Design Thesis Report - Ahmad Syafiq Mohd Unzir

Page 1



i


ii


iii


iv


v












2


3

Figure 1 : External Perspective 1

3


4

Figure 2 : Opinion on technology from public figure


Figure 3 : Article from website regarding AR

5


6

Figure 4 : Paper cutout regarding training issue


Figure 5 : Artificial Reality timeline

7


8

Table 1 : Artificial Reality current and future use


9


10


Figure 6 : Exterior Perspective 2

11


12

Table 2 : space concept zoning


Figure 7 : Training space study

13


14

Table 3 : space relationship studies


Figure 8 : Volumetric space program

15


16


Table 4 : Schedule of Acommodation

Figure 9 : Proposed program

17


18

Figure 10 : Proposed SOA in pie chart


Figure 11 : Cyberjaya enclave infographic map

19


Figure 12 : Cyberjaya natural environment and climate

Figure 13 : Gender and nationality percentage

20

Figure 14 : Cyberjaya advantages and quality


Figure 15 : Cyberjaya nodes and landmark

Figure 16 : Cyberjaya zoning and land purpose

21


22


Figure 17 : Cyberjaya macro map and study

23


24


Figure 18 : Bird eye view of site and analysis

Figure 19 : Diagrammatic site section

25


Figure 20 : VR revenue feasibility study

26


27


28

Table 5 : Precedent Study Comparison

Figure 21 : Movie referrence on AR



30


Figure 22 : Artificial Reality Trinity diagrams

31


32


Figure 23 : Hawthorne Effect diagrams

33


34


Figure 24 : Space Violating Bodies diagrams

35


36


Figure 25 : Design approach and concept

37


Figure 26 : General site zoning and principle

38


Figure 27 : Proposed spaces zoning by levels

39


40


Figure 28 : Exterior Perspective 3

41


42

Figure 29 : Site plan


Figure 30 : Ground floor plan

43


Figure 31 : Basement and 1st floor plan

44


Figure 32 : 2nd floor plan

Figure 33 : Sectional Perspective with programs

45


46

Figure 34 : 1st mezzanine and 3rd floor


Figure 35 : 4th floor and 5th floor

47


48


Figure 36 : Sections and elevation

49


50


Figure 37 : Atmosphere of spaces

51


52


Figure 38 : Interior Perspective A400 Training Area

53


54


Figure 39 : Interior Perspective of Garden Rooftop

55


56


Figure 40 : Interior Perspective of Land Training Area

57



Table 6 : Maximum range of small arm ammunition

Figure 41 : Type of AR technology

59


60

Figure 42 : Various special studies


Figure 43 : Type of artificial reality with examples

61


Figure 44 : Sectional Perspective on A400 space

62


Figure 45 : Kinetic Movement technology

Figure 46 : Interactive LED Panel technology

63


Figure 47 : Holo vapor projection technology

Figure 48 : A400 training simulation technology

64


Figure 49 : Structural system precedent study

Figure 50 : Structural construction phase

65


66


Figure 51 : Structural details and blowup

Figure 52 : Various Structural Details

67


Figure 53 : Portal frame details

68


69 Figure 54 : Green building strategy


70

Figure 55 : Fire and safety protection by levels


Table 7 : Fifth schedule - Purpose Group

Figure 56 : Fire hydrant and assembly point diagram

71


Table 8 : Fifth schedule - Dimension of building & compartment

Table 9 : Seventh schedule - Requirement for staircase & occupancy

Table 10 : Seventh schedule - Travel distance

72


Table 12 : Hose Reel calculation

Table 11 : Tenth Schedule - Requirement for fire extinguishment alarm

Table 13 : Automatic sprinkler calculation

73


Figure 57 : Fire detection and alarm system

Figure 58 : Smoke spill system

74


Figure 59 : Fire protection system vertical layout

75


76

Figure 60 : Water supply system by levels


Table 14 : Water capacity calculation

Table 16 : Water tank calculation

Table 17 : Sprinkler tank calculation

Table 18 : Suction tank calculation

Table 15 : Domestic water capacity calculation

77


Figure 61 : Diagrammatic layout of water supply

78


Figure 62 : Water supply system vertical layout

79


80

Figure 63 : Sanitary and sewerage system by levels


Table 19 : Sewerage system calculation

Table 20 : Pipe sizing calculation

Table 21 : Size of refuse chamber calculation

Figure 64 : Front elevation of building

81


Figure 65 : Diagrammatic layout of saniaty and sewerage sytem

82


Figure 66 : Sanitary and sewerage system vertical layout

83


84

Figure 67 : Electrical systems by levels


Table 23 : Maximum electrical demand calculation Table 22 : TNB compartment size calculation

Table 24 : Supply scheme of TNB sub-station

85


Figure 68 : Diagrammatic layout of Electrical systems

86


Figure 69 : Electrical systems vertical layout

87


88

Figure 70 : Air conditioning system and mechanical ventilation system by levels


Table 25 : Air conditioning calculation

Table 26 :VRV aircond system calculation

89


Figure 71 : Diagrammatic layout of air conditioning system and mechanical ventilation system

90


Figure 72 : Air conditioning system and mechanical ventilation system vertical layout

91


92

Figure 73 : Mechanical transportation by levels


Table 27 :Lift calculation area

Figure 74 : Elevator 3D diagram

93


94

Figure 75 : Mechanical transportation system vertical layout



96

Figure 76 : Final Model top view


Figure 77 : Final Model perspective 1

Figure 78 : Final Model perspective 2

Figure 79 : Final Model perspective 3

97


98

Figure 80 : Crit 3 (Master 03) conceptional model top view


Figure 81 : Crit 3 (Master 03) conceptional model perspective 1

Figure 82 : Crit 3 (Master 03) conceptional model top view 2

Figure 83 : Crit 3 (Master 03) conceptional model perspective 2

99


100

Figure 84 : Crit 2 (Master 03) Site Model top view


Figure 85 : Crit 2 (Master 04) Building model perspective

Figure 86 : Crit 3 (Master 04) Building model perspective

Figure 87 : Crit 2 (Master 03) Site Model perspective

101



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.