i
ii
iii
iv
v
2
3
Figure 1 : External Perspective 1
3
4
Figure 2 : Opinion on technology from public figure
Figure 3 : Article from website regarding AR
5
6
Figure 4 : Paper cutout regarding training issue
Figure 5 : Artificial Reality timeline
7
8
Table 1 : Artificial Reality current and future use
9
10
Figure 6 : Exterior Perspective 2
11
12
Table 2 : space concept zoning
Figure 7 : Training space study
13
14
Table 3 : space relationship studies
Figure 8 : Volumetric space program
15
16
Table 4 : Schedule of Acommodation
Figure 9 : Proposed program
17
18
Figure 10 : Proposed SOA in pie chart
Figure 11 : Cyberjaya enclave infographic map
19
Figure 12 : Cyberjaya natural environment and climate
Figure 13 : Gender and nationality percentage
20
Figure 14 : Cyberjaya advantages and quality
Figure 15 : Cyberjaya nodes and landmark
Figure 16 : Cyberjaya zoning and land purpose
21
22
Figure 17 : Cyberjaya macro map and study
23
24
Figure 18 : Bird eye view of site and analysis
Figure 19 : Diagrammatic site section
25
Figure 20 : VR revenue feasibility study
26
27
28
Table 5 : Precedent Study Comparison
Figure 21 : Movie referrence on AR
30
Figure 22 : Artificial Reality Trinity diagrams
31
32
Figure 23 : Hawthorne Effect diagrams
33
34
Figure 24 : Space Violating Bodies diagrams
35
36
Figure 25 : Design approach and concept
37
Figure 26 : General site zoning and principle
38
Figure 27 : Proposed spaces zoning by levels
39
40
Figure 28 : Exterior Perspective 3
41
42
Figure 29 : Site plan
Figure 30 : Ground floor plan
43
Figure 31 : Basement and 1st floor plan
44
Figure 32 : 2nd floor plan
Figure 33 : Sectional Perspective with programs
45
46
Figure 34 : 1st mezzanine and 3rd floor
Figure 35 : 4th floor and 5th floor
47
48
Figure 36 : Sections and elevation
49
50
Figure 37 : Atmosphere of spaces
51
52
Figure 38 : Interior Perspective A400 Training Area
53
54
Figure 39 : Interior Perspective of Garden Rooftop
55
56
Figure 40 : Interior Perspective of Land Training Area
57
Table 6 : Maximum range of small arm ammunition
Figure 41 : Type of AR technology
59
60
Figure 42 : Various special studies
Figure 43 : Type of artificial reality with examples
61
Figure 44 : Sectional Perspective on A400 space
62
Figure 45 : Kinetic Movement technology
Figure 46 : Interactive LED Panel technology
63
Figure 47 : Holo vapor projection technology
Figure 48 : A400 training simulation technology
64
Figure 49 : Structural system precedent study
Figure 50 : Structural construction phase
65
66
Figure 51 : Structural details and blowup
Figure 52 : Various Structural Details
67
Figure 53 : Portal frame details
68
69 Figure 54 : Green building strategy
70
Figure 55 : Fire and safety protection by levels
Table 7 : Fifth schedule - Purpose Group
Figure 56 : Fire hydrant and assembly point diagram
71
Table 8 : Fifth schedule - Dimension of building & compartment
Table 9 : Seventh schedule - Requirement for staircase & occupancy
Table 10 : Seventh schedule - Travel distance
72
Table 12 : Hose Reel calculation
Table 11 : Tenth Schedule - Requirement for fire extinguishment alarm
Table 13 : Automatic sprinkler calculation
73
Figure 57 : Fire detection and alarm system
Figure 58 : Smoke spill system
74
Figure 59 : Fire protection system vertical layout
75
76
Figure 60 : Water supply system by levels
Table 14 : Water capacity calculation
Table 16 : Water tank calculation
Table 17 : Sprinkler tank calculation
Table 18 : Suction tank calculation
Table 15 : Domestic water capacity calculation
77
Figure 61 : Diagrammatic layout of water supply
78
Figure 62 : Water supply system vertical layout
79
80
Figure 63 : Sanitary and sewerage system by levels
Table 19 : Sewerage system calculation
Table 20 : Pipe sizing calculation
Table 21 : Size of refuse chamber calculation
Figure 64 : Front elevation of building
81
Figure 65 : Diagrammatic layout of saniaty and sewerage sytem
82
Figure 66 : Sanitary and sewerage system vertical layout
83
84
Figure 67 : Electrical systems by levels
Table 23 : Maximum electrical demand calculation Table 22 : TNB compartment size calculation
Table 24 : Supply scheme of TNB sub-station
85
Figure 68 : Diagrammatic layout of Electrical systems
86
Figure 69 : Electrical systems vertical layout
87
88
Figure 70 : Air conditioning system and mechanical ventilation system by levels
Table 25 : Air conditioning calculation
Table 26 :VRV aircond system calculation
89
Figure 71 : Diagrammatic layout of air conditioning system and mechanical ventilation system
90
Figure 72 : Air conditioning system and mechanical ventilation system vertical layout
91
92
Figure 73 : Mechanical transportation by levels
Table 27 :Lift calculation area
Figure 74 : Elevator 3D diagram
93
94
Figure 75 : Mechanical transportation system vertical layout
96
Figure 76 : Final Model top view
Figure 77 : Final Model perspective 1
Figure 78 : Final Model perspective 2
Figure 79 : Final Model perspective 3
97
98
Figure 80 : Crit 3 (Master 03) conceptional model top view
Figure 81 : Crit 3 (Master 03) conceptional model perspective 1
Figure 82 : Crit 3 (Master 03) conceptional model top view 2
Figure 83 : Crit 3 (Master 03) conceptional model perspective 2
99
100
Figure 84 : Crit 2 (Master 03) Site Model top view
Figure 85 : Crit 2 (Master 04) Building model perspective
Figure 86 : Crit 3 (Master 04) Building model perspective
Figure 87 : Crit 2 (Master 03) Site Model perspective
101