Taehoon Kim

Page 1

tae hoon kim B. Architectural Science PORTFOLIO


2


tae hoon kim Ryerson University Department of Architectural Science 25 Scrivener Sq. #204 Toronto, ON CA M4W 3Y6 T. 647.389.6028 E. taehoon-kim@hotmail.com

3


“Design is not making beauty. Beauty emerges from selection, affinities, integration, love.� -Louis Kahn

4


5


CURRICULUM VITAE EDUCATION 2009-2013

Ryerson University, Toronto, ON., Canada -Bachelor of Architectural Science -Dean’s List 2012-2013

2006-2008

University of Toronto, Toronto, ON., Canada -Humanities and Social Science

2001-2006

Argyle Secondary School, Vancouver, BC., Canada

EXPERIENCE 06-08 2012

Anhui Xinshidai Architectural Design Co. Ltd., Hefei, China -Summer Intern

PUBLICATIONS 2013

An Architecture of Civility (Ryerson Architectural Science Collaborative Exercise Booklet) -Graphics Editor

ACHIEVEMENTS

6

2013

2013 Nuit Blanche Exhibition: Revitalight

2013

Extreme Redesign Competition: Ez Driver -Top 10 Finalist

2014

NXT City Competition: Underscape -Top 8 Finalist


TABLE OF CONTENTS ACADEMIC PROJECTS 08-17

Sacred Space Studio: Church of the Holy Community

18-23

George Street Condominium

24-25

Flexible Architecture: Mobile Pavilion

26-27

Geometer’s Studio: Angular Studio

28-31

China Studio: Centre for Study on Matter Migration in Water Basins

32-33

Documentation and Construction Contract: The Garden

COMPETITIONS 34-35

Extreme Redesign Competition: Ez Driver

36-37

NXT City Competition: Underscape

48-41

AC-CA Casablanca Competition: The Ramp

EXTRAS 42-45

Nuit Blanche: Revitalight

46-47

Sketches

7


THE CHURCH OF THE HOLY COMMUNITY STUDIO PROJECT This architecture explores a marriage of the Catholic Church program with the pedestrian/family-friendly, people-focused environment of the West Don Lands neighbourhood. Located at the Bayview-Mill intersection, the church attains a proud stance in its immediate urban environment by emphasizing contrast of its physical elements amongst the various human senses. team date duration class instructor

8

Taehoon Kim, Justin Oh April 2013 1 semester ARC820 Sacred Space Studio Edward Wojs


T.O. BELL TOWER +33000

T.O. PARAPET +23000 T.O. GREEN ROOF +20000 T.O. PARAPET +13500 GREEN ROOF +12000

RECTORY +8000

ALIGNMENT +7500

ADMINISTRATION +4000

LEVEL 02 +4800

MI

LL

ST

RE

ET

A BA

Y

E VI

N VE

U

E

W GROUND LEVEL +0000

DON RIVER PARK

BASEMENT LEVEL -5000

9


01 CHAPEL

02 SACRED GARDEN

03 ASCENDANCE

3.5 3.6 3.8

3.4 3.7

3.9

ET

3.12

3.10

B AY V I E W A VENUE

3.3

RE

3.2

ST

3.13

3.11

A1

A2

A3

RE

3.1

FU

TU

3.14

6

GROUND FLOOR PLAN

5

4

12

B

7

5

B

11 9

C

8

1 10

8 2

C

1

MILL STREET A1

A2

A3

N

10

0m

5m

15m

25m

1 2 3 4 5 6 7 8 9 10 11 12

Ascendance Plaza Stations of The Cross Bell Tower Parish Hall Cloak Room Storage Cafe Cafe Office Elevator Lobby CACF. / Mailroom Loading / Garbage


06 BAPTISTRY

B AY V I E W A VENUE

05 STATIONS OF THE CROSS

RE

ET

04 SANCTUARY

A2

A3

FU

TU

RE

ST

A1

4 13

B

8

SECOND FLOOR PLAN

9 2

15 12

16

7

5

1

B

3 6

16 2

11 C

14 C

10 1

MILL STREET A1

A2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Ascendance Narthex Baptistry Sacristy Sanctuary Tabernacle Pulpit Confession Room Bell Tower Administration / Reception Library Classroom Office Lounge / Pantry Meeting Room Storage

A3

N

0m

5m

15m

25m

11


T.O. PARAPET +23000

17

17

T.O. PARAPET +23000

GREENROOF EXTERIOR-INTERIOR WALL COMPOSITION +20150 1/2” CORRUGATED STEEL MOUNTED TO Z-GIRTS 50mm AIRSPACE 150mm RIGID INSULATION GYPSUM SHEATHING CONTINUOUS AIR/VAPOUR BARRIER STRUCTURAL STEEL C-CHANNEL FRAME MOUNTED TO I-BEAM STRUCTURE 90mm STRUCTURAL STEEL STUD FRAME MOUNTED TO I-BEAM STRUCTURE SKYLIGHT VOID 13mm GYPSUM BOARD MOUNTED TO STEEL STUD FRAME 90mm STRUCTURAL STEEL STUD FRAME MOUNTED TO I-BEAM STRUCTURE MECHANICAL CAVITY 90mm STRUCTURAL STEEL STUD FRAME 13mm GYPSUM BOARD MOUNTED TO STEEL STUD FRAME

LEVEL 02 +4800

LEVEL 02 +4800

GROUND LEVEL +0000

GROUND LEVEL +0000

BASEMENT LEVEL -5000

PROPERTY LINE BASEMENT LEVEL -5000

12

WALL SECTION

WALL SECTION

FIRST ITERATION

FINAL ITERATION


EAST, WEST ELEVATION

W.2

W.2

W.2

ARRISCRAFT STONE + RECYCLED BRICK 45mm AIRSPACE 100mm RIGID INSULATION GYPSUM SHEATHING AIR/VAPOUR BARRIER STEEL SUPERSTRUCTURE 90mm STRUCTURAL STEEL STUD WALL 13mm GYPSUM BOARD

W.1B

ARRISCRAFT STONE 50mm AIRSPACE 100mm RIGID INSULATION GYPSUM SHEATHING AIR/VAPOUR BARRIER 90mm STRUCTURAL STEEL STUD WALL 13mm GYPSUM BOARD

W.2

PROPOSED 7 STOREY RESIDENTIAL BUILDING +27000

T.O. PARAPET +23000 GREEN ROOF +20150

W.1A

T.O. PARAPET +23000 GREEN ROOF +20150 W.1A

PROPOSED 5 STOREY RESIDENTIAL BUILDING +18000

WN.2

W.1B

LEVEL 03 +8000

W.2

CAST IN PLACE CONCRETE WALL

T.O. PARAPET +13500 GREEN ROOF +12000

GL.1

LOW-E INSULATING VISION GLASS CURTAIN WALL W/ SILICONE BUTT JOINTS

LEVEL 03 +8000

GL.2

LOW-E INSULATING FRITTED GLASS CURTAIN WALL W/ SILICONE BUTT JOINTS

ARCHITECTURAL LOUVRES TO CONCEAL MECHANICAL

W.1A

T.O. PARAPET +13500 GREEN ROOF +12000 WN.2

CONCRETE STAIR

W.1B

WN.2

WN.1

LEVEL 02 +4800

LEVEL 02 +4000

GL.1

W.2 GL.1

WN.1 PRE-MANUFACTURED WINDOW ASSEMBLY 1 FRAME FINISHED BLACK AWNING WINDOW INCLUDED

GL.1

GL.1

GROUND LEVEL +0000

GROUND LEVEL +0000

0m

5m

15m

WN.2 PRE-MANUFACTURED WINDOW ASSEMBLY 2 FRAME FINISHED BLACK AWNING WINDOW INCLUDED

25m

SOUTH ELEVATION W.1A

ARRISCRAFT STONE + RECYCLED BRICK 45mm AIRSPACE 100mm RIGID INSULATION GYPSUM SHEATHING AIR/VAPOUR BARRIER STEEL SUPERSTRUCTURE 90mm STRUCTURAL STEEL STUD WALL 13mm GYPSUM BOARD

W.1B

ARRISCRAFT STONE 50mm AIRSPACE 100mm RIGID INSULATION GYPSUM SHEATHING AIR/VAPOUR BARRIER 90mm STRUCTURAL STEEL STUD WALL 13mm GYPSUM BOARD

W.2

CAST IN PLACE CONCRETE WALL

GL.1

LOW-E INSULATING VISION GLASS CURTAIN WALL W/ SILICONE BUTT JOINTS

GL.2

LOW-E INSULATING FRITTED GLASS CURTAIN WALL W/ SILICONE BUTT JOINTS

PROPOSED 11 STOREY RESIDENTIAL BUILDING +36000

W.2

W.2

PROPOSED 7 STOREY RESIDENTIAL BUILDING +27000

T.O. PARAPET +23000 GREEN ROOF +20150

PROPOSED 5 STOREY RESIDENTIAL BUILDING +18000

W.1A

ARCHITECTURAL LOUVRES TO CONCEAL MECHANICAL

T.O. PARAPET +13500 GREEN ROOF +12000

W.1A WN.2

W.1B

WN.2

WN.2

WN.1

CONCRETE STAIR + RAMP

GL.1

LEVEL 03 +8000 WN.2

WN.2

WN.1 GL.1

LEVEL 02 +4800

LEVEL 02 +4000 GL.1

GL.1

GL.1

GL.1

GROUND LEVEL +0000

GROUND LEVEL +0000

0m

5m

15m

25m

WN.1 PRE-MANUFACTURED WINDOW ASSEMBLY 1 FRAME FINISHED BLACK AWNING WINDOW INCLUDED WN.2 PRE-MANUFACTURED WINDOW ASSEMBLY 2 FRAME FINISHED BLACK AWNING WINDOW INCLUDED

13


07 PHYSICAL MODEL ON SITE

PRECAST SANWICH PANEL STRUCTURAL WYTHE RIGID INSULATION EXTERIOR WYTHE

08 WATER FEATURE SKYLIGHT AT GRADE

09 SECTION MODEL

TOP OF POOL WALL BEYOND CONCRETE CURB CONCRETE PAVING ADJUSTABLE PLASTIC PEDESTRAL

LINE OF WEATHER SEAL AT PANEL JOINTS

STONE BALLAST 150mm RIGID INSULATION WATER PROOFING MEMBRANE

LINE OF AIR SEAL AT PANEL JOINTS

CONCRETE SLAB 100mm DIAMETER PIPE TO IMMERSION CIRCULATOR 19mm STAINLESS STEEL WALL PLATE

Water Feature Skylight at Grade Section Detail 0mm

14

100mm

250mm

500mm


1

3

10

4

2

5

6

5

10

1

9

8 1 3

3

3

3

10

MILL STREET

7

10

MILL STREET

MILL STREET

10

3

3

0m

3

5m

15m

SECTION AA 1-3 1 2 3 4 5 6 7 8 9 10

Ascendance Cloak Room Parish Hall Kitchen / Food Preparation Narthex Baptistry Sacristy Nave Confession Room Mechanical

1 2 3 4 5 6 7 8 9 10 11

Nave Narthex Parish Hall Chapel Kitchen / Food Preparation Bell Tower Loading / Garbage Classroom Terrace Rectory Mechanical

25m

6

SECTION BB

9

11

B AY V I E W AV E N U E

FUTURE STREET

11

10

8

2

1

7 3

11

11

4

3

5

0m

5m

15m

25m

15


0

16

200

500

1000mm


0 50 100

200

500

1000mm

0 50 100

200

500

1000mm

17


GEORGE STREET CONDOMINIUM INDIVIDUAL STUDIO PROJECT The condominium is located on the corner of George Street and Gerrard Street in Toronto, Ontario. It is a commercial residential building with social housing units on the third floor. The project’s protruding form entails terraces and outdoor open spaces. date duration class instructor

18

April 2012 1 semester ASC620 Integration Studio II Arthur Wrigglesworth


01 CONCEPT

Shear Wall (Elevators, Shafts, Stairs, etc.)

Residential Unit

500x500mm Structural Column

Social Housing Units Amenities

200mm Floor Slab

Residential Lobby Commercial 02 PROGRAMS

03 STRUCTURE

19


04 LOBBY

GROUND FLOOR PLAN

20

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Cafe Walk-in Clinic Elevator Room Washroom (M) Washroom (W) Communication Room Office A Office B Mechanical Shaft Concierge Residential Lobby Garbage Room Bicycle Parking Loading Zone Community Meeting Space

SECOND FLOOR PLAN 1 2 3 4 5 6 7 8 9

Adult Learning Centre Washroom (M) Washroom (W) Gym Change Room A Change Room B Elevator Lobby Daycare Party Room / Lounge


05 BICYCLE PARKING

THIRD FLOOR PLAN

TYPICAL FLOOR PLAN

21


SECTION A-A

22

SECTION B-B


23


THE MULTIFLEX INDIVIDUAL ACADEMIC PROJECT The project takes a form of portable architecture which allows the building to move freely around. It can be installed and uninstalled at ease. The Multiflex contains four main programs: kitchen, storage, washroom, and the multi-purpose room.

24

date duration class instructor

December 2012 1 week ASC856 Small Buildings Baruch Zone


MOBILITY

PATIO

EAST ELEVATION

RESTAURANT

PERFORMANCE STAGE

SOUTH ELEVATION

SECTION Entrance

Multi-purpose room

WEST ELEVATION

Kitchen

PLAN

NORTH ELEVATION

Storage

HINGE JOINT CONNECTION

Roof structure

Louvre

Grey & black water tank Hinge joint Truck wheel Glass panel

25


ANGULAR STUDIO INDIVIDUAL ACADEMIC PROJECT Angular Studio is a small studio building designed for a mathematician whose research is in the area of advanced geometry. The studio is located behind his/her home in Toronto. Having a form of an acute angle, the building orients its position toward the south. date duration class instructor

26

November 2011 2 weeks ASC621 Tectonics and Materiality John Cirka


01 PHYSICAL MODEL

A

B

A

B

A

B

B

A

02 PLANS: GROUND LEVEL

UPPER LEVEL

03 SECTION: A-A

B-B

04 ELEVATION: NORTH

SOUTH 27


THE CENTRE FOR STUDY ON MATTER MIGRATION IN WATER BASINS FROM A JOINT DESIGN PROJECT WITH STUDENTS FROM CHINA THREE GORGES UNIVERSITY The Centre for Study on Matter Migration in Water Basins takes its form in a centralized shape where the artificial raining tower becomes the focal point of the whole system. Other functions such as water tanks, labs, filtration systems, office spaces, greenhouse and outdoor experimental spaces are distributed either on the outer edge or separated from the main buildings. The building is symmetrical emphasizes verticality. date June 2012 duration 2 weeks class ASC720 China Architecture Studio instructor Zaiyi Liao

28


RESIDENTIAL ZONE

EDUCATIONAL ZONE

SITE

RESEARCH ZONE

SITE

DORMITORIES

SITE

LITERATURE BUILDINGS

STAFF APARTMENTS NURSING BUILDINGS DORMITORIES

SCIENCE AND TECHNOLOGY BUILDINGS

TECHNOLOGY ACADEMY BUILDINGS

LABORATORIES

01 SITE ANALYSIS

5 4 1

2

1. Main tower and office 2. Pretesting preparation 3. Experimental Allotment 3

4. Green House 5. Observation field for water runoff

02 ISOMETRIC DIAGRAM 29


03 GROUND LEVEL

05 EXPLODED AXONOMETRIC

04 LEVEL 4 - 6 30


Mech. room

Laboratories Verticial circulation

Office space 06 SECTION A-A

Mech. room

Rain water Sediment handling lab Filtration system Water tank Artificial raining tower

07 SECTION B-B

Water tank Used water 31


PARKING FLOOR PLAN

N

GROUND FLOOR PLAN

THE GARDEN GEORGE STREET REDEVELOPMENT WORKING DRAWINGS team Taehoon Kim, Sunmi Choi, Hyoung Lee, Kyung Lee, Farzan Marzban, Ericka Song date April 2012 duration 1 semester class ASC622 Documentation and Construction Contract instructor Baruch Zone 32

ROOF FLOOR PLAN


NORTH ELEVATION

A200 SECTION

WEST ELEVATION

A201 SECTION 33


EZ-DRIVER 2013 EXTREME REDESIGN 3D PRINTING COMPETITION: TOP 10 FINALIST Extreme Redesign Competition asks its participants to reinvent products, compensating existing defects. EZ-Driver allows continuous turning of the screwdriver, making the use of a screwdriver more convenient. When using a conventional screwdriver, users were compelled to repeat multiple steps of holds and turns until screws were completely tightened. The EZ-Driver, however, has two phases: conventional mode, which can be used when it is necessary to screw or unscrew near corners or edges, as well as a turning mode, of which the shank can be pulled out and pivoted to enable the turning of a knob. 34

team date duration class instructor

Taehoon Kim, Daehee Kim October 2012 2 1/2 weeks ASC755 Digital Tools Vincent Hui


01 CONCEPTUAL RENDERING

02 COMPONENTS

03 MANUAL INSTRUCTION

04 INSTALLATION 35


UNDERSCAPE 2014 NXT CITY PRIZE COMPETITION: TOP 8 FINALIST Underscape defines problems of open public plaza and aims to maximize its use. Unless there are events being held, public plazas are underused because there are not enough seating and shades. This project improves flexibility of seating areas in Dundas Square by deploying benches underground with adjustable canopies. When the square needs open space for public events, the canopies can be folded down to a ground level, allowing pedestrians to walk on top of it. Inversely, Underscape provides ample seating and shades when no events are being held. The walls and canopies are oriented towards the south to deliver shades. The form derives from the size of the existing granite slabs on Dundas Square. The periphery of the pit is covered with pebbles with a patch of grass in the centre. This feature creates a strong visual link through the glass window on the canopy, bringing nature back into densely populated urban area. At night, the enclosed Underscape provides lighting from the below to generate dynamic experience for the users. team Taehoon Kim Jaepil Yoo Gunil Choi date July 2014 duration 1 week

36


White Aluminum Panel Clear Glass

Lightweight Wood

Pebbles Grass Open Space for Public Events

01 SECTION

02 MATERIAL DIAGRAM

Seating and shades for daily uses

03 SITE USE

37


THE RAMP 2012 AC-CA CASABLANCA MARKETPLACE COMPETITION The site of the proposed development is located a manageable distance from the Medina along Boulevard Tahar El Alaoui and the Hassan II Mosque in Casablanca, Morocco. Considering the floating population of the marketplace, the team has decided to maximize the total proposed area of 790m2: the marketplace has been lifted aboveground and pathways are unobstructed to allow continuous movements. The two ramps are the focal pieces and they intertwine and share architectural spaces such as roofs and ceilings. Additionally, non-linear shared spaces as open areas and the stage allow dynamic spatial sequences.

team Taehoon Kim, Daehee Kim, Benyi Hu, Kaylee Kwon date September 2012 duration 3 weeks class ASC856 Small Buildings instructor Baruch Zone

38


39


01 SECTION A-1

02 ROOFTOP

ROOFTOP GARDEN

MARKET MARKET

MARKET REFUSE COLLECTION AREA NEWSPAPER KIOSK INFO AREA RESTROOM

CAFE + COURTYARD

03 CIRCULATION

04 MASSING

TRADITIONAL ALLEYWAY

ADJUSTING TO THE SITE

MULTIPLE ENTRANCES

LIFTING ABOVE

FINAL FORM

05 FLOOR PLANS

STAGE

BACK STAGE

SEATINGS RE

FISH

LA

LA

OU

ET

HA

I&

HA

SS

AN

FACILITIES

UNDERG

II M

RO

NEWSPAPER QUOSK OS

QU

E

AN UND PL

UNDERGROUND 40

&S

EAF

RK

TA

PUBLIC SPACE

INFORMATION AREA

REFUSE COLLECTION

FLOWER

DM

ARK

ET

MARKET

GREEN ROOF

AN UND PL

NE PATH O

GROUND

PATH 1

GRO

OO

MA

D

ICE

AR

SP

EV

CAFE

RKET

UL

MEAT MA

BO

FRUIT &

VE

E MA GETABL

RKET

O PATH TW

PATH 2

ROOF

PLAN

ROOF


05 AERIAL VIEW The linear ramp connects to the green-roof which consists of small vendors and seatings.

41


REVITALIGHT 2013 NUIT BLANCHE Through responsive technology, the installation will acknowledge the participants’ presence. It provides a dynamic experience in the existing site for the passersby, but will also serve a purpose for the user to highly engage with the space through the use of motion sensors embedded in the installation. By integrating technology and aesthetic in urban context where population density is high, RevitaLight aims to inspire and interest the public in adaptive design features, as well as to increase the value of unused spaces. Therefore, pedestrians will engage in a unique sensory experience during the night with this kinetic installation, reflecting the scale and spirit of Scotiabank Nuit Blanche. team Taehoon Kim, Daehee Kim, Benyi Hu, Lisa Chien, Jeff Lei, Chao Fan date October 5, 2013 duration 8 weeks location Bata Shoe Museum, Toronto, ON class ASC755 Digital Tools instructor Vincent Hui

42


1. Initial state

2. Sensor activates the fan, lifting Styrofoam balls

3. The balls spiral upward

4. The balls drop when sensor is deactivated

WU\Xˉ WU\Wˉ

01

ypun ypun

02

ypunGul{G ypun ypunG z|wwvy{ slk mhu

~puk hkq|z{GG jhw ~pukGihzlGz|wwvy{G zohkpunGkl}pjl mpzopunG~pyl

mhuGz|wwvy{

} }hrG{|ipun

03 04 INSTALLATION

43


05 EXPLODED DIAGRAM

44


06 CONCEPTUAL RENDERING

C

E D C

1

6

2

7

3

8

4

9

5

10

F

B A

D

E A

B

A

B

C

D

E

F

F

07 COMPONENTS: ACRYLIC WINGS

08 COMPONENTS: CARDBOARD BASE 45


Hanging Temple 0.5mm fineliner 308mm x 219mm June 2012 46


Jinci Temple 0.5mm fineliner 308mm x 219mm June 2012 47


48


tae hoon kim Ryerson University Department of Architectural Science 25 Scrivener Sq. #204 Toronto, ON CA M4W 3Y6 T. 647.389.6028 E. taehoon-kim@hotmail.com

49


50


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.