ARCHITECTURE PORTFOLIO Master
of
Architecture
YONG SONG ZHE
NN
SONG ZHE YONG 颂哲
杨
A PROBLEM SOLVER IN ARCHITECTURE & THE SOCIETY WITH A PULSE ON THE LATEST DESIGN TECHNOLOGY.
ACHIEVEMENTS & AWARDS
“DEMOCRACY IN ARCHITECTURE BENEFITS EVERY INDIVIDUAL.”
INFO 17 January 1995 Malaysian Chinese Videography & Film Making Basketball, Badminton, Martial Art, Chess
SOCIAL +6016 2206937 roxas.szyong@gmail.com facebook.com/ sz.yongsongzhe instagram.com/songzhe_sz/ Roxas Song Zhe Art Studio
CHAMPION Felda 2.0 Timber Design Competition by MTIB i-CITY International Facade Design Competition PAM National Annual Workshop Design Idea Competition @USM Surface ARTsplosion Challenge by MICROSOFT AWARD WINNER PAM - ZSR Architecture Prize
2018 2016 2016 2015 2017
1ST RUNNER UP National Eco-Construction Competition (NECO) by CIDB PAM Multimedia Presentation Competition 2ND RUNNER UP M’sia ARCHITALENT Design Competition @ARCHIDEX
2017 2015 2017
MOST CREATIVE Inovative Award in PAM Student Multimedia Competition FINALIST TOP 10 Finalist in PAM - ZSR Architecture Prize BEST BEST CREW of the Year in FGACYC Event Specialist Ministry BEST STUDENT in CHS Creative and Art Award
2017 2016 2016 2010
EXTRACURRICULAR ACTIVITIES & POSITIONS • PRESIDENT, CHS Wu Shu Association, 2012-2013 • VICE PRESIDENT, CHS Creative and Art Club, 2011-2012 • SCHOOL REPRESENTATIVE in State Level Chess Competition, 2012 • COMMITEE, VERITAS Sports & Social Club (VSSC), 2018-2019 • CORE LEADER, Event Specialist & Management Ministry in FGA Chinese Youth Church, 2017-Present
EDUCATIONAL QUALIFICATION BACHELOR OF SCIENCE (HON) ARCHITECTURE , UNIVERSITI TUNKU ABDUL RAHMAN, SG. LONG, MALAYSIA
MAY 2017
SPM MALAYSIAN CERTIFICATE OF EDUCATION (SCIENCE STREAM), CATHOLIC HIGH SCHOOL, PJ, SELANGOR, MALAYSIA
DEC 2012
GRADUATED WITH A CGPA OF 3.4 ON A 4.0 SCALE
GRADUATED WITH A RESULT OF 11A’S (6A+, 5A) ON TOTAL 11 SUBJECTS
Built Environment-related Courses included: Architectural Design I to VI Construction Technology I, II & III Building Science I & II
LANGUAGES ENGLISH MANDARIN
Construction Drawings Building Industry Modelling (REVIT) Introduction To Professional Practice
Non Built Environment-related Courses included: Introduction to Japanese Sun Zi's Art Of War & Business Strategies
MALAY / INDONESIAN
English For Professionals Mechanics
CANTONESE HAKKA JAPANESE
SOFTWARE LITERACY AUTOCAD
PROFESSIONAL EXPERIENCE ASSISTANT ARCHITECT, VERITAS DESIGN GROUP, KL, MALAYSIA
OCT 2017 – NOW
• Prepare impressive 3D animation and graphics for presentations and competitions. • Attend project meetings and provides architectural design solutions.
3D & GRAPHIC DESIGN SOFTWARE TRAINER, CREATOR’S ART SZ DESIGN ACADEMY, MALAYSIA
MAY 2017– 2018
LUMION 3D
• Responsible for the academic performance of over 20 students from various industries. • To prepare lecture notes and necessary teaching materials to relevant students.
PHOTOSHOP
DESIGN ARCHITECT TRAINEE, SA ARCHITECTS (SAA), KL, MALAYSIA
OCT – DEC 2016
PUBLIC SPEAKING SKILLS TRAINER, ERICAN LANGUAGE CENTRE, PETALING STREET, KL
APR – JUN 2015
REVIT B.I.M SKETCHUP
ILLUSTRATOR INDESIGN PREMIERE PRO AFTER EFFECT
• Prepare presentation drawings, diagrams & slides for meeting with clients. • Prepare submission drawings including realistic perspectives for DBKL approval.
• Train students in English and Chinese speech presentation skil.ls • Prepare them to enter national level competition.
OFFICE WORD OFFICE POWERPOINT OFFICE EXCEL
Awarded by:
Table of Contents SHORTLISTED PROJECT | PROFESSIONAL
TETANGGA TMN TUN INTEGRATED LIFESTYLE HUB Mixed Used Commercial
01
TUGU GATEWAY PARK PUBLIC PARK AND CARPARK BUILDING Public Facilities
02
WINNING PROJECT | ACADEMIC
JALINAN JAMINAN TIMBER MULTIPURPOSE BUILDING & PLAYGROUND Public Instituition
03
MODULEX
INTEGRATED MODULAR HOUSING SCHEME Sustainable Construction
04
LIBRARY CAFE OF HOPE, FAITH, LOVE
NEW URBAN TYPOLOGY Private Insitutional
05
SHORTLISTED ENTRY | PROFESSIONAL | MIXED USE COMMERCIAL
TETANGGA TAMAN TUN 2018 Invited Competition by Malaysian GovernmentLinked Investment Company : TOP 2
Since its birth as a township in the 1970s, TTDI remains one of KL’s most vibrant communities well known for their social cohesion, multiculturalism and dynamic youthful entrepreneurs. Stylish retail outlets, multicultural groups and lifestyle communities shape the lively character of the township. The Hatch is conceptualised as the new integrated lifestyle hub for TTDI that incubates the economy of the future – the wellness and creative industries – boasting a generous public plaza with curated programs. At ground level, the development engages and connects the active streets of Jalan Tun Mohd Fuad on 3 sides with an unobstructed, pedestrian friendly plaza. The street life spills over to the public plaza, drawing people up the community centred podium which houses the incubators for Malaysia’s future creative industries. The tower soars above the podium, catering to the emerging niche field of healthcare and hospitality. As a whole, the development is not merely a synthesis of the three components – the plaza, podium and tower – but as a dénouement into the creation of a great public space for civic pride, celebration of life and the human imagination.
'di tangga' site analysis site analysis
Jalan tun Mohd fuad 3 Jalan tun Mohd fuad 3 Jalan tun Mohd fuad 1 1 Jalan tun Mohd fuad
Tetangga Taman Tun
“The plaza spans across the width of the site, creating a strong symbiotic connection between the development and the life of the streets that surround it.” “The plaza spans across the width of the site, creating a strong symbiotic connection between the development and the life of the streets that surround it.”
2 2
vehicular traffic vehicular traffic 3
3
pedestrian traffic pedestrian traffic
4
3
5 4
5
15 15
7
services services
6
8 7
1
6
8
1
9 9
11
10 10
11
12
views views
“At the center of the public space is the12 “Di Tangga” - a sunken plaza shaped like a caldera which sets the stage for the life of the agora in a geologically-inspired amphitheatre” 13
14 14
13
1. 1.2. 2.3. 3.4. 4.5. 5.6. 6.7. 7.8. 8.9. 9.10. 10. 11. 11.12. 12. 13. 13. 14. 14. 15. 15.
'Di tangga' 'Digallery tangga' drop off gallery postpartum lobby drop off rehab lobby postpartum lobby rehab lobby bubble lift bubble lift loading / unloading bay loading toilets/ unloading bay toilets loading storage loading storage m&E / tnb substation m&E / tnb substation CAFE CAFE service / bomba lift service / bomba lift banquet drop off banquet drop off office lobby office lobby pedestrianised street pedestrianised street
ground floorplan plan ground floor Jalan Jalantun tunMohd Mohd fuad fuad 22
site site
scale1:250 1:250 scale
design strategy design strategy
podium
hotel
drop off
office
amphitheatre sitesite
“One of KL’s most vibrant communities well known for their social cohesion, multiculturism and dynamic youthful entrepreneurs.”
rehab
postpartum
sky deck
1
plaza
public plaza public plaza
podium stacked components sky stacked components such as outdoor skygardens gardens The podium plaza incorporates dynamic flexible programs, movie nights, food tucks, skating rink, night market and gallery with installations, which ensures pedestrian activity throughout the day.
Proposed Plot Ratio Proposed GFA No. of Storeys Total Green / Plaza area
4
: : : :
2
1 : 7.9 699 070sqft G + 44 storey 30,000sqft, 35% site area
The design understands the importance of civic space and public life in this area and complements the Tier 4 - Post Partum Centre/ Service Apartments, 19% neighbourhood with a wide plaza 10 storey connecting the streets with plans for 25 units per floor 13 700 a pedestrian only street in front ofsqft per floor plate Total units 203 units the plaza on weekends and during Total GFA 130,700sqft special events. Total NFA 109,100sqft
sustainability
Rainwater harvesting
energy efficient fixtures
4
inddor air quality Natural ventilation recycled building materials
passive surveillance
Tier 3 - Rehabilitation Centre / Service Apartments, 19%
shading
10 storey 20 units per floor 13 700 sqft per floor plate Total units 180 units Total GFA 130,700sqft Total NFA 109,100sqft
24 hour site air to water permeable pavers IED
CERTIF
Tier 2 - Multi Tenancy Offices , 26%
green materials
pedestrian friendly
10 storey 17 200 sqft per floor plate Total GFA 159,600sqft Total NFA 142,700sqft
bicycle lanes
“The plaza spans across the width of the site, creating a strong symbiotic connection between the development and the life of the streets that surround it.”
within 500m of ttdi mrt
site analysis
bus stand
Tier 1 - Hotel, 14%
Jalan tun Mohd fuad 3
Jalan tun Mohd fuad 1
8 storey 27 keys per floor 12 700 sqft per floor plate Total units 133 units Total GFA 101,540sqft Total NFA 81,400sqft 2
Podium -traffic Community oriented facilities/ Office/ Retail, 21% vehicular 5 storey 130 700 sqft per floor plate Total GFA 176,500sqft Total NFA 128,100sqft
3
Total Car Park provided - 538 car park
5
“The podium is conceptualised as an incubator for the Fourth Industrial Revolution. It’s program is based on PNB’s investments in growth industries but with a perspective on 4 5 future economy of automation and high-tech creative industry
“The podium is conceptualised as an incubator for the Fourth Industrial Revolution. It’s program is based on PNB’s investments in growth industries but with a perspective on future economy of automation and high-tech creative industry
pedestrian traffic
15
7
6
8
woodworkshop
services
1
maker space
co-working space (groups) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
9
eye specialist clinic
retail
10
12
11
co-working space
14
boh
views 13
Level 1 Scale 1:500
Level 2 Scale 1:500
site
The Tower contains four components that respond to an emerging trend in woodworkshop maker hospitality and healthcare – a post-partum wellness centre, a rehabilitation space centre, a wellness hotel, an eye specialist centre, and open-plan office space for rental.
Level 3 Scale 1:500
Jalan tun Mohd fuad 2
banquet dining (320 pax) 'Di tangga' gallery drop off prefunction postpartum lobby space rehab lobby
bubble lift loading / unloading bay toilets loading storage hall m&E / tnb substation (120 pax) CAFE service / bomba lift banquet drop off office lobby hallstreet pedestrianised (140 pax)
ground floor plan Level 4 Scale 1:500
5 scaleLevel 1:250 Scale 1:500
Level 1
Level 2
Scale 1:500
Scale 1:500
The component is cloistered around a single sky garden, designed like an urban park to be shared by the floors that flank it. It acts a transitional space from where visitors or workers arrive from the Plaza, acting almost like a “ground floor” for each component.
cafeteria
podium
breakout area
stacked components
sky gardens
hall (120 pax)
boh
hall (140 pax)
Level 3
Level 4
Scale 1:500
Scale 1:500
Level 5 Scale 1:500
alternative configurations The components are cloistered around the sky garden, designed like an urban park; to be shared by the floors which flank it.
cafeteria
public plaza
banquet dining (320 pax)
prefunction space
eye
retail Designed as a vertical city, the four main components are stacked on top of specialist clinic each other and each is served by a separate lift core. The purpose of this is to create the highest level of flexibility in the configuration of ownership and co-working space use – while maintaining privacy, separate access routes, and security for each. The ownership, or operations of the tower can be divided into the four big components or into separate floors or even smaller subdivision on each floor. In each configuration, the divided unit maintains independence and has access to a dedicated lift core that maintains privacy and security. This flexibility is to respond to the different possibilities in future growth areas in commercial spaces, in particular niche business models in healthcare and hospitality.
design strategy
site
co-working space (groups)
Land Area Zoning Proposed Plot Ratio Proposed GFA No. of Storeys Total Green / Plaza area
: : : : : :
breakout area
co-working space
2.03acre (88,534 sqft) Commercial 1 : 7.9 699 070sqft G + 44 storey 30,000sqft, 35% site area
co-working space Rainwater harvesting
sustainability
AWARD WINNING | PROFESSIONAL | PUBLIC FACILITIES
TUGU GATEWAY PARK 2018 Carpark Complex Design Competition for Taman Tugu Project : WINNER
Inspiredbybythe theriver riverand andthe thestrata strataititshapes, shapes,the theTugu TuguGateway GatewayPark Parkacts actsas asaacomplementary complementary element element to to Padang Padang Merbok, Merbok, with a design which embraces Inspired thefield fieldininitsitswide widegrasp. grasp.The Themulti-tonal multi-tonallayers layersofofconcrete concreteresemble resemblebands bandsof ofsediment, sediment,emulating emulating the the jagged jagged and and striated striated rock formations. The layered the patternsform forma aseries seriesofofamphitheatres, amphitheatres,presenting presentingsweeping sweepingviews viewsof ofthe thearena. arena.Strips Stripsof ofsoftscape softscapeand andgentle gentle inclines inclines soften soften the hard edges of the design. patterns
11
PROGRAM PROGRAM
Thestructure structureascends ascendstowards towardsthe theNorth Northand andterminates terminateswith withaahard hardcliff cliff edge, edge, exposing exposing the the raw raw beauty beauty of of earth earth with with its distinctive geological strata The formations.This Thisisisexpressed expressedon onthe thefacade facadethrough throughdeep deephorizontal horizontalfins finsand andribbed ribbedpatterns, patterns,which which screen screen off off the the carpark. carpark. The carpark structure becomes formations. landsculpture sculptureexpanding expandingthe thepublic publicpark parkthat thatisisPadang PadangMerbok. Merbok. a aland
11
2 2 3 3 3
TheDry DryStage/Water Stage/WaterStage Stageisisaashallow shallowreflecting reflectingpond pondwhich whichdoubles doublesas asaastage stagefor forperformances. performances. ItIt isis designed designed to to be be used used with and without water. The The grandstand standcanopy canopyenvelops envelopsthe thenorthern northernborder borderofofPadang PadangMerbok, Merbok,while whilethe theexisting existingbleachers bleachers flanking flanking the the southern southern border border extend to meet the lower grand amphitheatre,forming forminga acontinuous continuouslandscape. landscape. amphitheatre,
55 5 4 44
TheTugu TuguGateway GatewayPark Parkisiscontiguous contiguouswith withPadang PadangMerbok. Merbok.The Theland landbridge bridgerising risingover overJalan JalanBerjasa Berjasa acts acts as as the the entrance entrance gateway gateway to the new rejuvenated The Taman Tugu Park, consolidating Padang Merbok and Tugu Gateway Park with the larger Taman Tugu Park. The design includes an additional additional junction junction along Taman TamanTugu TuguPark, Park,consolidating consolidatingPadang PadangMerbok Merbokand andTugu TuguGateway GatewayPark Parkwith withthe thelarger largerTaman TamanTugu TuguPark. Park. The The design design includes includes an along Jalan Parlimen, directly linking the city centre with the historic site. Jalan JalanParlimen, Parlimen,directly directlylinking linkingthe thecity citycentre centrewith withthe thehistoric historicsite. site.
Level 3 Level Level 3 3 66 6
1. 1. Destination Restaurant 1. Destination Destination Restaurant Restaurant 2. Toilets 2. 2. Toilets Toilets 3. Function Room 3. 3. Function Function Room Room
7 77 1111 11 12
10 1010
13 9 91212 1313 9
8 8 8
16 1616
14 1414
15 1515
TUGUGATEWAY GATEWAY PARK PARK TUGU
17 1717 21 2121
19 1919
Ground Floor Ground Ground Floor Floor 17. Lobby 17. Lobby Lobby 18.17. Office 18. Office Office 19.18. Cafe 19. Cafe Cafe Room 20.19. Function 20. Function Function Room Roomstage 21.20. Dry stage/Water 21.21. Dry Dry stage/Water stage/Water stage stage 143CP 143CP 143CP
20 2020
22 2222
1895 1895 1895
Level 1 Level Level 1 1 14. Lower Amphitheatre 14. Lower Lower Amphitheatre Amphitheatre 15.14. M&E 15.15. M&E M&E 16. Storage 16.16. Storage Storage 143CP 143CP 143CP
18 1818
Inspired by Inspired by the the river river and and the the strata strata strata ititit shapes, shapes, shapes, the the the Tugu Gateway Park embraces Padang Merbok creating Tugu Gateway Park embraces Padang Padang Merbok Merbok creating creating aaa unified unified public public park park park for for for the the the community community community 1889 1889 1889
Level 2 Level Level 2 2 4. Waiting Pavilion 4. 4. Waiting Waiting Pavilion Pavilion 5. Buggy Stop 5. 5. Buggy Buggy Stop Stop 6. Land Bridge 6. 6. Land Land Bridge Bridge 7. Lobby 7. 7. Lobby Lobby 8. Outdoor Sport Gym 8. 8. Outdoor Outdoor Sport Sport Gym Gym 9. Indoor Gym 9. 9. Indoor Indoor Gym Gym 10. Sports Shop 10.10. Sports Sports Shop Shop 11. Upper Amphitheatre 11.11. Upper Upper Amphitheatre Amphitheatre 12. Toilets 12.12. Toilets Toilets 13. Changing Room 13.13. Changing Changing Room Room 65CP 65CP 65CP
LG 1 LG LG 1 1 22. Bioswale 23.22. M&E Rooms 22. Bioswale Bioswale 208CP 23.23. M&E M&E Rooms Rooms 208CP 208CP
23 2323
24 27
28
2424
2828 2727
30
30 30 27
25
2525
26
2626
272729 2929 16
1616
LG 2 LG 2Office 2 24.LG 25.24. Maintenance Workshop 24. Office Office + Storage Room 25.25. Maintenance Maintenance Workshop Workshop 26. Clubrooms + Storage + Storage Room Room 27.26. Toilets 26. Clubrooms Clubrooms 28. Changing Rooms 27.27. Toilets Toilets 29. Multipurpose Room 28.28. Changing Changing Rooms Rooms 30. Coaches 29.29. Multipurpose Multipurpose Room Room 216CP 30.30. Coaches Coaches 216CP 216CP
2
SECTION a
a
Scale 1 : 600
1. Lower Amphitheatre 2. Upper Amphitheatre 3. Dry and Water Stage 4. Destination Restaurant
4 2
4 5
1
3
2
1
3
SITE PLAN Scale 1 : 1000
a
1. Waiting Pavilion 2. Land Bridge 3. Dry/Water Stage 4. Destination Restaurant 5. Grand Stand Canopy
The multi-tonal layers of concrete resemble bands of sediment, emulating the jagged and striated rock formations
The structure ascends towards the North and terminates with a hard cliff edge, exposing the raw beauty of earth with its distinctive geological strata formations
The layering of the earth’s strata is expressed on the facade through deep horizontal fins and ribbed patterns, which screen off the carpark
The amphitheatre opens onto a stage that can be transformed into an interactive splash pool for children and families. This water feature celebrates the historical geographical features of this river bank site through which ran two tributaries of the Sungai Gombak. These tributaries later formed a pond on the site at the end of the 19th century. Refer to KL map 1889/1895.
AWARD WINNING | PROFESSIONAL | PUBLIC INSTITUTIONAL
TIMBER BLD + PLAYGROUND 2018 Felda 2.0 Timber Design Competition by MTIB : CHAMPION
Ancillary Spaces Ancillary Spaces Ancillary Spaces Main Lobby Classroom Circulation Exhibition Exhibition
MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 2 Total Gross Floor Area (GFA): 16 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - ROOFTOP MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - ROOFTOP MULTIPURPOSE BUILDING - LVL 2 Total Roof Area- LVL : 2 MULTIPURPOSE BUILDING
Seating Area Seating Area Seating Area Exhibition Office Circulation
pR ROp Os e D ssiittee ppl An p OpOseD lA n
Exhibition
Seating Area Seating Area Seating Area Exhibition Office Circulation
Rooftop Rooftop
Male Toilet Handicap Toilet Store Room Reception Classroom Circulation Exibition Area Exibition Area
Exibition Area
(NV) (NV) (MV) (NV) Look Out Point A (AC) Look Out Point B (NV) Look Out Point C (NV) Exibition Area (NV) Mini Forestry Research Data Station Corridor Discussion Room Look Out Point A (NV) Look Out Point B (NV) Look Out Point C (NV) Exibition Area (NV) Rooftop Out Point Mini Forestry Research Data Look Station (AC) Rooftop Garden Corridor (NV) Discussion Room (AC)
DN
Total Gross Floor Area (GFA): 16 PROPOSRED 2 STOREY MULTIPURPOSE BUILDING PROPOSRED 2 STOREY MULTIPURPOSE BUILDING
DN
MULTIPURPOSE BUILDING - ROOFTOP MULTIPURPOSE BUILDING - ROOFTOP Total Roof Area :
Rooftop Rooftop
Rooftop Look Out Point Rooftop Garden
(NV) 68 ft² 38 ft² 18 ft² (NV) 351 ft² (NV) 155 ft² (NV) 428 ft² 343 ft² (NV) (AC) 206 ft² (NV) 1675 ft²
80 ft² 81 ft² 81 ft² 305 ft² 211 ft² 535 ft² 131 ft² 1424 ft² 3100 ft²
(AC)
80 ft² 81 ft² 81 ft² 305 ft² (NV) 211 ft² (NV) 535 ft² 131 ft² 1424 ft² 3100 ft²
(NV) (NV)
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
NOTE:
206 ft² 1675 ft²
DN
ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
De s i g nDevelO De v e l p Om p ent ment Design
DN
ARCHITECT: ARCHITECT:
555 ft2 2017 ft2 2572 ft2
I, ____________________________, hereby declare that ____________________________, hereby declare that (a) I am not the owner of the land within the meaning of the term "owner" as defined in Section the Planning (Cap 232, and as defined in (a) I am not the owner of 2theofland within theAct meaning of the1998Ed); term "owner" Section 2 of the Planning Act (Cap 232, 1998Ed); and (b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the submit this planland, to the Authority under the Planning Act (b) I have shownsaid this owner(s) plan to thetoowner(s) of the andCompetent have obtained the consent of the 232,1998Ed). to submit this plan to the Competent Authority under the Planning Act said owner(s)(Cap (Cap 232,1998Ed). I,
555 ft2 2017 ft2 2572 ft2
REV
DATE
AMENDMENTS
NOTE:
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) REV
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
p R O pO s e D s i t e p l A n T h e site sit e of of this t hi s proje p r o j ec L u r a h Bilut Bilut, th efirst f2irst FELD Asett settlem en tofofthe th eworld w o r l dwhich which The ctt isi s Lurah , PROPOSRED t he FELDA lement STOREY MULTIPURPOSE BUILDING st art e d its it s story st o r y since s i nc e the the eer o u r nation n ationgained gain editits in d epen d en c e.InInline l i n ewith w i t hFELFELstarted raa our s independence. D A 22..00 in initia it iati v es w hi c h aimed a i m ed t to d igitalizeLurah LurahBilut Biluttotobe bea amore m oremodern mo de r nand and DA tive s which o digitalize PROPOSRED 2 STOREY MULTIPURPOSE BUILDING o n sequently se que n t l y to to re r es er ve the the youngst y oun gsters to work workinint he th etown, town ,MTIB MTIBis iscollaborate collaborate c on serve ers to i th F ELDA, E LD A , prospecte pr o s pec ted to build bu i l d aa mult m ultipurpose build in gon ona a40m 40mhigh h ighhill h i land l a n da a w ith d to ipurpose building DN
DN
se t of pla play sc a pe at a t the the eex i s ti ng 0.7acre 0. 7ac rechildren c h ild renplayground playgroun dsitsite. set yscape x isting e.
Des ign c cOn O nc ceeppt Design t ss Growin G r owing g Community Com m u ni ty
AMENDMENTS
NOTE:
O bj b j ec e ctives t iv es O
O b je c ti v e s
DATE
De s i gn De ve l O p m e n t
pR O p O s e D s i te pl An
Desi g n D evelOpm ent ( 1 ) T h ebuildable b u i l da b l earea a r e a (2)Based ( 2 ) Ba s e d n t htotal e total (1)The on o the w i t h i nthe t h esite s i t eboundb o u n d- built-up. b u i l t - u pThe . The b u i l di n g within building a r yis i simposed i mp o s e dono n t h e height h e i gh tshall s h a lbe l b etwot w o ary the gr o u n d with w i t ha a3 3m m storey s t o r ewith y w i ta h accessia accessiground s e t b a c k line l i n e offset o ffs e t bleb lroof e roo f top. setback top. fr o mthe t h eedge e dgeof osite f site from b o u n da r y . boundary.
ARCHITECT: I,
( 3 ) P o r t i on (4)The intale rna l circu-(6 )Th(6)The st ruct ure (3)Portion of of th et he sl absla b (4 )Th e bui l building di n g i s seisp-se p-(5 )Th(5)The e i n te rn ci rcue structure are a re e r e move d a s d, void, arate a ra oo t wo sl ati on la t ion build-me an me a nt a e xpose d area rremov e d as v oi dte i ndtoint tw zon ezone s of of th e t he bui l dt to bet oa be e x pose d t o fo rdoubl m double volume w i thwitzon h e zone A se t orvse fe a d t ure by fe a t ure hel d-buildto form e v ol ume A to e rvei n g ing i s f eisature byd th e t hef e ature of thof e tbui s p a c e s a nd int roduce funct ion for e xhibit ion, z sha pe s long ra mp ing , spe a k out loud t he spaces and i n troduce f un cti on f or e x h i bi ti on , z sh ape s l on g ramp i n g, spe ak out l oud th e l a n ds c ape in tw beetewe zone incor-w h i ch which visit orspi ri tspirit t he be aof ut y of landscape i n be n e n w h i while l e zon e B i s B i niscorl e adilenagding v i si tor of thof e be auty e b u i lding . pora se conda t imbe conston ruct thet hbuilding. porati n gt ing se con dary ryup up w i thwit twho t wo 1 8 0 180 de - deti- mbe r conr structi . ion. funct f un cti on .ion. ____________________________, hereby declare that -
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
PROJECT MANAGER: PROJECT MANAGER:
I,
STRUCTURAL: STRUCTURAL:
____________________________, hereby declare that -
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
M&E:
M&E:
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232,1998Ed).
ARCHITECT:
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232,1998Ed).
QUANTITY: QUANTITY:
CONSULTANT: CONSULTANT:
CONSULTANT: CONSULTANT:
( 1) Th e b uilda b le a r ea ( 2) Ba sed on t h e t ot al (3)P orti on of the s l ab (4)The bu i l d i ng i s s e p(5)The i nte rnal ci rcu (6)The s tru ctu re are T h e s i t e of t h i s p r oj e c t i s L u r a h B i l u t , t h e f ir st FEL DA set t lem en t of t h e w or ld w h ich w it h in t h e sit e b oun db uilt -up . Th e b uilding are re move d as voi d , arate d i nto two zone s l ati on of the bu i l d me ant to be a e x pos e d sta d ei tss s t or y s i n c e t h e e r a ou r n a t i on ga in ed it s in dep en den ce. In lin e w it h FEL O b je cr ttei v a r y is im p osed on t h e h eigh t sh a ll b e t wo to form d ou bl e vol u me wi th zone A to s e rve i ng i s fe atu re d by the ( 1 ) T h e bu ild a ble a r e a (2)Based on the total ( 3 ) P or t ion of t h e sla b ( 4) Th e b u ild in g is sep ( 5) Th e in t er n a l c ir c u ( 6) Th e st r u c tfe u ratu e re a r eof the bu i l d Dte A 2of .0 thi i nsi t iparoje t i v ect s w ch h a iBmi le d the t o dfiig i t aFE l i ze The si i shLi ura ut, rst L D AL ur s eat h t leBilut m e n tt oo fbteh ea wmoor r lde wmhoder ic h n a n d greoun wuitnhdFELDA 32.0 DESIGN m- uCOMPETITION wild it hin g a a ccessi s pace and, i ntrod ce in t ofutncti hitbi ti on,of tzh e s hape ramp pe ak ou t l ou d the TIMBER TIMBER DESIGN COMPETITION F2.0TDC 2018 waitt e h in t h s it ed bo - a2.0FELDA bu ilt p. stTor hF2.0TDC eey2018 bu a r e r emoved a ss void a r a tued w o on zonfor es e xla ion b u ilds- l ong mea n t t o b e ai ng, expsosed “Hubungan Terjalin, Kedamaian Terjamin.” “ Hubun gan Terj alin , Ked am a i a n T e r ja mi n .” c on s e q u e n t l y t o r e s e r v e t h e y ou n g s t e r s t o w or k in t h e t ow n , MTIB is colla b or sta rte d i ts story si nce the e ra our na ti on g a i ne d it s in d e pe n d e n c e . I n lin e w it h F E L set b a ck lin e of f set b le r oof t op . l and s cape i n be twe e n whi l e zone B i s i ncorwhi ch l e ad i ng vi s i tor s pi ri t of a r y is im po s e d o n t h e h e ig h t s h a ll be t w o t o for m d ou b le volu me w it h zon e A t o ser ve in g is fea t u r ed b y t h e fea t u r e of t h e b u ild -the be au ty of DvA, r osch pec e de dt otob u a l im i pur uildin on 40m DA 2w . 0i t h i niFtiEaLti e s pwhi ati m dii lgdi ta zeu lLt ur a hpBose ilu t bt o be ag m ora e m o d ehrigh n a nhdill a n d a om edge sit i l dui ng. u pg wir athmptwo in180 e -k ou ttilou mbe tru cti on. g r o u n d f rw it h t hae 3 m ofs t o r eey w it h a a c c e s s is pa c es a nthe d inbu t r od ce fu n c t ion forporati exh ibng it ion , s e zcond sh aary p es lon g , spd ea d rt hcons e conse y oung r k ildr in ten he p t olawygr n , oun M T I Bd issitce. o lla bo r a t e s eqt ue ofntl p lya yto s cre a pseervaet tthe he e x i s t i nste g 0rs.7 to a c rwo e ch da r y. on. s e t ba c kb oun lin e o ffs e t ble r o o f t o p. la n d s c a p e in b et w een w h ile zon e fuBncti is in c or w h ic h lea d in g visit or sp ir it of t h e b ea u t y of wi th FE L DA , p rosp e cte d to b ui l d a m ul ti p urp ose bu ild in g o n a 4 0 m h ig h h ill a n d a fr o m t h e e d g e o f s it e t h e bu ild in g . p or a t in g sec on d a r y u p w it h t w o 180 d et imb er c on st r u c t ion . SITE PLAN SITE PLAN se t of p l a y sca p e a t the e x i sti ng 0 . 7 a cre chi l dren pla y g r o u n d s it e . bo u n d a r y . fu n c t ion . D e s i g n c O nc e pts
“ H H U U b b U Un ng gA An n “
Alli in n, , tt ee RR jj A
CONSULTANT: CONSULTANT:
PROJECT MANAGER:
STRUCTURAL:
PROJECT: PROJECT:
M&E:
PROJECT MANAGER:
QUANTITY:
STRUCTURAL:
CONSULTANT:
M&E:
CONSULTANT:
QUANTITY:
“ H U b U n g A n t e R j A l i n , “ H U b U n g A n t e R j A l i n , DRAWING TITLE: DRAWING TITLE:
PLAN ORIENTATION PLAN ORIENTATION CONSULTANT:
CONSULTANT:
N
N
CONSULTANT:
500 11 :: 500
SCALE @ A1:
G r ow i n g C om m u n i t y
“ H ub un ga n Ter j a lin , Keda m a ia n Ter j a m in .”
Design cOncepts G rowi ng C om m uni ty
“H ub u n g a n T e r j a lin , K e d a m a ia n T e r j a m in .”
DC REF/ BP NO.:
DATE:
PROJECT NO.
0001
STATE
1 : 500
08/02/18
FILE NAME:
LAND TENURE:
SCALE @ A1:
1 : 500
DATE:
CONSULTANT:
STATE
DRAWN BY: DC REF/ BP NO.:
DRAWING NO.
CHECKED BY:
DRAWN BY:
Author
08/02/18
PROJECT NO.
0001
DIRECTOR IN-CHARGE PROJECT ARCHITECT LAND TENURE: DIRECTOR IN-CHARGE PROJECT ARCHITECT PROJECT:
Checker
Author
REVISION
DRAWING NO.
A.A100A.A100 PROJECT:
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
CHECKED BY:
Checker REVISION
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt FILE NAME: C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
DRAWING TITLE:
PLAN ORIENTATION
LAND TENURE: PLAN ORIENTATION STATE
SCALE @ A1:
SITE PLAN
1 : 500 DATE:
DC REF/ BP NO.:
N
The T..h e Vantage Van t ag e Point P o i nt
DRAWING TITLE:
N
SITE PLAN
TT he sidents patt ern and modularity of Th e rigidity, rigid h e local local re r es i dents daily da i l y routineshall r oMULTIPURPOSE utin esh all The BUILDING - SITEity, PLANpattern an d m o du l a r i t y o f 1 not x porting : 500 g t heir tim ber construction c on struc tion showcased sh ow c a s e dono nitsi t s n o t be be solely sole ly working w o r k i ng for f o r eex po r1tin th eir timber MULTIPURPOSE BUILDING - SITE PLANjoinery syst em and arrangecrops for financial re turn. Instead, the complex 1 1Ins c r o ps for fina nc i a l r etu r n. t ead , th e c om plex j oin ery system and a r r a n ge : 500 “kebun” volved as m ensts ofof members, m em bers, is is portraying po r t r a y i n gthe the “ k ebun ” and an d “ladang” “ l a da ng ” can c a n eevolved as ment T h e l oc a l r e syi dof e n t“connect a i l y r ou t i n e s h a l l Th e r igidit y, p a t t er n a n d m odula r it y of a ce where y could a pla place wh er e the they c o u l d commune com m un e beaut beauty of s“ cdon n ecion”. tion ”. n ot b e s ol e l y w or k i n g f or e x p or t i n g t h e i r t im b er con st r uct ion sh ow ca sed on it s with th eir n eighbours while self-sust ain The l oca l re si de nts da i l y routi ne sha l l The r ig id it y , pa t t e r n a n d m o d u la r it y o f w i t h t h e ir n ei g hb o u r s w hi l e s elf -sustain c r op s f or f i n a n c i a l r e t u r n . In s t e a d , t h e com p lex j oin er y syst em a n d a r r a n gethroug y have not b eted sol e l y worki ng f or e x p orti ng the i r ti m b e r c o n s t r u c t io n s h o w c a s e d o n it s th r ough h the t h e products pr o du c ts the they ha ve planted. plan “ k e b u.n ” a n d “ l a d a n g ” c a n e v ol v e d a s m en t s of m em b er s, is p or t r a yin g t h e
08/02/18 PROJECT NO. SCALE @ A1:
LAND TENURE:
1 : 500
STATE
DATE:
DC REF/ BP NO.:
08/02/18
FILE NAME:
FILE NAME: DRAWN BY:
PROJECT ARCHITECT
DRAWN BY:
CHECKED BY:
Author
Checker
DRAWING NO.
0001
DIRECTOR IN-CHARGE
REVISION
A.A100
PROJECT ARCHITECT
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
CHECKED BY:
Author
PROJECT NO.
Checker
DRAWING NO.
REVISION
A.A100
0001
DIRECTOR IN-CHARGE
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
crop s f or f i na nci a l re turn. I nste a d, the com p le x j o in e r y s y s t e m a n d a r r a n g e a p l a c e w h e r e t h e y c ou l d c om m u n e b ea ut y of “con n ect ion ” . “ke b un” a nd “l a da ng ” ca n e v ol v e d a s m e nt s o f m e m be r s , is po r t r a y in g t h e w i t h t h e i r n e i g h b ou r s w h i l e s e l f - s u s t a i n a p l a ce whe re the y coul d com m une b e a u t y o f “ c o n n e c t io n ” . r oui rg h pours r od u cwhi t s tl eh ese y h v e pilna n t e d . wi th t hthe net ihgehb lfa - susta
throug T.h eh Vthe a n tparoducts g e P oi nthe t y ha v e p l a nte d. The V a nta g e P oi nt .
MULTIPURPOSE BUILDING -KEYPLAN Co MULTIPURPOSE BUILDING -KEYPLAN Co 1 :3500 1 : 500
3
The buildin g gains unbe atable advant ages of allowing t he visit or to have a 360 E D C B T h e build in g g a i ns u nb ea ta bl e ad van tages of allow in g th e visitor to h a v e a 3 6 0 degrees pa noram a vie w of the whole E D C B T hteownship, b u in l dsh i n gip, gplant aplan i n s uat n bions e a t asand b lan e admountains d vm aount n t a g es ofnearby d e g re e s pan o r a m a v i ew o f the wh ole tow tation ain s anllow e a rin bgy t h e visit or t o h a ve a 360 and orien ted to suit itself with the ofunb mount order maximize The alignment be uigl di bains, le aw nta ge e st own oft oash llo w,inpglatnhtea tvion is it o aoun v e at a3in 6 s0 n ea r b y d r eng es g p a inns or am ae a v ta iew ofatdv h ein h ol ip s ra tnod hm an d orie n t e d to s u i t i ts el f w i th th e align m en t of m oun tain s, in ord er t o ma x i mi z e de g re e s p a nora m a v i e w of the whol e townshi p , pla n t a t io n s a n d m o u n t a in s n e a r by a n d orexperience i e n t e d t o s u i tthemselves i t s e l f w i t h t h eas a l floating i g n men t of oun t a in s, in or der t o m a xim ize the v isibility outwards to allow occupants in mthe t h esurrounde visibilit y odu tw r ds torya lfrom l o w oall ca c c th em selves t ioer nug ndupan d suittwia tse l sf twi alig e nt oexp fam n tian intsh ,t he inem o rselves d e r t o ams af loa x imtizin eg in t h e t hori ee v nte its s i bexperien i l i tto y ou r de o th a l lthe ow oc cnm u pas a n ft slo ien ce air by ascene angles. the an vai si bsiul irty outwa ai r s urroun d e d by s c ener y f r o m all i rgles. r ou n d e drds b ytos cael lnow e r yoccup f r om a ants l l ae n xgpl eesr.ie n c e t h e m s e lv e s a s flo a t in g in t h e MULTIPURPOSE BUILDING - ROOF MULTIPURPOSE BUILDING - ROOF 59000
E
2000 1
A104
2
3000
A104
2000 E
D
C
3000
D
C
B
A
2000
2000
B
KEY PLAN:
KEY PLAN:
2000
2000
2000
2000
2 A104
2000
2000
2
1
A104
A104 1 A104
DN
MULTIPURPOSE BUILDING - ROOF MULTIPURPOSE MULTIPURPOSE 59000 -- ROOF BUILDING ROOF BUILDING
59000
4000
4000
4000
59000 59000
MULTIPURPOSE MULTIPURPOSE BUILDING - LVL 2 - LVL 2 BUILDING MULTIPURPOSE 55000 55000 BUILDING - LVL 2
4000
55000
55000
55000 MULTIPURPOSE BUILDING - LVL 1.
MULTIPURPOSE BUILDING - LVL 1.
4000
MULTIPURPOSE MULTIPURPOSE BUILDING - LVL 1. BUILDING - LVL 1. 51000 51000
MULTIPURPOSE BUILDING - LVL 2
4000
4000 8000
8000
8000
MULTIPURPOSE MULTIPURPOSE BUILDING - LVL 2 BUILDING - LVL 2 55000 55000
MULTIPURPOSE BUILDING - LVL 1. MULTIPURPOSE 51000 BUILDING - LVL 1.
DN
DN
DN
MULTIPURPOSE BUILDING - ROOF
4000
59000
59000
MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE 55000 BUILDING - LVL 2
SCHEMATIC
SCHEMATIC
A
8000
8000
1 A104
BUILDING SETBACK LINE
2000
BOUNDARY LINE
BUILDING SETBACK LINE
2000 8000
2000
BOUNDARY LINE
MULTIPURPOSE BUILDING - ROOF MULTIPURPOSE 59000 BUILDING - ROOF
2000
2000
A104
BUILDING SETBACK LINE
BOUNDARY LINE
a i r surrounde d b y sce ne ry f rom a l l a ng l e s.
2
SCHEMATIC SCHEMATIC
KEY PLAN:
A
BUILDING SETBACK LINE
2000
3000
1 : 500
KEY PLAN:
A
8000
3000
MULTIPURPOSE BUILDING -KEYPLAN Co 3 : 500 MULTIPURPOSE 1BUILDING -KEYPLAN Co
3
8000
MULTIPURPOSE BUILDING MULTIPURPOSE BUILDING -- SITE SITEPLAN PLAN
BOUNDARY LINE
MULTIPURPOSE 51000 BUILDING - LVL 1. MULTIPURPOSE 51000 BUILDING - LVL 1.
51000
51000 REV
REV AMENDMENTS
DATE
DATE
AMENDMENTS
NOTE:
NOTE:
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE
DISCREPANCIES MUST BE TO THE ARCHITECT BEFORE PROCEEDING. REPORTED IMMEDIATELY REV ONLY FIGURED DIMENSIONS DATE ARE TO BE WORKED FROM.AMENDMENTS REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
ORGANIZER: NOTE: ORGANIZER: REV ARE TO BE WORKED DATEFROM. DISCREPANCIES AMENDMENTS ONLY FIGURED DIMENSIONS MUST BE TANAH PERSEKUTUAN (FELDA) LEMBAGA KEMAJUAN
51000
KEMAJUAN TANAH PERSEKUTUAN (FELDA) REPORTEDLEMBAGA IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
NOTE: ORGANIZER:ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
MULTIPURPOSE BUILDING - LVL 1.
MULTIPURPOSE BUILDING - LVL 1. 51000
MULTIPURPOSE BUILDING - LVL 2
51000
55000
MULTIPURPOSE BUILDING - LVL 2
16
15
2000
2000
2000 MULTIPURPOSE - ROOF
14 A201
2000
2000
10
6
5
9
8
4
3
7
6
2
5 1.
20002000
20002000
10
40000
12
2 A201
2000
2000
2000 2000
9
11
40000
2000
10 2000
2000 2000
8
6
7
9 2000
2000
2000 2000 2000 2000 2000
2000
8 2000
2000 2000
7 2000
2000
20002000
5
6 2000
2000
5 2000
2000
2000
MULTIPURPOSE BUILDING - LVL 2 55000
2000
M&E:
55000
CONSULTANT:
2000
KEY PLAN:
2
1.
2000
2000
2000
DN
MULTIPURPOSE BUILDING - ROOF
59000
MULTIPURPOSE BUILDING - LVL 2 55000
51000
STATE
DC REF/ BP NO.:
08/02/18
DIRECTOR IN-CHARGE DRAWN BY:
CONSULTANT:
PROJECT: PROJECT NO.
Author
DRAWING NO.
DIRECTOR IN-CHARGE
STATE
DATE:
DC REF/ BP NO.:
PROJECT NO.
DRAWING NO.
0001 A.A103COMPETITION08/02/18 FELDA 2.0 TIMBER DESIGN F2.0TDC 2018 FILE NAME:
51000
SCHEMATIC
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
4
5
PROJECT:
0001 FILE NAME:
DRAWN BY:
CHECKED BY:
Checker
7
KEY PLAN: 8
10
51000 MULTIPURPOSE REV BUILDING - LVL 1.
____________________________, hereby declare that -
12
AMENDMENTS
REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
REV DATE (b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the (a) I am not the owner of the land within the meaning of the term "owner" as defined in said owner(s) to submit this plan to the Competent Authority under the Planning Act Section 2 of the Planning Act (Cap 232, 1998Ed); and (Cap 232,1998Ed). (b)
11
DATE
ARCHITECT: NOTE: 51000
(a) I am not the owner of the land within the meaning of the term "owner" as defined in ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST Section 2 of the Planning Act (Cap 232, 1998Ed); and I, ____________________________, hereby declare that -
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
9
AMENDMENTS
4000
I,
REVISION
A.A103 SCHEMATIC
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 6
ARCHITECT:
PROJECT ARCHITECT
Author
DATE
55000 MULTIPURPOSE ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE
MULTIPURPOSE BUILDING - LVL 1.
PLAN ORIENTATION
LAND TENURE:
Checker As indicated REVISION
51000 AMENDMENTS DATE MULTIPURPOSE BUILDING - LVL 2
ORGANIZER: REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. BUILDING - LVL 2 LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) ORGANIZER: 55000 LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
PROJECT ARCHITECT
CHECKED BY: SCALE @ A1:
DN
59000
MULTIPURPOSE BUILDING - LVL 1.
PLAN ORIENTATION
DRAWING TITLE:
LAND TENURE:
DATE:
DN
BUILDING55000 - ROOF
59000 MULTIPURPOSE BUILDING - ROOF
REV
CONSULTANT:
As indicated
MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE
NOTE: REV ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. NOTE:
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
QUANTITY:
SCALE @ A1:
DN
MULTIPURPOSE BUILDING - ROOF
59000
MULTIPURPOSE BUILDING - LVL 1.
DRAWING TITLE: CONSULTANT:
BUILDING - LVL 1.
3
3 2000
CONSULTANT:
PROJECT:
M&E:
SCHEMATIC SCHEMAT
KEY PLAN:
CONSULTANT:
51000 PROJECT: FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
CONSULTANT:
2
2000
1.
2
STRUCTURAL:
QUANTITY:
CONSULTANT:
1.
2000
2
A201
CONSULTANT:
MULTIPURPOSE BUILDING - LVL 1.
55000 MULTIPURPOSE BUILDING - LVL 2
KEY PLAN:
1.
QUANTITY:
STRUCTURAL: CONSULTANT: PROJECT MANAGER:
KEY PLAN:
st RUc t URe D esi g n
2
CONSULTANT:
MULTIPURPOSE BUILDING - LVL 2
1 : 100
2000
4 2000
A201
M&E:
51000
4000
1
3
3
Mu lt ip u r p or p ose b u ild in g MULTIPURPOSE SOUTH & WEST ELEVATIONS M u lt ipu r po r po s e bu ild in g BUILDING - LVL 1. MULTIPURPOSE Mu l tit pu SOUTH & WEST ELEVATIONS Ea st eleva ionrporpos e bu i l d i ng ipvur ornp ose b uildin g No r Mult t h e le a tpio BUILDING - LVL 1. 51000 MULTIPURPOSE BUILDING - EAST ELEVATION MULTIPURPOSE Eas t e l e vati on 51000 Nor t h eleva ion BUILDING -tLVL 1.1 1 : 100 MULTIPURPOSE MULTIPURPOSE BUILDING - EAST ELEVATION 51000
4
2000
4
2
QUANTITY:
CONSULTANT:
7
11
PROJECT MANAGER:
59000
PROJECT MANAGER:
8
40000
11
2000
M&E:
59000 MULTIPURPOSE BUILDING - ROOF
8000
13
2000
STRUCTURAL:
55000
12
2000
2000
PROJECT MANAGER: BUILDING
MULTIPURPOSE BUILDING - LVL 1. 59000
55000
13
9 12
4000
MULTIPURPOSE BUILDING - ROOF
14
SCHEMATIC
SCHEMATIC KEY PLAN:
10 13
4000
2000
MULTIPURPOSE BUILDING - LVL 2
MULTIPURPOSE BUILDING - ROOF
11 14
8000
MULTIPURPOSE 2000 2000 BUILDING - ROOF
15
17 2000
4000
MULTIPURPOSE BUILDING - LVL 2
51000
MULTIPURPOSE BUILDING - SOUTH ELEVATION 1 1 : 100 MULTIPURPOSE BUILDING - SOUTH ELEVATION 1 1 : 100
16
59000
55000
1215
4000 4000
59000
MULTIPURPOSE BUILDING - LVL 2 55000
1316
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act 2 (Cap 232,1998Ed).
18 2000
4000
BOUNDARY LINE
2000
17
19
1417
N
51000
MULTIPURPOSE BUILDING - ROOF 59000
2000
2000
15 18
N
s pecif ic A t i On Of mA t e R i Al s s p e c if ic At i On O f m A t e R i A l s
MULTIPURPOSE BUILDING - ROOF
59000 MULTIPURPOSE BUILDING - LVL 1.
55000 MULTIPURPOSE BUILDING - LVL 1.
20 2000
16 19
STRUCTURAL:
55000 MULTIPURPOSE BUILDING - LVL 2
51000 MULTIPURPOSE BUILDING - LVL 1.
21 2000
MULTIPURPOSE BUILDING - ROOF 59000
BOUNDARY LINE
MULTIPURPOSE BUILDING - LVL 2
BUILDING SETBACK LINE
MULTIPURPOSE BUILDING - ROOF 59000
3000
17 20
____________________________, hereby declare that -
8000
3000
I,
ARCHITECT: 40000 (a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and I, ____________________________, hereby declare that 2000 2000 2000 2000 2000 2000 2000 20002000 2000 2000of the land, 2000 2000 2000 (b)2000 I have shown this plan to the owner(s) and have obtained2000 the consent of the I amthis notplan the owner the land within the under meaning the term to the of Competent Authority the of Planning Act"owner" as defined in said owner(s) to(a)submit (Cap 232,1998Ed). Section 2 of the Planning Act (Cap 232, 1998Ed); and
18
4000
E
2000
18 21
2000
19
8000
D
2000
2000
20
4000
C
2000
2000
21 BOUNDARY LINE
8000
2000
E
BOUNDARY LINE
B
D
BUILDING SETBACK LINE
C
19
3000
4000
51000
2000
4000
s p e c i f i c At i O n Of mAteRiAls MULTIPURPOSE s pe c i fi c A ti O n -O f m A te Ri A l s BUILDING LVL 2
20
2000
B
55000
MULTIPURPOSE BUILDING - LVL 1.
3000 2000
2000
8000
59000
21
4000
59000 MULTIPURPOSE BUILDING - ROOF
E
8000 2000 2000 2000
8000
MULTIPURPOSE BUILDING - LVL 2
D
4000
2000
C
the Planning said owner(s) to submit this plan to the Competent Authority undersaid to submit this plan to the Competent Authority under the Planning Act owner(s) Act ARCHITECT: (Cap 232,1998Ed). (Cap 232,1998Ed).
4000
8000
2000
55000
B
E
8000
A
D
4000
C
8000
B
2000
A
MULTIPURPOSE BUILDING - ROOF
____________________________, hereby declare that -
(b) I have shown this plan to the owner(s) of the land, and have obtained theshown consentthis of plan the to the owner(s) of the land, and have obtained the consent of the (b) I have
2000
MULTIPURPOSE BUILDING - ROOF
____________________________, hereby declare that - I,
I,
I amasnot the owner (a) I am not the owner of the land within the meaning of the term(a) "owner" defined in of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and Section 2 of the Planning Act (Cap 232, 1998Ed); and
A
59000
ARCHITECT:
ARCHITECT:
A
8000
MULTIPURPOSE - NORTH ELEVATION MULTIPURPOSE BUILDING BUILDING - NORTH ELEVATION 2 1 : 100 1 : 100
BUILDING SETBACK LINE
2
MULTIPURPOSE BUILDING - NORTH ELEVATION 2 1 : 100 MULTIPURPOSE BUILDING - NORTH ELEVATION 2 1 : 100
BUILDING SETBACK LINE
1
MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2 MULTIPURPOSE BUILDING - LVL 1 MULTIPURPOSE BUILDING - LVL 2
13
14
15
16
17
18
19
20
21
ORGANIZER: NOTE: I have LEMBAGA shown this plan to the owner(s) ofONLY the land, and have obtained the consent of the FIGURED DIMENSIONS ARE TO BE(FELDA) WORKED FRO KEMAJUAN TANAH PERSEKUTUAN said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232,1998Ed).
REPORTED IMMEDIATELY TO THE ARCHITECT BEFOR
D E S IG N D E V E L O PME N T
(1)Con c enti o na l pl a yg roun d equ i pm ent i s ha vin g a l o t o f bl i nd s p o ts in be t w een w hi c h i s l ea di ng t o sec u r i ty a nd s a f et y issue to the v u l ner a b le ch ild re n.
E X P L OD E D A X O N O ME T R Y
( 2) Let’s im agin e, wh at if we d ism an tle th e playk its an d reord er th em in a lin e up, ac c ord in g to th eir d iff ic ulty level?
( 3) Al o n g w i t h t h i s l i n e u p , we t r y t o i mp o s e gi ga n tic l i n e a r s t r u c t u r e , t o ac c o mmo da t e all the play gr o u n d e q u i p me n t s .
( 4 ) A l o n g t h e w a l l , l e t ’s de du c t s o me s o l i d t o ma k e i t a v o i d, a s a me a s u r e t o e n h a n c e i n t e r n a l c i r c u l ation and ventilation as well as visual quality, based on t h e p a t t e r n o f ja l i n a n .
l i n e a r s t r u c t u r e i s swe e p a r o u n d t h e s i t e bounda r y a n d fo r mi n g isola t ion b e t w e e n i n n e r p l a yg round s p a c e a n d o u t er public s p a c e . T h i s fo r ma t ion is a da p t e d fo r “ ja m in” t he security.
K E D A M A I A N
(6)G a me s a re ca t e g orize d by it s difficult y le ve ls – a ll difficult g a me s will be fa c ing inwa rds so t ha t t he ma jor a ct ivit ie s is a ll ha p pe ne d inside t he wa ll.
(7)S oft scre e ns a re int roduce d on a ll t he inne r fa ce s of t he cube module a s a de sig n st ra t e g y t o e nsure childre n could a lwa ys st a y visua lly conne ct e d in t he ir g ua rdia n’s e ye .
T E R J A M I N ”
14 types of Playground Elemen ts La yout - organised in a w ay s urrounding the central o as i s . No s in gle euipment is bloc k i n g another one to prevent b l i n d s pot of supervision. Pla cement of Equipments inwa rds, facing the paren tal pla tform, the oasis
Timber - light structural memb er Modular - cost efficient, simpl e as s embling and mass produc ti o n , minimum skilled workers need ed . Structural system - reinforce d b y meta l beam brackets and cantilevered balancely inspired b y Dougo ng structure. The woo d en frame of each module is l o ad bea ring.
Envelope - Rattan to stimu l ate loca l craft and socio-econo m y Net - flexible protection w h i l e pres erving visibility Oa s is - located in the centr e o f the playground , it’s designe d f o r pa rent and family, to eas e parental sup er v i s ion from the centre po i n t.
C a s cading greeneries - To pro v i d e s haded & cooling seating place. Yellow layer - Safety mat for ch i l dren based on requirements.
P l a y gr o u n d s o u t h e a s t e l e v a t ion
(8)P a re nt s spa ce a re prog ra mme d a nd ce nt ric a t t he middle . It will be a cting a s a n oa sis for t he m t o ha ve e a sy supe rvision g re e s t urning s.
Long it ut iona l se ct ion
ENTER CONSULTANT NAME M&E:
Exibition Area 21 (NV) 206 SF
4000
QUANTITY:
PROJECT MANAGER:
21
21
21
8000 4000
20
21
21
21
1
PROJECT:
2
2
A104
A104
ENTER CONSULTANT NAME
2000
2000
2000 2000 2000 2000
2000 2000
20002000
2000 2000 2000 2000
20002000 20002000
2000
DATE RE
2000
2000 2000
7
REV
NOTE: 6
SCALE @ A1:
6 NOTE
LAND TENURE:
2000
FIGURED DIMENSIONS ARE STATE ONLY AsONLY indicated FI
TO DC REF/ BP NO.:THE REPORT 8 IMMEDIATELY ORGANIZER: DRAWING NO.
2000 2000
REPORTED DATE:
08/02/18 DRAWING TITLE:
2000
ORGA EAST & WEST ELEVATIONS 7 7 LEMBAGA KEMAJUAN 0001 A.A102 LEMBT PROJECT NO.
9 NOTE:
SCALE @ A1:
2000
REVC:\Users\user\Desktop\NTDC\Felda DATE FILE NAME: Timber Desig REV
NOTE:
LAND TENURE:
ONLY FIGURED DIMENSIONS ARE TO STATE ONLY As indicated AMENDMENTS FIGU
2000
20002000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
2000 2000 2000 2000 2000 2000 2000
2000 2000
20002000 20002000
4000
2000
2000
2000 2000
8000 4000 4000
2000
TO A DC REF/ BP NO.:THE8 REPORTE 8 IMMEDIATELY ORGANIZER:
REPORTED DATE: 08/02/18
2000
40000
40000
ARCHITECT: 11
ARCH1
_________________________ I, __
2000
I,
10
2000
(a) 10 I am not the owner of the(a)landI am w Section 2 of the Planning ActSec (C
1 (b) I12 have shown this plan to(b)theI ow ha said owner(s) to submit this plan 2000 40000
said ARCHITECT: (Cap 232,1998Ed). ARCHIT (Ca 11 2 11
I, __________________________ I, ____ A201 (a) I am not the owner of the(a)landI am with1 n
13
2000
13
2000
2000
A.A102
40000
40000
(NV) 555 SF 11 2
2000 2000
2000 2000
2000
58300 Rooftop Look 12Out Point
40000
2000 2000
40000
2000
12 (b) I12 have shown this plan to the owne 2000
Rooftop Look 12Out
2000 2000
2000 2000
CONSULTANT:
CONSULTANT:
CONSULTANT:
CONSULTANT:
CONSULTANT:
PROJECT:
PROJECT:
20 19 21 20
2000
2000 2000 2000 2000
1
15
2000 2000
2000 2000 20002000
15
1
14
PROJECT MANAGER:
17
1
QUANTITY: STRUCTURAL:
2000 2000
M&E: PROJECT1
17
2000 2000
18 17
QUANTI STRUCTU
1
19 CONSULTANT: M&E: 18
CONSUL M&E: 18
CONSULTANT: QUANTITY:
20
CONSUL QUANTITY
2 19
19 CONSULTANT: CONSULTANT: CONSULTANT:
CONSULT CONSUL
CONSULT2
21 20 PROJECT:
CONSULTANT:
PROJEC
16 STRUCT
STRUCTURAL: 16
M&E: PROJECT MANAGER:
2000 2000
19 18
16
1
13
2000 2000
CONSULTANT:
18 17
15 14
20002000
15
17 16 57100
QUANTITY:
21
21
57100
14
13
20002000
2000 2000 20002000 20002000 M&E:
18
QUANTITY:
20
20
CONSULTANT:
16
STRUCTURAL:
19
19 CONSULTANT: CONSULTANT:
57100
STRUCTURAL:
M&E:
18
QUANTITY:
15 14
A201
2000 2000
M&E:
13
PROJECT MANAGER:
PROJECT MANAGER:
17
A201
57700
2000 2000
2000
57100
2000
17
20002000
16
16
STRUCTURAL:
14
2000 2000
2000 2000 2000 2000
2000
57100
PROJECT MANAGER:
20
PROJEC
CONSULT FELDA 2.0 TIMBER DES FELD
FELDA 2.0 TIMBERFELDA DESIGN FELDA F2.0TDC 2.0 TIMBER 2018 DESIGN COMPETITION F2.0TDC 2018 2.0COMPETITION TIMBER DESIGN COMPETITION F2.0TDC 2018
21
21
21
PROJECT
FELDA 2.0 TIMBERFELDA DESIG
2
2
A104
2
A104
A104
2
2
A104
A104
2 A104
2
2
A104
A104
2 A104
2
2
A104
A104
2 A104
2 A104
DRAWING TITLE:
2
DRAWING TITLE: PLAN ORIENTATION
DRAWING TITLE:
2
DRAWING TITLE: PLAN ORIENTATION DRAWIN
PLAN ORIENTATION
2 & ROOF FLOO2 1ST, 2ND STOREY1ST, FLOOR 1ST, 2ND STOREY FLOOR PLANS & ROOF1ST, 2ND STOREY1ST, 2NDPLANS STOREY FLOOR PLANS &A104 ROOF A104 PLAN PLAN A104 PLAN PLAN PLAN SCALE @ A1:
QUANTITY:
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
As indicated
LAND TENURE: SCALE @ A1:
STATE As indicated
DIRECTOR IN-CHARGE SCALE @ A1: LAND TENURE:
STATEAs indicated
PROJECT ARCHITECT LAND TENURE: DIRECTOR IN-CHARGE
STATE
DIRECTOR IN-CHARGE PROJECT ARCHITECT PROJECT ARCHITECT SCALE @ A1: LAND TENURE:
DRAWING TITLE: As indicated
2
A104
2
2
2
A104
A104
2
A104
2
DATE:
08/02/18
A104
2
A104
DC REF/ BP NO.: DATE:
08/02/18
A104
PROJECT NO.
DRAWING NO. PROJECT NO.
DC REF/ BP NO.: DRAWING NO.
A.A002
08/02/18
FILE NAME:
CONSULTANT:
2
CHECKED BY: DC REF/ BP NO.: DRAWN BY:
Checker AuthorA104
DRAWN BY: CHECKED BY:
Author Checker
DATE:
CHECKED BY:
Checker
CHECKED BY:
Checker
1 : 100
LAND TENURE: REVISION
DIRECTOR IN-CHARGE
PROJECT ARCHITECT
STATE
DC REF/ BP NO.:
DATE:
FILE NAME:
DRAWING TITLE:
DRAWN BY:
CHECKED BY:
Author
Checker
DRAWING NO.
STRUCTURAL DIAGRAMS A.A002
REVISION
PLAN ORIENTATION
N
0001
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
SCALE @ A1:
LAND TENURE:
DIRECTOR IN-CHARGE
PROJECT ARCHITECT
DRAWN BY:
CHECKED BY:
Author
Checker
STATE DC REF/ BP NO.:
DATE:
08/04/18 PROJECT NO.
0001 FILE NAME:
08/02/18REVISION
PROJECT NO.
SCALE @ A DRAWING STATE As indicat
SCALE @ A1:
DC REF/ BP NO.: DATE:
1 : 100
FILE NAME: DC REF/ BP NO.: DATE:
DRAWING NO.
A.A002
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
REVISION
Ground floor plan
PROJECT NO.
1 : 100
1st storey plan
08/02/18
DRAWING NO. PROJECT N
LAND TENURE: SCALE @ A1:
STATE AsFILE indicated As indicated NAME: C:\Users\user\Desktop\NTDC\Felda Timber D
08/02/18
PROJECT:
DRAWING TITLE: PLAN ORIENTATION FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 STRUCTURALPROJECT DIAGRAMS ARCHITECT
DRAWN BY:
SCALE @ A1:
REVISION
DATE:
DIRECTOR IN-CHARGE
Author
08/04/18
REVISION DRAWING NO.
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvtFILE NAME: C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt FILE NAME: C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
PLAN ORIENTATION
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
PROJECT NO. DRAWING NO.
CONSULTANT:
N
LAND TENURE:
STATE
DRAWN DATE: 2DC BY: REF/ BP NO.:
Author
A104
1 Multipurporpose 2 1 : 100 3 1 : 100 0001 building A.A101 building 1 : 1002 1 : 1002 1 : Multipurporpose building 1 : 100 Multipurporpose 3 1 : 1003 1 : 100 1 : 100 0001 A101 A.0001 1 : 100 100 GroundMULTIPURPOSE floor plan- LVLBUILDING 1st storey planMULTIPURPOSE MULTIPURPOSE BUILDING 1plan MULTIPURPOSE BUILDING - plan LVLBUILDING 2 - LVL 2 - LVL 2Roof plan MULTIPURPOSE MULTIPURPOSE BUILDING - ROOF BUILDING MULTIPURPOSE BUILDING - LVL 1 - LVL 1 MULTIPURPOSE BUILDING MULTIPURPOSE BUILDING - ROOF - ROOF Ground floor 1st storey Roof plan 1 1 : 1001 1 Multipurporpose 2 1 : 1002 2 1 : 100 3 1 : 100 3 1 : 100 building Multipurporpose building Multipurporpose building 3 1 : 100 0001 A.A101 PROJECT NO.
4
5
5 2.0 DRAWING TITLE: FELDA TIMBER DESIGN EAST & WEST ELEVATION
M&E:
CONSULTANT:
1 : 1001
08/04/18
STRUCTURAL DIAGRAMS - D
8000
2000 2000 2000 2000
2000 2000 2000 2000 2000 40000 2000 2000 2000 2000
15 57100
PROJECT:
2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 1 FELDA : 100 ENTER CONSULTANT NAME
STRUCTURAL DIAGRAMS
SCALE @ A1:
FILE NAME:
STRUCTURAL DIAGRAMS - D
11 10
A201
57700
15
21
21
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
CONSULTANT:
1
DRAWING TITLE:
PROJECT NO.
STRUCTURAL DIAGRAMS - D
9
4
PROJECT:
ENTER CONSULTANT NAME FELDA 2.0 TIMBER DESIGN COMPETITION PROJECT: F2.0TDC 2018
DATE:
4
6
1ST, 2ND STOREY1ST, FLOOR 2N MULTIPURPOSE MULTIPURPOSE BUILDING - LVLBUILDING 1 - LVL MULTIPURPOSE MULTIPURPOSE BUILDING - LVLBUILDING 2 -BUILDING LVL-2LVLBUILDING MULTIPURPOSE BUILDING - ROOF BUILDING - ROOF MULTIPURPOSE BUILDING 1 - LVL BUILDING LVL 2 - BUILDING MULTIPURPOSE BUILDING - ROOFMULTIPURPOSE PLAN PLAN MULTIPURPOSE MULTIPURPOSE BUILDING - LVL BUILDING 1 - 1LVL 1 2- LVL 1 MULTIPURPOSE MULTIPURPOSE 2 - LVL -3LVL 2 3 MULTIPURPOSE MULTIPURPOSE BUILDING - ROOF BUILDING MULTIPURPOSE BUILDING MULTIPURPOSE MULTIPURPOSE BUILDING - ROOF - ROOF 1 Multipurporpose 2 1MULTIPURPOSE 3 12: 100 building Multipurporpose building Multipurporpose building 1 : 1001 1 : 100 1 : 1002 : 100 1 : 100 0001 0001 A.A101 A.A101
0001
4
A201
Rooftop Look Out
14
N
PLANTER BOX Planter box
(NV) 555 SF 2 ARCHITECT:
13 57700
ENTER CONSULTANT NAME
SECONDARY STRUCTURE
58300 Rooftop Look Out Point
ARCHITECT: 11
A201
20
21 20
4
PROJECT:
DATE AMENDMENTS
8
3
5 2.0 TIMBER DESIG FELDA
CONSULTANT:
57700 57700 I have 12 of thethis Point (b) I12 have shown this plan to(b)theI owner(s) land, (b) have I have obtained shown thethis consent plan ofhave thePoint owner(s) land, and have obtained the consent of the (b) 57700 have shown planand toPoint the owner(s) of the land, andto obtainedofthetheconsent of the to submit this plan said owner(s) said to o this plan the Competent under Planning to submit Actthis plan to the Authority under the Planning Act said owner(s) to submit said (NV) (NV) to submitAuthority this to owner(s) thethe Competent Authority under theCompetent Planning Act said to owner(s) (NV)plan (Cap 232,1998Ed). (Cap 2 (Cap 232,1998Ed). 555 SF (Cap 232,1998Ed). (Cap 232,1998Ed). 555 SF 555 2 SF 2 2 2
14
19
20 19
(NV) 555 SF
13
18
PROJECT: CONSULTANT:
2
(a) I am not the owner of the(a)landI am within (a)term I am "owner" not asowner defined of the theasmeaning as defined Section 2 of theinPlanning ActSectio (Cap notthe themeaning owner of of thethe land within thethe meaning of in the land term within "owner" defined of in the term "owner" Section 2 of the Planning ActSection (Cap 232, and Act (Cap Section of the Planning 2 of1998Ed); the Planning 232,2 1998Ed); and Act (Cap 232, 1998Ed); and
17
19 18
2000
2000 2000 2000
2000 2000 2000 2000 2000 2000
40000 2000 57100
3
A201 ____________________________, hereby declare that I, - ____________________________, hereby declare that I, ____________________________, hereby declare that -
I,
16 57100
58300 Rooftop Look Out Point
ARCHITECT: 11
15
18 17
10
2000
57100
13
8 7
NOTE:PROJECT ARCHITECT
9
Rooftop Look Out
2000
17 16
11
14
15
7 6
DN AMENDMENTS REV DATE
DN
DIRECTOR IN-CHARGE
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
10
2000 2000
A201
NOTE:
9
Rooftop Look 12Out Point (NV) 555 SF 2
57700
DATE REV
LAND TENURE:
A.A102
FILE NAME:
58300
14
16
DN
1.
ORGAN ROOFTOP TO ARCHITECT BEFORE REPORTED PROCEEDING. IMMEDIATELY TOPROCEEDING. THE10 ARCHITECT BEFORE PROCEEDING. 10 KEMAJUAN TA1 DC REF/ BP NO.:THE8 DRAWN BY: CHECKED BY: BEFORE GARDEN REPORTED IMMEDIATELY TO THE ARCHITECT 8 IMMEDIATELY GARDEN LEMBAGA 0001 LEMBA 08/02/18 Author Checker (NV) (NV) ORGANIZER: ORGANIZER: FILE NAME: C:\Users\user\Desktop\NTDC\Felda Timber Design Co PROJECT NO. DRAWINGORGANIZER: NO. REVISION 2017SF 2017SF 58300 9 PERSEKUTUAN9(FELDA) 9 58300 LEMBAGA LEMBAGA58300 KEMAJUAN TANAH PERSEKUTUAN KEMAJUAN TANAH 0001 59200 LEMBAGA KEMAJUAN TANAH(FELDA) PERSEKUTUAN (FELDA) 59200 REPORTED DATE:
2000
15
57700
2000
2000
57700
2000
2000
2000 2000 2000
2000 2000 2000
2000 2000
2000
2000
4000 8000 4000 A201
13
20
21
4000
2000 2000
2000 2000 2000 2000 2000 2000 2000 2000 2000
2000
19
14
Rooftop Look Out Point (NV) 555 2 SF
5
2000 2000
20
18
58300
6
51000
DN
CONSULTANT:
DN
5
PLAN ORIENTATION
2 CONSULTANT: QUANTITY: 4
FIGURED DIMENSIONS ARE TO BE WORKED FROM. ONLY DISCREPANCIES FIGURED DIMENSIONS MUST BEARE TO BE WORKED FROM. DISCREPANCIES MUST BE NO. STATE ONLY AsONLY indicated NO. DRAWING ROOFTOP FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BEPROJECT
10
13 Rooftop Look Out Point (NV) 555 SF
59200
2000
2000
19
17
11
ROOFTOP GARDEN (NV) 2017SF
1. 3
CONSULTANT: M&E:
2000 2000
21
19
16
58300
7
REV
NOTE:
SCALE @ A1:
9
12
DN
6
2000
20 53100
18
DN
ROOFTOP GARDEN (NV)
DRAWING TITLE: 2017SF
EAST & WEST ELEVATIONS 7 59200 59200
ROOFTOP 8 GARDEN (NV) 2017SF
59200
3
MULTIPURPOSE4 BUILDING - LVL 1.
5
6
2000
2000
Look18 Out Point A (NV) 80 SF
17
ROOFTOP GARDEN (NV) 2017SF
2000
2000
2000
2000
16
19
2000
15
2000
2000
2000
15
16
4
2
DN
QUANTITY: PROJECT MANAGER: CONSULTANT: STRUCTURAL:
3
5 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 FELDA
ROOFTOP GARDEN (NV) 2017SF
2000
2000
14
Look Out Point B (NV) 17 81 SF
Exibition AreaOut Point A Look (NV) 18 (NV) 305 SF 80 SF 17 53100
15
9
11
DN
M&E:
2
MULTIPURPOSE MULTIPURPOSE BUILDING - LVL 24 BUILDING - LVL 1. 55000 51000
4
PROJECT:
59200 7
59200
2000
13
2000 2000
81 SF
16
2000
2000
15 Exibition Area (NV) 305Look SF Out Point 14 B 56850 (NV)
2000
14
3
CONSULTANT:
51000
DN
DN
12
A201
MULTIPURPOSE2 MULTIPURPOSE BUILDING BUILDING--ROOF LVL 2 59000 550001.
3
CONSULTANT:
6
10
2000
2000
2
CONSULTANT:
5
8
ROOFTOP GARDEN (NV) 2017SF
2000
12
QUANTITY:
MULTIPURPOSE4 BUILDING - LVL 1.
5
2
2
55000
3
8
2000
13
2
7
9
M&E:
STRUCTURAL:
KEY PLAN:
1.
1.
STRUCTURAL:
MULTIPURPOSE BUILDING - LVL 2
2000
20 53100
A201
2000
2000
2000
13
2000
2000 2000 2000
2000
20
11
12
6
DN 10
2000
13
12
KEY PLAN:
PROJECT MANAGER:
1.
4
1
1.
SCHEMATIC SCHEMATIC SCHEMATIC
59000
5
2000
2000
2000
2000
2000
2
10
2
3
KEY PLAN
PROJECT MANAGER:
1.
KEY PLAN:
2000
MULTIPURPOSE BUILDING - ROOF
2
KEY PLAN:
59000
1
4
40000
2000 40000
9
11
59200
E 2000
SCH
E
BUILDING - ROOF
A104
8000 2000 2000
D
E
MULTIPURPOSE 2000 2000
1
A104
E
C
D
2000 2000
2000 2000
53100
ROOFTOP GARDEN (NV) 2017SF
D
D
B E
C
2000 2000
1.
3
2000 40000
8
2000
2000
12
Look Out Point C (NV) 11 81 SF
2
A D
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the 8000 to submit this plan to the Competent Authority under the Planning Act said owner(s)8000 (Cap 232,1998Ed).
1
A104
7
2000 2000
2000
2000 2000
2000 2000
2000 2000
2000
2000
2000 2000
2000
9
10
2000
2000
7
10
2000
2000 2000 2000 2000 2000 2000
19
8
2000 2000
2000
9
C
8000 2000 2000
C
6
2000 2000
2000 2000
2000
8
40000
2000 2000 2000
40000
2000
6
2000
2000
2000
2000 2000 2000 40000
7
11
5
7
2000
2000
2000
8
9
6
40000
2000
2000 2000
2000
2000
2000
6
10
4
2000
2000
2000 2000
2000
2000 2000 2000 2000 2000
5
7
5
B E
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
2000 2000
A104
2000 2000
2000 2000
53100
20
20
6
1.
A104 ____________________________, hereby declare that -
I,
B
2000
53100
REVISION
4
3
1
2000
Checker
DN
4
2
2000 2000
2000
53100 CHECKED BY:
5 UP
Look Out Point A (NV) 80 SF 53100
19
1
1.
C 8000
N
ENTER CONSULTANT NAME
SCH
(b) I have shown this plan to the owner(s) said owner(s) to submit this plan to th KEY PLAN: (Cap 232,1998Ed). KEY PLA
2000
N
CONSULTANT:
ENTER CONSULTANT NAME
PLANTER BOX Planter boxbox PLANTER BOX Planter
SECONDARY STRUCTURE
2000
N
CONSULTANT:
CONSULTANT:
STRUCTURAL: ENTER CONSULTANT NAME ENTER CONSULTANT NAME
SECONDARY STRUCTURE
2000 2000
____________________________,
(a) I am not the owner of the land within t Section 2 of the Planning Act (Cap 23
E
2 BUKIT MERAH CENTRAL #17-00 SINGAPORE 159835
M&E:
CONSULTANT:
CONSULTANT:
ARCHITECT:
D
E
8000
ARCHITECTS PTE, LTD.
STRUCTURAL:
ENTER CONSULTANT NAME
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
ENTER CONSULTANT NAME
C
D
ARCHITECT: 1
1
A
ENTER CONSULTANT TELNAME (65) 6220 0411 FAX (65) 6224 9929 ENTER CONSULTANT NAME QUANTITY:
B E
C
8000 2000 2000 2000 2000
A104
B
2000
2000
DRAWN BY:
Author
DRAWING NO.
A.A002
2000
2000 2000 2000
40000
2000 2000
53100
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
18
18 Look Out Point A (NV) 80 SF 53100
19
PROJECT ARCHITECT
3
A201
21
A104
A
2000
2000
0001 FILE NAME:
DIRECTOR IN-CHARGE
STATE
PROJECT NO.
21
19
DC REF/ BP NO.:
08/04/18
20
21
2000 2000
1 20
19
2000
A104
3
2000 2000
20 DATE:
19
LAND TENURE:
4
B
2000 2000
2000 2000
STRUCTURAL DIAGRAMS
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
1
2000
PLAN ORIENTATION
17 Exibition Area Look Out Point A (NV) (NV) 305 SF 80 SF 53100
Look18 Out Point A (NV) 80 SF
Look Out Point A (NV) 80 SF
REVISION
2
1.
2
A D
8000 2000 2000
2000
CHECKED BY:
Checker
DRAWING NO.
SCALE @ A1:
2000
2000
Look Out Point A (NV) 80 SF
PROJECT ARCHITECT
DRAWN BY:
Author
A.A00218
DN
2000
DIRECTOR IN-CHARGE
DC REF/ BP NO.:
DRAWING TITLE:
Exibition 17A LookArea Out Point (NV) (NV) 305 SF 80 SF 53100
A
2000
2000
2000
FILE NAME:
LAND TENURE:
STATE
19
17
2000
0001
UP
2000
PROJECT NO.
2000
DATE:
53100
2000
17
STRUCTURALPROJECT: DIAGRAMS FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 SCALE @ A1:
2000
2000 2000
16 Exibition Area (NV) 305 SF
53100
15
C
A104
3
Exibition Area Look Out Point (NV) B (NV) 305 SF 16 81 SF 53100
2000
Exibition Area (NV) 305 SF
53100
PLAN ORIENTATION
81 SF
15
2000
2000
Exibition Area (NV) 305 SF
CONSULTANT:
ENTER CONSULTANT NAME
Exibition Area (NV) 14 305Look SF Out Point B VOID BELOW 56850 (NV)
Look OutExibition Point BArea (NV) (NV) 81 SF305 SF 16 53100
53100
16
ENTER CONSULTANT NAME
08/04/18
2000 2000 2000
2000 2000 2000
40000 2000
17
CONSULTANT:
Exibition Area (NV) 305 SF Out Point 14B Look 56850VOID (NV)BELOW 81 SF
14
305 SF
FELDA 2.0 TIMBER COMPETITION ENTERDESIGN CONSULTANT NAME F2.0TDC 2018
13
13
Look Out Point B (NV) Area Exibition 81(NV) SF
Look Out Point B (NV) 81 SF
CONSULTANT:
18
13
2000
ENTER CONSULTANT NAME
2000
Look Out Point B (NV) 81 SF
QUANTITY:
DRAWING TITLE:
2000 2000 2000
2000 2000 2000
2000 2000
2000
2000 2000 2000
15
M&E:
12
15
ENTER CONSULTANT NAME
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
11
1.
B
Look12 Out Point C Look Out Point C Exibition Look Out Point C Area Exibition Area (NV) (NV) (NV) (NV) (NV) 81 SF 81 SF 2 81 SF 305 SF 2 2 14 305 SF VOID BELOW 56850VOID BELOW 56850 56850 A201 A201 A201
VOID BELOW
STRUCTURAL:
CONSULTANT:
Look Out Point C (NV) 81 SF 11 A201 2
Exibition Area
Look Out Point C (NV) (NV) 305 81 SFSF
Exibition Area (NV) 305 SF 56850
2000
Exibition Area (NV) 305 SF VOID BELOW 56850
16 ENTER CONSULTANT NAME
18
2000
21
2000
21
2000
2000
2000
2000
2000
2000
2000
2000
2000 2000
2000
2000
40000 2000 2000
2000 2000
2000
REVISION
20
40000
2000
21
2000
2000 CHECKED BY:
Checker
20
2000
2000 2000
DRAWN BY:
19
14
PROJECT MANAGER:
CONSULTANT:
10
10
Look Out Point C VOID BELOW (NV) 81 SF
11
9
9
2000
20
2000
18
PROJECT ARCHITECT
Author
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
21
15
(NV) 305 SF SINGAPORE 159835 QUANTITY: BELOW 56850VOID BELOW TEL (65) NAME 6220 0411VOID FAX (65) 6224 9929 ENTER CONSULTANT
2000 2000
17
PLAN ORIENTATION
19
A D
2000
21 53100
20
FILE NAME:
DRAWING NO.
A.A002
2000
0001
10
Look Out Point C (NV) 81 SF VOID BELOW 2 A201 A201 2
STRUCTURAL:
M&E:
8
12
Look Out Point C (NV) 81 SF
PTE, LTD. ARCHITECTS Exibition Area
7
VOID BELOW
VOID BELOW
REVISION
ARCHITECT(LEAD CONSULTANT) ENTER CONSULTANT NAME
ENTER CONSULTANT NAME
55000
7
2000
Exibition Area (NV) 20206 SF
19
DC REF/ BP NO.:
08/04/18
PROJECT NO.
DRAWING NO.
ARCHITECTS PTE, LTD.
13
PROJECT MANAGER:
2000
16
18
DIRECTOR IN-CHARGE
12A.A002
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
2 BUKIT MERAH CENTRAL #17-00 SINGAPORE 159835 14 0411 FAX (65) 6224 9929 TEL (65) 6220
2000
17
STATE
DATE:
FILE NAME:
2000
2000
2000
2000
2000 2000
2000 2000
2000
18
LAND TENURE:
(a) I am not the owner of the land within the meaning of the term "owner" as defined in SCALE @ A1: 2 of the Planning LAND TENURE: DIRECTOR PROJECT ARCHITECT Section Act (Cap 232, 1998Ed); and IN-CHARGE
(b) I have shown this plan theBPowner(s) of the land, and consent DCto REF/ NO.: DATE: DRAWN BY:have obtained the CHECKED BY: of the said owner(s) to submit this plan to the Competent Authority under the Planning Act 08/04/18 Author Checker (Cap 232,1998Ed).
6
Corridor (NV) 535 SF
VOID 8 BELOW
VOID BELOW
13
5
211 SF 55000 55000
55000
7
2000
2000
2000
2000
2000
2000
2000
2000
2000 2000
2000 2000
40000
2000
40000
2000
2000
2000
2000
2000
2000 2000
2000 2000
2000
2000
2000
2000
2000
2000
2000
19
SINGAPORE 159835
ENTER CONSULTANT NAME
2000
2000 2000
2000 2000
2000
2000 2000
2000 2000
2000
40000
2000
2000
2000
40000
2000
2000
2000
2000 2000
2000 2000
2000
2000 2000 2000 2000
Exibition Area (NV) 206 SF
40000
2000
2000 2000 2000
Ramp up 1: 10
2000 2000 2000 2000
21
53100
17
18
DRAWING TITLE:
STRUCTURAL DIAGRAMS
SCALE @ A1:
2 BUKIT MERAH CENTRAL TEL #17-00(65) 6220 0411 FAX (65) 6224 9929 ARCHITECT(LEAD CONSULTANT) SINGAPORE 159835 TEL (65) 6220 0411 FAX (65) 6224MANAGER: 9929 PROJECT ENTER CONSULTANT NAME PROJECT MANAGER: STRUCTURAL:
2000
2000 2000
2000
2000 2000
2000
2000
2000
2000 2000 2000
2000
Exibition Area (NV) 206 SF
17
8000
2000
53100
Ramp up 1: 10
2000
2000
STRUCTURAL DIAGRAMS - D
ARCHITECTS PTE, LTD.
2 BUKIT MERAH CENTRAL #17-00 PTE, LTD. ARCHITECTS
18
VOID BELOW
PLAN ORIENTATION
11
PROJECT NO.
PROJECT:
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
2000
B
2000
4
ARCHITECT(LEAD CONSULTANT)
16
CONSULTANT:
DRAWING TITLE:
ARCHITECT: STRUCTURAL DIAGRAMS VOID BELOW VOID BELOW I, ____________________________, hereby declare that -
STATE ARCHITECT(LEAD CONSULTANT)
CONSULTANT:
ENTER CONSULTANT NAME
PROJECT:
19 53100
17 16
CONSULTANT:
12A.A002
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
15
2000
C
A
2000
STRUCTURAL DIAGRAMS - D
Exibition Area (NV) 206 SF
15
2000
17
2000
2000
4
Exibition Area (NV) 20620 SF
53100
CONSULTANT:
VOID BELOW
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
Mini Forestry Research Data Corridor (NV) Station 535 SF (AC)
5
6
VOID BELOW
VOID BELOW
VOIDREVISION BELOW
3
4
Corridor (NV) 535 SF
9
VOID BELOW
PERSEKUTUAN (FELDA) 2018
2 BUKIT MERAH ENTER CONSULTANT NAME CENTRAL #17-00
14
16
ENTER CONSULTANT NAME
ENTER CONSULTANT NAME
UP
10
2000
2000
53100
QUANTITY:
AMENDMENTS
VOID BELOW
VOID BELOW DRAWING NO.
A
2000
Area (NV)
15
ENTER CONSULTANT NAME
ENTER CONSULTANT NAME
52400
9
6
VOID BELOW
CONSULTANT:
____________________________, hereby declare that LEMBAGA TANAH PROJECT: KEMAJUAN
20
2 DN
4
8
VOID BELOW
REV CONSULTANT DATE NAME ENTER
Corridor (NV) 535 SF
1.
UP
2000
REVISION
16
M&E:
17
15
14
STRUCTURAL:
55000
55000
DN
1.
2000
Exibition Area (NV) 206 SF
53100
Checker
13
ORGANIZER: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
21
B
2000
19
2000
2
Mini Forestry Research DataCorridor (NV) Station 535 SF (AC) 5211 SF 55000 55000
2000
1.
2000
UP
2000
PROJECT ARCHITECT CHECKED BY:
53100
A201
20
A
2000
18
A201
MiniRoom Forestry UP Discussion DN Research Data (AC) Station 131 SF (AC) 3 211 SF 55000
DN
55000
Corridor (NV) 535 SF
Corridor (NV) 535 SF
CONSULTANT:
2000
DIRECTOR IN-CHARGE DRAWN BY:
Author hereby declare that -
(NV)
(b) I have shown this plan to the owner(s) of the of the 206 SFland, and have obtained the consent206 said owner(s) to submit this plan to the Competent Authority under the Planning Act SF
14
2000
DC REF/ BP NO.:
(a) I am not the owner of the land within the meaning in Exibition Areaofandthe term "owner" as defined Exibition Section 2 of the PlanningTimber ActDesign (CapCompetition 232, 1998Ed); C:\Users\user\Documents\Felda Latest_user.rvt 53100
FILE NAME:
15
ENTER CONSULTANT NAME
9
0001
UP Discussion DN Room (AC) 131 SF 1.
211 SF 55000 55000
8
12
2
19
2000
16
E
2
Mini Forestry Research DataCorridor (NV) Station (AC) 535 SF
10 ENTER CONSULTANT NAME
2000
2000
17
2000
4
6
11
UP
2000
LAND TENURE:
STATE
ARCHITECT:
I, ____________________________, PROJECT NO. DRAWING NO.
ARCHITECT(LEAD CONSULTANT) (Cap 232,1998Ed).
REVISION
ARCHITECTS PTE, LTD.
PROJECT MANAGER:
2000
STRUCTURAL DIAGRAMS - D
STRUCTURAL DIAGRAMS -D 0001 A.A002
13
12
2000
15
D
2000
2
2000
Mini Forestry Discussion Room Research Data (AC) 131 Station SF (AC) 3 211 SF 55000
DN
CONSULTANT: NOTE: ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE ENTER CONSULTANT NAME DRAWING TITLE:REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PLANPROCEEDING. ORIENTATION
FILE NAME:
DRAWING NO.
2
UP
7
FELDA 2.0 TIMBER DESIGN (a) I am not the owner of the land within the meaning of the termCOMPETITION "owner" as defined inF2.0TDC SCALE @ A1: 2 of the Planning LAND TENURE: DIRECTOR PROJECT ARCHITECT Section Act (Cap 232, 1998Ed); and IN-CHARGE STATE (b) I have shown this plan theBPowner(s) of the land, and consent DCto REF/ NO.: DATE: DRAWN BY:have obtained the CHECKED BY: of the said owner(s) to submit this plan to the Competent Authority under the Planning Act 08/04/18 Author Checker (Cap 232,1998Ed).
0001
12A.A002
14
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act
ARCHITECT: STRUCTURAL DIAGRAMS APPLICANT:
11 VOID BELOW
A201
Mini Forestry Discussion Room Research (AC) Data 131Station SF (AC) 211 SF 55000
Section 2 of the Planning Act (Cap 232, 1998Ed); and
6
2000
2000 2000
16
2
SCHEMATIC
8
PLAN ORIENTATION
C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
2000
4
12
18
2000
2000
7
I,
2000
14
E
8000
A104
E
Discussion Room (AC) 131 SF
(FELDA)
CONSULTANT: ENTER CONSULTANT NAME REV CONSULTANT DATE AMENDMENTS ENTER STRUCTURAL: NAME NAME CONSULTANT: ENTER CONSULTANT Corridor NOTE: ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE ENTER CONSULTANT NAME (NV) M&E: REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. 535 SF ENTER CONSULTANT NAME APPLICANT: QUANTITY: 55000 LEMBAGA PROJECT: KEMAJUAN TANAH PERSEKUTUAN (FELDA) ENTER CONSULTANT NAME FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
____________________________, hereby declare that -
13
2000
4
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the DATE: said owner(s) to submit this plan to the Competent Authority under the Planning Act 08/04/18 (Cap 232,1998Ed).
2
2000
Section 2 of the Planning Act (Cap 232, 1998Ed); and C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
FILE NAME:
11
ENTER CONSULTANT NAME
2000
STRUCTURAL DIAGRAMS - D STRUCTURAL DIAGRAMS - D
12
Discussion Room (AC) 131 SF
4APPLICANT:
ARCHITECT:
1
C
2000
AMENDMENTS
ENTER CONSULTANT NAME Mini Forestry Mini Forestry Mini Forestry M&E: Research Data Research Data Research Data PTE, LTD. Station ARCHITECTS ENTER CONSULTANT StationNAME Station (AC)MERAH CENTRAL #17-00 (AC) 2 BUKIT QUANTITY: (AC) 211 SFNAME 211 SF ENTER CONSULTANT SINGAPORE 159835 211 SF 55000 55000 6224 9929 CONSULTANT: TEL (65) 6220 0411 FAX (65)55000 ENTER CONSULTANT NAME PROJECT MANAGER:
PROJECT NO.
2 BUKIT MERAH CENTRAL #17-00 SINGAPORE 159835 14 0411 FAX (65) 6224 9929 TEL (65) 6220
2000
4
10
(a) I am not the owner of the land within the meaning of the term "owner" as defined in SCALE @ A1: 2 of the Planning LAND TENURE: DIRECTOR PROJECT ARCHITECT Section Act (Cap 232, 1998Ed); and IN-CHARGE STATE (b) I have shown this plan theBPowner(s) of the land, and consent DCto REF/ NO.: DATE: DRAWN BY:have obtained the CHECKED BY: of the said owner(s) to submit this plan to the Competent Authority under the Planning Act 08/04/18 Author Checker (Cap 232,1998Ed).
2000
4
Exibition Area (NV) 343 SF 15
18
19
10
2000
PLAN ORIENTATION
STRUCTURAL DIAGRAMS
(Cap 232,1998Ed).
APPLICANT: LEMBAGA PROJECT: KEMAJUAN TANAH PERSEKUTUAN (FELDA) FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
10
DATE
2
STRUCTURAL:
9
AMENDMENTS
13 13
Ramp up 1: 10
A.A002
CHECKED BY:
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the
11 9
2000
2000
N
DRAWN BY:
18
N
FILE NAME:
DC REF/ BP NO.:
08/04/18 Author Checker said to submit this plan to the Competent Authority under the Planning Act I, ____________________________, hereby declare thatowner(s) PROJECT NO. DRAWING NO. REVISION
0001 A002 (a) I am not the ownerA. of the land within the meaning of the term "owner" as defined in @ A1: SCALE
PLANTER BOX
REV CONSULTANT DATE NAME ENTER
A201
2000
REVISION
owner of the land withinTITLE: the meaning of the term "owner" as defined in PROJECT ARCHITECT DRAWING Section 2 of the Planning Act (Cap 232, 1998Ed); and C:\Users\user\Documents\Felda Timber Design Competition Latest_user.rvt
STATE
11
9
ENTER CONSULTANT NAME
ARCHITECT(LEAD CONSULTANT)
13
2000
Checker
2000
Ramp up 1: 10
PROJECT ARCHITECT
CONSULTANT:
FILE NAME:
16
17
UP
Ramp up 1: 10
0001
(a) I am not the DIRECTOR IN-CHARGE
LAND TENURE:
ARCHITECT:
DIRECTOR IN-CHARGE
APPLICANT: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) DRAWN BY: CHECKED BY:
DC REF/ BP NO.:
16 52400
ENTER CONSULTANT NAME
CONSULTANT: NOTE: ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE ENTER CONSULTANT NAME REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
N
SCALE @ A1: DATE:
LAND TENURE:
STATE PLAN ORIENTATION
ARCHITECT:
Ramp up 1: 10
REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
SCALE @ A1: DATE:
08/04/18 Author I, ____________________________, hereby declare that PROJECT NO. DRAWING NO.
Ramp up 1: 102000 2000
PLAN ORIENTATION AMENDMENTS
DATE
STRUCTURAL DIAGRAMS APPLICANT: NOTE: 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)FELDA ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE DRAWING TITLE:
STRUCTURAL DIAGRAMS
DetAileD Design
UP
UP
BOX
2000
REV PROJECT:
52400
UP
ENTER CONSULTANT NAME APPLICANT: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) CONSULTANT: AMENDMENTS ENTER CONSULTANT NAME PLANTER
Ramp up 1: 10
SECONDARY STRUCTURE
4METER X 2METER PRIMARY STRUCTURE
PLANTER BOX 52400
52400
REPORTED IMMEDIATELY TO THE ARCHITECTUPBEFORE PROCEEDING. CONSULTANT:
Ramp up 1: 10
PLANTER BOX Secondary structure WOODEN DECK AND RAMP
4METER X 2METER PRIMARY STRUCTURE
DATE
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE DRAWING TITLE: REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
QUANTITY:
PROJECT NO.
14
UP
10 8
ENTER CONSULTANT NAME
0001
A201 A201
52400
REV
N
Secondary structure SECONDARY STRUCTURE WOODEN DECK AND RAMP
REV PROJECT:
NOTE: 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 FELDA
Ramp up 1: 10
CONSULTANT:
ENTER CONSULTANT NAME
N
DetAileD Design
NOTE:
CONSULTANT:
2.0 TIMBER ENTER DESIGNCONSULTANT COMPETITIONNAME F2.0TDC 2018 ENTER CONSULTANT NAME FELDA ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE
SECONDARY STRUCTURE PLANTER BOX
Ramp up 1: 10
UP
AMENDMENTS
N
AileD Design
DATE CONSULTANT:52400
2000
SECONDARY STRUCTURE
PLANTER BOX Secondary structure WOODEN DECK AND RAMP
9
10
M&E:
I, A201
2 2
Exibition Area (NV) 343 SF
2000
UP
QUANTITY:
ENTER CONSULTANT NAME
REV PROJECT:
Exibition Area (NV) 34315 SF
2000
M&E:
CONSULTANT:
13
2000
CONSULTANT:
ENTER CONSULTANT NAME ENTER CONSULTANT NAME
ENTER CONSULTANT NAME ENTER CONSULTANT NAME ENTER CONSULTANT NAME
51700 12
14
Exibition Area
Exibition(NV) Area 343 SF (NV) 343 SF 52400
52400
STRUCTURAL:
CONSULTANT:
2 A201
Exibition Area (NV) 343 SF
2000
ARCHITECTS PTE, LTD.
2 BUKIT MERAH CENTRAL M&E: #17-00 2 BUKIT ENTER CONSULTANT NAMEMERAH CENTRAL #17-00 SINGAPORE 159835 SINGAPORE 159835 TEL (65) 6220 0411 FAX (65) 6224 9929 QUANTITY: TELNAME (65) 6220 0411 FAX (65) 6224 9929 ENTER CONSULTANT PROJECT MANAGER: Exibition Area Exibition Area ENTER CONSULTANT NAME CONSULTANT: PROJECT MANAGER: (NV) (NV) ENTER CONSULTANT NAME STRUCTURAL: ENTER CONSULTANT NAME 343 SF 343 SF ENTER CONSULTANT NAME
ENTER CONSULTANT NAME
12
2000
Ramp up 1: 10
Ramp up 1: 10
Ramp up 1: 10
ARCHITECTS
Ramp up 1: 10
STRUCTURAL:
ENTER CONSULTANT NAME PTE, LTD.
QUANTITY:
7
ENTER CONSULTANT NAME
2 ARCHITECT: STRUCTURAL 11DIAGRAMS
11
A201
2000
2000 2
Exibition Area (NV) 343 SF
ARCHITECT(LEAD CONSULTANT) ENTER CONSULTANT NAME
M&E:
11
51700
Ramp up 1: 10 2000
51700
STRUCTURAL DIAGRAMS -D A201
4
PROJECT MANAGER:
ARCHITECT(LEAD CONSULTANT)
51700
Ramp up 1: 10
2 BUKIT MERAH CENTRAL #17-00 SINGAPORE 159835 TEL (65) 6220 0411 FAX (65) 6224 9929 STRUCTURAL DIAGRAMS -D
ENTER CONSULTANT NAME
7
STRUCTURAL:
DRAWING TITLE:
40000
SCHEMATIC
said owner(s) to submit this plan to the Competent Authority under the Planning Act
51700 PTE, LTD. ARCHITECTS 51700
51700
40000
____________________________, hereby declare that -
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
ARCHITECT(LEAD CONSULTANT) SCHEMATIC
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and (b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the
4
9
PROJECT MANAGER:
ENTER CONSULTANT NAME
10
2
SCHEMATIC
5
13
D
2
ENTER CONSULTANT NAME ARCHITECT(LEAD CONSULTANT)
ARCHITECTS PTE, LTD.
17
2 A201
B E
2000
8000 2000 2000
15
A104
N
I,
10
51700
STRUCTURAL DIAGRAMS - D
4
____________________________, hereby declare that -
7
16
E
2000
A201
PROJECT MANAGER:
6
2000
2000
12
C
2000 2000
D
N
I,
6
E
8000
Discussion Room(Cap 232,1998Ed).Discussion Room Discussion DN Room ARCHITECTS PTE,UPLTD. (AC) (AC) (AC) 131 SF
5
2 BUKIT MERAH CENTRAL #17-00 SINGAPORE 159835 TEL (65) 6220 0411 FAX (65) 6224 9929
C
2000
2 BUKIT MERAH CENTRAL #17-00 131 SF 131 SF SINGAPORE 1598355 TEL (65) 6220 0411 FAX (65) 6224 9929
7
6
2000 2000
40000
1
2000 2000
4
ARCHITECT(LEAD CONSULTANT)
CONSULTANT:
Ramp up 1: 10
51700
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the 232,1998Ed). PLAN: said owner(s) to submit this plan to the Competent Authority under the Planning KEY Act (Cap 232,1998Ed). KEY(Cap PLAN:
Ramp up 1: 10
2000
351 SF 51000
Ramp up 1: 10
51000
Reception
PLANTER BOX (NV)
2000
51000
Ramp up 1: 10
(b) I have shown this plan to the(NV) owner(s) of the land, and have obtained the consent of the 351 SF said owner(s) to submit this planSF to the Competent Authority under the Planning Act 351 232,1998Ed). KEY(Cap PLAN:
Ramp up 1: 10
Ramp up 1: 10
SCHEMATIC PLANTER BOX 351 SF (NV) 51000 51000
(a) I am not the owner of the land within the meaning of the term "owner" as defined in APPLICANT: 351 SFReception Reception Section 2 of the PlanningReception LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)Act (Cap 232, 1998Ed); and
ARCHITECT:
SECONDARY STRUCTURE
Circulation 7(NV) 428 SF 51000
WOODEN DECK9 AND RAMP 9
WOODEN DECK AND (NV) RAMP (NV)
ARCHITECT:
SECONDARY STRUCTURE
2000
2000
Ramp up 1: 10
AMENDMENTS
APPLICANT: Reception Reception LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
Ramp up 1: 10
DATE
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE
ARCHITECT:
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE ____________________________, hereby declare that REPORTED IMMEDIATELY TO THE ARCHITECTI, BEFORE PROCEEDING.
(NV) 351 SF 51000
5
5
D
2000
8000 2000 2000
ARCHITECT(LEAD CONSULTANT) (a) I am not the owner of the land within the meaning of the term "owner" as defined in
(a) I am not the owner of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
7
1
A104
B E
KEY PLAN: I, ____________________________, hereby declare that -
4
2000
8000
11
1
14
3
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232,1998Ed).
5
C
2000
AMENDMENTS
2000 2000
2000 2000
(b) I have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232,1998Ed).
6 SCHEMATIC
4
15
D
E
2000
A104
2000
8000
N
Wooden deck and ramp
51000
REV
NOTE:
AMENDMENTS REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
DATE
6 ARCHITECT:
2000
A D
B
2000
13
1.
3 NOTE:
5
4
C
D
8000 2000 2000
10
C
A
FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE ARCHITECT:ONLY REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. KEY PLAN: I, ____________________________, hereby declare that -
APPLICANT: LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA)
14
I,
B E
C
2000
91
1 1 APPLICANT: 1 LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) A104 A104 A104
3
2000
68 SF
DN
1 : 100
REV
NOTE:
2
5
8000
12
40000
A D
(a) I am not the owner of the land within the meaning TANAH of the term PERSEKUTUAN "owner" as defined in LEMBAGA KEMAJUAN Section 2 of the Planning Act (Cap 232, 1998Ed); and
AMENDMENTS
3
13
(b) I have shown this plan to the owner said owner(s) to submit this plan to (Cap 232,1998Ed).
N
2
4
DATE
11
B
2000
DATE
2000 2000
2
1.
2
12
40000
A104
B
2000
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
2
4 1.
C
A
2000 REV
2000 NOTE:
3
2000
AMENDMENTS
11
A D
B
2000
8
1
A
2000
10
1.
B
2000
MULTIPURPOSE BUILDING - WEST ELEVATION 8 8
2
DN
WOODEN DECK AND RAMP Wooden deck and ramp
2000
1.
3
REV
2000
DATE
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE
(NV) DN -50 68 SF APPLICANT: 68 SF Circulation 68Reception SF Circulation Reception LEMBAGA KEMAJUAN TANAH PERSEKUTUAN (FELDA) (NV) (NV) 428 SF 428 SF 51000 5100051000
2000
A104
2000
9
A
KEY PLAN: I, ____________________________, hereby declare that -
(NV) 1 : 100 (NV) MULTIPURPOSE BUILDING - WEST ELEVATION8 351 SF 351 SF DN
7
2000
8
2
3
6
Female Toilet -50 (NV) (NV) 68 SF 7 68 SF Circulation Circulation (NV) (NV) 428 SF DECK AND428 WOODEN RAMP SF 51000 51000 Reception Circulation PLANTER BOX (NV) (NV) 428 351SFSF 8 51000 51000
10 2000 Ramp up 1:2000
REV
NOTE:
6
2000
1 : 100
DN
4METER X 2METER PRIMARY STRUCTURE
Circulation (NV) 428 SF 51000
6
REVISION
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
4
5
2000
DN
DN
Female ToiletREPORTED IMMEDIATELY Female Toilet TO THE ARCHITECT BEFORE PROCEEDING. Female Toilet 4METER X 2METER PRIMARY STRUCTURE OUTDOOR PLANTING AREA PLANTING OUTDOOR AREA -50 -50 (NV) PLANTING (NV) OUTDOOR AREA
SECONDARY STRUCTURE 4METER X 2METER PRIMARY STRUCTURE WOODEN DECK AND RAMP SECONDARY STRUCTURE
4
5
Checker
7
MULTIPURPOSE BUILDING - WEST ELEVATION 8 8
2
Female Toilet Female OUTDOOR PLANTING AREA PLANTING OUTDOOR AREAToilet-50 -50 (NV) PLANTING OUTDOOR AREA
DN
2000
Female Toilet -50 (NV) 68 SF Circulation (NV) 428 SF 51000
Circulation (NV) 428 SF 51000
2000
3
DN
Male Toilet -50 (NV) 68 SF
Male Toilet -50 (NV) 68 SF
DN
68 SF
(NV) -50 (NV)68 SF 68 SF
DN
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
C
A
2000
1.
NOTE:
2
3
Handicap Toilet (NV) 38 SF
10
REVISION
B
___________________________
(a) I am not the owner of the land within Section 2 of the Planning Act (Cap
AMENDMENTS
Checker
A.A103 A 2000 2000 SCHEMATIC
CHECKED BY:
2000
2000
DN
Male 68 Toilet SF-50 (NV) 68 SF
2000
2000 2000
DN
18 SF
Female Toilet Female OUTDOOR PLANTING AREA OUTDOOR AREAToilet-50 -50 (NV) PLANTING OUTDOOR PLANTING AREA Male Toilet Male Toilet -50
2
51000
4
DRAWN BY:
Author
2000
Handicap Toilet (NV) 38 SF
DN
Handicap Toilet 51000 (NV) 38 SF
Handicap Toilet Male Toilet (NV) -50 (NV) 38 SF
Classroom (AC) 155 SF
9
CHECKED BY:
DATE
ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.
PROJECT ARCHITECT
DRAWING NO.
2
WOODEN DECK 1. AND RAMP 1.
155 SF
Handicap Toilet (NV)Store -51000 LVL 1. Room 38 SF (MV)
3
DC REF/ BP NO.:
REV
NOTE:
PROJECT ARCHITECT
8
DRAWN BY:
Author
FILE NAME: 2000
DIRECTOR IN-CHARGE
6
2000
51000
2000
18 SF 51000
2000
Classroom (AC) 155 SF
2000
51000 Store Room BUILDING (MV)
2000
2000
18 SF
SCHEMATIC
Store Room (MV) 18 SF
DIRECTOR IN-CHARGE
7
DRAWING NO.
Multipurporpose building 8000 East elevation 2000 2000 2000 2000 2000
2000
A.A103 E SCHEMATIC 2000 2000
1.
2000
Classroom (AC) 155 SF Store Room 51000 (MV) 18 SF
155 SF MULTIPURPOSE KEY PLAN: 155 SF
SCHEMATIC
DN
2000
Handicap Toilet (NV) DN DN 38Classroom SF (AC) 155 SF Store Room Store Room 51000Store Room 51000 (MV) (MV) WOODEN DECK AND(MV) RAMPMale Toilet -50 18 SF Male Toilet -50 18 SF Male Toilet -50 18 SF (NV) (NV) (NV) Classroom 68 SF Classroom Classroom 68 SF 68 SF (AC) (AC) (AC)
MULTIPURPOSE BUILDING - LVL 2
38 SF
E
2000
E
DN
55000
(NV) 68 SF
D
2000
MULTIPURPOSE KEY PLAN: MULTIPURPOSE Handicap Toilet - LVL 2Handicap Toilet BUILDING (NV) 1. BUILDING - LVL (NV)Classroom 38 SF 55000 38 SF (AC) 51000 155 SF
KEY PLAN: MULTIPURPOSE Handicap Toilet (NV) 1. BUILDING - LVL
4METER X 2METER PRIMARY STRUCTURE
DC REF/ BP NO.:
6
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
5
2000
X 2METER PRIMARY STRUCTURE 4 meter x 2 4METER meter primary structure
4
WOODEN DECK AND RAMP
1
51000Store Room (MV)
SCHEMATIC
1
8000
Classroom (AC) 155 SF
Store Room (MV) 18 SF
MULTIPURPOSE BUILDING - ROOF
C
D
3
2
A104
A104
2000 2000
A104
A104
59000
55000
59000
4METER X 2METER PRIMARY STRUCTURE
LAND TENURE:
STATE
DATE:
PLAN ORIENTATION
2000
2000
C
8000 2000 2000
2000 2000
2
08/02/18
0001 FILE NAME:
2000
2000
A104
B E
2000
2000
X 2METER PRIMARY STRUCTURE 4 meter x 2 4METER meter primary structure
51000
PLAN ORIENTATION
KEY PLAN:
2000 2000
2000
B
8000 2000 2000
MULTIPURPOSE 1 MULTIPURPOSE 1 BUILDINGBUILDING - LVL 2 - ROOF
As indicated DATE:
D
E
8000
2000
A
A D
1.
C
D
8000 2000 2000
2000 2000
1
B E
C
2000
C
LAND TENURE:
STATE
2000
2000 2000
A104
B
1.
SCALE @ A1:
2000
A D
B
2000
2000 1
2000
4METER X 2METER PRIMARY STRUCTURE
SCALE @ A1:
As indicated
0001
I,
51000
REVISION
KEY PLAN:
PROJECT NO.
C
A
2000
A
Material/construction method for each space:
5
2000
A104
A104
B
59000
WOODEN DECK AND RAMP Wooden deck and ramp SECONDARY STRUCTURE
2000
1
1
A104
stRUctURe Design
Material/construction method for each space:
4
SOUTH 2000 & WEST ELEVATIONS 2000
2000
1
1 : 100
MULTIPURPOSE BUILDING - ROOF
X 2METER PRIMARY STRUCTURE 4 meter x 2 4METER meter primary structure
2000 2000
Ramp up 1: 10
1
8000
4METER X 2METER PRIMARY STRUCTURE
3
EDRAWING TITLE:
2000
MULTIPURPOSE BUILDING - EAST ELEVATION A
erial/construction method for each space:
2
D
E
8000
8000 2000 2000 2000 2000
2000 2000
C
D
2000
B E
C
2000
8000 2000
A D
B
ORGANIZER: LEMBAGA KEMAJUAN TANA ARCHITECT:
MULTIPURPOSE BUILDING - LVL 1.
CHECKED BY:
2000
4000
C
A
DATE
NOTE:
ONLY FIGURED DIMENSIONS ARE TO B REPORTED IMMEDIATELY TO THE ARC
Checker
08/02/18
B
2000
1 : 100
1.
1 : 100
PROJECT NO.
stRUctURe Design
MULTIPURPOSE BUILDING - SOUTH ELEVATION
MULTIPURPOSE BUILDING - EAST ELEVATION
REV
55000
Multipurporpose building East elevation
FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018 KEY PLAN:
A
Multipurporpose building North elevation
DRAWN BY:
A.A103 SOUTH & WEST ELEVATIONS SCHEMATIC DRAWING TITLE:
C:\Users\user\Desktop\NTDC\Felda Timber Design Competition (KIEN)_0308.rvt
PROJECT:
1
PROJECT ARCHITECT
Author DRAWING NO.
0001
N
1
1 : 100
DC REF/ BP NO.:
08/02/18 PROJECT NO.
FILE NAME:
stRUctURe Design
MULTIPURPOSE BUILDING - SOUTH ELEVATION
DIRECTOR IN-CHARGE
STATE
As indicated
CONSULTANT:
51000
2000
1
LAND TENURE:
DATE:
MULTIPURPOSE BUILDING - LVL 1.
51000
MULTIPURPOSE BUILDING - LVL 2
N
Multipurporpose building North elevation
SCALE @ A1:
ORGANIZER: LEMBAGA KEMAJUAN TAN
MULTIPURPOSE BUILDING - LVL 1.
PLAN ORIENTATION
ELEVATIONS FELDA 2.0 TIMBER DESIGN COMPETITION F2.0TDC 2018
CONSULTANT:
CONSULTANT:
1 : 100
51000
51000
Multipurporpose building East elevation
DRAWING TITLE: SOUTH &PROJECT: WEST
MULTIPURPOSE BUILDING - EAST ELEVATION
1
MULTIPURPOSE BUILDING - LVL 1.
MULTIPURPOSE BUILDING - LVL 1.
1 : 100
55000
2000
MULTIPURPOSE BUILDING - SOUTH ELEVATION
CONSULTANT:
51000 QUANTITY:
4000
1
8000
55000
55000
MULTIPURPOSE BUILDING - LVL 1.
M&E:
MULTIPURPOSE BUILDING - LVL 2
2000
Multipurporpose building North elevation
STRUCTURAL:
51000
MULTIPURPOSE BUILDING - LVL 2
N
specificAtiOn Of mAteRiAls specificAtiOn Of mAteRiAls
MULTIPURPOSE BUILDING - LVL 1.
MULTIPURPOSE BUILDING - LVL 1. 51000
MULTIPURPOSE BUILDING - LVL 2
08/02/18
DRAWING NO. PROJECT NO.
0001
Roof plan
FILE NAME:
C:\Users\user\Desktop\NTDC\Felda Timber Desi FILE NAME: C
STRUCTURE DESIGN STRUCTURE DESIGN
(1)The middle zone of the playground (1)The middle zone of the playground is a sunken modern landscaped plaza is a sunken modern landscaped plaza with steps for seating. with steps for seating.
The playground is formed with The playground is formed with repetition repetition ofof timber timber cubic cubic module modulefixed fixedtogether. together.
The module are screened for some The module are screened for some of of the the sides sides to to protect protect children children from from falling falling down down while while exploring exploring the the comcomplex plex structure, structure, while while maintaining maintaining parparent’s ent’s eyes eyes on on them. them.
04 04
03 03 02 02
(2)The middle layer of the playground (2)The middle layer of the playground is a loop of playkits datum under the is a loop of playkits datum under the groups of timber cubic modules, with groups of timber cubic modules, with numerous entrances and exits where numerous entrances and exits where children can explore the entire facilichildren can explore the entire facilities with with their their imagination. imagination. ties
01 01
02 02 (3)The rear rear of of the the playground playground are are (3)The incorporate with with modern modern landscape landscape incorporate to portray portray the the evolution evolution of of Lurah Lurah Bilut Bilut to townscape. townscape.
(4)A small small triangle triangle shape shape water water play play swallow pond pond isis included included for for with swallow diversified activities activities especially especially more diversified hot day. day. during hot
0303
05 05
Playground Playground Ground Groundfloor floorplan plan Thestandard standardsize size of of each each module module The 1200mm x x 1200mm 1200mm xx 1200mm, 1200mm, isis 1200mm which is a suitable size for accomwhich is a suitable size for accommodate any any kind kind of of movement movement modate within itit under under the the consideration consideration within safety ofofsafety
The modules modules are are able able to to stacked stacked and The arranged in in numerous numerous form form and patarranged tern and then bolted or screw as a tern and then bolted or screw rigid structure, structure, making making it it offers offers flexrigid ibility of of renovation renovation with with easy easy “plug ibility and play” play” kind kind of of construction construction feaand ture. ture.
SPECIFICATION SPECIFICATIONOF OFMATERIALS MATERIALS (5)The paved paved ground ground extended extended from from the main main road road introduce introduce aa inviting inviting entrance entrance divert divert the the crowd crowd to to the the core core of the playground. playground.
AWARD WINNING | ACADEMIC | SUSTAINABLE CONSTRUCTION
MODULEX : AFFORDABLE HOUSING 2017 National Eco-Construction Competition (NECO) by CIDB : 1ST RUNNER UP
AWARD WINNING | ACADEMIC | INSTITUTIONAL
LIBRARY CAFE
2017 PAM - ZSR Architecture Prize : AWARD WINNER M’sia ARCHITALENT Design Competition @ARCHIDEX : 2ND RUNNER UP
_____________________________________________________________________________________________________________________________
__________________________________________
THANK YOU. LET’S WORK IT TOGETHER! __________________________________________