCHITECT /LIGHTING CONSULTANT FOR SETTING OUT AND SPECIFICATION OF NON-DECORATIVE LIGHTING. ALL SAMPLES TO BE APPROVED BY INTERIOR DESIGNER.
F.C.L 2230 mm minimum
ARCHITECT
Wardrobe
WC
TCMF & Minibar
Eq.
03
1
Existing building Information taken from Maltbys Surveys April 2015.
11. ALL VISIBLE M&E FIXTURES TO BE APPROVED BY INTERIOR DESIGNER PRIOR TO CONSTRUCTION.
Cornice to match existing.
F.C.L 3160 mm minimum
PT 03 Ventilation Grille paint finish to match wall.
1
S - Suite
-
NOTES 4P
JS FP
PT
PT
TCMF & Minibar
Basin
Heated Towel Rail
Wardrobe
111 36m2 CD
10. NO EMERGENCY LIGHTING IS INDICATED ON DRAWINGS. CO-ORDINATION BY OTHERS FOR APPROVAL BY INTERIOR DESIGNER.
850
57d jamestown road london nw1 7db UK
JS FP 7267 4440 Junior Suite Fourpostert:f: 020 1 020 7267 6044
Notes specific to C4 revision:
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
700
1:50
Picture rail paint finish
Shelf/Box
Toiletries Shelf
Wardrobe
Desk Lamp
Note: Electrical sockets, TV, CATS and Telephone points 114 layouts as per PSH drawings 31m2
Full Length Mirror
04 Eq.
Folding Luggage Rack
Robe Hooks
Shelf/Box
TV
PT
ROLE
5
Toiletries Shelf
TCMF
115 23m2 CD
Desk/Vanity
1800 x 2000 King Size Bed
116 35m2 JS
Room 115 23m²
A
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
FCU
Cornice to match existing.
STAGES 1-2 / 5-6
DEXTER MOREN ASSOCIATES
Bench
Shower 1700 x 750 Basin
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
Easy Chair
STAGES
AUTOCAD ADOBE SUITE SKETCHUP/RHINO
WC
WC
UP
Mini Bar
Side Table
ELEVATION
4P
Copyright: All rights reserved. This drawing must not be reproduced without permission.
Key Plan
01
SOFTWARE
Full Length Mirror
℄
SL
Bespoke Desk
Bespoke Wardrobe
110 36m2 CD
Wardrobe
Floor Lamp
D
R2
3
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
drawing status
FCU
Mini bar at lower level to wardrobe.
112 21m2 CD
by
MUR
Blinds with sheers due to restricted head height
RAD
RAD
1600
date
S FP - Superior Fourposter
Pendley Manor Hotel
Wardrobe
5
2
AA
scale
108 21m2 CD
109 Bespoke Made 19m2 to Fit On Site CD
16.11.17
architecture
DOWN
UP
4P
rev amendments
RAD
Housekeeping
Blinds with sheers due to restricted head height 102 34m2 SFP
For Tender
project
Head Board Site Measure Reqd
-
AC - Accessible
JS - Junior Suite
℄
LIFT
Robe Hooks
Heated Towel Rail
R1
RAD
UP
1350
Heated Towel Rail
1350 4P
15 MONTHS
Task Lamp
Bedside Lamp & Bedside Reading Light
Shower 1700 x 750
Shelf
Pedestal Basin
Pedestal Basin
Full Length Mirror
Full Length Mirror
Shelf/Box
Full Length Mirror
Heated Towel Rail
Bespoke Wardrobe
107 18m2 CD
12
CT - Classic Twin
SD - Superior Double
1500x900mm Shower Tray
Linen 3 sqm
C
TIME ON PROJECT
Desk/Dining
Bedside Lamp & Bedside Reading Light
Full Length Mirror
Full Length Mirror
Full Length Mirror
DH 1.98
Shelf
Shelf
Pedestal Basin
4P
B
5
Full Length & Full Width curtains & sheers
Side Table
Bedside Lamp & Bedside Reading Light
120
TV
118 119 21m2 21m2 CD Workshop CD
1400x900mm Shower Tray
103 28m2 SFP
700
1
Furniture layouts and FF&E as reviewed onsite and phone by PM and CB.
CD - Classic Double
Task Lamp
Desk/Dining
117 21m2 CD
Full Length Mirror
UP
Smaller Mirror
1600
0
Desk units at 1000mm within rooms 102 and 109, remianing desks in all other rooms are at 1200mm.
C1
101 27m2 CD
GRADE II LISTED HOTEL REFURB & EXTENSION
Chaise Longue
Floor Lamp
Easy Chair
BOH Corridor
Desk/Vanity
Desk/Vanity
1350
FOH Corridor
Desk Lamp
Desk Lamp
Floor Lamp
Desk Lamp
Side Table
128
Room 026
1350 x 2000 Small Double Bed
106 20m2 CD
-Isolated Mini-bar unit 500m approx
2500
2860
WC
1350
105 29m2 Meeting CD Room 04
-Wardrobe Unit 1200mm approx
All works are to be validated by the appointed contractor prior to further construction works taking place.
500
1350
1800 4P
Basement Floor +129.60
Corridor
WC
104 24m2 CD
Chaise Longue
1
Room 027
Floor Lamp
0
2280
2730
Ground Floor +132.91
Drawings based on original scheme, works completed to date have been highlighted and are not included within this Tender. Where works have been partially completed, onus is with the contractor to ensure that the works completed to date are as per DMA drawings and specifications.
2730
3100
100
500
479
1200
Pendley Manor was listed in 1986, with Grade II status. As part of the planning application, a listed building consent application was included to allow the proposed works. Following consent, the works carried out to the building would form part of the listing. The Pendley Manor Hotel project entailed a refurbishment of the existing 73 room hotel, adding 13 to make a total of 86 new guest-rooms and a leisure centre comprising of a pool, spa with treatment rooms, dance studio and gym. The project programme was split into 4 phases to maintain hotel operation. The hotel would be split into the old wing of the building, The Manor House, and the newer addition wing, The Harcourt. The site also includes many other facilities including meeting rooms, restaurant and Banquette halls, and also vast expanses of manicured grounds (12.4 acres). As a project Architect, I played a pivotal role in the execution of the construction of the scheme. I developed key relationships was all involved and personally monitored site progress to ensure the design standards and quality were met. The project lead to me receiving a commendation for my RIBA Part III examination.
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES Scale 1:1000
529
459
WC
529
100
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
100
WC
Room 223
Void
2280
2280
2735
3120
Second Floor +138.67
Pendley Manor
2350
Copyright: All rights reserved. This drawing must not be reproduced without permission.
RIBA PART III CAR COMMENDATION PROJECT.
TRING, UK
WC
Room 303
100
1100
Existing rafters and tiles.
555
A
550 001
Third Floor +141.79
Refer to Structural engineers details and specifications for steelwork information. Existing beam size TBC by contractor upon opening up works.
00
Refer to Structural engineers details and specifications for steelwork information. Existing beam size TBC by contractor upon opening up works.
-
Contractor to review appropriate deflection head type
-
Contractor to review appropriate additional support for if T.V is required to be mounted on wall.
Mandeville Hotel Group drawing title
Mock Up Room/Roll Out Manor Bedroom Elevations drawing status
FOR TENDER scale
date
drawn by
checked by
1:20 @ A1 1:40 @ A3
24.07.15
AF
EC
job no.
drawing no.
1264
ID 251 200
revision
T6
FOR CONSTRUCTION scale
date
drawn by
checked by
1:100 @ A1 1:200 @ A3
12.08.18
SQ
EC
job no.
drawing no.
1264
A 130 103
revision
C4
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi ARCHITECT \ ARB RIBA
Premier In, New Marylebone Yard LONDON, UK.
Located between Waterloo Station and Tate Modern, in the heart of the London Borough of Southwark, this 274-key new build, mid-market hotel, has two separate blocks of accommodation connected via an elegant lightweight glazed bridge link. The 9800 sq ft development includes a ground-floor restaurant, fronting onto an inviting public courtyard and pocket park. My role allowed me to provide documentation and drawings in tender and construction phases, through BIM and on-site review. I was producing schedules, coordinating required services into the design as well as specifying and detailing issues onsite. The unique and complex project provided a great insight into a new build project of this scale.
STAGES
STAGE 5-6 ROLE
SUPPORT ARCHITECT TYPE
NEW BUILD HOTEL
TIME ON PROJECT
2 MONTHS
SOFTWARE
AUTOCAD ADOBE SUITE REVIT
EMPLOYER
DEXTER MOREN ASSOCIATES
6
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi ARCHITECT \ ARB RIBA
1A Bath Road SLOUGH, UK.
Neighbouring Heathrow and part of London’s greenbelt, the Bath road scheme was produced by the office to promote generous accommodation, sustainable design concepts that are immersed within nature. The scheme was revitalised to bring in the NPPFs most current policies, as well as a contemporary demand for such a hotel offer. Through my coordination of an esteemed consultation team, the scheme boasted rich ecological respect to the landscape, advanced services technologies and also the design lead sustainable double-skin facades. The scheme received planning consent successfully, for 192 high-end hotel accommodation, with vast conferencing space, and front of house provisions.
Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
STAGES
All shop drawings to be submitted to the architect for comment prior to fabrication. This drawing is to be read in conjunction with the Architect's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect.
STAGES 2-3
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES FF FP DR EV
ROLE
FIRE FIGHTING FIRE PROTECTED DRY RISER POWERED EXTRACT VENT [0.6M2]
ARCHITECT PL1-120
North 3:06
3:05
3:04 3:03 ACCESSIBLE ACCESSIBLE ROOM ROOM
3:02
4:11
3:01
4:10
4:09
4:08 4:07 ACCESSIBLE ACCESSIBLE ROOM ROOM
4:06
4:05
4:44
4:45
4:03 4:04 ACCESSIBLE ACCESSIBLE ROOM ROOM
4:02
4:01
4:12
4:13 BUILT IN PLANTER GUEST LIFT 1 [FF]
GUEST LIFT 3
STAIR 1 [FF]
3:42
3:43
3:44
3:45
3:46
PL1-130
3:18
East
3RD FLOOR TERRACE
PL1-120
PL1-121
EXTERNAL VOID
BB
PL1-130
BB
RISER
SERVICE LIFT 1
SERVICE LIFT 2
3:37
3:34
3:35
3:36
3:33
4:16
4:40
4:17
4:39
3:32
4:18
4:38
4:47
BB
PL1-130
RISER
4:19
SERVICE LIFT 1
SERVICE LIFT 2
4:37
4:36
4:35
4:34
4:25
4:26
4:27
4:28
4:33
4:32
LINEN ROOM
3:20
4:20
MAINTENANCE WALKWAY / BRISE SOLEIL
ACCESS FOR MAINTENANCE ONLY
4:46
EXTERNAL VOID
LINEN ROOM
VERTICAL LOUVRE
4:43
PL1-130
3:38
3:19
4:42
PL1-121
3:39
STAIR 1 [FF]
West
3:40
3:17
GUEST LIFT 3
4:41 ACCESSIBLE ROOM
4:15
West
3:16
GUEST LIFT 2
DR EV FF LOBBY
FOR PLANTING DETAILS REFER TO HED DWGS
3:41 ACCESSIBLE ROOM
3:15
BB
4:14
3:47
PL1-120
GUEST LIFT 2
DR EV FF LOBBY
East
GUEST LIFT 1 [FF]
3:14
SOFTWARE
DEXTER MOREN ASSOCIATES
3:08 3:07 ACCESSIBLE ACCESSIBLE ROOM ROOM
3:13
5 MONTHS
EMPLOYER
3:09
PL1-120
TIME ON PROJECT
AUTOCAD ADOBE SUITE SKETCHUP/RHINO
3:10
3:12
North
3:11
AA
NEW BUILD HOTEL
PL1-130
AA
PL1-130
TYPE
MAINTENANCE WALKWAY / BRISE SOLEIL
3:21
VERTICAL LOUVRE 3:23
3:24
3:25
3:27
3:26
3:28
3:22
3:29
3:30 STAIR 2
3:31
ACCESS FOR MAINTENANCE ONLY
4:21
4:23
4:24
4:22
4:29
4:30
N
4:31
STAIR 2
0
AA
PL1-130
AA
PL1-130
South PL1-121
South PL1-121
C B A
10m
2m
Revised layout and Sunken Garden ommitted Building height amended Drop off area, pedestrian footpaths & rear car park layout revised
rev amendments
7
THIRD FLOOR PLAN
SCALE 1:200
FOURTH FLOOR PLAN SCALE 1:200
08.11.18 08.02.10 12.01.10
SQ ZT ZT
date
by
57d jamestown road london nw1 7db UK architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
t: 020 7267 4440 f: 020 7267 6044
project
PROPOSED HOTEL 1-1A BATH ROAD, HILLINGDON, TW6 2BA client
SKYPORT ENTERPRISE UK LTD drawing title
PROPOSED THIRD & FOURTH FLOOR PLANS drawing status
PLANNING scale
date
drawn by
checked by
1:200 @ A1 1:400 @ A3
27.10.09
ZT
DM
job no.
drawing no.
0645
PL1-104
revision
C
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi
08
PR
ARCHITECT \ ARB RIBA
D
C
B
A
Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
sion to the north-east side will replace the while replicating the window formats and g building.
Proposed lowering of 8th Floor FFL
Room 710
Corridor 104
•
R
Riser
Room 613
95
1100
36.93
1150
Room 611
Corridor
88
34.81
6th Fl. FFL 44.930
86
34.15
2940
38.61
WORK IN PROGRESS
31.86 Issued for Information
rev amendments
28.91
28.03
1100
1118
Room 511
Corridor
06.02.20
JZ
date
by chk
JH
57d jamestown road london nw1 7db UK
79
29.83
Room 514
01
81
31.02
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
t: 020 7267 4440
architecture project
Mercure London Bloomsbury
73
client
Fairview Hotels
5th Fl. FFL 41.930
70
drawing title
Mansard Roof Section Details - Stair 02 Sheet 1 drawing status
FOR INFORMATION
Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any scale shop drawings.
Proposed Cosmo Place (SE) Elevation GA Scale 1:50@A1
REAR EXTENSION
0
1
2
Mansard Roof Section Details - Stair 02
0
Scale 1:25@A1 (1:50@A3)
5
1
date
drawn by
1:25 @ A1 All shop drawings to be submitted to the architect / interior designer for comment prior to 1:50 @ A3 fabrication.
06.02.20
JZ
no. This drawing is to be read in conjunction with the architect's / interior job designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
drawing no.
revision
5
2
1450
A-500-039
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
A-A
This drawing is to be read in conjunction with the following information:
C-C
A 120 001
A 120 003
- A 025 GA Existing Plans - A 035 GA Existing Elevations - A 045 GA Existing Sections - A 050 GA Demolition Plans - A 055 GA Demolition Elevations - A 100 GA Plans - A 110 GA Elevations - A 120 GA Sections - A 130 GA Floor Finishes - A 140 GA Wall Types - A 150 RCP - A 160 GA Fire Strategy - A 170 GA Doors and Window numbers - A 700-003 Door Schedule - A 700-005 Window Schedule
Room 801 (20 m2)
130-134
- NBS Specifications - Relevant Consultant's information
4000
KEY:
STAGES
Existing walls
STAGES 2-4
Proposed walls
D
ROLE
3900
ARCHITECT
B-B
B-B
A 120 002
A 120 002
Southampton Row
TYPE
C
Room 802 (14 m2)
Lift Overrun Stair
4500
HOTEL REFURBISHMENT AND EXTENSION
Lift
TIME ON PROJECT
110
8 MONTHS
117
B
SOFTWARE
Room 803 (14 m2)
Room 804 (13 m2)
Room 806 (14 m2)
Room 805 (13 m2)
WORK IN PROGRESS
5800
AUTOCAD ADOBE SUITE SKETCHUP/RHINO
01
Issued for Information
rev amendments
06.02.20
JZ
date
by chk
JH
57d jamestown road london nw1 7db UK
EMPLOYER
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
t: 020 7267 4440
architecture
DEXTER MOREN ASSOCIATES
A
project
Mercure London Bloomsbury client
Fairview Hotels
Cosmo Place 5600
01
SIDE EXTENSION
4800
02
6400
4800
03
04
A-A
A 120 001
Eighth Floor GA Plan
PROPOSED MASSING
Scale 1:50@A1
0
130-134 SOUTHAMPTON ROW D&A
1
28
2
5
01
NOTES
Copyright: All rights reserved. This drawing must not be reproduced without permission.
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
SQ JH
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
by chk
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
NOTES
06.02.20
Denotes Window Level / Window Number
New build elements
date
Existing facade / window repairs to be undertaken by specialist subcontractor
WX
XX
KEY:
Issued for Information
t: 020 7267 4440
57d jamestown road london nw1 7db UK
WORK IN PROGRESS
01
rev amendments
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
client
project
architecture
drawn by
Mercure London Bloomsbury
Fairview Hotels
drawing title
drawing status
Proposed Cosmo Place (SE) Elevation GA
revision
01
SQ
2000
A-110-002
date
drawing no.
06.02.20
FOR INFORMATION
1450
job no.
scale
1:50 @ A1 1:100 @ A3
F
E
EXISTING MASSING
R
2310
Existing Building Outline
ROOF EXTENSION
NEW WINDOWS ON EXISTING FACADE
•
7th Fl.FFL 47.870
102
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
8
S
These on the area.
2750
110
•
106
Through a successful planning achievement, the council’s comments on the conservation lead scheme where it was more aesthetically in keeping with its surroundings than the original building. My role of project architect leads me to develop the project into a successful tender for the client. The main challenges, which we aimed to tackle at tender stage, where the operation of the hotel in a staged construction and also the confined nature of a central London hotel.
NORTH-EAST REAR WING
Existing roof folding line height 8th Fl. FFL 50.620
1100
1100
DMA’s successful design uses high-quality materials and architectural elements complementary to the existing red and cream brick with Portland stone ornaments of the 08 late Victorian / Edwardian hotel. Combined with a deliberate decluttering of miscellaneous distracting external elements, the new extension allows the as aviews whole to engage more positively with the surrounding [ A ll]hotel I sometric diagram of FORM AND MASSING Cosmo Place elevation. townscape and enhance the character and appearance of the Bloomsbury Conservation Area.
EXISTING EXTERNAL STAIR
2687
2294
Outline of Section A-A in front shown orange dashed
The cu
Proposed folding line (intermediate ridge/ knee) height
117 116
The roof will be raised marginally to allow for guestrooms space on the existing roof space.
add one extra floor to the existing north-east ng to the rear some of the back rooms.
The pr curren hotel s
3000
Roof Extension
℄
Existing building roof line
2367
LONDON, UK
NOTES
Proposed roof
Newly Proposed 8th Floor Windows
1628 1811
Mecure Bloomsbury
Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
Existing Roof Outline
2021 2204
Current 8th Floor FFL
℄
Proposed roof
Proposed folding line (intermediate ridge/ knee) height adjustment
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.
3200
05
C-C
A 120 003
drawing title
3700
06
07
Eighth Floor GA Plan drawing status
FOR INFORMATION scale
date
drawn by
1:50 @ A1 1:100 @ A3
06.02.20
JZ
job no.
drawing no.
revision
1450
A-100-008
01
0
1
5 10
Sulaiman Quereshi
Generator H 3M
02 Guestroom
03 Guestroom
04 Guestroom
01 Guestroom External Stair
07 Guestroom
17 Guestroom
Water and Ice
18 Guestroom
19 Guestroom
Linen
08 Guestroom
16 Guestroom
15 Guestroom
14 Guestroom
13 Guestroom
12 Guestroom
11 Guestroom
09 Guestroom
10 Guestroom
All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.
Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.
Copyright: All rights reserved. This drawing must not be reproduced without permission.
This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.
10.08.20 30.07.20
by chk
SQ PW SQ PW
NOTES
date
Issued for Pre-application Issued for Draft Pre-Application
F1 F0
t: 020 7267 4440
57d jamestown road london nw1 7db UK
rev amendments
architecture urban design interior design creative media www.dextermoren.com dma@dextermoren.com
project
architecture
client
Bayham Street London, NW1 0EY Camden Lifestyle (UK) Ltd drawing title
Proposed Second Floor Plan
9
DEXTER MOREN ASSOCIATES
BAYHAM STREET
Camden Lifestyle
05 Guestroom
1:100
My role allowed me to lead the complex scheme into a new planning submitted, followed by a acceleration into stages 3 and 4.
06 Guestroom
ARCHITECT \ ARB RIBA
Proposed Second Floor
EMPLOYER
drawn by
AUTOCAD / REVIT ADOBE SUITE SKETCHUP/RHINO
drawing status
6 MONTHS
Pre-Application
revision
SOFTWARE
GC
TIME ON PROJECT
date
F1
NEW BUILD SUSTAINABLE HOTEL
scale
A-100-102
TYPE
drawing no.
ROLE
05.04.2020
ARCHITECT
job no.
1783
STAGES 1-3
1:100 @ A1 1:200 @ A3
STAGES
In review of the previously approved scheme, from alternative archites, numerous issues were raised in relation to layout efficiencies, buildabillity and viability. Furthermore, the consented scheme did not comply with current fire regulations as it lacked a second means of escape, which has now been intricately incorporated through the use of an external stair. The consented scheme also had insufficient service/ plant areas. Through professional consultation with structural and services consultants, the proposed scheme is now more buildable and adequate plant and servicing for the intended hotel offer has been allowed for. The new scheme offers a better quality of hotel, with an increase of hotel key provision, reconfigured FOH area and quality office space. All of which contribute to the successful development of the Camden Lifestyle Hotel.
LONDON, UK
ARCHITECTURAL PORTFOLIO 2021
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi ARCHITECT \ ARB RIBA
5263
2 3115
3 3110
BB 07
1058
02
03
Luxury Ski Chalet
346
01
672
10
360
BEAM LEVEL + 1780.26
2 3141
3615
A high-end residential Ski Chalet set within a challenging environment, provided a unique project experience. The role required me to assist in the coordination and technical delivery of stages 3/4 for the project. The unique environment required constant review of material suitability, as well as the accuracy of the architecture with the terrain. I further assisted through the delivery of BOH, external and interior drawing packages.
BEAM LEVEL + 1776.285
3265
360
ARGENTINA
BEAM LEVEL + 1781.292
Dining Room
2 3120
NOTES
Drawings are not based not accurately represent Do not scale from this d All dimensions are in mi Studio Lord shall be not
09
1 3211
UPPER GROUND FFL + 1773.02
295
STAGE 3 - DESIGN I
THIS DRAWING HAS B IS DESIGN INTENT AT CONSTRUCTION. IT S REPORT THAT SETS O
1245
THE LOCAL TEAM AN INFORMATION AND D CONTRACT ADMINIST PROCUREMENT OR FA
IT IS THE RESPONSIBIL PROPOSED DESIGN IS APPROVALS AND BUIL
11
2260
Kitchen
825
12
3 3210
LOWER GROUND FFL + 1769.22
STAGES
STAGES 3+ ROLE
ARCHITECT
E-E 2302
B-B 2301
E-E 2301
TYPE
HIGH-END RESIDENTIAL
BB 1 - Glue laminated timber frame 2 - Glue laminated fascia board 3 - Glue laminated rafters C1
B11
B10
B9
B8
B7
B6
B5
B4
B3
B2
B1
A10
A9
A8
A7
A6
4 - PPC aluminum window frame 5 - PPC aluminum panel
1 Detail Section Dining Room and Kitchen 3012 1:25 @ A1/ 1:50 @ A3
6 - Timber door 7 - Zink roofing 8 - Zink gutter 9 - Bespoke timber and PPC aluminum balustrade
TIME ON PROJECT
1 MONTH
SOFTWARE
AUTOCAD ADOBE SUITE
0 - Bespoke timber screen with PPC aluminum frame 1 - Natural stone 2 - Precast RC lintel to structural engineer's specification
1 3002
13 - Precast RC coping to structural engineer's specification. 4 - Timber infill pane 5 - Movement joint 6 - Timber garage door
NOTES Drawings are not based on accurate topographical survey data and may not accurately represent what is physically present. Do not scale from this drawing. All dimensions are to be verified on site. All dimensions are in millimeters unless noted otherwise. Studio Lord shall be notified in writing of any discrepancies.
KEY PLAN
REV
DATE
DRAWN
CHECKED
REASON
CLIENT
DRAWING TITLE
REVISION
STATUS
B
Detail Sections
Thornham Management Limited
C
For Information
KEY PLAN
B
C
PROJECT
PROJECT No.
Baguales
20001
DRAWING No.
BAG-SL-ZZ-XX-DR-A-3012
SCALE
1:25@A1
EMPLOYER
STUDIO LORD
10 REV
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi ARCHITECT \ ARB RIBA
PROJECT TITLE :
PHASE 1 PROPOSED TEMPORARY LANDSCAPE ON LOT PT1226, SEKSYEN 57, JALAN SULTAN ISMAIL, KUALA LUMPUR, WILAYAH PERSEKUTUAN.
PHASE 2 PROPOSED PODIUM FACADE & LOBBY UPGRADE FOR MENARA HAW PAR ON LOT 242, SEKSYEN 57, JALAN SULTAN ISMAIL, KUALA LUMPUR, WILAYAH PERSEKUTUAN.
TAPAK CADANGAN
ARCHITECTURE PACKAGE
02
KEY PLAN NTS
TO 'S
NT CO DE TA IL
46
PA5252
45
PA 113623
1222
PA103449
1359
1208
Menara Haw Par is located at the heart of Kuala Lumpur, an environment which is constantly ever evolving. Being given the opportunity to influence both the design, tender and construction management stages enhances much of my understanding in the professional context of architecture. PLAN 03 LOCATION The office tower was my work environment, as such I had been constantly evolving along with the project itself. Through development stages such as governmental submissions and construction tender, I was immersed into the scale of the proposal, understanding how each detail need to be nurtured. The delivery of the package entailed two stages, stage one the internal refurbishment of the lobby and rental units, and stage two the landscaping and tower facade. MHP Tower project was completed in 2016. PA 101060
1223
861
N
11
14
13
1242
PA
KUALA LUMPUR, MALAYSIA
44
LL
221
43
G
AN
MP
NA
LA
JA
FA
PA11508
PA20118
LOT PT1226 PHASE 1
95
186
OP
PA101227
SL
Menara Haw Par
FOR HAW PAR LAND (MALAYSIA) SDN. BHD.
1226
TAPAK CADANGAN
KEY PLAN
PA 104575
242
JA
1225
LA
N
SU
LT
1235
PA104184
AN
PA 103624
IS
M
AI
L
1228
1291
NTS
REVISION
DATE
REVISION DESCRIPTION
CHK. BY
" THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING " FEATURE WALL WITH LOUVERS TO ARCHS DETAIL EXISTING DRAINAGE WATER WATER INLET FROM EXISTING OUTLET TO RISER SUPPLY EXISTING DRAIN
MECHANICAL & ELECTRICAL ENGINEER
GREASE TRAP WITH OUTLET TO MAIN DRAIN
CIVIL & STRUCTURAL ENGINEER :
LOT 242 PHASE 2
ARCHITECT :
AR. AHMAD IZAHAM ARCHITECT LAM A/A 116 54-C, JALAN MEMANDA 9, AMPANG POINT, 68000, AMPANG, SELANGOR DARUL EHSAN. TEL : 603 4256 9787 FAX : 603 4256 6787 E-MAIL : ahmad.izaham@hlarchitecture.net
DESIGN CONSULTANT
:
HL Design Group Sdn. Bhd.
(Formerly known as Positive Trend Sdn. Bhd.) LEVEL 30 , MENARA HAW PAR, JALAN SULTAN ISMAIL , 50250 KUALA LUMPUR , MALAYSIA. TEL : 603 2072 6223 FAX : 603 2072 7223 E-MAIL : studio@hlarchitecture.net
STAGES
HAW PAR LAND (MALAYSIA) SDN BHD
STAGES 2-6
9TH FLOOR, MENARA HAW PAR, JALAN SULTAN ISMAIL 50250 KUALA LUMPUR, MALAYSIA TEL: 03 2070 1855 FAX: 03 2070 6078
ROLE
DRAWING TITLE :
PROJECT LEAD
20
19
18
2550
17
2550
16
2550
15
2550
14
2550
13
2550
2550
12
11
2550
1000
10 1000
9 1000
8 1000
7
6
1000
6075
5 3650
4
3
1900
2
1900
1
1900
PROJECT TITLE :
1900 +39.20
ACALYPHA WILKESIANA CULTIVA
NEW SLOPE LINE
1200
+34.00
1200
+36.20
1200
450
400
600
design group +34.00
DECEMBER 2014
15 15
12660
300
50 25 100
200mm THK TOPSOIL GROWING MEDIUM
275
1200
VOID
KEY PLAN
WATERPROOFING TO ENGR'S DETAIL
600 x 300mm x 20mm THK COMPRESSED SANDSTONE PANEL WITH BRUSHED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)
300
850
275
VOID
ACALYPHA SIAMENSIS
45° CHAMFER 20 x 30 mm STAINLESS STEEL ANGLE WITH HAIRLINE (GRADE 304) TO ARCH'S DETAIL
350mm THK BASE COURSE
30
90 150
135mm THK RC RETAINING WALL TO ENGR'S DETAIL
30 400 x 200 x 60mm THK GREY 'PRIME PAVER' TO ARCH'S SELECTION
400 x 150mm THK RC SHALLOW FOOTING TO ENGR'S DETAIL
02 ELEVATED PLATFORM DETAIL SECTION
30mm THK QUARRY DUST BEDDING TO MANUF'S DETAIL
NEW SLOPE LINE
I 1800
H 1800
50mm Ø PERFORATED PVC DRAIN PIPE
FFL +34.00
1:10
J
230
30
F
G 1800
1800
E 1800
REVISION
DATE
REVISION DESCRIPTION
CHK. BY
" THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING "
D
B
C
1800
150
400
HL DESIGN GROUP
90 150
400
30
3472
1100
350mm THK BASE COURSE TO MANUF'S DETAIL
600 x 180 x 50mm THK COMPRESSED SANDSTONE COPING WITH BRUSHED FINISH (COLOR SF108)
A 1100
200
20 10 135
465 850
MECHANICAL & ELECTRICAL ENGINEER
FFL +39.20
16000
FFL +38.20
4°
16000
4°
FFL +34.00
16000
1200
20 x 30 mm STAINLESS STEEL ANGLE WITH HAIRLINE (GRADE 304) TO ARCH'S DETAIL 600 x 300mm x 20mm THK COMPRESSED SANDSTONE PANEL WITH BRUSHED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)
1200
11
4°
CIVIL & STRUCTURAL ENGINEER :
FFL +36.20
16000 4°
FFL +35.20
1200
17250 4°
FFL +34.00
200
03
ELEVATION 2
05
450mm HIGH CONCRETE SEATING TO ARCH'S DETAIL
1:100
RETAINING WALL DETAIL
1:10
ARCHITECT :
AR. AHMAD IZAHAM ARCHITECT LAM A/A 116 54-C, JALAN MEMANDA 9, AMPANG POINT, 68000, AMPANG, SELANGOR DARUL EHSAN.
150 x 150 x 50mm THK COMPRESSED SANDSTONE COPING WITH BRUSHED FINISH (COLOR SF108)
B
200 200
200
200
1100 600 x 300mm x 20mm THK COMPRESSED SANDSTONE PANEL WITH BRUSHED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)
C
D
1100
3470 150mm THK RC WALL WITH SMOOTH TROWEL FINISH & 'DARK GREY' COLOR PIGMENT TO ENGR'S DETAIL
10mm GROOVE LINE
CAST IN SITU CONCRETE BOLLARD WITH SMOOTH TROWEL FINISH
E 1800
400 x 200 x 60mm THK GREY 'PRIME PAVER' TO ARCH'S SELECTION
600 x 180 x 50mm THK CAESALPINIA FERREA COMPRESSED SANDSTONE COPING WITH BRUSHED FINISH (LEOPARD TREE) (COLOR SF108)
10
10 50
A
130
390
10
FFL 33.95
30mm THK QUARRY DUST BEDDING TO MANUF'S DETAIL
DESIGN CONSULTANT
:
HL Design Group Sdn. Bhd.
CLIENT :
HAW PAR LAND (MALAYSIA) SDN BHD 9TH FLOOR, MENARA HAW PAR, JALAN SULTAN ISMAIL 50250 KUALA LUMPUR, MALAYSIA
FFL 34.00 RC STEPS WITH SMOOTH TROWEL FINISH TO ENGR'S DETAIL
TEL : 603 4256 9787 FAX : 603 4256 6787 E-MAIL : ahmad.izaham@hlarchitecture.net
(Formerly known as Positive Trend Sdn. Bhd.) LEVEL 30 , MENARA HAW PAR, JALAN SULTAN ISMAIL , 50250 KUALA LUMPUR , MALAYSIA. TEL : 603 2072 6223 FAX : 603 2072 7223 E-MAIL : studio@hlarchitecture.net
200 x 200mm CONCRETE EDGE RESTRAINT TO MANUF'S DETAIL 350mm THK BASE COURSE TO MANUF'S DETAIL
TEL: 03 2070 1855 FAX: 03 2070 6078
DRAWING TITLE :
ELEVATION 1 ELEVATION 2
:
JOB NO :
N
50 40
850
VOID
600 x 180 x 50mm THK COMPRESSED SANDSTONE COPING WITH BRUSHED FINISH (COLOR SF108)
15
300
83 10
125
90mm THK RC WALL TO ENGR'S DETAIL
FFL +34.00
135
20 50
80 20 50
25 x 50mm x 3MM THK GAL. RHS BATTEN CONNECTED TO GAL. RHS JOIST WITH 30 x 30 x 3mm THK GAL. ANGLE TO ENGR'S DETAIL
15 15
450
3050 x 125 x 25mm THK COMPOSITE WOOD DECKING TO MANUF'S DETAIL
120
300
300
10 83 5
150
600
600 x 300mm x 20mm THK COMPRESSED SANDSTONE PANEL WITH BRUSHED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)
50 x 100 x 3mm THK GAL. RHS JOIST WELDED TO 50 x 100 x 3mm THK 50 x 100 x 3mm THK GAL. RHS BEAM CONNECTED TO GAL RHS BEAM RC WALL TO ENGR'S DETAIL TO ENGR'S DETAIL
50 25
FFL +34.45
15 15
20 x 30 mm STAINLESS STEEL ANGLE WITH HAIRLINE (GRADE 304) TO ARCH'S DETAIL
:
CAD FILE NO
: DECEMBER 2014
5
45° CHAMFER
SCALE
AZ
:
DATE
ARCHITECTURE PACKAGE ( PHASE 1 )
17
CL/SQ/AZ
DRAWN BY
FOR HAW PAR LAND (MALAYSIA) SDN. BHD. CHECKED BY :
+35.20
2550
600 x 180 x 50mm THK COMPRESSED SANDSTONE COPING WITH BRUSHED FINISH (COLOR SF108)
15 15
100
SOFTWARE
120
80 20 50
LED STRIP TO MANUF'S DETAIL
KEY PLAN, LOCATION PLAN SITE PLAN
TENDER 18
EMPLOYER
+38.20
1:100
15 15
AUTOCAD ADOBE SUITE SKETCHUP/RHINO
150mm THK RETAINING WALL TO ENGR'S DETAIL
PROPOSED TEMPORARY LANDSCAPE ON LOT PT1226, SEKSYEN 57, JALAN SULTAN ISMAIL, KUALA LUMPUR, WILAYAH PERSEKUTUAN. ISSUE OF DRAWING
ELEVATION 1
TIME ON PROJECT
8 MONTHS
500
800
900
150mm THK SCULPTURAL WALL TO ARCH'S DETAIL
700
CAESALPINIA FERREA (LEOPARD TREE)
600
FFL 34.00
1000
1:150
01
450mm HIGH ELEVATED PLATFORM TO ARCH'S DETAIL
KEMUTONG TREE
800
SITE PLAN
RC STEPS WITH SMOOTH TROWEL FINISH TO ENGR'S DETAIL
1300
01
150mm THK SCULPTURAL WALL TO ARCH'S DETAIL
450mm HIGH CONCRETE SEATING
1200
ACALYPHA SIAMENSIS SHRUB PANDANUS PYGMAEUS SHRUB
1200
TYPE
COMMERCIAL OFFICE TOWER
design group
CLIENT :
design group
1:150 G:\12660(P)-Haw_Par_Extension\02-Architecture\
CAD XREF NO : G:\12660(P)-Haw_Par_Extension STAGE
T
DRAWING NO. :
A11000
REV. NO :
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi
VISION OPENING 2018
MARKETING 2015 - 2018
SITE CLEARANCE 2015
PRE DEVELOPMENT 2015
ARCHITECT \ ARB RIBA
PUBLIC ART USING MILLABLE
OUG Development KUALA LUMPUR, MALAYSIA
STAGES
STAGES 2-3 ROLE
PROJECT LEAD
TYPE
COMMERCIAL OFFICE TOWER REFURBISHMENT
TIME ON PROJECT
4 MONTHS EMPLOYER
HL DESIGN GROUP
12
The OUG Mixed-use development is a 22acre space located in Kuala lumpur. The proposal brings forth a mall complex, office towers, residential towers and hotel towers. The development’s location is critical to its surrounding areas as intended to promote the integration of a whole new community to an already thriving suburban community. My intervention to the concept would be through outdoors spaces, social and cultural spacial design, and an Urban rooftop garden hosting urban farming concepts through Aquaponics. By using technologies such as rainwater harvesting and filtration to provide usable water for the development, we intended to become a president in sustainable design in the region. The canopies have been assorted to shelter the urban Aquaponic farm, defining the space and allowing the necessary natural light in to maintain the balanced environment required for such farming. I took initiative to head a Corporate Social Responsibility programme for the provision of a public greenspace through replanting of tree and plant saplings on-site prior demolition. The Saplings would be placed within a communal garden for residents of the mixed-use complex and local community. Through successful pitching of the technical and programmatic documents, the CRS balanced the economic demands of developers and access of local community, whilst fostering a natural environmentally positive solution
REPLACEMENT TREES FOR COMMUNITY FOREST.
Opening processes:
- Ribbon cutting - Replacement tree planting at OUG roof park - News coverage - Open day event
EXISTING
MILLABLE
COMMUNITY PLANTING EVENTS
SITE ECO SYSTEM
TIMBER RETAINED
TIMBER
TREE NURSERY MAINTAINED
INDIGENOUS SAPLING SPE-
AT ‘R1’ SITE
CIES RETAINED
NEW RESIDENTS INHERIT TREES WITH HOMES
- Marketing program Initiated
During excavation: OUTCOMES -Noise control
-Dust control WCTL -Water pollution control
Existing eco system preservation and survey carried out RESIDENTS + USER GROUPS
• CSR STRATEGY
• PLATFORM FOR ENGAGEMENT
• COMMERCIAL + CIVIC ACTIVATION OF AUTHORITY
• GIVING BACK THEIR TREE AND AMENITIES
Sales unit to be developed REQUIRED SPACE at siteOPEN ‘R1’ with landscaping • for PROACTIVE REACTIVE APPROACH TO CITItreeNOT nursery.
• ENHANCED INTEGRATION WITH PUBLIC SPACES, (ROOF GARDENS AND LANDSCAPES
ZEN CONCERNS
• ENHANCED INTEGRATION WITH EXISTING
• POSITIVE MARKETING ANGLE
COMMUNITIES
• ENHANCED VISIBILITY ON SALES
• IMPROVED SENSE OF CIVIC AND NATIONAL
• FLOW-ON TO SALES
PRIDE
• ENHANCED STATUS AND CREDIBILITY WITH GOVERNMENTAL, CORPORATE AND SOCIAL NETWORKS • PUBLIC ROOFTOP ACTIVITIES FLOW INTO MALL COMMERCE
ARCHITECTURAL PORTFOLIO 2021
Sulaiman Quereshi ARCHITECT \ ARB RIBA
RIBA PART I CASS SCHOOL OF ARCHITECTURE
10.09.10
10.09.13
13
Undertaking the RIBA Part 1 course at the CASS School of Architecture provided a personal pivotal milestone into my architectural profession and education pathway. During the first year, this undergraduate course provided students with a platform to expand unfiltered creative designs and spatial ideas, allowing us to explore those ideas using various techniques and expressions. Towards the end of the year and as I approached the second year my tutors began to encourage me to capture my ideas within specific boundaries of conventions in the form of set briefs. Through these limitations, I began to understand that the scope of responsibility that this profession may hold was indeed a learning curve. I successfully completed the course, having driven approaches of architecture, that where holistic, sustainable and within a diverse range of contexts.
Sulaiman Quereshi ARCHITECT \ ARB RIBA
RIBA PART II : USE MANCHESTER SCHOOL OF ARCHITECTURE
10.09.15
10.05.16
14
My exploration and research within the university led me to STUDO USE. Here i explored the potential of urban artistic intervention to convert dis-used world war two bunkers within Dortmund Germany to house an entire network of production, consumption, and mobility, of a staple smoked meat for Dortmund. This proposal also aimed to integrate the recent flux of migrant communities around the region. The theme of agrarian reform helped me dismantle the way food shapes our cities, and in particular, I focused on the model of Cuba through its revival from the impacts of the embargo, as the country provided for its national demand through localized, community-led food supply.
Sulaiman Quereshi ARCHITECT \ ARB RIBA
RIBA PART II : MSAP MANCHESTER SCHOOL OF ARCHITECTURE
10.09.16
10.05.17
15
Throughout the summer in between the years of the MArch degree, I joined the WWOOF initiative, (World Wide Organisation for Organic Farming), which allows organic farmers around the world to invite members to work on their farms in exchange for accommodation and food. One of the farms I worked on was with a family within Aljezure Portugal, A town which would become the focus of my final year design thesis. Using a registered staple cuisine, the Aljezure Sweet Potato, for which the town hosts an annual festival where 25,000 people congregate for the harvest of the vegetable, I proposed an agrarian reform of the region. The master planning provided for a closed loop system across the Aljezure valley, suggesting it could become a precedent for sustainable living within Europe through this. I further explored the architectural material of the region by investigating harvest cycles to ethically produce my proposals onsite. For example, cork is known to be harvested in abundance within the region, however, it is required to be hung to dry out for 6 months, and to promote its ancestral harvest technique, I proposed that the façade of my building would have Cork solar shading which would be changed annually through an integrated cork festival.