Vendor
: Hitachi
Exam Code : HH0-230
Version: Free Demo
IT Certification Guaranteed, The Easy Way!
Cheat-Test.us - The Worldwide Renowned IT Certification Material Provider! The safer, easier way to help you pass any IT Certification exams.
We provide high quality IT Certification exams practice questions and answers (Q&A). Especially Cisco, Microsoft, HP, IBM, Oracle, CompTIA, Adobe, Apple, Citrix, EMC, Isaca, Avaya, SAP and so on. And help you pass an IT Certification exams at the first try.
Cheat-Test product Features: •
Verified Answers Researched by Industry Experts
•
Questions updated on regular basis
•
Like actual certification exams our product is in multiple-choice questions (MCQs).
•
Our questions and answers are backed by our GUARANTEE.
7x24 online customer service: support@cheat-test.us
Click Here to get more Free Cheat-Test Certification exams!
http://www.Cheat-Test.us
Q: 1 Which three files are created when executing the Blade Symphony Test Program? (Choose three.) A. current hardware configuration B. BSTP test log C. Fiber Channel log dump D. HVM configuration file E. SVP log file Answer: A,B,C Q: 2 You are configuring an HVM partition in a Hitachi Compute Blade system. Which type of Fibre Channel WWNs must be used? A. Virtual WWN B. Original WWN C. Additional WWN D. Extended WWN Answer: A Q: 3 You have an LPAR environment on a physical partition and need to verify the logical partition configurations. Which three tools will provide the required information? (Choose three.) A. server blade Web console B. BSMS C. HVM Navigator D. HVM screen E. Remote Console Answer: B,C,D Q: 4 For maintenance reasons you must power down a Hitachi CB 2000 server blade installed in the fourth slot from the left of the chassis. Which three CB 2000 consoles will accomplish this task? (Choose three.) A. chassis management Web console B. management Web console for blade 4 C. management Web console for blade 3 D. remote console for blade 3 E. remote console for blade 4 Answer: A,C,D Q: 5 You are configuring the N+M Cold Standby feature on a Hitachi CB 2000 platform. Which three logical steps are required? (Choose three.) A. Set the server blade for preconfigure mode. B. Enable the N+M Cold Standby support function. C. Set the management module to basic mode. D. Configure the BSMS Plus N+M server pools. E. Set up the IP addresses on the LAN. Answer: A,B,D
Q: 6 Your customer has five applications to run in a Hitachi Blade server. The application "xyz" uses three CPU cores at all times. The other applications need the remaining five CPU cores. Which two configurations satisfy the requirement? (Choose two.) A. Five dedicated CPU cores for application xyz B. Threededicated CPU cores for application xyz C. Shared CPU cores for all applications D. Shared CPU cores for all applications except application xyz Answer: B,D Q: 7 Which two parameters are configured with the Hitachi CB 2000 blade management Web console? (Choose two.) A. Partition Settings B. Server Reductions C. AC Recovery D. KVM Mouse Control Answer: B,D Q: 8 You have a Hitachi CB 2000 platform with four blades. Each blade has one Gbps mezzanine card in slot 0 and a Hitachi 4-port FC card in slot 1. Which switch bay is used for the first onboard 1 Gbps interface? A. switch bay 0 B. switch bay 1 C. switch bay 2 D. switch bay 3 Answer: A Q: 9 How many internal hard drives are supported by the Hitachi CB 500 platform blades? A. Twohot swappable 2.5" HDDs B. Threehot swappable 2.5" HDDs C. Fourhot swappable 2.5" HDDs D. Sixhot swappable 2.5" HDDs Answer: A Q: 10 Which two devices are shareable among LPARS on Hitachi Compute platforms? (Choose two.) A. Emulex FC mezzanine B. onboard 1 GB Ethernet card C. FusionIO PCIe card D. Hitachi FC mezzanine Answer: B,D