ATHLETICS AND ACTIVITIES, BUSINESS AND FINANCE,
Renovated library at C. H. Bird Elementary
AND FACILITIES AND GROUNDS DEPARTMENTS. This team is integral in the support of our mission of Every Child, Every Day in areas like school nutrition, safety, cleanliness, materials, budgeting and ordering, teacher retention, etc. Providing our students with a top-quality physical learning environment is important to us, and we are continuously investing back into our facilities. We work hard to provide a physical environment that is safe and conducive to how learning has evolved over time.
New tile and lockers at C. H. Bird Elementary
• Porcelain tile was placed in
Middle School boilers
the hallways at C. H. Bird. • New furniture and
Recent projects were completed through our Capital Projects
carpeting were installed in
budget, including projects identified in the 2016 referendum,
the LGIs at C. H. Bird and
projects identified in the 2019 referendum, and projects that were
Westside, and paint work was done.
completed with conserved funds from the 2016 construction of Meadow View and Token Springs Elementary schools.
Some of the Recent Projects Elementary Schools: • C. H. Bird, Eastside, Northside, Royal Oaks, and Westside all received new lockers or cubbies to replace the old ones that were rusting. • C. H. Bird, Eastside, Northside, and Westside had hallway wood paneling replaced with a more modern drywall finish that matches the interior finish of our newer elementary schools. • LED lighting retrofit projects were completed at Horizon and Creekside.
facilities
OUR HUMAN RESOURCES, SCHOOL NUTRITION,
& operations
THE “OPERATIONS” OF THE SCHOOL DISTRICT INCLUDE
Northside Elementary lockers
• Eastside and Northside had new casework installed in their staff lounges and paint work was done. Secondary Schools: • Patrick Marsh and Prairie View received two new boilers, new exterior windows with integral blinds, skylight replacements, new flooring in needed areas, and paint work. • LED lighting retrofit projects began at Patrick Marsh. • At Sun Prairie High School, work was done to refurbish the mulch beds at the front of the school, and work is being completed to replace the short backstop areas at the softball fields with taller netting backstops to prevent foul balls from leaving the playing area.
• Classroom door openings to support personalized learning were added at C. H. Bird, Creekside, Eastside, and Horizon.
2019–2020 A REPORT TO OUR COMMUNITY