Suzaan Swart - Architect CV & Portfolio

Page 1

SUZAAN SWART

curriculum vitae /// architect


personal details FULL NAME & SURNAME /// Suzaan Swart

NATIONALITY /// South African

DATE OF BIRTH /// 11 December 1991 LANGUAGES /// English & Afrikaans CONTACT DETAIL /// 0846 62 02 10 EMAIL /// suzaanswart@yahoo.com

education SCHOOL ATTENDED /// Reddam House Constantia - 2009

SUBJECT CHOICES /// Mathematics /// English 1st Lang. /// Afrikaans /// Physical Sciences /// Accounting /// Design /// Life Orientation

TERTIARY EDUCATION /// University of the Free State 2010 - 2014 2010 - 2012 /// BAS Degree [Baccalaureus Architecturae Studorium] 2013 /// B. ARCH [Honours] 2014 /// M. ARCH. PROF [Masters] /// Thesis topic: Not an institution: a new facility for the institute for Reconciliation and Social Justice 2016 /// Professional practice examination (October 2016)

skills

awards

HIGHEST GRADE /// Matric (Full Exemption)

SUZAAN SWART aboutme me /// manifesto about

Inspiration is everywhere. I am intrigued by beautiful architecture, sculptural works and formgiving. From an early age I have had a passion for architecture and design. Throughout my life I have always been an ambitious person, striving to do the best and as a result have developed many skills in order to achieve my goals. I work well under pressure, with a high production rate in a short amount of time. Over the years I have taught myself to organize and manage time in order to make a success of all my endeavours. I consider myself a hard-working and motivated person in every aspect of my life with a work ethic that proves my dedication. I am an open-minded person, with a very systematic and pragmatic approach when it comes to design and architecture. I enjoy advice and input from my peers, as I believe that teamwork is of utmost importance in the architectural field. I adapt quickly to new environments and would consider myself a people’s person, always happy to meet and work with new people.

/// Archicad High /// Autodesk AutoCAD Intermediate /// Google SKETCHUP High /// Adobe Photoshop + InDesign High /// Detail design High /// Technical resolution High /// 3D computer modelling High /// Running of site meetings and project architect duties High /// Interior design skills High

REFERENCES /// Greg Wright Director at Greg Wright Architects 082 855 6946 /// Irma Sergeant Design teacher Reddam House Constantia *letter of recommendation /// Jaco Olivier Design Lecturer and Masters mentor University of the Free State olivierji@ufs.ac.za *letter of recommendation /// See attached letters of recommendation

2009 /// Sportwoman of the year award /// Best Design student [RHC] 2012 /// UFS Waterpolo player of the year (UFS) 2013 /// UFS 4th year architecture competition [Winner of an internal architectural competition for the UFS, to be bu

leadership 2012 /// Wag-’n-Bietjie Residence Commitee [Portfolio: RAG] 2013 /// University of the Free State 1st team Waterpolo captain

community service (RAG) UNIVERSITY OF THE FREE STATE RAG 2010 /// Rag Finalist [Raise R28 000 for Kidz Care Trust & Vrystaat Nasorg Sentrum] 2011 /// UFS RAG Finalist 2012 /// Best RC RAG on UFS campus /// Best overall RAG Hostel on UFS campus /// Best Ladies RAG Residence /// Most Improved Residence /// Overall Float winners /// Award for excellent leadership

work experience

interests

Nov 2014 - Currently /// Candidate Architect at Greg Wright Architects.

/// Photography /// Travel /// Sport /// Interior design /// Graphic design & layout /// Drawing

/// QUALIFYING AS PROFESSIONAL ARCHITECT JANUARY 2017.

1


01

Grave scheme /// Marianne fassler

PROJECT /// Grave Scheme for Marianne Fassler SITE /// University of the Free State, Main Campus, Bloemfontein

ARCHITECTURE jewellery piece /// shoulder & head piece

PORTFOLIO ///SUZAAN

PROJECT /// Jewellery Piece TYPE /// Large broach & head piece

about///mefirst year 2010

The year 2010 marks the start of my architectural career. The modules of the first year course are aimed at developing the ability to identify and creatively solve problems concerning man’s interaction with his physical environment. Aspects such as functional planning, structural integrity and meaningful shaping was emphasised during the first year. A compulsory excursion to Clarens formed the Design courses final project and exploration of all the above mentioned elements hich form part of the first year course.

main project /// conference & accomodation PROJECT /// Conference Centre & Accomodation SITE /// Clarens, Golden Gate

photography /// class aSSIGNMENTS 2


02

3d extrapolation ///

PROJECT /// 3D Extrapolation from a ‘random’ image

ARCHITECTURE pavillion & book store /// bloemfontein cbd

PORTFOLIO ///SUZAAN

PROJECT /// Pavillion & Book store SITE /// Bloemfontein CBD

about///meSECOND year 2011

In the second year of my architectural studies the design focus shifted towards an urban approach where the spectrum of design theories, wide variety of project types and architectural history is utilised in varying combinations in order to integrate all the fields of study into the curriculum.

Public library /// Bloemfontein cbd PROJECT /// Bloemfontein Public Library SITE /// Bloemfontein CBD

photography /// class aSSIGNMENTS 3


03

BRIDGE IN AMSTERDAM /// crossing over

PROJECT /// Bridge in Amsterdam SITE /// Amsterdam, Holland

ARCHITECTURE DES BAKER /// CAFETERIA

PORTFOLIO ///SUZAAN

PROJECT /// Cafeteria for UFS students SITE /// UFS Main Campus, Bloemfontein

about///meTHIRD year 2012

During my three years of study all the above-mentioned aspects of design, taking into consideration the variety of courses presented in each year, are addressed in an even more complex form, with a combonation of landscape, urban and interactive design.

PG BISON /// oneric house PROJECT /// PG Bison - Bath House SITE /// Rosendal, Free State

4


04

conservation /// HANOVER

PROJECT /// Conservation of the existing Hanover entrance SITE /// Hanover

ARCHITECTURE

PORTFOLIO ///SUZAAN about///mefourth year 2013

Fourth year consists of four themes, one per quarter, each critically researched and exploited through a specific design project as identified by each student. The four themes involve aspects such as urban design, sustainability (environmental impact, earth construction/alternative technologies, etc.), conservation, contemporary theoretical philosophical issues, housing and landscape.

Sustainability/// Adidas headquarters PROJECT /// Headquarters for Adidas SITE ///Bloemfontein Spruit, CBD CONCEPT /// Parasite

5


04

social housing /// bloem cbd PROJECT /// Social Housing SITE /// Bloemfontein CBD

ARCHITECTURE

PORTFOLIO ///SUZAAN

about me COMPETITION /// to be built UFS PARKADE PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PROJECT /// Multi-storey parkade for the University of the Free State with Juan van Wyk SITE /// Bloemfontein, UFS Main Campus AWARD /// First prize - to be built

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

6


05

a new facility for the institute for reconciliation and social justice suzaan swart

Man, by nature, is a social creature capable of interaction. Unfortunately, the planning and implementation of the University of the Free State built environment has not always influenced or created oppurtunities for social exchange. This thesis explores how architecture can influence the interconnection between different types of people by promoting interaction.

The current project springs from a great need to enhance and allow for social transformation to occur on the University of the Free State Main campus.

ARCHITECTURE The Institute for Reconciliation and Social Justice, known for their strong emphasis on social transformation and reconciliation, veers away from the tree-like traditional hierarchial principles and resemble French philosophers; Deleuze and Guattari’s idea of the rhizome.

PORTFOLIO ///SUZAAN

thesis /// Not an institution

The project springs from a great need to enhance and This thesis explores whether dialogue, allow for social narrative and architecture cantransformation to occur on the University of the Free State main campus. The institute for amalgamate to become a rhizome in reconciliation and social justice, known for their strong itself within the urban fabric of the UFS emphasistoon social campus, by proposing draw a transformation and reconciliation, veers away from the tree-like traditional connection between narrative, hierarchial principles and resemble french architecture and man, through philosophers; Deleuze and Guattari’s idea of the highlighting the ability of narratives rhizome. and as a result allows architecture to communicate to the general public. This dissertation explores whether dialogue, narrative The application of narrative on can amalgamate to become a and architecture architecture initiates generates rhizomeand in itself within the urban fabric of the ufs University of an interaction campus, between by man and proposing to draw a connection between architecture which results in a space and man, through highlighting narrative, architecture easily identifiable to man. the ability of narratives and as a result allows architecture to communicate to the general public. The aim of this theoretical discourse, The application of narrative on architecture initiates together with the macro and and generates micro an interaction between man and context analysis, precedent studies architecture which results in a space easily identifiable and case studies illustrate the to man. theoretical engagement with Deleuze and Guattari which leads to the The aim of this theoretical discourse, together with the development of the Institute for and micro context analysis, precedent studies Reconciliationmacro and Social Justice on case studies the theoretical engagement the University and of the Free State illustrate Main with Deleuze and Guattari which leads to the Campus. development of the Institute for Reconciliation and Social Justice on the University of the Free State main campus.

about me

View from the Thakaneng Bridge

6


CONCEPT DESIGN /// PRESENTATIONS

current

BOUNDARY LINE 17 400

4 500 BUILDING LINE Street Boundary

5 000 Garage Setback

PROPOSED VERTICAL DIVISION LINE

VERTICAL DIVISION LINE

3 000 BUILDING LINE Common Boundary

BOUNDARY LINE 28 820

PROJECT /// Family home in Fresnaye, Cape Town SITE /// Bartholomew Avenue, Fresnaye INVOLVEMENT /// Preperation of presentation layouts + concept design with Principal director, Greg Wright.

ERF 1523 TOP of BEDROOM ROOF: 153,03 TOP of GARAGE: 152,36

TOP of BEDROOM ROOF: 153,04

WORK EXPERIENCE

152,36 TOP of GARAGE ROOF:

* MAX HEIGHT (as per Subdivision): GARAGE

TOP of THIRD FFL: 149,78

PORTFOLIO ///GWA

ROOF GARDEN TERRACE

POOL TERRACE

DRIVEWAY TOP of THIRD FFL: 149,51

DOUBLE VOLUME FAMILY LOUNGE

149,11 TOP of SCREEN:

KITCHEN

TOP of GARAGE FFL:

KITCHEN

TOP of KITCHEN FFL: 146,17

TOP of SECOND FFL: 145,81

145,54 U/S of FMAILY LOUNGE SLAB:

POOL

EN-SUITE

144,25 U/S of POOL SLAB:

LAUNDRY

CIRCULATION

EQUIPMENT

STORAGE BEDROOM NEW BASE LEVEL: (Vertical Div.1) MAX GF LEVEL: (Vertical Div.1)

TOP of FIRST FFL: 141,68

141,30 U/S of TERRACE CANOPY:

SAUNA

TOP of FIRST FFL: 142,31

141,68 TOP of GROUND TERRACE CANOPY:

CIRCULATION

SHOWER GUEST WC

TOP of CIRCULATION SLAB: 138,54

TOP of GROUND FFL: 138,00

138,00 TOP of CIRCULATION SLAB:

POOL

U/S of POOL: 135,12

U/S of POOL: 135,12 NGL

SECTION A-A Scale 1:100

H

O

U

S

E

S

T

_Render produced by GWA office

E

F

A

N

U

T

T

I

_Render S E Cproduced T I O by N GWA A office - A 1

:

1

0

0

_Render produced by GWA office

CONCEPT DESIGN /// PRESENTATION + SITE RESTRICTIONS PROJECT /// Multi-storey residence SITE /// Bakoven, Cape Town INVOLVEMENT /// Site restrictions + assuring design complies with CTZS + Title deed conditions. Presentation layouts for client + concept design with Principal director, Greg Wright + associate. YEAR /// SEPTEMBER 2016 10m ABOVE AGL: 24 261

24 261 10m ABOVE AGL:

8m ABOVE AGL: 22 261

Neighbouring building

8m ABOVE AGL: 22 261

MASTER BALCONY

L

L

LAWN 21,95 m2

A

V

P

A

I

T

I

D O

1

:

1

N 0

17 500 TOP OF WALL:

fixed window

ENTRANCE

17 247 TOP OF WALL: 16 570 TOP OF WALL:

fixed window LIVING ROOM

0

POOL TERRACE

Neighbouring building

14 261 BASE LEVEL AGL:

TOP OF POOL TERRACE SLAB FL: 12 440

11 720 TOP OF GROUND FLOOR FFL:

24,261 10m ABOVE AGL:

3 000 BUILDING LINE - setback

ERF 37

12 000 BUILDING LINE

5 000 BUILDING LINE - Road Ordinance 19/1976 (PROCLAIMED PUBLIC ROAD)

4 720 BUILDING LINE - Title Deeds

8m ABOVE AGL: 22,261

3 500 BUILDING LINE - setback

24,261 10m ABOVE AGL:

EXISTING ROOF FL: 20,600

TOP OF ROOF FL: 21,070

ting

hou

se

MASTER BALCONY

MASTER BEDROOM

E

O

U R

T

S

E

H

E

L L

E

A V

P

A

I

T

I

D

O

1

:

N

1

0

0

TOP OF BALUSTRADE: 18,990 TOP OF BALCONY FFL: 18,090

17,840 U/S OF SLAB: FLAT LAWN

DINING ROOM

LIVING ROOM

KITCHEN

TERRACE

TOP OF FIRST FLOOR FFL: 14,645

BOUNDARY LINE 14 190

O

N 20,820 TOP OF ROOF FL:

20,570 U/S OF ROOF FL:

exis

MASTER LOUNGE

18,120 TOP OF WALL:

F

H

22,261 8m ABOVE AGL:

Neighbouring building Skylight

STUDY 1

19,397 TOP OF WALL FL:

BOUNDARY LINE 4 720

TOP OF ROOF FL: 20,597

BOUNDARY LINE 14 190

SKYLIGHT BELOW

STUDY 2 13,07 m2 Concrete Line of skylight above

E

TOP OF WALL: 17 847

ENTRANCE

Neighbouring building

fireplace

bath wc

High level BIC

DRESSER 7,80 m2

hob

skylight above

shower EN SUITE 2 5,57 m2 wc

F/R

whb

E

22 070 BAKOVEN OVERLAY: 6000 above existing ground level

TOP OF WALL: 16,036 NGL

BOUNDARY LINE 14 190

E

H

NORTH ELEVATION Scale 1:100

VICTORIA ROAD

E sliding gate

T

NORTH ELEVATION

TOTAL SECOND FLOOR AREA 103,62 m2

bin

F

BOUNDARY LINE 14 190

Line of skylight above

DRIVEWAY BELOW

E

F

g ho MASTER LOUNGE

stin

exi

S

EXISTING ROOF RIDGE 20 600

TOP OF WALL: 14 645

ERF 35 bin

U U

11 720 TOP OF GROUND FLOOR FFL:

3 500 BUILDING LINE - setback

LAWN 22,03 m2

DRIVEWAY 34,48 m2 Exposed aggregate

O

20 297 TOP OF ROOF FL:

14 261 BASE LEVEL AGL:

4 720 BUILDING LINE - Title Deeds

3 500 BUILDING LINE - setback

O

S

use

fixed STUDY 2 window

16 570 TOP OF WALL:

12 000 BUILDING LINE

MASTER LOUNGE 19,01 m2 Concrete

STUDY 1 9,14 m2 Concrete

3 500 BUILDING LINE - setback

ERF 35

18 120 TOP OF WALL: VICTORIA ROAD

CIRCULATION 8,85 m2 Desk Concrete 5 000 BUILDING LINE - Road Ordinance 19/1976 (PROCLAIMED PUBLIC ROAD)

4 720 BUILDING LINE - Title Deeds

ERF 35

20 297 TOP OF ROOF FL: 19 397 TOP OF WALL FL: TOP OF CANOPY: 18 682

whb whb

SKYLIGHT BELOW

MASTER EN SUITE 10,23 m2

Balcony above

fireplace

outdoor fireplace

SKYLIGHT

Sliding

whb EN SUITE 4 6,91 m2 Skylight above

Sliding

MASTER BEDROOM 23,30 m2 Stone tile

BIC & shelving

VOID 5 000 BUILDING LINE - Road Ordinance 19/1976 (PROCLAIMED PUBLIC ROAD)

H Neighbouring building

TOP OF ROOF FL: 20 597

BOUNDARY LINE

22 090

4 720 BUILDING LINE - Title Deeds

8m ABOVE AGL: 22 261

10 040

Low level joinery

gas

24 261 10m ABOVE AGL:

ERF 37 LAWN BELOW

sliding

CIRCULATION 4,84 m2

5 000 BUILDING LINE - Road Ordinance 19/1976 (PROCLAIMED PUBLIC ROAD)

SOUTH ELEVATION Scale 1:100

SOUTH ELEVATION 24 261 10m ABOVE AGL:

MASTER BALCONY 16,88 m2 Stone tile Line of roof above

- setback

TOTAL FIRST FLOOR AREA 136,99 m2

22 070

prep

High window

KITCHEN SCULLERY 19,70 m2 sink

TOTAL GROUND FLOOR AREA 140,73 m2

BOUNDARY LINE

ENTRANCE 20,30 m2

BOUNDARY LINE

whb

GUEST WC 3,08 m2 wc whb

GARAGE 33,94 m2 Epoxy coated

22 090

22 070

22 090

BOUNDARY LINE

EN SUITE 3 5,05 m2

TERRACE BELOW

Line of roof above

10 060

10 040

- setback

BIC

BOUNDARY LINE

BOUNDARY LINE

WINE DISPLAY

dw

D

BOUNDARY LINE 4 730

3 000 BUILDING LINE - setback

LIVING ROOM 18,31 m2

CIRCULATION 18,19 m2

STORAGE 4,40 m2 td

TOP OF GROUND FLOOR FFL: 11 720

11 620

NGL

3 000 BUILDING LINE - setback

3 000 BUILDING LINE

3 000 BUILDING LINE - setback

sliding

3 000 BUILDING LINE

LAWN BELOW

LIVING ROOM 33,11 m2

C

H

12 000 BUILDING LINE

Sliding BEDROOM 2 15,23 m2

Sliding

14 261 BASE LEVEL AGL:

TERRACE BELOW

12 000 BUILDING LINE

FAMILY ROOM 30,01 m2

shower

wm

D

BOUNDARY LINE 4 730

sliding

10 060

fireplace

15 170 TOP OF GARAGE FFL: 14 261 BASE LEVEL AGL:

4 730

BOUNDARY LINE 4 730

3 000 BUILDING LINE - setback

LAWN 19,80 m2 10 040

3 000 BUILDING LINE - setback

wc

C

H

TERRACE BELOW

Line of wall above

10 060

BIC

BEDROOM 3 18,68 m2

BOUNDARY LINE 4 730

TERRACE 29,65 m2

- setback

wc

16 347 TOP OF ENTRANCE FFL:

NGL

TOP OF FIRST FLOOR FFL: 14 470

EXISTING TERRACE LEVEL

3 000 BUILDING LINE

INFORMAL TERRACE 50,97 m2 3 000 BUILDING LINE setback

VICTORIA ROAD

TOP OF BALUSTRADE: 15 470

NEW POOL TERRACE FFL 12 440

G G

BEDROOM 4 19,30 m2

TOP OF SILL FL: 19 397 TOP OF CANOPY: 18 682

18 120 TOP OF WALL:

DRIVEWAY

GARAGE

4 730

D

BOUNDARY LINE 4 730

BIC

bath

shower

STUDY 1

existing house

LIVING ROOM

TERRACE

ERF 38

4 730 4 730

C

H

22 261 8m ABOVE AGL: TOP OF ROOF FL: 20 597

DRESSING

17 847 TOP OF MASTER BALCONY FFL:

AREA: 429 m2

ERF 36 ERF 38

4 730

BOUNDARY LINE 4 730

MASTER EN-SUITE fixed window

fixed window

N

24 360

AREA: 429 m2

ERF 36 G

24 660

BOUNDARY LINE

24 360

ERF 37

ERF 38

4 730

fixed window

MASTER BALCONY

EXISTING ROOF 18 120

ERF 37

24 660

AREA: 429 m2

ERF 36

20 297 TOP OF ROOF FL:

BOUNDARY LINE

N

BOUNDARY LINE

24 660

24 360

BOUNDARY LINE

BOUNDARY LINE

BOUNDARY LINE

ERF 37

Neighbouring building

ERF 37

EXISTING ROOF 20 616

Neighbouring building BAKOVEN OVERLAY: 6000 above existing ground level

TOP OF BALUSTRADE: 15,520 TOP OF WALL: 14,520

TOP OF POOL TERRACE SLAB FL: 12,440

14,261 BASE LEVEL AGL:

sliding sliding

11,720 TOP OF GROUND FFL:

sliding

TERRACE sliding

14,261 BASE LEVEL AGL: POOL TERRACE

NEW POOL TERRACE FFL: 12,440

11,720 TOP OF existing pool level GROUND FFL:

existing pool level

NGL

VICTORIA ROAD

VICTORIA ROAD

VICTORIA ROAD

GROUND FLOOR PLAN

SECOND FLOOR PLAN

FIRST FLOOR PLAN

GROUND FLOOR Scale 1:100

FIRST FLOOR Scale 1:100

meters

meters

LONGITUDINAL SECTION _ living + bedroooms LONGITUDINAL SECTION Scale 1:141

SECOND FLOOR Scale 1:100 meters

meters

0

1

2

5

10

H

O G

U R

S O

E U

N

L D

A F

P L

I

O 1

D

O :

1

R 0

0

0

1

2

5

10

H

O

U

S F

E I

R

L S

T

A F

P L

I

O 1

D

O :

1

R 0

0

0

1

2

5

10

H

O

U

S

E

L

A

P

I

D

0

1

2

5

H

10

L

O

N

G

I

O

T

U

U

D

S I

N

E A

L

L S

A E

C

P

I

T

I 1

S

E

C

O

N

D

F

L

O 1

O :

1

R 0

0

8

D

O :

1

N 4

1


CONCEPT DESIGN /// PRESENTATION PROJECT /// New House SITE /// Higgovale, Cape Town INVOLVEMENT /// Site restrictions + assuring design complies with CTZS + Title deed conditions. Presentation layouts for client + concept design with Principal director, Greg Wright + associate. YEAR /// 2015 _Render produced by GWA office

_Render produced by GWA office

_Render produced by GWA office C

E

A

R

D

E BUILDING

H

LINE - setback

O

U

S

E

J

A

M

I

L

A

F

Y

L

F I

E

V

I

H

R N

G

1

O

A

U

F

R

F

T

E

Y

A

R

R

D

MAX HEIGHT 1 / ROOF LEVEL 207,805

FAMILY TERRACE BRIDGE / BEDROOMS FFL 204,345

HIGGO ROAD

10

FORMAL TERRACE BELOW

DOMESTIC LANDING

KITCHEN FFL

FORMAL TERRACE

201,421 SWIMMING POOL

BASE LEVEL 2

BAR FFL

200,605

199,991

ENTRANCE ATRIUM ENTRANCE FFL

B

FAMILY TERRACE Natural Stone FFL:204,345

LINE 25 190

A

EAST ELEVATION

LINE - setback BUILDING BOUNDARY 4 500 STREET LINE - setback BUILDING 5 000 GARAGE

meters

0

5

H

10

O

U E

S A

E S

J

T

E

A L

E

F V

F A

E

T

I

BOUNDARY LINE

R O

:

1

N 4

1

MAX HEIGHT 2: 211 605

ROOF LEVEL:

ENTRANCE BELOW

FIRE PIT TERRACE BELOW

209 290

FORMAL TERRACE BELOW

BOUNDARY LINE 63 730

WATER FEATURE BELOW

COURTYARD BELOW

3 000 COMMON BOUNDARY BUILDING LINE - setback

2

MAX HEIGHT 1 / ROOF LEVEL: 207 805

BALCONY TERRACE BEDROOMS LEVEL FFL:

BRIDGE / BEDROOMS FFL:

205 115

204 345

COURTYARD

BRAAI TERRACE

PASSAGE

POOL TERRACE

KITCHEN LEVEL

NGL

201 421

BAR FFL:

200 605

NGL

BASE LEVEL 2

199 991

COURTYARD DRIVEWAY

ENTRANCE FFL: 197 080

ERF 2634

SHW Seat

WC

COURTYARD BELOW

WATER FEATURE BELOW

DOMESTIC LANDING BELOW

BIC

Seat

BIC

BIC

DRESSING ROOM Carpet FFL:204,682

SHW

EN-SUITE DRESSING ROOM Timber Flooring Natural Stone FFL:205,115 FFL:205,115

WHB

BALCONY Natural Stone FFL:205,115

196 805

BASE LEVEL 1: 1:4 Gradient:

WEST ELEVATION

VERTICAL DIVISION

meters

0

1

2

5

H

10

O

U

A L

E

F V

F A

E

T

I 1

R O

:

1

N 4

1

MAX HEIGHT 2 211,605

ROOF LEVEL

DOMESTIC LANDING BELOW

205,115

BRIDGE / BEDROOMS FFL 204,345

BREAKFAST AND KITCHEN

DINING ROOM

LOUNGE

BRAAI TERRACE

ENTRANCE LOBBY

TERRACE

KITCHEN LEVEL

NGL

201,421 VIEW TOWARDS BOWL CAPE TOWN CITY

BAR FFL

BASE LEVEL 2

Compacted Fill

200,605

199,991 Compacted Fill

ENTRANCE Compacted Fill

ENTRANCE FFL 197,080

BASE LEVEL 1 196,805 NGL

ERF 2635

S

CONCRETE ROOF

E

E

Sky Light Below

R O

A

LONGITUDINAL SECTION

F

BRAAI TERRACE

F

F

J

F

O

A

BRAAI TERRACE

D

POOL

J

1535m²

N

F

ERF 2633 AREA

O

F

POOL 55,50 m2

A

FAMILY GARDEN 156,64 m2

T

1535m²

S

J

L

BOUNDARY BUILDING

meters

N

0

1

2

5

H

10

O

U

S

E S

J E

C

A T

F I

O

F

E

N

1

POOL

LINE - setback

L

:

R

A 1

:

2

A 0

0

D

2

A

E

D

1 4

O

E

1 :

O

A

25 190

0

A

C

0

N

C

R

1

R

R

A

1

R

R

ROOF PLAN

PROJECT MANAGEMENT /// CRANBERRY COTTAGE

E

PROJECT /// Additional cottage SITE /// Cranberry Crescent, Camps Bay, Cape Town INVOLVEMENT /// Produced all working drawings, detail design layouts and details. Designed all joinery + interior designed elements with Principal Director, Greg Scott. Oversaw all site related aspects of project. YEAR /// 2015 N

*Render produced by GWA office

S

2

A

W

1 gridlines

B

3

6 018

4

2 284

5

4 606

3 371

external overall

6 235

18 869

openings

1 618

2 265

1 584

160

14 826

935

Pump store

internal

3 883

160

197

9 978

4 650

935

Kitchen & foyer

197

160

6 606

3 371

Kitchen

330

5 176

1 101

2 186

Kitchen island

RC COLUMN as per engineer's specifications

3 015

Existing Tree

W0.02

1P1

Existing

270

270 1 367

1 232

Entrance

118

3 708

53 118 1 070 D0.06

889

1 042 2 207

1 067

D0.07 Master Bedroom

7 128 2 214

11 313

25

23

Red dashed line indicates existing pool filled with unknown rubble

569 3 923

W0.19

DB Board BIC

BIC

BIC

395 1 204

924 1 233 309

Existing Tree

26

2 953

D0.06 D0.07

27

24

22 21

245 244

CCO| DET.009

RC up stand beam according to engineer's specifications

TOP OF RC PARAPET: 103 240

wall below

102 996

TOP OF RC SLAB:

175 100

75

W0.10

W0.07

D0.03

Setb CTZS

TITLE

115

To drop into

CCO|DET.008 lower garden

W0.18

FSL 99.845

CTZS Rear setback 3 000

CCO|DET.027

132

929

929

929

internal

182 gridlines

external overall

W0.11

below

below

ation

ort wall

3 000 ack Line

1 570

RC found

supp Line of

setb DEEDS

Line of

ack line

Foyer

2 069 3 708

1 450 D0.03

6 140 1 042

Passage

3 304 2 207

Bedroom 2

683 569

569 3 084

2 515

2 515

TITLE DEEDS Setback Line 1 570

BOUNDARY LINE 22 460

W0.10

102 896

20

Existing Tree

19

18

U/S OF RC SLAB: 17

3 101

2 450

D0.04 1340 x 2225 PIVOT DOOR

PASSAGE D0.06 800 x 2600

D0.08

BEDROOM

Plaster & paint

6 736

3 883

160

150

120

NGL

86 284

6 458

198

1400 x 1400 x 300 deep RC pad footing foundation underneath RC column as per e n g i n e e r ' s specifications

GROUND FLOOR PLAN GROUND STOREY Scale 1:50

200mm RC slab, to be cast, to be covered with a 15mm polished concrete topping. Slab to be laid over 30mm GREENCUBE or similar approved insulation by specialist.

111

3 718 GARDEN TERRACE Bedroom 2

678

A

4 192

100 220 3 371

4 Sand fill compacted in 150mm layers to 98% MOD AASHTO or fill not weaker than G7 material compacted to 95% MOD AASHTO on firm in-situ material

POST 1 as per Engineer's details. Colour as per A r c h i t e c t ' s specification and to m a t c h a l u m i n i u m 5 292 Master Bedroom door frames.

TOP of GROUND FFL: 6 265

Opening

CCO|DET.010

4 606

3 2

1 436

8 861 D0.02

2 000

1

759 D0.05

Living Room

3 957 3 957

Terrace

100 020

990

Living Room

Terrace

100 220

Existing Tree

D0.01

160

Terrace

Existing boundary wall

16

900 x 2600

Plaster & paint

3 883

TOP of GROUND FFL:

Existing SPARE Tree

2 600 2 676 3 021

FOYER

E x i s t i n g boundary wall to remain.

MASTER ENSUITE WC

60 60 60

BOUNDARY LINE 22 460

5 222 1.2

RC931roof slab to be cast with CRISTEX HD A.13 admixture or similar approved as per engineers specifications with approved POOL waterproofing system by specialists FSL 98.455

gridlines

821

1.2

2.3

external overall

3 021

180mm RC slab to be beam cast below with of ground CRISTEX HDLineadmixture as per engineer's specifications with Min. 50mm layer of select stone chip to Architect's approved sample to be laid on approved waterproofing system by specialist on min. 30mm screed laid to fall to outlet pipes.

RC up stand beam according to engineer's specifications

internal

2 200

Line of

wn

150mm wide x 100mm high water outlet opening

A

27

internal

80 80

Ram p do

W0. 16 CCO|DET.020

below ground beam

B

Storey

200 200

Projection of roof above

5 255

Ground |WD1.1

TITLE DEEDS Setback Line 1 570

1P10

569

CCA

CTZS - Rear setback 3 000

2 207

3. Ref.

2 200

1 042

C C

28

MH0

3 021

D0.01

ting

1 506

CCO|DET.025 CCO|DET.019

to exis

Raft slab as per e n g i n e e r ' s specifications

A FFL 100.170

FSL 100.155

3 708

Line of slab thickening below

P4 W0.17

CCO| DET.018

tion

SECTION A-A CROSS SECTION _ living room + pool terrace Scale 1:50

98 455

TOP of RC SLAB: 98 255

B

Connec

Foundation as per Engineers Detail

TOP of RC SLAB:

51 280

Red dashed line indicates existing pool filled with unknown rubble

CCO|DET.007

BITUTHENE 3000 to form stepped DPC.

RY LINE

98 255

NGL

C

CCO|DET. 017

A.12 POOL TERRACE Polished concrete

pad of RC below Line ation found

98 455

Sand fill compacted in 150mm layers to 98% MOD AASHTO or fill not weaker than G7 material compacted to 95% MOD AASHTO on firm in-situ material

below

W0.18

.15

Compact Fill layers

thickening

P3 D0.02

D

102 420

TOP of GABIAN WALL: Red dashed line indicates existing roof to be demolished.

U/S of GROUND SLAB:

High Pocket RC as per Engineer's details & specifications. Ref. G WA | D 9 . 4 . 2 1 . 2 Typical RC Pockets detail W0

POOL

TOP of RC NGL SLAB:

U/S of RC SLAB:

100 220

TOP of TERRACE FFL:

BOUNDA

Line of slab

29

21

P2 CCO|DET.016

Line of slab thickening below

T.0

GARDEN TERRACE

100 160

99 855

1P9

FFL 100.220 FSL 100.205

O|DE

CCO|DET. 003

CCO|DET.004

CCO|DET.005

CCO|DET.006

99 960

U/S of POOL TOPPING EDGE

TOP of STONE WALL: 300mm masonry wall to engineer's specification. Wall to be clad with natural stone as per Architect's approved sample. Existing boundary wall to remain. TOP of GROUND FFL:

A.10 MASTER BEDROOM Polished concrete

C mØ uPV 110m & Soil Pipe Drain

SLIDING

E

D Red solid line indicates RC Concrete slab line

CC

FFL 100.220 FSL 100.205

30

000

D0.03 6200 x 2711 FIXED

SLIDING

2.1

1.3

.14

KITCHEN LIVING ROOM D0.02

Line of slab thickening below 1P8

W0.09

Line 3

POOL TERRACE

102 420

BUILT-IN BATH

FFL 100.220 1P7 FSL 100.205

A.11 BEDROOM 2 Polished concrete

Red dashed line indicates existing pool filled with unknown rubble

U/S of INTERIOR SOFFIT:

TOP of GROUND FFL: 100 220

102 820

SHW

570

FFL 100.220 FSL 100.205

Line 1

P1

D0.05 A.06 PASSAGE Polished concrete

Feather slope slab from FSL 100.205 to FSL 100.115 on edge

Setback

POST 1 as per Engineer's details. Colour as per Architect's specification and to match aluminium door frames.

U/S of INTERIOR SOFFIT:

W0.08

SHW

A.09 MASTER EN-SUITE Polished concrete

W0

103 240

102 820

1.4

1P6

Red line indicates RC concrete slab cast line

Setback

CCO|DET.001

WHB

WC

2.4

FFL 100.220 WHB FSL 100.205

A.03 LIVING ROOM Polished concrete

1P5

W0.06

WC A.07 GUEST WC Polished concrete

SHW

6 736

FFL 100.170 FSL 100.115 W0.12

CTZS

TOP of RC UPSTAND: TOP of CONCRETE ROOF: 103 010

102 895

A.11 ARRIVAL TERRACE Polished concrete

Feather slope

W0.05

FFL 100.220 FSL 100.205

Specialist to confirm if this joint will be required

2.2

ROCAL Habit 50V graffiti fireplace as per architects specifications

Centre of Pool

PIVOT

CCO|DET.026a

.13

CCO|DET.002

TOP of RC SLAB: U/S of SOFFIT:

3 151

Line of RC pad foundation below

D0.04 A.01 FOYER Polished concrete

DEEDS

A.02 KITCHEN Polished concrete

W0

4 X 60X60X4MM EQUAL LEG ANGLES with 150 x 10mm FLAT PLATE as per Architects specifications

1P4

CCO|DET.022

3 957

Red solid line indicates RC concrete slab cast line

4 X 60X60X4MM EQUAL LEG ANGLES with 150 x 10mm FLAT PLATE as per architects specifications

1P2

W0.01

E

102 995

Existing Tree

Gulley

24

350 x 350mm RC up stand beam according to engineer's specifications

MH

Line of RC pad foundation below

CCO|DET.026b

T.0

180mm RC slab to be cast with CRISTEX HD admixture or similar approved as per engineers specifications with Min. 50mm layer of select stone chip to Architect's approved sample to be laid on approved waterproofing system by specialist on min. 30mm screed laid to fall to outlet pipes.

NEW. RE06

2.5

HWC

O|DE

B

3 151

NEW. RE05

NEW. RE04

Gulley W0.04

CC

103 240

3 708

NEW. RE03

Line of RC pad foundation below

1.2

Purple line indicates concrete topping cast joint line

E

1 042

NEW. RE07

110mmØ uPVC Drain & Soil Pipe

2 953

3 957

Projection of roof above

270

1 309

58 810

TOP of UPSTAND:

2 207

B

TITLE

134

31

RY LINE

100mm thick RC roof slab to be cast with CRISTEX HD admixture as per engineer's specifications with approved waterproofing system by specialists

569

74

Line of RC pad foundation below

BOUNDA

4 754

NEW. RE02

Gulley W0.03 1P3 CTZS 3 000 Building Line - rear setback

2.6

A

D

34

1P5 721

C C

C

74

Master En-suite

150 x 150 square post above RC column RC COLUMN as per engineer's specifications

⍉600 HWC

Projection of roof above Line of RC pad foundation below

CCO|DET.015 1.1

D

B

2 748

935 Opening

TITLE DEEDS Setback Line 1 570 NEW. RE01

Line of RC pad foundation below

1 397

⍉90 x 135mm Spazio s LED N e m o f r a m e l e s2 061 buried light fitting as per architects schedule

A

110

Master WC

RC COLUMN as per engineer's specifications

⍉30 Gas sleeve below slab, to connect to 9 litre gas cylinder

3 015

Pump store

Existing Tree

Existing Tree

136

3 151

Existing Tree

EXTERNAL RENDER _ pool terrace + living space

932

Guest WC

RC COLUMN as per engineer's specifications

BOUNDARY LINE 22 460

A

E

4 650

Foyer

3 014

3 883

197

3 014

internal

160

3 149

3 883

3 149

internal

144

R

R

1 4

O

E

A

O

E

1 :

O

O

F

P

F

F

F

L

L

3 000 COMMON

BOUNDARY LINE

SECOND FLOOR PLAN

E

DS IN TOWAR VIEW MOUNTA TABLE

209,290

1535m²

U

C

BALCONY Natural Stone FFL:205,115

E

S

R

ERF 2633 AREA

I

F

F

BOUNDARY LINE 25 190

C

J

T

TERRACE MASTER BEDROOM / YOGA STUDIO FFL

CONCRETE ROOF

O

S

Braai

E

F

A

D

N

E S

YOGA STUDIO VIEW TOWARDS SIGNAL HILL LOOKOUT

ERF 2633 AREA

H

ERF 2632

e

MASTER BERDOOM Timber Flooring FFL:205,115

YOGA STUDIO Natural Stone FFL:205,115

U

BEDROOM 2 Timber Flooring FFL:205,115

O

ERF 2635

ac

pl

BOUNDARY LINE

re

Fi

COURTYARD BELOW

BIC

BIC

Bath

H

3 000 COMMON BOUNDARY BUILDING LINE - setback

EN-SUITE Natural Stone FFL:205,115

WHB

SHW

Prep

DRESSING ROOM Timber Flooring FFL:205,115

WC

ERF 2635

Hob

KITCHEN & BREAKFAST Natural Stone FFL:201,421 BRAAI TERRACE Natural Stone FFL:201,421

S

BOUNDARY LINE 63 730

U

1535m²

J

N

ERF 2632

ERF 2633 AREA

U

3 000 COMMON BOUNDARY BUILDING LINE - setback

S E

MAX HEIGHT 1 / ROOF LEVEL 207,805

BOUNDARY LINE 58 800

DW

SSS

SCULLERY Porcelain Tile FFL:201,421

F

R

BOUNDARY LINE 58 800

Hob

BEDROOM 3 Timber Flooring FFL:205,115

R

DOMESTIC LANDIND Porcelain Tile FFL:201,421

GREASY KITCHEN Porcelain Tile FFL:201,421

Seat

ENTRANCE LOBBY BELOW

WHB

WC

CONCRETE ROOF

Bath

EN-SUITE Natural Stone FFL:204,682

Sauna

DRYING COURTYARD

SHW

TERRACE BELOW

Seat

WC

WHB

VERTICAL DIVISION

W

N

FIRST FLOOR PLAN

1

1

DRIVEWAY BELOW

SHW

WHB

CIRCULATION Natural Stone FFL:204,345

SECOND FLOOR INTERNAL AREA 380,56 m2

DINING ROOM BELOW

COURTYARD BELOW

ERF 2632

Prep

F

Fireplace

TV LOUNGE Natural Stone FFL:201,421

O

EN-SUITE Porcelain Tile FFL:197,080

DOMESTIC QUARTERS Porcelain Tile FFL:197,080

SHW

Lift

LIFT LOBBY & CIRCULATION Natural Stone FFL:197,080

ENTRANCE LOBBY Natural Stone FFL:198,899

BIC

IT ROOM Porcelain Tile FFL:197,080

STORAGE Porcelain Tile FFL:197,080

E

O

25 190

ERF 2634

WC

BIC

Landscape

COURTYARD Natural Stone FFL:200,880

CIRCULATION Natural Stone FFL:200,880

DINING ROOM Natural Stone FFL:200,880

STUDY 2 Natural Stone FFL:201,421

COURTYARD Natural Stone FFL:201,421

H

BIC

BIC

BIC

R

S

BOUNDARY LINE

EN-SUITE Natural Stone FFL:204,345

BIC

Lift

Seat

COURTYARD Natural Stone FFL:200,880

BOUNDARY LINE 58 800

ERF 2634

GF INTERNAL AREA 215,19 m2

STUDY 01 Natural Stone FFL:197,080

ENTRANCE Natural Stone FFL:197,080

3 000 COMMON BOUNDARY BUILDING LINE - setback

DRYING COURTYARD Natural Stone FFL:197,080

BIC

BIC

STORAGE Porcelain Tile FFL:197,080

LAUNDRY Porcelain Tile FFL:197,080

TD

WM

G

U

D

3 000 COMMON BOUNDARY BUILDING LINE - setback

BEDROOM 5 Timber Flooring FFL:204,345

BIC

BIC

ENTRANCE LOBBY BELOW

WHB

SHW

EN-SUITE Natural Stone FFL:204,345

LIFT LOBBY DRESSING Natural Stone ROOM FFL:204,345 Timber Flooring FFL:204,345

BOUNDARY LINE 63 730

WATER FEATURE 18,13 m2

Lift

LIFT LOBBY BIC Natural Stone FFL:200,355

ERF 2632

sculpture

GARAGE Exposed Aggregate FFL:197,080

DRYING COURTYARD Tile FFL:197,080

O

3 000 COMMON BOUNDARY BUILDING LINE - setback

GROUND FLOOR PLAN

J

C

BRAAI AREA

BOUNDARY

BEDROOM 4 Timber Flooring FFL:204,345

DRYING COURTYARD

3 000 COMMON BOUNDARY BUILDING LINE - setback

10 ERF 2634

Fireplace

WC

GUEST WC Natural Stone FFL:200,355

sculpture

DRIVEWAY 114,86 m2 Gradient: 1:4

3 000 COMMON BOUNDARY BUILDING LINE - setback

H

N

E

BALCONY

197,080

Server

VERTICAL DIVISION

S

209,290

BASE LEVEL 1

VERTICAL DIVISION

BIC

U

ROOF LEVEL

205,115

196,805

ENTRANCE LOBBY BELOW

Prep whb

211,605

MASTER BEDROOM / YOGA STUDIO FFL

NGL

FIRST FLOOR INTERNAL AREA 420,04 m2

BAR & LOUNGE Natural Stone FFL:199,991

DRYING COURTYARD

sculpture

BOUNDARY LINE 58 800

BUILDING 5 000 GARAGE LINE - setback

ERF 2486

5

FORMal TERRACE Natural Stone FFL:199,991

FIRE PIT TERRACE Natural Stone FFL:199,991

Fireplace

10

B

A Y BOUNDAR 4 500 STREET - setback LINE BUILDING

FIRE PIT TERRACE BELOW

Seat

3 000 COMMON BOUNDARY BUILDING LINE - setback

5

HIGGO ROAD

10

LINE 25 190

A

5

ERF 2485

2

2

A

5 BOUNDARY

Gate

O

MAX HEIGHT 2

ERF 3216

0 1 2

A

0

meters

A

1

meters

0

2

ERF 2486

1

ERF 2485

F

meters

0

meters

5 000 GARAGE

BOUNDARY LINE

F

A

COMMON BOUNDARY BUILDING LINE

F

F

VERTICAL DIVISION

A

T

VERTICAL DIVISION

J

LINE - setback

VERTICAL DIVISION

N

BUILDING

GARAGE BUILDING LINE

O

STREET BOUNDARY BUILDING LINE

E

R

5 000 GARAGE

BOUNDARY LINE

S

GARAGE BUILDING LINE

F

STREET BOUNDARY BUILDING LINE

U

3 000 COMMON BOUNDARY BUILDING LINE - setback

O

BOUNDARY LINE 63 730

ERF 3216

H

5

14 13 12 internal 11

1 669

internal

LINE TYPE LEGEND

Master Bedroom 10

1 391

external overall

1 391

gridlines 9

Concrete topping joint line NOTE: 200mm thick raft slab 200 x 33 = 6600mm Max. Sp

D0.01

100 160

TOP of TERRACE FFL

5 148

Threshold / weather step cas

8

DRAINAGE LEGEND Gulley

B

D_GUL

NGL Red dashed line indicates existing pool filled with unknown rubble

RC slab according to e n g i n e e r ' s specifications, to be laid over 30mm GREENCUBE or similar approved insulation by specialist.

SECTION B-B Scale 1:50

Existing Tree

15

1 391

MH

GULLEY

D_MH

MANHOLE

D_RE

RODDING EYE

STRUCTURAL LEGEND

S_RCP

HIGH POCKET RC AS PER DETAILS & SPECIFICATIO

S_RCC

RC COLUMN AS PER ENG SPECIFICATIONS

9


GENERAL NOTES

PROJECT MANAGEMENT /// HOUSE SEALION DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED

B

C

D

5 145

E

1 930

F

1 195

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

G

1 700

3 445

PROJECT /// New House SITE /// Top Road, Fresnaye, Cape Town INVOLVEMENT /// Produced working drawings, detail design layouts and details. Designed joinery + interior designed elements with Principal Director, Greg Wright. Gained tremendous experience in project management, dealt with contractor & sub-contractors + oversaw entire construction process from inception to completion. Present in client meetings and represented GWA at site meetings. YEAR /// 2015/2016 1 283

COPYRIGHT:

03 15

635

410

935

06 24

2 757

230

2 049

15

180 360

5 260

178 135

BASEMENT TOC PLANTER WALL TOC

Dashed line indicates Tie beam beyond as per Engineers detail and specification.

230

JOJO TANK (2500L capacity) Overflow

370

30 30

RC pool structural wall to engineer's structural drawings and manufacturers detail and waterproofing spec, Xypex addmixture or similar approved by Engineers &/or Architects. 2 layers of

15

MIN 1 : 100 FALL

fiberglass and tiled finsh on internal side

of pool wall. Plaster with SIKALITE waterproofing additive, on external face and top of concrete beam.

DET.285

ISONEM S-FLEX Hydrophilic water bar to all RC construction joints, with CRISTEX Concentrate slurry to all joint surfaces at a rate of 1kg/m2.

2 968

1 325

1 199

Reinforced Concrete Wall as per engineer's details and specifications

230

MIN 1 : 100 FALL

15

939

15

230

Planter along Pool wall to be planted as per Landscape Architect's layouts and specification.

15

03

JOJO TANK (2500L capacity) Grey Water

1 844

2 269

2 269

1 544

RC wall as per Engineers detail and specification. 12 502

JOJO TANK (2500L capacity) Overflow

03

NGL

230

03

JOJO TANK 5000L capacity) Stormwater

1 544

15

15

PLANTER

JOJO TANK 5000L capacity) Stormwater

2 229

940

939

245

RC Beam as per Engineers detail and specification.

2 229

15

2 229

17

230

30

5 260

MIN 1 : 100 FALL

15

15

Plaster with SIKALITE waterproofing additive, on external face of concrete b e a m . P a i n t c o l o u r t o G WA approved sample & specifications or similar.

230

Lightweight concrete as per engineer's details and specifications. Waterproofing spec, CHRISTEX ADMIX HD at a rate of 1.5% of crementitious content as per waterproofing specialist.

RC wall as per Engineers detail and specification.

03

177 745

06 50 330

17

PLANTER

178 195

200

287

230

975

BASEMENT FFL

VOID 4.2

DET.283

4 430

1 522

350

450

350

245

550

1 200

900

350

POOL SLAB TOC

260

330

750

30

4.1

350 100

179 070

2 114

400

30

2 973

30

POOL BOTTOM FL (DEEP END) 179 200

230

1

1 060

POOL

287

1 101

2

587

179 500

VOID 2 010

POOL BOTTOM FL (SHALLOW END)

1 530

Reinforced Pool structure as per engineer's details and specifications. Waterproofing spec, CHRISTEX ADMIX HD at a rate of 1.5% of crementitious content as per waterproofing specialist.

POOL DAYBED SOS

1 401

1 950

180 130

2 150

03

POOL DAYBED TOC

287

943

3

180 330

240

DET.284

240

POOL DAYBED FFL

130

06 130

180 600 WATER LEVEL

130

15

180 730

20

130

2 887

130

545

06 2 441

15

1 654

939

DRAWING NOTES

Fibreglass as per pool specialists recommendation. Tiled finish over fibreglass as per GWA approved sample.

60

60

15 15 30 230 150 20

95 339

470

15 155

10 385

300

210 470

181 080

POOL TERRACE FFL

MIN 1 : 100 FALL

200

BRAAI AREA FFL

The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

1 199

60

181 280

170

03 450

100

03

DIVING PLATFORM FFL

1 484 Seat

150 150 150

894

10 794

DIVING PLATFORM

485

470

670

15

2 197

1 844

MIN 1 : 100 FALL

NGL

Compacted fill as per engineer's details and specifications for pool structure.

Dashed line indicates Tie beam beyond as per Engineers detail and specification.

Precast RC beam supports as Per Engineers detail and specification Dashed line indicated the RC footing along the Pool Pump Room as per Engineers detail and specification.

All reinforced concrete foundations & walling, surface beds, slabs and retaining walls to Engineer's design specifications.

PLANTER BASE SOS

300

Dashed line indicates Tie beam beyond as per Engineers detail and specification.

300

GW

175 900

590

590

176 200

590

PLANTER BASE TOC

EX ER OR RENDER _ poo e ace v ng + d n ng oom POOL | SECTION d-d scale 1 : 25

C 35 140 15 ℄

3 572

1 791 ℄

3 986

30

1 206

1 522

670

DIVING PLATFORM

POOL TERRACE

200

130

1 679

1 522

VOID

230

15

521 Fibreglass as per pool specialists

recommendation. Tiled finish over fibreglass as per GWA approved sample.

2 300

1 230

1 950

540

6.1

20

230

1 522

245

506

350 900 1 475

1 875

03

230

15

575

JOJO TANK (2500L capacity) Overflow

03

230

230

9 1 455

OPTI WHITE glass balustrade

OPTI WHITE glass balustrade

3 466

E2

3 440

E4

E2

GYM

160 2 985

STORAGE / PUMP ROOM

E4

NORTH ELEVATION BOUNDARY LINE 21 510

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

7

8

Aluminium cladded Steel framed structure, to engineers later spec as per GWA details.

E4

E4

E4

E4

DOMESTIC QUARTERS BEHIND

E3

300

450

450

BOUNDARY LINE 19 200

130

TOP of SEAT FL: 185 305

INTERNAL Note : This Drawing is not valid for construction unless stamped accordingly

370

184 555 TOP OF PERGOLA FL:

Galvanised Hollow Steel Box Sections Screen & Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

654

570

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

1 573

E2

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

POOL SECTIONS LIGHTING AND VENTILATION All rooms to have minimum 5% floor area natural ventilation and 10%

External RC Staircase with 13 risers @ 200mm and 12 treads @ 280mm, with tile finish to GWA's later detail and spec, as per Engineer's drawings and specifications to comply with SANS 10400 part M for stairs.

E3

E2

GYM BEHIND 4 682

1 660 875

E1

architect's detail.

180 630 TOP OF POOL GLASS: 180 330 TOP OF POOL WALL: 180 130 POOL FL:

POOL

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

PUMP ROOM

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

ERF 1713 CEILINGS Suspended ceilings by specialist, skimmed and painted. No Top Road,gypsum Fresnaye cornice, flush joint with "paintersmate" or similar as per architects details. Cape Town STAIRS

180 730 POOL TERRACE FFL:

E3

179 256 U/S OF LANDING:

SKIRTINGS

181 140 GROUND FLOOR FFL:

600

180 440 POOL TERRACE FFL:

SEA 15mm LION recessed, 20mm high Aluminium skirting screw fixed to wall. To

TOP OF SEAT FL: 181 730

E2

E6 E6

floor area natural light. Project :

TOP OF WALL FL: 182 215

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

RC Pad footing as per Engineers design and detail.

410

2016/03/30

CAPE TOWN

studio@gwarchitects.co.za

E1 POOL BASE FSL: 179 070 BASEMENT, POOL PUMP ROOM FFL: 178 720 POOL PUMP ROOM FFL:: 178 195

177 745 TOP OF PLANTER

178 135 POOL PUMP ROOM FSL: 177 935 POOL PUMP ROOM SOS: 177 745 TOP OF PLANTER:

Plaster &REVISIONS Paint DULUX 30YY 78/018 E2 Milk MoustacheRev. / WinterbirdDescription

45°

Date

EXISTING DOUBLE STOREY HOUSE

TANK ROOM TOC: 176 526 TANK ROOM SOS: 176 376

NGL

175 936 PLANTER BOX SOS:

POOL | SECTION b-b scale 1 : 25

EAST ELEVATION Scale 1:50

EAST ELEVATION

E3

E2

E2 E1 E3

E2

E1

E2

D

F

BOUNDARY LINE 28 834

ERF 1532

EAST ELEVATION FINISHES Project :

0

Description

SEA LION

Date

ISSUED FOR CONSTRUCTION

ERF 1713 Top Road, Fresnaye Cape Town

2016/03/30

Winterbird ALUMINIUM . COLOUR: QYL 259 D2525 Matt Dark Umber Grey FINISH: POWDERCOAT finish, INTERPON colour:

E4

GLASS 01 . COLOUR: Clear FINISH: NS SMARTGLASS SolarVue Low ERangeTM clear laminated safety glass, to comply with the SANS 10400 Part N. Colour: Clear, to Architect's approved sample.

DRAWING NUMBER

extra clear toughened safety glass with light transmission GRANITE TILE. COLOUR: New Sardo Granite tile FINISH: Brushed & flamed 600 x 1200mm

E7

CERAMIC TILE. COLOUR: Basic - Dark Nature. 3mm XLight ceramic tile.

T

PG SIZE

1:50

A1

SLIDING

E4

3 675

Powder coated aluminium sliding window into cavity, to GWA's later detail.

STUDY

W3.04 FIXED

FIXED

E3

E2

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E4 SLIDING

E4 SLIDING

W3.05

E2

Aluminium cladded Steel framed canopy structure, to engineers later spec, as per GWA details.

E3

A2.14 COVERED ENTRANCE COURTYARD

D2.13

Aluminium cladding - to match panel sizes of garage door

D2.01

G2.02

A2.12 DRIVEWAY

E3

1.1

1.1

2 524

2 260

2 200

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

E3

E3

1.2 50

Motorized Double 5545 x 2100mm Garage door with powder coated finish to manufacturers detail and spec, to GWA's approved sample. Exposed Aggregate driveway. Surface bed to falls, to architects later detail layouts, towards Stormwater channel in front of garage door, at Garage FFL and as per engineer's details & specifications.

E3

E4

E3

SECOND FLOOR FFL: 187 880

187 820 SECOND FLOOR TOC: 187 630 TOP OF GARAGE: 187 455 U/S OF GARAGE DOWN-STAND:

Aluminium

Aluminium

E1

E1

188 780 U/S OF WINDOW:

E2

325

E3

A2.15 PLANTED GARDEN

E4 FIXED

TOP OF WINDOW: 189 830

ERF 1713 Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

RC & Steel stairs as engineers details, finished as per GWA's finishes DRAWING DRAWNand risers asREVISION schedule andNUMBER Staircase layouts. Treads shown on architects drawings. Risers to be max 200mm and treads to be min MAN|D9.1.2 250mm. Balustrade walls and railings to be 1000mm from FFL. SCALE PG SIZE CHECKED DATE INTERNAL DOORS 1:25, 1:50merantiA0 Semi solid Duco Sprayed doors, as per GWAs 2016/05/08 door schedule. Jamb liners as per architects details Ironmongery - as per architects schedule FIREPLACE Custom Gas fireplace as per GWA's details. 4th FLOOR TEMPLE HOUSE . 57 BUITENKANT STREET . CAPE TOWN EXTERNAL GAS BRAAI PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA Custom Gas braai as per GWA's details. constructed building regulations (021) 465 9775 in accordance (021) 465with 9778SANS@10400 studio@gwarchitects.co.za T Flue F and to GWA's later details. GAS INSTALLATION: Gas installation by specialist. Gas supply to hobs in kitchen, Gas fireplace & Gas Braai comes from 2x 48 liter Gas bottles stored in the Planted Garden outside as per specialist recommendations. SECURITY Keypads and passive system to be designed and installed by specialist to ensure that all zones can be individually armed or disarmed as deemed necessary by the Client. Keypads are to be situated as per Electrical layout and design. Security system to incorporate remote panic buttons. No panic buttons are to be mounted on walls anywhere. It is imperative that in the event of there being no electricity or telephone power supply that the security system will continue to work from a remote power source. JOINERY Joinery as per GWA's details and specifications. PARAPETS Top parapets to be laid to 1:100 fall back towards roofing/roof slab. All parapets to be waterproofed in accordance as per GWA's details and specifications.

NEIGHBOURING DWELLING

E3

E2

W2.01

90

2016/03/30

CAPE TOWN

studio@gwarchitects.co.za

@

190 870 U/S OF ROOF SLAB FL:

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E4

SLIDING

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

187 570 U/S OF SECOND FLOOR SLAB:

ENTRANCE TOC: 185 245 185 145 ENTRANCE SOS:

All reinforced concrete foundations & walling, surface beds, slabs and retaining walls to Engineer's design specifications.

NGL

4 015

4 215

DATE

GW/FP

57 BUITENKANT STREET .

(021) 465 9778

F

E2 E2

W3.02

E4

MASTER BEDROOM

3 500

E2

E2

1.1

ENTRANCE TOC: 185 245

0

CHECKED

TEMPLE HOUSE .

(021) 465 9775

TOP OF PARAPET FL:

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E3

185 145 ENTRANCE SOS:

REVISION

SS

SCALE

4th FLOOR

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

TOP OF SCREEN FL:

SECOND FLOOR FFL: 187 880 187 820 SECOND FLOOR TOC:

DRAWN

MAN|D2.25.2

GLASS 02 . COLOUR: Opti White FINISH: 15mm "Opti White, low iron,

E6

ROOF

2 125

NEIGHBOURING DWELLING

Rev. 0

PLASTER + PAINT 01 . COLOUR: DULUX 30YY 78/018, Milk Moustache /

E3

E5

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

2 990

189 680 U/S OF WINDOW:

E3

H

REVISIONS

MARMORAN . COLOUR: 30YY 10/038 S 18414-2 1,5mm Permacrete (Vertical), 30YY 10/038, S 18414-2

E2

191 230 TOP OF LIFT SHAFT:

790

190 469 TOP OF WINDOW:

G

NOTE: All finishes and paintwork to Architect's approval. All colours to Architect's approved sample.

E1

Note : This Drawing is not valid for construction unless stamped accordingly

E2 E2

ELEVATION FINISHES LEGEND

E

350

360 350

190 870 U/S OF ROOF SLAB FL:

E3

E2

C

760 200

191 430 TOP OF LIFT SHAFT: 191 230 TOP OF PARAPET FL:

FOR CONSTRUCTION

E1

B

Powder coated aluminium sliding window into cavity, to GWA's later detail.

150

DATE :

E1

E2

E2

BOUNDARY LINE 30 270

A

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein. CLIENT / CLIENT REPRESENTATIVE :

LONGITUDINAL SECTION

PROJECT STATUS : FOR CONSTRUCTION

E3

E1

E2 E1

E2

E2

E2

E2

COPYRIGHT:

E3

E2 E1

E6

GENERAL NOTES The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

E3

E2

E3

PLASTER: Plaster of External walls to include SIKA 1 waterproofing addmixture, Walls to be finished with 2 coats paint on "ALTEK" finishing skim NCL coat - 1127 or similar to Architect's finishing schedule. Selected Resin bonded plaster to RC wall by specialist. Concrete and brick work junctions to be bandaged with DURAMESH mesh over lapping 300mm either material as per architects details. Internal walls to be plastered skimmed and painted as per GWA's finishes schedule where specified. DOORS AND WINDOWS: Doors and windows are to be powdercoated aluminium as per GWA's door and window schedules. BALUSTRADE : All dimensions and positions must be checked and verified on site prior to any related portion of work beginning and that any variances or discrepancies to the documentation be reported to the Architect This drawing to be read in conjunction with all related documentation by the Engineer, other consultants or sub-contractors. All footings and fixings to be approved by the Engineer before construction work may begin. POOLS: Pool to be finished approved tile finish. All work to be carried out by a specialist contractor in consultation with the engineer. All necessary connections to skimmer boxes and suction points are to be made by the specialist contractor. The specialist contractor & structural engineer is to inspectENDORSEMENT all conditions relating to the subsoil drainage, bearing capacity, CLIENT : impact on adjacent structures etc. It is agreed that the client, by its signature to this drawing, accepts and approves the DRAINAGE: conceptual design and / or technical informations contained herein. All soil and waste pipes to connect into drainage run, plumber to confirm all drainage points prior to installation. All new drainage runs are to CLIENT / CLIENT REPRESENTATIVE : may not exceed 1000mm in DATE : connect to municipal connection and depth. All work to be carried out and supervised by a registered drainlayer in accordance with part P of the SANS 10400. Swimming pool to discharge into sewer system . A rodding eye or manhole may be omitted where there are no more than two bends of up to 90°, at each change in direction the bend does not exceed 45° and bends have a centre-line radius of not less than 600mm. A rodding eye or manhole shall be REVISIONS installed with 1.5m of the connection of the drain to the connecting sewer, as Description well as at the highest point of the drain and at such intervals of Rev. Date 25m measured from a rodding eye along the line of the drain. All drainage under slabs to be incased in minimum 100mm concrete and be laid without change in gradient or direction, with access at each point of entry or exit from the building. STORMWATER: All stormwater from hard surfaces as well as from downpipes from roofs are to connect to stormwater system and municipal stormwater. Backwash to sewer or garden and overflow to connect into municipal stormwater. Access intervals to stormwater drains should be no more than 40m apart. WATERPROOFING : All waterproofing at foundations and retaining wall subject to confirmation of details by Engineer. Details may change due to subsurface conditions. Before laying waterproofing, all end-laps, turn-ups, joints, corners etc are to be done in accordance with specialist applicators standard procedures as approved by waterproofing manufacturer's recommended methods of practice. All drawings to be checked by waterproofing supplier and applicators prior to any work commencing. All details and all necessary warranties and guaranties for thisCONSTRUCTION project are to be agreed upon and PROJECT STATUS : FOR approved prior to any work commencing. All surfaces to be prepped for waterproofing membranes as per manufacturer's requirements. All concrete work to be verified and done in accordance with Engineer's drawings, details and specifications.

FIRST FLOOR FFL: 184 855

885

E2

173 240

TOP OF LANDING: 179 456

@

SECOND FLOOR FFL: 187 880

E3

E5

LOWER GROUND FLOOR FFL: 181 140

57 BUITENKANT STREET .

(021) 465 9778

F

187 305 TOP OF CANOPY FL:

Soil mix/fill onto 100mm free draining clean sand layer onto PT 115 Polypropylene filter fabric, on 30mm thk Dipsystems Neopor protection/insulation boards, onto torch fused Professional Line 3mm Evolight Reoxthene modified bitumen membrane followed by one layer Professional Line Evolight 4mm Reoxthene modified bitumen waterproofing membrane both with 75mm side and 100mm end laps, onto screed to fall towards full bore outlet.

2 000

E5

GW/FP

TEMPLE HOUSE .

(021) 465 9775

E2

182 425 U/S OF LANDING SLAB:

180 730

176 100

0 DATE

Powder coated aluminium window to GWA's later detail & specification to comply with SANS 10400 part N for glazing

350

350

E5

3 750

3 466

RC PAD FOOTING TOC:

E2

BEDROOM 4 BEHIND W2.11 FIXED

E5

E5 W1.02

2 390

E5

BED 3 & 4 TERRACE

W2.08 Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E2 D1.01

External RC Staircase with 14 risers @ 200mm and 13 treads @ 250mm, with tile finish to GWA's later detail and spec, as per Engineer's drawings and specifications to comply with SANS 10400 part M for stairs.

ROOF OF EXISTING BUILDING

REVISION

SS

TOP OF BALUSTRADE: 188 580

963

2 250 450 250

E2 W1.01

TOP OF LANDING SLAB: 182 595

30 240

950mm Glass Balustrade of 15mm "Opti White, low iron, extra clear toughened safety glass with light transmission, on Neoprene Setting block, in continuos non-shrink grout to specialist's spec, set into s/steel channel fixed into up stand, with 10x50mm steel handrail fixed to glass with steel supports at max 1000m c/c intervals, copper plated finish.

3 100 E4

E3

Compacted fill as per engineer's details and specifications for pool E5 E5 structure.

E6

1 060

150

T

2 650

E4

GARAGE BEHIND

(Vert) 30 YY 10/038 S18414-2

S2.01

A1

DRAWN

CHECKED

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

CERAMIC TILE. COLOUR: Basic - Dark Nature. 3mm XLight ceramic tile. TOP OF PERGOLA FL:

E7

2 500

E1 1,5mm Permacrete

G2.01

E6

1:50

4th FLOOR

190 855

2 460

Planted wall

PG SIZE

extra clear toughened safety glass with light transmission 191 580

TOP tile OF PARAPET FL: GRANITE TILE. COLOUR: New Sardo Granite FINISH: Brushed & flamed 191 230 600 x 1200mm

E6

ROOF TERRACE

SCALE

GLASS 02 . COLOUR: Opti White FINISH: TOP 15mm White, OF "Opti SCREEN FL: low iron,

E5

Galvanised Hollow Steel Box Sections Screen & Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

E3

925

Planted wall

GLASS 01 . COLOUR: Clear FINISH: NS SMARTGLASS SolarVue Low ERangeTM clear laminated safety glass, to comply with the SANS 10400 Part N. Colour: Clear, to Architect's approved sample.

Marmoran

E6

DRIVEWAY

terra-force blocks.

ERF 1713

Top Road, Fresnaye All reinforced concrete foundations & Town slabs and walling, surface Cape beds, retaining walls to Engineer's design DRAWING NUMBER ALUMINIUM . COLOUR: QYL 259 D2525 Matt Dark Umber Grey FINISH: POWDERCOAT finish, INTERPON colour: specifications. MAN|D2.25.1

PLASTER + PAINT 01 . COLOUR: DULUX 30YY 78/018, Milk Moustache /

E4

3 675

2 990

Winterbird

E3

TOP ROAD

185 903 TOP of WALL

FOR CONSTRUCTION Existing retaining boundary wall and

Project :

SEA LION

MARMORAN . COLOUR: 30YY 10/038 S 18414-2 1,5mm Permacrete (Vertical), 30YY 10/038, S 18414-2

E2

325

Granite tile New Sardo Brushed & flamed

187 305 U/S OF SLAB FL:

2016/03/30

15

NORTH ELEVATION FINISHES

E1

E3

Dashed line indicates RC wall that extends down to the RC Pad footing as per Engineers design and detail.

E3

230

PROJECT STATUS : FOR CONSTRUCTION

NGL

ELEVATION FINISHES LEGEND

STUDY BEHIND

E2

Aluminium

Date

15

NOTE: All finishes and paintwork to Architect's approval. All colours to Architect's approved sample.

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E3

Entrance Steps & Road edge interface to Architects later detail layouts.

Description ISSUED FOR CONSTRUCTION

733

10

200

360 350

DATE :

15

100

9

TOP OF SCREEN FL: 189 800

235

844 6

ROOF

TOP OF SCREEN FL:

190 855 U/S OF ROOF SLAB FL:

0

REVISIONS Rev. 0

737

300

5

3500 BUILDING LINE setback

175 900

184 555 TOP OF PERGOLA FL:

177 935 U/S OF BASEMENT SLAB:

TOP OF TANK STORAGE SLAB: 176 526

175 936 U/S OF PLANTER SLAB:

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED

PLANTER BASE SOS

187 880

TOP OF BASEMENT SLAB: 178 135

15

Note : This Drawing is not valid for construction unless stamped accordingly

approved3 2

1

MIN 1 : 100 FALL E2

2 085

20mm Dorken MS20 or similar dimpled polyethylene 4 protection membrane to back of Retaining wall with CRISTEX ADMIX HD at a rate of 1.5% of crementitious content, to waterproofing specialists All relevant details, levels, dimensions, setting out positions are to be checked prior recommendation, or to any work commencing and any discrepancies are to be brought to the attention of the Architect. similar approved. Sub Soil drain The Architect accepts no responsibility for errors resulting from misinterpretation of 110mm subsoil drain laid to 1:100 the drawings. All dimensions are given in millimeters unless otherwise noted. fall, covered with 19mm clean Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. crushed stone around pipe wrapped Contractor is responsible for the correct setting out of the building on site with into kaytech U14 geotextile wrap orE2 particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same similar approved to discharge into against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. municipal stormwater connection. Large scale details to be used where available.

176 200

185 355 TOP of SLAB 184 855 TOP OF SCREEN:

401

Planter along Pool wall to be planted E2 as per Landscape Architect's layouts E2 and specification. E1

178 720 U/S OF POOL BASE:

150

PLANTER BASE TOC

TOP OF SCREEN FL: 188 134

15

E3 E2

988

03

2 229

Soil mix/fill onto 100mm free draining clean sand layer onto PT 115 Polypropylene filter fabric, on 30mm thk Dipsystems Neopor protection/insulation boards, onto torch fused Professional Line 3mm Evolight Reoxthene modified bitumen membrane followed by one layer Professional Line Evolight 4mm Reoxthene modified bitumen waterproofing membrane both with 75mm side and 100mm end laps.

NGL

Reinforced Pool structure as per engineer's details and specifications. Waterproofing spec, CHRISTEX ADMIX HD at a rate of 1.5% of crementitious content as per waterproofing specialist.

176 376 U/S OF TANK STORAGE SLAB:

NORTH ELEVATION Scale 1:50

COPYRIGHT:

E2

PLANTER 250

POOL BASE FSL: 179 070

RC surface bed as per Structural Engineers detail and specification

The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

E3 E1

TOP OF LIVING SLAB: 180 730

1 680

1 809

2 000

E2

GROUND FLOOR FFL: 181 140

specification.

Marmoran 1,5mm Permacrete

(Vert) JOJO TANK 30 YY 10/038 (5000LS18414-2 capacity) Stormwater

230

ISONEM S-FLEX Hydrophilic water bar to all RC construction joints, with CRISTEX Concentrate slurry to all joint surfaces at a rate of 1kg/m2.

E2 E2

180 400 POOL TERRACE FFL:

32mm Structural glazing to specialist design bonded into Custom Stainless Steel channel fixed to topside of concrete wall, with countersunk bolts, with steel grate & decorative

EXTERNAL

E2

E3 E2

TOP OF SEATING WALL: 182 215

3 168

NGL

175 936 U/S OF PLANTER SLAB:

191 430 TOP OF LIFT SHAFT: 191 230 TOP OF PARAPET:

850

550

Powder coated aluminium window to GWA's later detail & specification to comply with SANS 10400 part N for glazing

E1

E2

183 840 TOP OF PARAPET FL:

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

PLANTER Plaster & Paint

E2

184 555 TOP OF PERGOLA FL:

Filter drainage/ waste to connect intoriver pebbles. Steel channel to be retro fitted to concrete conservancy tank once construction existing sewer waste pipe below andcomplete and waterproofed. into municipal foul water Planter along Pool wall to be planted as connections. E1 per Landscape Architect's layouts and

176 376 U/S OF TANK STORAGE SLAB:

E2

330 15

TOP OF SEAT FL: 185 305

Variable Speed pool pump and pool Plaster & Paint DULUX 30YY recommendation 78/018 filters toE2Specialists Milk Moustache / Winterbird and installation.

178 135 TOP OF BASEMENT SLAB:

191 580 : CLIENT / CLIENT REPRESENTATIVE

TOP OF BALUSTRADE: 186 030

Galvanised Hollow Steel Box Sections Screen & Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

FIXED

177 935 U/S OF BASEMENT SLAB:

GENERAL NOTES

850

300 200

3 073

GROUND FLOOR FFL: 184 855

230

POOL

E1

TOP OF TANK STORAGE SLAB: 176 526

150 150

BOUNDARY LINE 28 834

E1

E1

KITCHEN/ BAR

E2

E1 Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

VOID

E5

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

waste New Sardo Granite Tiles

E6

60

410

Pool Filter

waste

D0.02

E1

1 660

U/S OF POOL BASE:

SLIDING

BRAAI AREA

E4

E2

water feature pump

New Sardo Granite Tiles

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

875

178 720 177 745

SLIDING

E4

POOL TERRACE

OPTI WHITE glass balustrade

NGL

E6

178 135 TOP OF STAIRS FSL:

179 456 BASEMENT TOC 179 070 PLANTER WALL TOC U/S OF POOL BASE:

SLIDING

E4

water feature filter

B1.01

E5

181 140

178 195 180 400

B2.03

1

E2

W1.04

SLIDING

E4

fiberglass and tiled finsh on internal side

345

Dashed line indicated access door to Plaster & Paint E2 DULUX 30YY 78/018 void beneath Pool from Storage room. Milk Moustache / Winterbird

E4

100

TOP OF BALUSTRADE: 181 730 GROUND FLOOR FFL:

POOL TERRACE FFL: BASEMENT FFL 180 730

2

OPTI WHITE glass balustrade

E4 Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E2

D1.09 DINING ROOM

RCE2pool structural wall to engineer's structural drawings and manufacturers detail and waterproofing spec, Xypex addmixture or similar approved by Engineers &/or Architects. 2 layers of

of pool wall. Plaster with SIKALITE waterproofing additive, on external face and top of concrete beam. Plaster with SIKALITE waterproofing additive, on external face of concrete b e a m . P a i n t c o l o u r t o G WA approved sample & specifications or similar.

E3

E3

3 073

E4

ROOF

15 E4 230

pool return

intake 1 680

1 135

2 190

SLIDING

D1.11

E4

E4

BEDROOM 3

E4

Steel Pergola

D1.10 LIVING ROOM

POOL SLAB TOC

E3

E6

E3

187 555 U/S OF SLAB FL:

E4

03

E6

E7

E6

E3

FIRST FLOOR FFL: 187 880

3

245

TERRACE

2 620

E4

POOL PUMP ROOM

988

ERF 1532

BEDROOM 2

FIXED

SLIDING

D2.08

E4

50 330 15 MIN 1 : 100 FALL

NEIGHBOURING DWELLING

1 640

Plaster & Paint

BEDROOM 4

E4

E4

trough return

450 250

1 065 W1.03

183 840

15

E3

D2.04 SLIDING

W2.07 FIXED

D2.09

245

TOP OF GYM PARAPET: 179 100

950mm Glass Balustrade of 15mm "Opti White, low iron, extra clear toughened safety glass with light transmission, on Neoprene Setting block, in continuos non-shrink grout to specialist's spec, set into s/steel channel fixed into up stand, with 10x50mm steel handrail fixed to glass with steel supports at max 1000m c/c intervals, copper plated finish.

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E2

Steel Pergola

179 070

POOL

MASTER EN-SUITE

B3.02 Glass Balustrade

OPTI WHITE glass balustrade

06

06

190 635 U/S OF CANOPY:

Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

SLIDING

E4

4

U/S OF ROOF SLAB FL: 190 870

2 945 Galvanised Hollow Steel Box Sections Screen &

W3.01

E2 FIXED

E5

Aimflow

Shelf SLIDING

3 684

06

E4

SLIDING

E5

E5

E3

350

Pool Pump

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

SLIDING

E1 TOP OF SEAT FL: 185 305

E4

SLIDING

MASTER BEDROOM

E5

E5 to aimflow E5

1 406

550

15 OPTI WHITE glass

06

15

D3.03 SLIDING

E5

from skimmer

TOP OF SCREEN FL: 191 580 191 430 TOP OF LIFT SHAFT ROOF: 191 230 TOP OF PARAPET FL:

200

465 50 FALL TO E4

E4 E2

intake B3.07

03

24

975

OPTI WHITE glass

NOTE: Exact position of piping, pumps & filters to GARAGE specialists FIXED W2.12 recommendation to allow for E4 future access.

245

2 350

2 250

287 E3

925

SLIDING

E4 ROOF TERRACE

E5

Plaster & Paint DULUX 30YY 78/018 E2 Milk Moustache / Winterbird

187 555

U/S OF SLAB FL: POOL DAYBED SOS

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E2

06

D3.04

FIXED

E4

from water E5 feature OPTI WHITE glass

E5

Reoxthene modified bitumen membrane followed by Professional Line Evolight 4mm Reoxthene modified bitumen waterproofing membrane both with 75mm side and 100mm end laps, including dressing into drainage outlet, on minimum 35mm screeds to min 1:100 fall towards Fullbore outlet

Fibreglass as per pool specialists recommendation. Tiled finish over E1 fibreglass as per GWA approved sample.

E1

E1

Dipsystems Neopor protection/insulation boards, 06 063mm Evolight onto torch fused Professional Line

2 865

150

345

E5 to water sheet

Steel Pergola

W3.02

E2

FIXED

E4

E5

510

325

FIRST FLOOR FFL: POOL 187 880 DAYBED TOC

E5

24

1 679

Dark Colour Textured Wall Finish

STUDY

E2

RC Roof slabs to be constructed in accordance with Structural Engineers Specifications, with 50mm stone chips loose laid onto PT 115 Polypropylene filter fabric, on 30mm thk

DIVING PLATFORM

TO FALL

1 525

450

W3.06

E2

SLIDING

3 264

2 990

06

E4

D3.05

SLIDING

B3.03 OPTI WHITE glass

E5

E2

E2

BOUNDARY LINE 19 200

2 914

MIN 1 : 100 FALL

E4

TOP OF BALUSTRADE: 180 360 188 855 188 580 180 330 TOP OF BALUSTRADE:

03

130 175 175

E4 SLIDING

310

06

190 635

U/S OF CANOPY: 180 730

180 600 WATER LEVEL

Plaster & Paint E2

E3 E3

380

Seat

Stainless Steel (Grade 316) Scupper Drain connected to 2 x 75mm D P a s p e r G WA ' s design and detail. ROOF

GRIDLINES

3 004

48

360 350

2 810

190 870 U/S OF ROOF SLAB FL: POOL TERRACE FFL

3 394

A

350

POOL TERRACE 500

MIN 1 : 100 FALL

104

200

TOP OF SCREEN FL:

181 080 191 580

200 130 175 175

BRAAI AREA FFL

350

181 280

300

BOUNDARY LINE 30 270

24

03

DIVING PLATFORM FFL

INTERIOR RENDER _ dining, kitchen + bar

B 500

240

C

352

D

1260

E

1 640

F 3 839

140

2 525

G

100

229

FLOOR SLAB: RC as per engineers details (up/downstand beams at glazing lines and slab edges as necessary) ROOF SLAB: RC as per engineers details (cut outs as noted on drawings) 30mm min. thick screed to fall to Fullbores with FLEXCEM LQ addmixture and Polyglass 4mm or similar approved torch on membrane by specialist. 30mm DIP Insulation system on top of waterproof membrane, under min. 50mm stone chip layer. All rainwater downpipes to be set within walls and therefore hidden and waterproofed as per architects details. Roof to comply with SANS 10400 part L for roofs. FOOTINGS: Footings as per Engineer's details. WALLS: Masonry walls with brick-force every 3rd course to be used as per Engineers details and as necessary. RC walls and columns as per Engineer's details. Retaining walls as per Engineer's details and specification - DPC sheets or similar approved to all walls with min 100 mm overlap at junctions. Install brick grip at all window and door sills.

PLASTER: Plaster of External walls to include SIKA 1 waterproofing addmixture, Walls to be finished with 2 coats paint on "ALTEK" finishing skim NCL coat - 1127 or similar to Architect's finishing schedule. Selected Resin bonded plaster to RC wall by specialist. Concrete and brick work junctions to be bandaged with DURAMESH mesh over lapping 300mm either material as per architects details. Internal walls to be plastered skimmed and painted as per GWA's finishes schedule where specified. DOORS AND WINDOWS: Doors and windows are to be powdercoated aluminium as per GWA's door and window schedules. STRUCTURE : BALUSTRADE All dimensions and positions must be checked and verified on site prior to any related portion of work beginning and that any variances or FLOOR SLAB: discrepancies to the documentation be reported to the Architect RC as per engineers details (up/downstand beams at glazing lines and This drawing to b slab edges as necessary) ROOF SLAB: RC as per engineers details (cut outs as noted on drawings) 30mm min. thick screed to fall to Fullbores with FLEXCEM LQ addmixture and Polyglass 4mm or similar approved torch on membrane by specialist. 30mm DIP Insulation system on top of waterproof membrane, under min. 50mm stone chip layer. All rainwater downpipes to be set within walls and therefore hidden and waterproofed as per architects details. Roof to comply with SANS 10400 part L for roofs. FOOTINGS: Footings as per Engineer's details. WALLS: Masonry walls with brick-force every 3rd course to be used as per Engineers details and as necessary. RC walls and columns as per Engineer's details. Retaining walls as per Engineer's details and specification - DPC sheets or similar approved to all walls with min 100 mm overlap at junctions. Install brick grip at all window and door sills.

10

549

8 H

STRUCTURE

EXTERNAL

POOL | SECTION c-c scale 1 : 25

Galvanised Hollow Steel Box Sections Screen & Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

260

NGL

NGL

DE A L LAYOU _ poo + poo ea ng

184 555

955

150

RC Tie Beams as per Engineers detail and specification.

1 522

Precast RC beam supports as Per Engineers detail and specification

All reinforced concrete foundations & walling, surface beds, slabs and retaining walls to Engineer's design specifications.

GROUND FLOOR FFL: 184 855

15

MIN 1 : 100 FALL

2 819

JOJO TANK (2500L capacity) Overflow 5 260

RC Tie Beams as per Engineers detail and specification.

300

175 900

PLANTER BASE SOS

POOL BOTTOM FL TOP OF PERGOLA FL:

230

1 544

JOJO TANK (2500L capacity) Grey Water

NGL

180 130

15

03

RC wall as per Engineers detail and specification.

230

1

176 200

NEIGHBOURING

940

PLANTER

1 125

3

5 260

PLANTER BASE TOC

DWELLING POOL DAYBED FFL ERF 1713

15

Reinforced Pool structure as per engineer's details and specifications. Waterproofing spec, CHRISTEX ADMIX HD at a rate of 1.5% of crementitious content as per waterproofing specialist.

Lightweight concrete as per engineer's details and specifications. Waterproofing spec, CHRISTEX ADMIX HD at a rate of 1.5% of crementitious content as per waterproofing specialist.

1 550

2

Compacted fill as per engineer's details and specifications for pool structure. NGL

191 430 191 230 TOP OF PARAPET FL:

15

15

03

250

℄ LA1 19-01

450

1 679

1 819

1 254

7 242

03

03

215

751

4

JOJO TANK (5000L capacity) Stormwater

230

MIN 1 : 100 FALL

03

1 522

794

954

415

1 694

260

Dashed line indicated access door to void beneath Pool from Storage room.

5

2 229

2 869

JOJO TANK (5000L capacity) Stormwater

03

Plaster with SIKALITE waterproofing additive, on external face of concrete beam. Paint colour to GWA approved sample & specifications or similar.

6

450

4 430

7

Galvanised mild steel ladder leading to

03

Planter along Pool wall to be planted as per Landscape Architect's layouts and specification.

1 000

975

4 260

MIN 1 : 100 FALL

177 745

1 300

350

230

1 244

15

480

780

400

939

PLANTER 03

178 135

BASEMENT TOC PLANTER WALL TOC

1 400

1 100

1 100

860

30

30

15

178 195

POOL LIGHT

28

R 200

4.1

794

230

550

03

15

BASEMENT FFL

POOL 8 266

550

ISONEM S-FLEX Hydrophilic water bar to all RC construction joints, with CRISTEX Concentrate slurry to all joint surfaces at a rate of 1kg/m2.

1 300

21

15

860

VOID

03

POOL SLAB TOC

560

1

20

2 333

15 AIMFLOW/ PORT

03

30

230

℄ LA1 19-02

750

179 070

130

130

540

2 114

Plaster & Paint

179 200

130

130

130

4.2

℄ Aimflow

7 066 ℄

06

7 466

400

08 21

POOL BOTTOM FL (DEEP END)

Skimmer Box

240

656

400

2

155

D1.09

350 100

7

179 500

400

400

1 170

345

400

2 577

D1.10

30

8

08 21

5

3

287

9

08 21

POOL BOTTOM FL (SHALLOW END)

2 364

2 010

08 21

STAIRS

℄ ℄ Aimflow

06

287

POOL DAYBED SOS

130

130

330

1 260

10

1 460

03

30

150

08 21

15

180 130

1 110

POOL DAYBED TOC

140

LA1 19-03

11 Plaster & Paint

180 330

270

240

399

12

08 21

180 360

EQ EQ

180

13

180 600 WATER LEVEL

06

7 249

06

MIN 1 : 100 FALL

180 730

POOL DAYBED FFL

600

861

POOL TERRACE FFL

100

100

200

180

68

400

800

D1.11

450

100

215

13

271

10 385

Seat

200

15

06 800

550

345 50

181 080

350

1 700

BRAAI AREA FFL

510

06

181 280

Seat 1 195

Position of aimflows to specialist specification. Pool specialist to confirm exact placement.

06

DIVING PLATFORM FFL

15

15

Pool lights fittings as per Electrical lighting schedules. Pool specialist to confirm exact placement.

306 521

Galvanized steel structured Pergola powder coated to match window and doors as per GWA's approved sample.

MIN 1 : 100 FALL

Position of skimmer to specialist's specification. Pool specialist to confirm exact placement.

920

03 6.1

230

2 027

935

RC pool structural wall to engineer's structural drawings and manufacturers detail and waterproofing spec, Xypex add-mixture or similar approved by Engineers &/or Architects. 2 layers of fiberglass and tiled finsh on internal side of pool wall. Plaster with SIKALITE waterproofing additive, on external face and top of concrete beam.

Plaster & Paint

13 03

15 140 15 STRUCTURE

2 213

230

170

03

1000mm Glass Balustrade of 15mm "Opti White, low iron, extra clear toughened safety glass with light transmission, on Neoprene Setting block, in continiuos non-shrink grout to specialist's spec.

GW

B

7 431

250

D ℄

3 572 4 120

250

E

400

450

390

150 150

30

60

230 ℄

210

2 114 2 040 1 492

2 150

F

330

975

G 24

GROUND FLOOR FFL: 181 140 610

GROUND FLOOR FFL: 181 140

180 530 U/S OF LIVING ROOM SLAB:

750

180 530 U/S OF LIVING ROOM SLAB:

179 780 U/S OF GYM SLAB:

1 585

2 945

179 780 U/S OF GYM SLAB:

BASEMENT FFL: 178 195

178 195

SOUTH ELEVATION SOUTH ELEVATION Scale 1:50

E2

E2

E2 E3

E3 E2

9

8

Description

0

E3 E2

E2

10

1

REVISIONS Rev.

E4

E2

E3

7

E2

6

5 E4

4

E4

3

Date

ISSUED FOR CONSTRUCTION

2016/03/30

1

ISSUED FOR CONSTRUCTION

2016/08/25

1.1

Addition of new screens

1.2

Addition of aluminium wall cladding

E2

E4

2

E2

1

E4

E2 E3

E3

E3 E1

E1 E3

BOUNDARY LINE 19 200

PROJECT STATUS : FOR CONSTRUCTION

E3

Note : This Drawing is not valid for construction unless stamped accordingly

SOUTH ELEVATION FINISHES

E2

Winterbird

G2.01

POWDERCOAT finish, INTERPON colour:

6 375

B3.06 Glass Balustrade

GLASS 02 . COLOUR: Opti White FINISH: 15mm "Opti White, low iron, TOP ROAD

E6

GRANITE TILE. COLOUR: New Sardo Granite tile FINISH: Brushed & flamed PARKING 600 x 1200mm

E7

CERAMIC TILE. COLOUR: Basic - Dark Nature. 3mm XLight ceramic tile.

350

184 970 BEDROOM 2 TOC: 184 795 BEDROOM 3 & 4 TOC:

E4

410 1 450

Marmoran 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

2 508

POOL FL:

Marmoran

179 070

1 085

1 085

180 730 POOL TERRACE FFL:

1 800

417 1 450

E1

E1 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

178 195

178 195 BASEMENT FFL:

178 135 BASEMENT FFL:

E2

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

1 746

E2

REVISIONS Rev.

Description

Date

NGL

GW

176 376 TANK ROOM SOS: 175 936 PLANTER BOX SOS:

WEST ELEVATION WEST ELEVATION Scale 1:50

E3

E3

E3 E2

E3 E2

E3

PROJECT STATUS : FOR CONSTRUCTION

E1

E2

E2

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein. DATE :

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

E1 Note : This Drawing is not valid for construction unless stamped accordingly

E2

E2

NOTE: All finishes and paintwork to Architect's approval. All colours to Architect's approved sample.

E1

MARMORAN . COLOUR: 30YY 10/038 S 18414-2 1,5mm Permacrete (Vertical), 30YY 10/038, S 18414-2

E2

E1

WEST ELEVATION FINISHES Project :

REVISIONS Rev.

1 Date 2016/03/30

1

ISSUED FOR CONSTRUCTION

2016/08/25

ALUMINIUM . COLOUR: QYL 259 D2525 Matt Dark Umber Grey FINISH: POWDERCOAT finish, INTERPON colour:

1.1

Addition of screen

E4

GLASS 01 . COLOUR: Clear FINISH: NS SMARTGLASS SolarVue Low ERangeTM clear laminated safety glass, to comply with the SANS 10400 Part N. Colour: Clear, to Architect's approved sample.

E5

PLASTER + PAINT 01 . COLOUR: DULUX 30YY 78/018, Milk Moustache /

0

Description ISSUED FOR CONSTRUCTION

Winterbird

E3

E2

FOR CONSTRUCTION

E2

E4

E1

E2

ELEVATION FINISHES LEGEND

The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

OUTDOOR RENDER _ front facade

E2

E4

E4

E4 E1

GENERAL NOTES

E3

E2

E2

COPYRIGHT:

E3

E3 E2

E1

E2

E1

CLIENT / CLIENT REPRESENTATIVE :

DATE

2016/08/25

CAPE TOWN

studio@gwarchitects.co.za

KITCHEN FLOOR FFL: 181 140

E1 TOP OF WALL: 179 355

TANK ROOM TOC: 176 526

@

TOP OF SEAT FL: 185 305

CINEMA ROOM

W1.05 SLIDING

GW/FP

W1.04

KITCHEN 2 685

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

1

CHECKED

57 BUITENKANT STREET .

(021) 465 9778

Plaster & Paint

E2 Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

F

E2

250

PLANTER behind

BAR

410

GROUND FLOOR FFL: 181 140

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E2

A1

2 350

ROOF TERRACE

450 1 545

E2

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

BRAAI AREA

PG SIZE

1:50

(021) 465 9775 T 187 655 TOP OF PARAPET FL:

E2

3 466

250 3 090 3 466

E2

REVISION

SS

SCALE

MASTER FFL: 4th BEDROOM FLOOR TEMPLE HOUSE . 187 880

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

E3

3 465

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

ROOF

E3

DRAWN

MAN|D2.25.3

extra clear toughened safety glass with light transmission

Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E1

BEDROOM 2 Marmoran E1 1,5mm Permacrete (Vert) 30 YY 10/038 S18414-2

Steel Pergola

POOL TERRACE

DRAWING NUMBER

Planted Garden Wall to NS specialist GLASS 01 . COLOUR: Clear FINISH: SMARTGLASS SolarVue Low Erecommendation. laminated safety glass, to comply with the SANS 10400 Part RangeTM clear N. Colour: Clear, to Architect's approved sample.

E5

ENTRANCE

E5

1.1

E2

ERF 1713 Top Road, Fresnaye Cape Town

ALUMINIUM . COLOUR: QYL 259 D2525 Matt Dark Umber Grey FINISH:

2 990

E3 E4

E3

SEA LION

190 870 U/S OF ROOF SLAB FL:

PLASTER + PAINT 01 . COLOUR: DULUX 30YY 78/018, Milk Moustache /

E4

BED 3 & 4 TERRACE

TOP OF SCREEN FL: Project : 191 580 TOP OF LIFT SHAFT ROOF: 191 430 191 230 TOP OF PARAPET FL:

225

2 650

E2 MASTER BEDROOM Plaster & Paint DULUX 30YY 78/018 Milk Moustache / Winterbird

E3

E5

FOR CONSTRUCTION

E6

MARMORAN . COLOUR: 30YY 10/038 S 18414-2 1,5mm Permacrete (Vertical), 30YY 10/038, S 18414-2

E3

Powder coated aluminium window to GWA's later detail & specification to comply with SANS 10400 part N for glazing

ROOF TERRACE

E5 E5

925

2 290

Opti White low iron extra clear toughened safety glass

W2.06

183 838 TOP OF PLANTER:

182 215 TOP OF WALL:

POOL TERRACE FFL: 180 730

E5

Galvanised Hollow Steel Box Sections Screen & Pergola Structures, powder coated to colour at later spec, as per Architect's & Engineers Details and Specification

E3 E3

184 555 TOP OF PERGOLA FL:

Gas braai as per Architect's design and details and installed in accordance with manufacturer's specification.

182 020 U/S OF WINDOW:

180 252 U/S OF WALL:

950mm Glass Balustrade of 15mm "Opti White, low iron, extra clear toughened safety glass with light transmission, on Neoprene Setting block, in continiuos non-shrink grout to specialist's spec, with 10x50mm steel handrail fixed to glass with steel supports at max 1000m c/c intervals, copper plated finish.

E5

Steel Pergola

2 000

2 350

2 350 184 970 BEDROOM 2 TOC:

E3

Kleemann Flexylift MRL 450KG 6 person (Hydraulic with motor in pit), 1000x1250 lift cabin, fixed within 1625x1700mm RC lift shaft as per manufacturer's detail and spec.

E1

450

TOP OF SEAT FL: 185 305

179 070 POOL BASE FSL:

Powder coated aluminium window to GWA's later detail & specification to comply with SANS 10400 part N for glazing

925 350

225

Soil mix/fill onto 100mm free draining c l e a n s a n d l a y e r o n t o P T 11 5 Polypropylene filter fabric, on 30mm thk Dipsystems Neopor protection/insulation boards, onto torch fused Professional Line 3mm Evolight Reoxthene modified bitumen membrane followed by one layer Professional Line Evolight 4mm Reoxthene modified bitumen waterproofing membrane both with 75mm side and 100mm end laps, onto screed to fall towards full bore outlet.

E3

E3

ELEVATION FINISHES LEGEND

710

350

200

360

3 575

2 990

DATE :

187 305 TOP OF CANOPY:

184 795 BEDROOM 3 & 4 TOC:

E3

NOTE: All finishes and paintwork to Architect's approval. All colours to Architect's approved sample.

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

188 580

E3

E2

E3

E6 E6

ROOF

FIRST FLOOR FFL: 187 880 TOP OF PARAPET FL: 187 655

E3

E2

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

32mm Structural glazing to specialist design bonded into Custom Stainless Steel channel fixed to topside of concrete wall, with countersunk bolts, with steel grate & decorative river pebbles. Steel channel to be retro fitted to concrete conservancy tank once construction complete and waterproofed. TOP OF WINDOW: 182 620

E3

E6

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED

E3

E3

E6

The copyright of the literary works, artistic and published editions TOP works OF PARAPET FL: 191 230 Architects (Pty.) Ltd. contained herein is vested with GREG WRIGHT Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than 190 870 GREG WRIGHT Architects (Pty.) Ltd. is an of FL: this copyright, and U/Sinfringement OF ROOF SLAB GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

CLIENT / CLIENT REPRESENTATIVE :

E3

E3

360 350

E3

E2

BOUNDARY LINE 21 510

E3

150

TOP OF SCREEN FL: 191 580

COPYRIGHT:

E3

3500 BUILDING LINE setback

E1

E3 E1

GENERAL NOTES

E3

E3

E2

SEA LION ERF 1713 Top Road, Fresnaye Cape Town DRAWING NUMBER

extra clear toughened safety glass with light transmission GRANITE TILE. COLOUR: New Sardo Granite tile FINISH: Brushed & flamed 600 x 1200mm

E7

CERAMIC TILE. COLOUR: Basic - Dark Nature. 3mm XLight ceramic tile.

DRAWN

SCALE

PG SIZE

1:50

A1

4th FLOOR

REVISION

SS

MAN|D2.25.4

GLASS 02 . COLOUR: Opti White FINISH: 15mm "Opti White, low iron,

E6

1

CHECKED

GW/FP

TEMPLE HOUSE .

57 BUITENKANT STREET .

DATE

2016/08/25

CAPE TOWN

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA T

(021) 465 9775

F

(021) 465 9778

@

studio@gwarchitects.co.za

10


PROJECT MANAGEMENT /// SOUTH BEACH 2 - BOUTIQUE HOTEL PROJECT /// New boutique hotel SITE /// Link Road, Camps Bay, Cape Town INVOLVEMENT /// Appointed as design architects + collaborating with MLB architects (principal architects). Designed + detailed all interior and advised on exterior design, together with Principal Director, Greg Wright. Very involved with client meetings and site related aspects of the project. YEAR /// 2015 / 2016

_Render produced by GWA office

OUTDOOR RENDER _ pool terrace + seating A

B

C

D

E

F

G

H

K 23,400

MAX HEIGHT: Front of site: 21,370

MAX HEIGHT: Back of site: 21,370

48

DULUX 30BB 31/043 (SWORDPLAY)

DULUX 10BB 73/039 (HORIZONS)

2 761

WHITE

DULUX 10BB 73/039 (HORIZONS)

18,500 U/S of ROOF TERRACE FFL: 1 821

DULUX 30BB 31/043 (SWORDPLAY)

814

DULUX 30BB 31/043 (SWORDPLAY)

DULUX 10BB 73/039 (HORIZONS)

WHITE

DULUX 30BB 31/043 (SWORDPLAY)

2 600

170

2 500

CUP

BOARD

FRID

GE

CUP

BOARD

DRAWING NOTES

DINING DRESSING AREA SHOWER

932 100 VANITY

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein. CLIENT / CLIENT REPRESENTATIVE :

DATE :

Project :

SOUTH BEACH 02

DULUX 30BB 45/049 SWORDPLAY

FRIDGE Sink

DISH WASHER

WHITE

OPEN SHELVING

WHITE

DULUX 10BB 73/039 HORIZONS

KITCHEN

BATH

PROJECT STATUS : FOR INFORMATION WHITE

WHITE

VANITY

BAR

Note : This Drawing is not valid for construction unless stamped accordingly DESK DESK

SOUTH BEACHDINING 02

STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN

FRIDGE

BEDROOM

BEDROOM

WEST ELEVATION Project :

DINING

Floor levels - All levels noted as per final MLB drawings

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. BAR The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. DESK / DRESSER Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

FOR INFORMATION ONLY

VANITY DRESSING TABLE

BAR

UNIT 204 = SILKSCREEN #16 Discounted price: R20 748 (incl. VAT) Paper size: 700mm x 1000mm (horizontal) Edition of 10

UNIT 203 VANITY = SILKSCREEN #12 Discounted price: R20 748 (incl. VAT) Paper size: 700mm x 1000mm (horizontal) DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM Edition of 10CUPBOARD

CUPBOARD

CUPBOARD

DRAWING NUMBER

DRAWN

REVISION

SO2|WD2.4

SS

SCALE

CHECKED

DATE

1:50

GW

2016/04/21

0

TV TV

LOUNGE

4th FLOOR

50 x 50cm ARISE (Red)

TEMPLE HOUSE .

57 BUITENKANT STREET .

CAPE TOWN

50 x 50cm PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

LOUNGE

BEDROOM

50 x 50cm ARISE (Grey)

T

(021) 465 9775

ARISE (Red)

F

(021) 465 9778

@

studio@gwarchitects.co.za

50 x 50cm ARISE (Grey)

50 x 50cm ARISE (Blue)

50 x 50cm ARISE (Blue)

SUITE 03DRAWN BALCONY

DRAWING NUMBER

SO2|1

70 x 100 cm (horizontal) artwork to be centred between door frame & line of carpet

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

CLIENT / CLIENT REPRESENTATIVE :

CLIENT / CLIENT REPRESENTATIVE :

CLIENT / CLIENT REPRESENTATIVE :

DATE :

REVISIONS

DATE :

REVISIONS

DINING Description

Rev.

Date

Rev.

70 x 100 cm Date (horizontal) artwork to be centred between door frame & line of carpet

DINING

Description

DATE :

REVISIONS Rev.

Description

Date

PROJECT STATUS : FOR INFORMATION

PROJECT STATUS : FOR INFORMATION

PROJECT STATUS : FOR INFORMATION

Note : This Drawing is not valid for construction unless stamped accordingly

Note : This Drawing is not valid for construction unless stamped accordingly

Note : This Drawing is not valid for construction unless stamped accordingly

SUITE 02 SUITE 03 BALCONY

SUITE 03

SUITE 04

Project :

Project :

Project :

SOUTH BEACH 02

SOUTH BEACH 02

SOUTH BEACH 02

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN

GENERAL NOTES

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN SS

REVISION

0

SCALE

CHECKED

DATE

1:25

GW/SS

2016/08/02

SUITE 04 BALCONY

POOL

UNIT TYPE 02, 03 + 04 _ unit 101, 201, 102, 202, 103, 203 UNIT TYPE 05.1 _ unit 105 TEMPLE HOUSE .

57 BUITENKANT STREET .

DRAWING NUMBER

CAPE TOWN

(021) 465 9778

@

DRAWN

REVISION

DRAWING NUMBER

SO2|2

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA F

WHITE

DRESSING ROOM

EN-SUITE

BEDROOM

TV and sound bar

TV and sound bar

WHITE

DULUX 10BB 73/039 HORIZONS WHITE

WHITE

BALCONY

(horizontal) artwork to be centred between door frame & line of carpet

SUITE 01

(021) 465 9775

Date

70 x 100 cm (vertical) artwork to be centred to door

WHITE

EN-SUITE

FOR INFORMATION ONLY

T

Description

Date

70 x 100 cm Note : This Drawing is not valid for construction unless stamped accordingly DINING

4th FLOOR

WHITE

WHITE

DULUX 10BB 73/039 HORIZONS

KITCHEN WHITE

BATH

WHITE

KITCHENETTE

39

BAR

DESK / DRESSER

PROJECT STATUS : FOR INFORMATION

UNIT TYPE 01 _ unit 101 + 201

FRIDGE Sink

DISH WASHER

OPEN SHELVING

EN-SUITE

Rev.

HOB

WC

DULUX 10BB 73/039 HORIZONS

DULUX 10BB 73/039 HORIZONS

WHITE

DRAWING NOTES DRESSING ROOM

WC

SHOWER

WHITE

CUPBOARDS

WHITE

TV and sound bar

Description

WC

SUITE 01 BALCONY

70 x 100 cm (vertical) artwork to be centred to door

DATE :

BEDROOM

REVISIONS Rev.

CUPBOARDS DULUX 10BB 73/039 HORIZONS

TV and sound bar

CLIENT / CLIENT REPRESENTATIVE :

EN-SUITE

ITY

DULUX 10BB 73/039 HORIZONS

DRAWING NOTES WHITE

REVISIONS

10BB DULUX 73/039 S HORIZON

45/049 30BB PLAY DULUX SWORD

HOB

HOB

UNIT 201 = MERGE (BLUE WITH ORANGE) Unframed: R23 500 (incl. VAT) ENDORSEMENT : Paper size:ItCLIENT 700mm x 700mm is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein. Edition 12 of 12

VAN

DULUX 10BB 73/039 HORIZONS

INTERNAL AREA: 88,16 SQM. BALCONY AREA: 17,51 SQM. TOTAL AREA: 105,67 SQM.

45/049 LAY

WC

The copyright of the literary works, artistic works and publishedSHOWER editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or inWHITE their entirety, by any party other than CUPBOARDS GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

73/0 B 10B NS UX IZO DUL HOR

The copyright of the literary works, artistic works and published editions CUPBOARD contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

FRIDGE

BAR

BATH

SUITE 105 | DULUX 30BB SWORDP

DULUX 10BB 73/039 HORIZONS

WHITE

DULUX 10BB 73/039 HORIZONS

UNIT 104 = SILKSCREEN #2 Discounted price: R20 748 (incl. VAT) Paper size: 700mm x 1000mm (horizontal) CUPBOARDS Edition 1 of 10COPYRIGHT:

DRESSING TABLE

FRIDGE

DESK / DRESSER

BEDROOM

DULUX 10BB 73/039 HORIZONS

WC

HOB

CUPBOARD

70 x 70 cm (square) artwork to be centred to desk

TV

EN-SUITE

UNIT 202 = SILKSCREEN #9 Discounted price: GENERAL R20 748 (incl. VAT) NOTES Paper size: 700mm x 1000mm (horizontal) COPYRIGHT: Edition of 10

VANITY

DESK

KITCHENETTE

DULUX 30BB 45/049 SWORDPLAY

KITCHENETTE The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damagesHOB from any party infringing this copyright, unless these rights are varied in writing.

DRESSING TABLE

WHITE

DRAWING NOTES

WC

COPYRIGHT: EN-SUITE

KITCHENETTE

WHITE

The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. AnySHOWER adaption, distribution, sale or for hire, or any form of reproduction of these works, in any part or in their entirety, by any party other than WHITE SINK GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party WHITE infringing this copyright, unless these rights are varied in writing.

DULUX 30BB 45/049 SWORDPLAY

SINK

PASSAGE

DULUX 30BB 45/049 SWORDPLAY

TOTAL AREA: 105,35 SQM.

Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. UNIT 103 = SILKSCREEN #5all levels and dimensions on site and check same Contractor and Engineer to verify against Architect's drawings before commencing work. Discounted price: R20 748 (incl. VAT) ENTRANCE Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where (horizontal) available. Paper size: 700mm x 1000mm Edition of 10 COPYRIGHT:

DULUX 10BB 73/039 HORIZONS

DULUX 30BB 45/049 SWORDPLAY

DrawingsSHOWER are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. SINK Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

The copyright of the literary works, artistic works and published editions contained herein is vested with GREG WRIGHT Architects (Pty.) Ltd. Any adaption, distribution, sale or for hire, or any form of reproduction of SHOWER these works, in any part or in their entirety, by any party other than GREG WRIGHT Architects (Pty.) Ltd. is an infringement of this copyright, and GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages from any party infringing this copyright, unless these rights are varied in writing.

SUITE 205 Drawings | INTERNAL 89,08 SQM. BALCONY AREA: 16,27 SQM. are to AREA: read in conjunction with Engineer's drawings.

TV and sound bar

HOB

UNIT 102 = SILKSCREEN #14 Discounted price: R20 748 (incl. VAT) Paper size: 700mm x 1000mm (horizontal) Edition of 10 COPYRIGHT:

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM STRUCTURAL ELEMENTS NOT FINISHES, UNLESS OTHERWISE INDICATED All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted.

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings.

INTERNAL AREA: 35,79 SQM. BALCONY Contractor to keep full set of drawings on site.AREA: 4,88SQM. TOTAL AREA: 40,67 SQM.

DULUX 30BB 45/049 SWORDPLAY

STAIRCASE LANDING

GENERAL NOTES

GENERAL NOTES DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM FINISHED SURFACE / MATERIALS AND NOT STRUCTURE, UNLESS OTHERWISE INDICATED

SUITE 04 |

SQM.

DULUX 30BB 45/049 SWORDPLAY

SINK

SUITE 03 |

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep fullBALCONY set of drawings on site. 4,80 SQM. TOTAL AREA: 40,79 INTERNAL AREA: 35,99 SQM. AREA: Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same PASSAGE against Architect's drawings before commencing work. ENTRANCE Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

DULUX 30BB 45/049 SWORDPLAY

PASSAGE UNIT 101 =All MERGE (WITH YELLOW) relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention Framed: R26 000 (incl. VAT) ENTRANCE of the Architect. Architect accepts responsibility for errors resulting from misinterpretation of Paper size:The700mm xno700mm the drawings. Edition 12 of 12 are given in millimeters unless otherwise noted. All dimensions

LOBBY

BAR

FINISHED SURFACE / MATERIALS AND NOT STRUCTURE, INTERNAL AREA: 36,38 SQM. BALCONY AREA: 4,75 SQM. UNLESS TOTAL AREA: 41,13 SQM. OTHERWISE INDICATED

TOP of GROUND FLOOR FFL: 10,400

WEST ELEVATION GENERAL NOTES

DULUX 30BB 45/049 SWORDPLAY

SUITE 02 |

12,900 U/S of FIRST FLOOR SLAB:

10,300 U/S of GROUND FLOOR SLAB:

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM FINISHED SURFACE / MATERIALS AND NOT STRUCTURE, UNLESS OTHERWISE INDICATED

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM

INTERNAL AREA: 55,48 SQM. BALCONY AREA: 9,16 SQM. TOTAL AREA: 64,64 SQM.

TOP of FIRST FLOOR FFL: 13,150

WHITE

DULUX 10BB 73/039 (HORIZONS)

WHITE

WEST ELEVATION Scale 1:50

GENERAL NOTES

SUITE 01 |

15,700 U/S of SECOND FLOOR SLAB:

2 187

DULUX 30BB 31/043 (SWORDPLAY)

613

WHITE

DULUX 30BB 31/043 (SWORDPLAY)

WHITE

WHITE

10,300 U/S of GROUND FLOOR SLAB:

OUTDOOR RENDER _ unit 205 (penthouse)

TOP of SECOND FLOOR FFL: 15,950

WHITE

DULUX 10BB 73/039 (HORIZONS)

TOP of GROUND FLOOR FFL: 10,400

OUTDOOR RENDER _ unit 105

TOP of ROOF TERRACE SLAB: 18,750

10 731

WHITE

20,400 TOP of WALL:

10 683

250

20,770

WHITE

250

5 170

21,195 DULUX 10BB 73/039 (HORIZONS)

DULUX 10BB 73/039 (HORIZONS)

DULUX 10BB 73/039 (HORIZONS)

DULUX 30BB 31/043 (SWORDPLAY)

DULUX 10BB 73/039 (HORIZONS)

1 170

TOP of FIRST FLOOR FFL: 13,150

12,900 U/S of FIRST FLOOR SLAB:

ASTROTURF

DULUX 10BB 73/039 (HORIZONS)

WHITE

2 550

15,700 U/S of SECOND FLOOR SLAB:

ASTROTURF

WHITE

DULUX 10BB 73/039 (HORIZONS)

1 107

TOP of SECOND FLOOR FFL: 15,950

WHITE

WHITE

WHITE PAINTED STONE

ASTROTURF

1 433

993

WHITE

18,500 U/S of ROOF TERRACE FFL:

ASTROTURF

DULUX 10BB 73/039 (HORIZONS)

600

175

1 650 250

4 695

2 545

WHITE

2 550

_Render produced by GWA office

DULUX 30BB 31/043 (SWORDPLAY)

2 430

_Render produced by GWA office

WHITE

DULUX 30BB 31/043 (SWORDPLAY)

TOP of ROOF TERRACE SLAB: 18,750

DULUX 10BB 73/039 (HORIZONS)

20,450 20,400 TOP of WALL:

DULUX 10BB 73/039 (HORIZONS)

655

20,770

370

600

WHITE

21,195

157

23,400

CHECKED

1:25

4th FLOOR

DATE

(021) 465 9775

F

57 BUITENKANT STREET .

(021) 465 9778

@

DRAWING NUMBER

REVISION

CAPE TOWN

studio@gwarchitects.co.za

CHECKED

1:25

4th FLOOR

DATE

2016/08/02

GW

TEMPLE HOUSE .

57 BUITENKANT STREET .

CAPE TOWN

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA T

(021) 465 9775

DRAWN

SO2|4

SCALE

2016/08/02

GW

TEMPLE HOUSE .

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA T

DRAWN

SO2|3

SCALE

studio@gwarchitects.co.za

F

(021) 465 9778

@

studio@gwarchitects.co.za

REVISION

GWA

UNIT 205 = ARISESCALE (RED), (BLUE)CHECKED & (GREY) DATE 2016/08/02 GWA Unframed: R7 0001:25 (incl. VAT) Paper size: 500mm x 500mm Edition of 10 4th FLOOR

TEMPLE HOUSE .

57 BUITENKANT STREET .

CAPE TOWN

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA T

(021) 465 9775

F

(021) 465 9778

@

studio@gwarchitects.co.za

GENERAL NOTES

BALCONY

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM FINISHED SURFACE / MATERIALS AND NOT STRUCTURE, UNLESS OTHERWISE INDICATED

DIMENSIONS NOTED ON ARCHITECT'S DRA FINISHED SURFACE / MATERIALS AND NOT OTHERWISE INDICATED

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing and any discrepancies are to be brought to the attention of the Architect. The Architect accepts no responsibility for errors resulting from misinterpretation of the drawings. All dimensions are given in millimeters unless otherwise noted. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting out of the building on site with particular reference to boundaries and building lines. Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. Figured dimensions to be used as preference to scaled dimensions. Large scale details to be used where available.

All relevant details, levels, dimensions, setting to any work commencing and any discrepancie of the Architect. The Architect accepts no responsibility for error the drawings. All dimensions are given in millimeters unless o Drawings are to read in conjunction with Engin Contractor to keep full set of drawings on site. Contractor is responsible for the correct setting particular reference to boundaries and building Contractor and Engineer to verify all levels and against Architect's drawings before commencin Figured dimensions to be used as preference t Large scale details to be used where available.

UNIT TYPE 05.2 _ unit 205 (penthouse)

COPYRIGHT:

The copyright of the literary works, artistic works and published editions

UNIT 205 = SILKSCREEN #18 / SIMILARcontained herein is vested with GREG WRIGHT Architects UNIT(Pty.) 105 Ltd. = ARISE (RED), (BLUE) & (GREY) Any adaption, distribution, sale or for hire, or any form of reproduction of Discounted prices: R23 748 (incl. VAT) Unframed: R7 000 (incl. VAT) these works, in any part or in their entirety, by any party other than of this copyright, Paper size: 1000mm x 700mm (Vertical) GREG WRIGHT Architects (Pty.) Ltd. is an infringement Paper size: and 500mm x 500mm GREG WRIGHT Architects (Pty.) Ltd. reserves the right to claim damages Edition 9 of 10 Edition of 10 from any party infringing this copyright, unless these rights are varied in writing.

CLIENT / CLIENT REPRESENTATIVE :

DATE :

Rev.

Description

The copyright of the literary works, artistic w contained herein is vested with GREG WRIG Any adaption, distribution, sale or for hire, o these works, in any part or in their entirety, GREG WRIGHT Architects (Pty.) Ltd. is an in GREG WRIGHT Architects (Pty.) Ltd. reserve from any party infringing this copyright, unl writing.

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to th conceptual design and / or technical information CLIENT / CLIENT REPRESENTATIVE :

0

REVISIONS

COPYRIGHT:

UNIT 105 = SILKSCREEN #18 Discounted prices: R23 748 (incl. VAT) Paper size: 1000mm x 700mm (Vertical) Edition 9 of 10

CLIENT ENDORSEMENT : It is agreed that the client, by its signature to this drawing, accepts and approves the conceptual design and / or technical informations contained herein.

REVISIONS

Date

Rev.

PROJECT STATUS : FOR INFORMATION

Description

PROJECT STATUS : FOR INFO

FOR INFORMATION ONLY

FOR INFORMATI ONLY

Note : This Drawing is not valid for construction unless stamped accordingly

Note : This Drawing is not valid for constru

SUITE 5 - PENTHOUSE

SUITE 05 - OTHER

Project :

Project :

SOUTH BEACH 02

SOUTH BEACH 02

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN

ERF 133 6 LINK STREET, CAMPS BAY CAPE TOWN DRAWING NUMBER

DRAWN

SS

0

SCALE

CHECKED

DATE

1:25

GW

2016/08/02

4th FLOOR

TEMPLE HOUSE .

DRAWING NUMBER

REVISION

SO2|5.2

57 BUITENKANT STREET .

T

(021) 465 9775

F

(021) 465 9778

@

DR

SO2|5.1

S

SCALE

CHE

1:25

4th FLOOR

CAPE TOWN

G

TEMPLE HOUSE .

57 BUITENK

PO BOX 50024 . V&A WATERFRONT . CAPE T

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

T

studio@gwarchitects.co.za

_Render produced by GWA office

(021) 465 9775

F

(021) 465 9778

11


CONCEPT DESIGN /// BARN IN FRANNSCHOEK PROJECT /// New barn in Frannschoek SITE /// Frannschoek INVOLVEMENT /// Together with Principal Director (Greg Wright) + Associate, designed, modelled and prepared concept design (stage 1) drawings for client. YEAR /// 2016 FINISHES LEGENDS

FLOOR FINISHES LEGENDS F1

TIMBER FLOORING. Finish: TBC

F6

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

F2

GRANO SCREED. Colour: Light grey

F8

TIMBER CLADDING. Finish: TBC

F3

STONE TILE Colour: Light grey

PLASTER & PAINT. Colour: Light

F6

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

STONE TILE Colour: TBC

F7

OFF-SHUTTER CONCRETE (PLANK SHUTTERING)

F9

F4

ROOFING PROFILE: TBC Colour: TBC

F8

TIMBER CLADDING. Finish: TBC

PLASTER & PAINT. Colour: Dark

W

S

20 505 8 065

10 683

EXISTI

F5

GRANO SCREED. Colour: Light grey

F3

E

10 683

650

TIMBER FLOORING. Finish: TBC

F2

N

B

950 300

F1

500

12 440

7 565

500

11 440

500

NG HOU

SE FOO

C

500

500

500

2 200

2 700 75

4 240

2 700

EXISTI

INT

260

140

7 960

1 850

4 650

9 740

2 700

4 650

12 450

500

2 700

4 650

F7

OFF-SHUTTER CONCRETE (PLANK SHUTTERING)

F4

ROOFING PROFILE: TBC Colour: TBC

F8

TIMBER CLADDING. Finish: TBC

O G

FLOOR FINISHES LEGENDS

U R

S

O

E

U

N

H D

A

F

L

R O

R

O

I

R

S

3 400

7 519

P

300

L

A

N

1

4

F4 F5 EXISTING BUILDING

5 355

3 950

F4

ROOFING PROFILE: TBC Colour: TBC

F8

F2Colour: TBC + TO MATCH ALUMINIUM. F2 CORRUGATED SHEETING

3 790

4 950

250

3 624

3 624

3 624

1 654

WC BEHIND

F6

TOP of INTERIOR FFL: 251 000

250 750

wc

WATER FEATURE BELOW

ENTRANCE BELOW

F2 5 100

410

3 748

342

4 650

FIRST FLOOR INTERNAL AREA 89,36 m2 TOTAL INTERNAL AREA 382,65 m2

3 200

EXISTI

powder coated aluminium F6 screen below

1 502 300

300

F2

1 750

BIC

11 600

300 KITCHEN BELOW

F2

2 096

9 080

TOP of ROOF FL: 259 978

RAGE

TOP of GLASS: 258 309

3 200

timber

MASTER BALCONY

U

S

TIMBER CLADDING. Finish: TBC

I

E

R

S

H T

F

A L

R O

R

O

I

R

S

P

L

N

1

3 A :

N

1

4

aluminium screen

O

F

F8

S

E E

S

H

A

T

E

R L

R

E

V

timber

TOP of FINISHES LEGENDS F6 LAUNDRY FFL: 251 000

1

F1

I

sliding

F4

F9

3 085

F2

F2

F3

TIMBER FLOORING. Finish: TBC

F5

PLASTER & PAINT. Colour: Light

sliding

DINING ROOM

BIC

sliding

fixed

sliding

POOL TERRACE

sliding sliding

LIVING ROOM

F2 F9

253 550 U/S of CIRC. SLAB:

F2

TOP of POOL TERRACE FFL: 250 750

F2

PLASTER & PAINT. Colour: Dark

GRANO SCREED. Colour: Light grey

F6

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

STONE TILE Colour: TBC

F7

OFF-SHUTTER CONCRETE (PLANK SHUTTERING)

F4

ROOFING PROFILE: TBC Colour: TBC

F8

TIMBER CLADDING. Finish: TBC

29 052

EXISTI 2 785 NG HO

29 052

USE

FOO

TPR

INT

C

SECTION A-A Scale 1:100

LONGITUDINAL SECTION_master bedroom, laundry, garage + living area

POOL BELOW

H

HOUSE HARRIS ERF 3387

11 600

3 400

11 600

3 400

O

U

S

E

3 800

H

A

S

E

R

C

T

I

R

I

O

N

S

3

A 1

12 948

1 440

F8

14 110

3 340

3 400

300

PERGOLA CANOPY BELOW

3 400

3 400

BEDROOM 2 & 3 TERRACE BELOW F1

3 400

0

U/S of OVERHANG 254 700

fixed glass

sliding

GUEST WC

F3

NGL F2

W

S

3 400

N 0

E

B

300

1

F2

F3

GARAGE plastered + painted

F5

O

:

256 187

timber

fixed glass

sliding

F1

3

ROOF FL: 259 978

1

F8 cladding

sliding

joinery

STOP of T

EXISTING BUILDING

sliding

F2

LAUNDRY plastered + painted

I A

timber cladding F8

fixed glass

MASTER BEDROOM

TOP of BALCONY WALL: 254 700

H

ROOFING PROFILE: TBC Colour: TBC

U

F8 cladding

fixed glass

10

F4

3 325

O

F8 cladding

timber cladding

TOP of BALCONY FFL: 253 800 F4

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

H

W

F8 FOOT

4 650

B

F6

14 275 30 595

21 545

TIMBER FLOORING. Finish: TBC

1 615

F4

NG GA

13 695

F1

245

1 243

96

1 945

A

meters

300

TOP of SCREEN: 253 559

F6

500

FIRST FLOOR PLAN

ROOF FINISHES LEGENDS

0

TOP of UP-STAND FL: 254 700

300

1 945

2 700

FIRST FLOOR PLAN Scale 1:141 5

0

341

300

C

2

N

1

TIMBER CLADDING. Finish: TBC

U/S of OVERHANG: 256 000

1

O :

256 354

F6

powder coated aluminium screen

BEDROOM 2 PLASTER & PAINT. Colour: Dark BEHIND

OFF-SHUTTER CONCRETE (PLANK SHUTTERING)

32 138

0

fixed

corrugated

F9

F6

MASTER DRESSER BEHIND

sliding

F4 sheeting aluminium screen

3 400

3 400

F7

PRINT

5 238

corrugated

F4 sheeting

sliding

5 091

5 210

WAY 5 355

3

I

7 075

11 000

300

DRESSER 9,23 m2 Timber

NEW DRIVEWAY

F6

DRIVE

5 238

T

3 700

ING

300

1 450

3 640

1 900 3 481 1 581

shower

2100mm x 970mm bath

powder coated aluminium screen

EXIST

1 450

CIRCULATION 9,10 m2 Grano Screed 5 978

140

BIC

3 432 1 182 MASTER EN-SUITE F1 17,26 m2 5 815 Timber + Stone tile

S

A

300

650

140

300 3 481 300

F3

300

BIC

whb

whb

1 201

I

V

WEST ELEVATION WEST ELEVATION Scale 1:100

F2

300

1 295

CIRCULATION BELOW

htr

4 528 DRESSER 14,75 m2 Timber

F1

R

E

3 240 1 182

155

5 815 9 070

3 602

F6

LOUNGE BELOW

F2

300

1 240

3 984

3 984

70

155

3 481

155

3 153

BIC

300 4 081

3 481

3 453 300

powder coated aluminium screen below

300

DINING ROOM BELOW

DOUBLE VOLUME

line of

300

R L

fireplace below

300

3 240

155 above roof

MASTER BEDROOM 36,21 m2 Timber F1 fireplace

250 600 STONE TILE Colour: TBC

250

270

300

300

300

300 3 240

3 540

3 255 3 979

3 979

11 600

A

PLASTER & PAINT. Colour: Light

F1

GRANO SCREED. Colour: grey TOP Light of TERRACE FFL:F6

F3

250 741 POOL TERRACE BELOW

14 088

MASTER BALCONY 60,51 m2 F2 Grano Screed

BEDROOM 2 & GYM TERRACE

F5

TIMBER FLOORING. Finish: TBC

F2

BRAAI TERRACE BELOW

F2

timber

F8 cladding

253 559 TOP of EN-SUITE SCREEN:

3 700

3 800

3 800

3 800

3 340

2 415

F8

270

F1

14 110

3 400

1 440

powder coated F6 aluminium screen below

1 000

PERGOLA CANOPY BELOW

F1

12 298

3 400

3 400

3 400

254 450 TOP of CANOPY:

FINISHES LEGENDS

18 890

BEDROOM 2 & 3 TERRACE BELOW 3 415

POOL BELOW

fixed glass MASTER BALCONY

1 654

TOP of BALCONY UP-STAND: 254 700

12 298

fixed glass MASTER BEDROOM BEHIND

fixed glass 1 654

C

950

A E

E

W

HOUSE HARRIS ERF 3387

300

H T

1

FOOT

950

S

1 429

:

PRINT

300

A

1

256 354

USE

E E

TOP of ROOF FL: 259 978

S NG HO

S

4 081

N

B

EXISTI

O4 081 U

H

7 219

5 278

TIMBER CLADDING. Finish: TBC

300

3 849

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

F8

STONE TILE Colour: Light grey

250

250 600 TOP OF WATER FEATURE EDGE FL:

TOP of ROOF FL: 259 978

3 624

F6

GRANO SCREED. Colour: Light grey

TOP OF POOL TERRACE FFL: 250 750

3

1

TIMBER FLOORING. Finish: TBC

TOP OF BRAAI COUNTER FL: 251 650

F2 POOL

3 100

H

F3

F2

EAST ELEVATION

EAST ELEVATION Scale 1:100

10

F2

PLASTER & PAINT. Colour: Dark

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

500

B

F1

5 604

1 654

9 228

4 100

STONE TILE Colour: TBC

F8

3 950

timber cladding

F9

PLASTER & PAINT. Colour: Light

3 200

GROUND FLOOR PLAN 5

F3

250 600

4 357

860

3 490

C

2

F6

SLAB FFL: 250 750

FOO

GROUND FLOOR PLAN Scale 1:141 meters 1

GRANO SCREED. Colour: Light grey

NG GAR

32 138

0

TIMBER FLOORING. Finish: TOP TBC OF ENTRANCE F5

F2

TPR

600

timber

F1

F8 BRAAI & POOL TERRACE

4 409

6 600

TOTAL INTERNAL AREA 382,65 m2

F7 LOUNGE BEHIND TERRACE

aluminium screen

6 600

5 238

GROUND FLOOR INTERNAL AREA 292,32 m2

300

powder coated aluminium screen

6 600

5 238

500

line of roof above

NEW DRIVEWAY 260

3 624

WATER FEATURE 9,83 m2 Tile

F2 4 763

AGE

2 140

aluminium screen

7 360

7 060

300

3 902

aluminium screen

F2

3 870

3 640

ENTRNACE FOYER 15,94 m2 Grano Screed

140

1 654

4 500 300

300 4 688 prep

sink

F6

TOP of POOL CANOPY FL: 254 700

aluminium screen

260

F8

3 624

2 278

256 354

TOP OF DOOR: 254 700

500

FINISHES LEGENDS ENTRANCE 18,73 m2 Grano Screed

F6 IVEWA Y

300

140

fridge

300

powder coated aluminium screen

NG DR

F8

ENTRANCE

F2

3 490

sink

EXISTI

2 700

BIC

2 258 900

6 018

dw

7 200

F2

whb

rru

co

kitchen counter

KITCHEN 5 210 26,59 m2 Grano Screed F2

140

15 1 450

WC wc 2,98 m2

F2

1 850

ga

F6

256 354

A

F R

659

8 740

270

2 877

300 1 307

F2

whb

BIC

STORAGE 6,17 m2 2 140 260

2,84 m2 bin

F3

5 510

WC F3 3,93 m2 wc Stone tile 1 739

F2

6 540

F2

150

3 400 1 182

whb

EN SUITE 3 7,48 m2 Stone tile

260

4 722

3 400

300

300 3 670 1 554 140

F2

3 200

LOUNGE 61,93 m2 Grano Screed

1

BIC

bin

F2 BINS

F6

2

8 364

GARAGE 43,47 m2 Grano Screed

260

wc

F2

CIRCULATION 9,98 m2 Grano Screed

300

11 600

shower

2 199

3 670

4 940 93

1 554 140

BIC

td

300

1 902

140

6540

1 270

4 365

powder coated aluminium screen

300 2 199 260

sink

wm

945

s ted

line of roof above

14 390

9

whb

LAUNDRY 10,29 m2 4 678 Grano Screed

260

ng

eti

he

EXISTING BUILDING

DINING ROOM 26,85 m2 Grano Screed F2

1 300

5 884

wc

TOP of ROOF FL: 259 978

F4 500

8,1

EN SUITE 2 4 679 7,27 m2 Stone tile F3

F3

4 500

line of pergola above

-8

300

BEDROOM 3 / GYM 20,01 m2 Grano Screed 4 584

2 200

3 400

TOP of ROOF FL: 259 978

500

16 950 POOL TERRACE 72,16 m2 F2 Grano Screed

line of roof above shower

5 884

2 840 SCULLERY 7,63 m2 Grano Screed

300 300

line of roof above

F2

300

F2

powder coated aluminium screen

BEDROOM 2 22,60 m2 Grano Screed

2 200 11 440

12 160

1 140

3 400

11 300

18 800

300

POOL 25,17 m2 Tile

line of pergola above

3 940

F6 12 298

5 510

4 500

F1

braai

BEDROOM 2 & 3 TERRACE 41,81 m2 Timber decking

1 440

BRAAI TERRACE 31,14 m2 Grano Screed

950

4 584

fireplace

A

2 480

3 400

5 234

3 400

3 400

300

650

Porsche Cayenne S

3 400

3 400

300

1 600

2 200

1 700 500

11 600

HOUSE HARRIS ERF 3387

3 700

INT

timber cladding

TPR

5 800

POOL TERRACE BELOW

F6

5 800

2 400

800

1 000

300 2 200 300

1 100

2 200

-

:

1

A 0

0

200

500

powder coated aluminium screen

TOP of ROOF FL: 259,98

TOP of ROOF FL: 259,98

F7

F4

ROOFING PROFILE: TBC Colour: TBC

F8

FOO

F5F6

GRANO SCREED. Colour: Light grey

TOP of INTERIOR FFL: 250,75

F6

250,60

F3

STONE TOP ofTILE Colour: TBC

F4

ROOFING TBC PLINTHS PROFILE: FFL: Colour: TBC

F2

BRAAI & POOL TERRACE

OFF-SHUTTER CONCRETE (PLANK SHUTTERING)

F8

TIMBER CLADDING. Finish: TBC

3 624

3 624

F2

TIMBER CLADDING. Finish: TBC

TOP of BRAAI COUNTER: 251,65 TOP of POOL TERRACE FFL: 250,75

F2

STEPPING

OFF-SHUTTER CONCRETE (PLANK

TOP of BRAAI OPENING: 253,56

250

PLASTER & PAINT. Colour: Dark

kitchen

F2 TBC + TO counter ALUMINIUM. Colour: MATCH CORRUGATED SHEETING joinery

F7

F8 timber cladding

3 950

9 378

TIMBER FLOORING. Finish: TBC

F2 NGL

ALUMINIUM. Colour: TBC + TO MATCH CORRUGATED SHEETING

EXISTING DRIVEWAY SHUTTERING)

C

5 754

F1 TPR

INT

off-shutter concrete F7

DINING ROOM

3 700

RAGE

PLASTER & PAINT. Colour: Dark

32 138

off-shutter F7 concrete

F9

STAIRS grano KITCHEN screed PLASTER & PAINT. Colour: Light F9

TOP of CANOPY FL: 254,70

F4

B

1 750

F6

STONE TILE Color: TBC

NG GA

21 546

F9

dark paint

F8

fixed glass

1 500 250

GRANO SCREED. Colour: Light grey

F3

EXISTI

powder coated aluminium screen

PLASTER & PAINT. Colour: Light

plaster + paint F5

256,35

F8

plaster + paint F5

CIRCULATION

300

F2

F6

5 353

F5

off-shutter concrete F7

F4 aluminium screen

F6

NG DR IVEWA 5 238 Y

F8

300

5 800 powder coated aluminium screen

EXISTI

aluminium screen

11 600

11 600

4 365

4 303

powder coated aluminium screen

406

1 497

253,80 253,55 FINISHES LEGENDS

1 797

300

300

TOP of CIRCULATION WALL FL: 254,70

line of structure below

TIMBER FLOORING. Finish: TBC

fixed glass

256,35

line of structure below

F6

F1

F8

EXISTING BUILDING

A

line of structure below

FINISHES LEGENDS

F6

1 654

ROOF F4 354,90 m2 Corrugated sheeting

A

F4

1 654

3 624

5 800

5 333

5 800

F4

250,60 TOP of POOL COPING FFL:

POOL tiled

NGL

249,00 248,70 U/S of POOL SLAB:

SECTION B-B

ROOF PLAN ROOF PLAN Scale 1:141

CROSS Scale 1:100 SECTION_living area

meters

0

1

2

5

H

30 595

10

O

U

S

E

H

A R

R

O

29 052

R

O

F

I

S

P

L

1 543

17 750

11 900

3 A

1

:

N

1

4

114

5 800

O

U

S

E

H S

300

A E

R

C

T

I

R

I

O

N

S

114

TOP of ROOF FL: 259 978

300

3 481

140

3 994

3

B 1

12 845

TOP of ROOF FL: 259 978

H

5 800

1

:

1

B 0

0

3 685

TOP of ROOF FL: 259 978

TOP of ROOF FL: 259 978

NORTH ELEVATION

NORTH Scale 1:100 ELEVATION_pool terrace + bedroom balconies

909

DRIVEWAY

GARAGE plaster + paint

F3 EN-SUITE 3 stone tile

F5 F2

F2

F3

3 978

3 624 354 1 300 1 141

1 123 2 545

2 545

9 228

250 750 U/S of GARAGE SLABL

F4

253 559 U/S of FIRST FLOOR SLAB:

F6 2 559

250 750 TOP of POOL TERRACE FFL:

F1 F4

U/S of DOWNSTAND FL: 252 900 TOP of GARAGE FFL: 251 000

F2

2 441

3 624

TOP of TERRACE FFL: 251 000

F6

MASTER BEDROOM

250

F4

TOP of WALL FL: 254 700 TOP of BALCONY FFL: 253 800

F4 fixed glass

2 559

fixed

U/S of ROOF OVERHANG: 256 000

250

sliding

BEDROOM 2 & GYM TERRACE

RDS TOWA P: VIEW ITSKO DU TO

EXISTING BUILDING

aluminium screen

F6

MASTER EN-SUITE

F3

253 800

2 809

sliding powder coated aluminium screen

F4 F8

F1

1 900

sliding sliding fixed BEDROOM 3 / GYM F1

stone

F3 tile

250

F2

F8

fixed glass

plaster + paint

TOP of BEDROOM 2 TERRACE FFL: 251 000

F1

250

3 624

F2

timber cladding

256 354

256 000 254 700 TOP of BALCONY BALUSTRADE FL: 253 559 TOP of DOORS:

5 935

sliding sliding sliding fixed

256 354

F4

4 447

3 700

sliding

F4 corrugated steel

BRAAI TERRACE

sliding sliding

MASTER BEDROOM BEHIND

aluminium screen

fixed

timber cladding

F8

POOL TERRACE

LOUNGE BEHIND

MASTER BALCONY

F5

1 487 166

F4

F8 4 100

corrugated steel

150

TOP of POOL TERRACE FFL: 250 750

3 791

3 624 5 278 1 654

254 450 U/S of CANOPY FL:

250

256 354 256 000 TOP of CANOPY FL: 254 700

F8 fixed glass

F5

F6

EXISTING HOUSE corrugated sheeting F4

2 501

F4

F8 timber

250 750 U/S of BEDROOM 2 TERRACE SLAB:

CROSS Scale 1:100SECTION_bedrooms + garage SECTION C-C

H

O

U

S

E

H S

H

O

U

S N

O

E R

H T

H

A E

R L

E

R V

I A

S T

3

I 1

O :

1

N 0

0

E

A C

R T

R I

O

I N

S

3

C 1

:

1

12 C

0

0


DETAIL DESIGN LAYOUTS /// VARIOUS INVOLVEMENT /// Detail design entails drawing up every specification, tile thickness, specific switchgear, specific sanitary ware and joinery of a space. A detail layout leads to the resolution of close up details so often missed or ignored in the industry. They help give the client a “real” and “realistic” representation of each space in the building. I enjoy detail design, as interior design is one of my passions in life - one also deals alot with the choosing and specifying of finishes (also something i thoroughly enjoy).

CRANBERRY COTTAGE_master bedroom, en-suite + guest wc 1

2

gridlines:

284

structure:

284

overall counter:

284

3

4

2 000 156

4 451

330

counter:

1 220

485

2 2 000

1 101

counter:

1 101

2 234

3 4 606

overall counter:

78

5 175

614

4 gridlines:

4 606

1 922

1 101

20

600

600

500

600

1 284

5 175

330

218

1 438

1 180

20

330

1 236

IP2

W0.03

102 820 U/S of INTERIOR SOFFIT: 102 420 TOP of STONE WALL:

400

Painted steel post

IP1

400

W0.02

190

190

103 010 TOP of ROOF SLAB:

75

102 820 U/S of INTERIOR SOFFIT: 102 420 TOP of STONE WALL:

400

345

U/S of CANTILEVER: 102 896

230

TOP of RC UPSTAND BEAM: 103 241

230

TOP of RC UPSTAND BEAM: 103 241

D0.02

06 Plaster & paint

Slider Slider

ROCAL Habit 50V graffiti fireplace flue

S11

S11

S10

S10

A.02 KITCHEN

ROCAL Habit 50V graffiti fireplace

09

15

100 205 TOP of FSL:

15

100 005 U/S of FLOOR SLAB:

200

200

3

4

d 284

4 606 5 176

20

E

c 2 000

528 528

1 200

20

791

14

597

807

1 116

611

1 101

gridlines:

1 101

overall counter: counter:

OUTSIDE

gridlines:

284

330 20

1 200

20

2

325

345

230

75

W0.22

400

1 336

1 336

TOP of RC UPSTAND BEAM: 103 241 TOP of ROOF: 103 010

c 3

102 820 U/S of ROOF SOFFIT: 102 420 TOP of WALL:

1 700 4 606

W0.06

D0.04

OUTSIDE 1 300

Plaster & paint

S11

S11

S10

S10

900

900

09

100 205 TOP of FSL: 100 005 U/S of FLOOR SLAB:

4

KITCHEN | plan Scale 1 : 25

09

TOP of INTERIOR FFL: 100 220

DET.033

100 205 TOP of FSL:

KITCHEN | elevation c-c Scale 1 : 25

99 955 U/S of THICKENED FLOOR SLAB:

KITCHEN | elevation d-d Scale 1 : 25 PROJECT STATUS : FOR TENDER

CRANBERRY COTTAGE_kitchen

FOR TENDER Note : This Drawing is not valid for construction unless stamped accordingly

KITCHEN LAYOUTS | GROUND LEVEL

GENERAL NOTES COPYRIGHT: The copyright of the literary works, artistic works and published editions

460

06

a

TOP of INTERIOR FFL: 100 220

1 101

d 1

850 65

Pivot

589 1 101

5 175 2 000

390

A.02 KITCHEN

Sliding

850

DPP 1.02-04

3 935

330

947

2 186 1 336 1 336

15

284

850

counter:

E 151

200

284

overall counter:

1 336

15

Open shelving below counter

200

S11

A.03 LIVING ROOM Polished concrete

13

30

A3

261

261

RLV 1.02-02

65

D0.03

overall counter:

589

D0.03

850 gridlines:

overall counter:

Gaggenau RC SMEG FL130P 200 undercounter RLV 1.02-04refrigerator undercounter fridge

RLV 1.02-03

460

gridlines: overall counter:

OUTSIDE

DPP 1.02-05

partitions counter:

325

Fixed

S10

Drawers below

H

04

102 820 U/S of ROOF SOFFIT:

b

I

RLV 1.02-01 Counter top 09

a

RFLV 1.12-04

HAILO CS Slide 40.2/34 integrated bin below basin

Drawers below

Seating area

Spazio nemo recessed floor light

Gas sleeve

partitions counter:

Slider

1 336 2 187

RFLV 1.12-03

FFL 100.220 FSL 100.225

151 1 336

TOP of RC UPSTAND BEAM: 103 241 TOP of ROOF: 103 010

OUTSIDE

Drawer

190

E

b

Drawer

CL

E

A.02 KITCHEN Polished concrete

2 186 850

floor layout

Gas bottle

RFLV 1.12-02

Drawer

900

gridlines: overall counter: 86

A4

KITCHEN | elevation b-b Scale 1 : 25

2

counter partitions: 86

09

Drawer

30

1

Hailo CS Slide 40.2/34 integrated bin below basin

CTZS 3000 Building line - setback

KITCHEN | elevation a-a Scale 1 : 25

Drawer

GAGGENAU RC 200 ubdercounter refrigerator

CTZS 3000 Building line - setback

99 945 U/S of SLAB:

200

15 15

100 145 TOP of TERRACE FSL:

A2

SMEG undercounter refrigerator

TOP of INTERIOR FFL: 100 220

880

880

Open shelving

900

A1 900

09

Seating area open through

900

09

45

TOP of TERRACE FFL: 100 160

A5

20

20

09

1 300

08 Stone clad wall

1 300

1 300

Slider

08 Stone clad wall

DIMENSIONS NOTED ON ARCHITECT'S DRAWINGS ARE FROM

ELECTRICAL, GAS, JOINERY NOTES

D4 PLUMBING, WET SERVICES + SANITARY WARE

All electrical, gas and plumbing points are to be provided by specialist sub-contractors in position approved by Architect and Joinery specialist to accommodate the respective appliances, fittings etc. prior

All drainage to be as per design and supply by appointed sub-contracor. All layouts to be approved by architect prior to installation. All soil and waste pipes to connect to sewer

KITCHEN SANITARY WARE + BRASS WARE LEGEND Refer to Sanware Schedule for complete specifications and quantities

Project :

REVISIONS

0

CRANBERRY COTTAGE

13


DETAILING /// VARIOUS INVOLVEMENT /// Designing a detail entails thinking of every little piece related to a specific portion of the design. A detail allows you to figure out the finer connections and the way different finishes and elements come together, seamlessly. Detail design has taught me to think beyond the day-to-day standards in the industry and by doing this one is able to dictate the outcome + standard of a space. E RC Roof slab to be cast with CRISTEX ADMIX HD at a rate of 1.5% of cementitious content 103015

100

120

100

Sand & cement gusset in corner to dress waterproofing over

H

FFL 100.220 FSL 100.225

250 x 250 x 10mm square topplate welded to SHS and cast into RC slab as per engineers specifications

1P3

75

95

340 x 270mm wide RC column as per engineer's specifications

20

U/S of EXT. SOFFIT: 102895

A.02 KITCHEN Polished concrete

Frameless glass window above wall

150 x 150 x 4mm square SHS Steel post as per Engineer's detail specification

100 x 100 x 4mm SHS fixed above RC column as per engineer's detail specifications

102820 U/S of SOFFIT:

Double glazing as per specialist recommendation

INSIDE

OUTSIDE

Resiflex

Wtech DURAMESH reinforcement glass fibre mesh fixed at 150 min over joint between brickwork and RC column, covered with min. 15mm plaster as per Engineers specification

1

A l u m i n i u m threshold cover

ISO 100 Aluminium door as per Aluplan detail specifications

120

Wall cladded with natural stone as per Architect's schedule and approved sample, thickness of stone subject to final selection

Galvanised steel with paint finish

FFL 100.160 FSL 100.165

DOOR JAMBS - TRIPLE LEAF CONNECTION TO RC COLUMN DETAIL CCO|DET.015 (Ref: CCO|WD1.1.1 GROUND FLOOR PLAN)

Rev. 0

from misinterpretation of the drawings.

ISSUED

DWG.

Date

2

ERF 725 - 14 CRANBERRY CRESCENT, CAMPS BAY

CRANBERRY COTTAGE

0

Contractor and Engineer to verify all levels and dimensions on

All relevant details, levels, dimensions, setting out positions are to be checked prior to any site and check same against Architect's drawings before work commencing, details take precedent over working drawings, any discrepancies are to be commencing work. brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's The Architect accepts no responisibiilty for errors resulting drawings. Contractor to keep full set of drawings on site.

DOOR TRIPLE LOCK JAMB

2015/07/09 PROJECT STATUS : FOR CONSTRUCTION

SCALE

CCO|DET 015

PG SIZE

1:2 DRAWN:

SS

120x120x5mm hollow Galvanised steel members @ 1500mm c/c, cladded and welded to hollow galvanised steel beam to engineer's details & specifications. Aluminium cladding to be laser cut to GW's later detail.

215

134

20 38

20

22

34

100

POST FIXING DETAIL CCO|DET.022a (Ref: CCO|WD1.1.1 GROUND FLOOR PLAN)

Cantilevered screen comprised of 50x50x3mm hollow Galvanised steel members @ 1500mm c/c max to form primary framed structure, cladded, welded & cantilevered with GMS bracket to engineer's details & specifications. Aluminium cladding to be laser cut to GW's later detail.

164

120

68 50

215

scale 1:2

148

15

72

50

22

70

187,570 SOFFIT OF CANOPY FL:

ENTRANCE FOYER

115

PRO-STRUCT 649 Quickseal polyuthene joint sealant with backing cord.

19mm Walnut timber finish laid onto 15mm plaster, on soffit of 267mm RC slab as per Engineer's details and specification

20

60

80

22

32

Aluminium drip mold.

Powder coated WISPECO aluminium pivot door and glazing by specialist as per Architects schedules.

4th FLOOR TEMPLE HOUSE . Suitable packing

57 BUITENKANT STREET .

CAPE TOWN

3 4

0

SEA LION

FOR CONSTRUCTION

ENTRANCE BRIDGE & CANOPY JUNCTION

DWG.

MAN|DET.036

SCALE

DRAWN:

60

CHECKED

RS

FP

40

40 20 15

5

193

Sandblasted 15mm New Sardo Granite tiles as per GWA approved sample laid onto 40mm screed on RC slab to Engineers details & specs.

200

Resiflex Polymer modified cementitious slurry over one layer Adeso Spider P FT APP plastomeric compound self adhesive reinforce membrane surface with a polypropylene fabric onto one Layer Adeso Spider P Self Adhesive membrane on screeds with Cristex Screed Admix @ 2% of cement content, to fall on balconies & terraces, including turnups.

15

180

116

181,080

PG SIZE

REV.

FLEXCEM PDR reinforced waterproofing by specialist

38

93

60

A2.06 BEDROOM 3 Walnut Timber

54

A2.20 DOUBLE VOLUME

15

207

12

3

BEDROOM 3 | POST CLADDING DETAIL | PLAN MAN|DET.240 (Ref. MAN|BEDROOM 3 - MAN|D7.1.2)

15

PRO-STRUCT 649 Quickseal polyuthene joint sealant with backing cord.

4th FLOOR

T

SAP H3 Treated Timber stud STREET by 57 BUITENKANT specialist

TEMPLE HOUSE .

(021) 465 9775

F

(021) 465 9778

270

.

Pro-struct DYMONIC NT Polyurethane joint sealant with non-slip backing chord

EXTERIOR

CAPE TOWN

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site.

Line of aluminium cladded beam above Fixed window frame

approved by architect to match existing, fixed to new steel post by Engineer. Pro-struct DYMONIC NT Polyurethane joint sealant with non-slip backing chord

184 310

TOP of ALUMINIUM CLADDED BEAM

Marine ply wood by specialist

U/S of RHS BEAM 184 240

ERF 1713 -649 Top Road, Fresnaye, Cape Town PRO-STRUCT SCALE PG SIZE REV. Quickseal polyuthene 1:2

joint sealant withDRAWN: MAN|DET.240 backing cord.

INTERIOR

Date

2016/03/03

CHECKED

A3 1 2016/06/09

DATE

FP/GW

SS

EXTERIOR

Aluminium clad column behind Fixed window frame section by specialist approved by architect to match existing, fixed to new steel post by Engineer.

Sikaflex 11FC I Cure.

U/S of ALUMINIUM CLADDED BEAM Pro-struct DYMONIC NT Polyurethane joint sealant with non-slip backing chord

PRO-STRUCT 649 Quickseal polyuthene joint sealant with backing cord.

15

PROJECT STATUS : FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

184 245

120mm x 60mm x 6mm RHS Beam as per engineers specifications

DIVING PLATFORM LIGHT DETAIL AT STEP MAN|DET.040 (Ref. MAN|WD 3.1 - SECTION B-B)

DWG.

POST CLADDING DETAIL

F

Description

1

Column to be clad in powder coated aluminium to match door frames

Sikaflex 11FC I Cure waterproofing.

Gusset inserted at all corners

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

SEA LION

FOR CONSTRUCTION section by specialist

studio@gwarchitects.co.za

Beam to be clad in powder coated aluminium to match door frames

RC slab to be waterproofed with Polyglass Evolight 4mm and 3mm or similar approved torch on membrane by specialist. 200mm RC roof slab as per Engineer's details and specification. Roof to comply with SANS 10400 part L for roofs.

BRAAI AREA SOS:

@

Rev.

GENERAL NOTES

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

Exterior wall to be plastered to fall and painted as per Architect's approved colour and sample.

180,750

1

F

Min. 30mm thick screed to fall

285

180,950

470

BRAAI AREA TOC:

SCALE

approved by architect to match existing, fixed to new steel post by Engineer.

257 252

LED light strip - PLED-T6-1210/60 (3000K warm white). Housed in aluminium profile PLED-AL45EX with opal diffuser.

130

20

BRAAI AREA FFL:

ERF 725 - 14 CRANBERRY CRESCENT, CAMPS BAY

1:2 A3 0 CCO|DET DRAWN: CHECKED DATE frame section by specialist 022a Fixed windowSS GS / LA 2015/07/27

PROJECT STATUS : FOR CONSTRUCTION

1

2015/07/27 2015/07/09

scale 1:2 70

150

130

40

DIVING PLATFORM TOC: 181,220

60

60

5

181,280

REV.

0 A3 2015/12/17

DATE

Polyurethane foam filling between frame & packing block by specialist. Pro-struct DYMONIC NT Polyurethane joint sealant with non-slip backing chord

Skim to be cut back out of corner, filled and neatly finished with PAINTERS MATE or similar approved. All to be painted to match colour of walls.

15

5

PG SIZE

1:5

10 15

2015/12/16

Date

Post formed sheet glued & fixed to

81

Date

ISSUED FOR CONSTRUCTION

ERF 1713 - Top Road, Fresnaye, Cape Town

PROJECT STATUS : FOR CONSTRUCTION

RESIFLEX Polymer waterproofing slurry

Description

substrate by Specialist. ISSUED ISSUED

39

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

Description

00

3

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site.

studio@gwarchitects.co.za

@

3

Rev.

GENERAL NOTES

Adeso Spider P FT

DIVING PLATFORM FFL:

Structural steel post as per engineer's specifications & detail drawings

Rev.

36

CAPE TOWN

studio@gwarchitects.co.za

5

@

44

(021) 465 9778

200

F

215

9775

2

Professional Line Evolight 4mm Reoxthene modified bitumen waterproofing membrane

(021) 465 9778

F

15mm Sandblasted New Sardo tile

DWG.

POST FIXING DETAIL

INTERIOR

57 BUITENKANT STREET .

4 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

Torch fused Professional Line 3mm Evolight Reoxthene modified bitumen membrane

15

TEMPLE HOUSE .

(021) 465 9775

0

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

FOR CONSTRUCTION CRANBERRY COTTAGE

36

T

8

15

0

All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site.

blocks. V&A by specialist PO BOX 50024 WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

SEQUENCE LEGEND

51

GENERAL NOTES

Dashed red line indicates position of weather step

scale 1:5

63

A2.18 BEDROOM TERRACE New Sardo Granite tile

Powder coated aluminium door as per GWA windows & door schedule

ENTRANCE BRIDGE & CANOPY JUNCTION MAN|DET.036 (Ref. MAN|WD 3.1 - SECTION A-A)

1

C

244

Post to be clad in powder coated aluminium to match door frames

Steel angle fixed between walnut timber ceiling & timber spacer.

39

50

39

20

24

68 97

120x60x3mm hollow Galvanised steel members fixed between cantilevered members welded to front of 150x50x3mm cantilevered hollow GMS channel (rainwater channel base) to engineer's details & specifications.

Wall clad with natural stone as per Architect's schedule and approved sample. Thickness of stone subject to final selection

38

1:100 min. fall

340 x 270mm wide RC column as per engineer's specifications

267mm RC slab as per Engineer's details and specification

362

70

267

24

50

100

RESIFLEX reinforced waterproofing

250x100x4mm GM Steel hollow beam as per engineer's details & specifications.

40

98

100 24

1:100 min. fall

100x60mm cladded rainwater channel to fall, moulded by concealed GMS hollow sections,varying in size as per engineers details. Channel width TBC.

150x50x3mm hollow Galvanised steel members welded between 120x120x5mm cantilevered hollow GMS members as rainwater channel base to engineer's details & specifications.

60

252

116 32

to engineer's

19mm Walnut timber finish laid onto 40mm screed, cast onto 267mm RC slab as per Engineer's details and specification

148

ENTRANCE BRIDGE TOC: 187,820

120x60x3mm hollow Galvanised steel members fixed between cantilevered members to engineer's details & specifications.

0 2015/07/09

DATE

LA / GS

Resiflex Polymer modified cementitious slurry over one layer Adeso Spider P FT APP plastomeric compound self adhesive reinforce membrane surface with a polypropylene fabric onto one Layer Adeso Spider P Self Adhesive membrane.

ENTRANCE BRIDGE 90

ENTRANCE BRIDGE FFL: 187,880

Min. 15mm 14MPa non-shrink grout as per engineer's specifications

REV.

A3 CHECKED

Cantilevered GMS bracket details & specifications.

46

CAPE TOWN

studio@gwarchitects.co.za

165

@

6

57 BUITENKANT STREET .

(021) 465 9778

120

F

Window cill at 6 deg. angle, plaster and painted as per Architects schedules. Acrylic waterproofing system

39

(021) 465 9775

T

150 x 150 x 6mm square endplate welded to SHS

165

GENERAL NOTES TEMPLE HOUSE .

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA

OUTSIDE

102385 TOP of SILL:

FOR CONSTRUCTION

scale 1:2

SHS Steel post as per engineer's specification. Colour to be confirmed by architect.

1P3

INSIDE

TOP of WALL: 102420

Exterior wall to be plastered and painted as per Architect's approved colour and sample.

4th FLOOR

285

A.12 TERRACE Polished concrete

120mm x 60mm x 6mm RHS Column as per engineers specifications

Pro-struct DYMONIC NT Polyurethane joint sealant with non-slip backing chord

ALUMINIUM CLADDED BEAM MAN|DET.257 (Ref. MAN|MAIN STAIRCASE - MAN|D2.15.1) scale 1:2

PRO-STRUCT 649 Quickseal polyuthene joint sealant with backing cord.

ALUMINIUM CLADDED COLUMN MAN|DET.252 (Ref. MAN|MAIN STAIRCASE - MAN|D2.15.1) scale 1:2

scale 1:5

FOR CONSTRUCTION GENERAL NOTES All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect.

GENERAL NOTES All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site.

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

Drawings are Description to read in conjunction with Engineer's drawings. Contractor to Rev. keep full set of drawings on site.

0 4th FLOOR

TEMPLE HOUSE .

57 BUITENKANT STREET .

(021) 465 9775

F

(021) 465 9778

@

FOR CONSTRUCTION

0

Date

Rev. 0

Description

studio@gwarchitects.co.za

PROJECT STATUS : FOR CONSTRUCTION

2016/07/27

GENERAL NOTES All relevant details, levels, dimensions, setting out positions are to be checked prior to any work commencing, details take precedent over working drawings, any discrepancies are to be brought to the attention of the Architect. Drawings are to read in conjunction with Engineer's drawings. Contractor to keep full set of drawings on site.

MAN|DET.257

SCALE

PG SIZE

1:2

DRAWN:

SS

CHECKED

FP

REV.

A4 0 2016/07/27

DATE

ERF 1713 - Top Road, Fresnaye, Cape Town

DIVING PLATFORM LIGHT DETAIL DWG.

SCALE

PG SIZE

REV.

FOR CONSTRUCTION Rev. 0

TEMPLE HOUSE .

57 BUITENKANT STREET .

CAPE TOWN

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA (021) 465 9775

F

(021) 465 9778

@

studio@gwarchitects.co.za

FOR CONSTRUCTION

Date

ISSUED FOR CONSTRUCTION

2016/07/27

PROJECT STATUS : FOR CONSTRUCTION

14

ERF 1713 - Top Road, Fresnaye, Cape Town DWG.

ALUMINIUM CLADDED COLUMN

0

Description

SEA LION 4th FLOOR

T

SEA LION

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

ERF 1713 - Top Road, Fresnaye, Cape Town DWG.

ALUMINIUM CLADDED BEAM

0

Date

ISSUED FOR CONSTRUCTION

SEA LION

CAPE TOWN

PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA T

Contractor and Engineer to verify all levels and dimensions on site and check same against Architect's drawings before commencing work. The Architect accepts no responisibiilty for errors resulting from misinterpretation of the drawings.

2015/10/29

ISSUED FOR CONSTRUCTION

MAN|DET.252

SCALE

1:2

DRAWN:

SS

CHECKED

FP

PG SIZE

REV.

0 A4 2016/07/27

DATE


24 May 2014 To whom it may concern Suzaan Swart was a student in the Design Department for all her high school years at Reddam House. She pursued an architecture major in Design for her senior phase, excelling at both her theory and practical components. Subsequently Suzaan achieved an A+ symbol for Design on her Senior Certificate and was awarded the Gold Award for Environmental Design at the Valedictory ceremony. After matric, Suzaan went on to study Architecture at Bloemfontein University and is currently completing her Master’s Degree. From Grade 9, Suzaan’s passion for architecture was her main driving force and her focus was unwavering. This determination impacted on all her academic subjects and she achieved an exceptional matric result. Suzaan is a strong individualist with an amazing sense of ambition and a razor-sharp intellect that is constantly inquisitive and productive. She displays an exceptional work ethic and is really dedicated to her craft, working incredibly well under pressure. Her creative focus and natural talent sets her way above her peers. She also has a very powerful, gregarious personality and maintains a very active sports and extramural curriculum in university. Suzaan is an exemplary student who has set the standard at Reddam. I have no doubt that she will become highly respected in her field and am honoured to act as a referee. I wish her the very best in her endeavours. Yours truly, Irma Sargeant Art and Design Department Reddam House 021 702 2322 (wk) 076 876 0844 (cell)


13 October 2014

TO WHOM IT MAY CONCERN

RE: Suzaan Swart (Student number 2009006251)

I have pleasure in providing a reference for Miss Swart. Suzaan is a full-time student in the Department of Architecture at the University of the Free State, currently registered for the Master Professional degree. As masters facilitator I have gotten to know Suzaan as a reliable and honest hardworking student. She completed her previous years successfully with above average achievement in Building Science and Theory of Architecture. Miss Swart is exceptionally creative and her design endeavours acknowledge her ability to think outside the conventions so often slavishly followed by many students. During her masters year Suzaan worked especially hard to develop an extremely well integrated theoretical underpinning, serving as a practical design tool for her design strategy and resolution. Except for the creative ability, Miss Swart is a strong rational designer that always considers functionality and practical implications of her design solutions. Regarding her personality it is worth mentioning that Miss Swart has the utmost respect and care for students and staff. Suzaan is gentle, polite and well mannered. She keenly participates in social aspects of class and is always willing to learn, considering advice and critique as a mechanism to enhance not only architectural problems but her worldview in general. Suzaan is a young lady of great promise who will be an industrious and creative contribution to practice. I will strongly recommend her as a worthy employee. My best wishes for her in future.

JAKO OLIVIER PROGRAMME DIRECTOR | LECTURER Department of Architecture University of the Free State Email: olivierji@ufs.ac.za

Departement Argitektuur/Department of Architecture 205 Nelson Mandela Drive/Rylaan, Park West/Parkwes, Bloemfontein 9301, South Africa/Suid-Afrika P.O. Box/Posbus 339, Bloemfontein 9300, South Africa/Suid-Afrika, +27(0)51 401 2332, +27(0)51 444 5108,  PretoriusY@ufs.ac.za, www.ufs.ac.za


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.