Tanner Ulrich 2022 Portfolio

Page 1

TANNER ULRICH Portfolio

02

TREEHOUSE OF LIFE

CONTENTS

KEYS ON THE QUAY

WATERFORD WALLS DESIGN COMPETITION

VOILÀ (BY SOBEYS) METHOD ARCHITECTS

GREAT LAKES ACOUSTIC PANEL SKETCH SERIES

PHOTOGRAPHY

CURRICULUM VITAE

02 03 01 05 06
04 03
07 08

TREEHOUSE

CONCEPT DEVELOPMENT

For Architectural Studio 5’s - ‘The Old and the New’ students are asked to make proposal for a Creche and Afterschool Centre at the site of the old town hall in the town of Templemore, Ireland. Due to its location in the main square, it stands as the most prominent building in Templemore and its most architecturally significant. On August 16th, 1920, the then market house was set on fire by British forces leaving the building substantially destroyed with only two remaining original parts of the building at the East and West.

The Treehouse of Life aims to revitalize the historic and neglected town square. The goal of the concept is to promote a green future through sustainable advantages and by utilizing a diversified approach to encourage positive engagement among peers. This includes a specialized curriculum in youth horticulture and the interactive playrooms which act as branches that stem from a central circulation core and can be pushed, pulled, and rotated by students.

OF LIFE Location: Templemore, Ireland Year: Fall 2017 Course: ARCH 0018 // Architectural Studio 5 Role: Individual Studio Project
Demo Existing Demolish 1920’s addition and conserve original 19th century structures at East and West ends Rejuvenate Maximize green space in town square Revitalize Introduce specialized horticulture program Restore Commence restoration of town square by transplanting trees grown in specialized program Site Plan Highlighting existing green space and extent of town square
04 01
Classroom
Concept Conceptual Cross Section
1:100 Study
Model South-West View
1:100
Final Presentation Model
Playroom “Boxes”
and Rooftop Garden
1:100 Final
Presentation Model
05 After
School Hangout
1:50 Design Development Model DESIGN DEVELOPMENT // MODEL STUDIES

Front (South) Elevation

Rear (North) Elevation

Ground Floor Second Floor Third Floor 06 Tanner Ulrich Portfolio
Playroom “Boxes” Visualization
07
Treehouse
of Life

KEYS ON THE QUAY

As you enter the site to the South, you must immediately change direction from the sudden turn in the street. This is the result of the clear obstruction created by the site’s current function as a parking lot. Alternatively, North of the site is home to a Cork City hidden gem, where a large portion of stone wall that extends down the street, is beautifully dressed in an ever-changing collage created by local street artists at battle. These major factors informed the basis of my scheme in response to the site’s unique challenges.

The building’s overall form now suggests a much more inviting approach with the aim at bringing pedestrian traffic into the site, and guiding them past an outdoor performance space at the river. The idea behind the project draws inspiration from the beauty and organic nature of harmonic curves, and how that could be expressed in the material form of a building. Guests experience the journey through an unimaginable and uniquely curious space where floors, walls, and ceilings become one.

SITE ANALYSIS AND RESPONSE

Walkability

Performance Space

For Architectural Studio 6’s - “The Building in Context” students are asked to make proposals for a facility for the assembly, display, and sale of pianos on a complex site in the centre of Cork City, Ireland.
Location: Cork, Ireland Year: Winter 2018 Course: ARCH 0019 // Architectural Studio 6 Role: Individual Studio Project 02
Site Plan Highlighting site views and traffic levels Raise building to allow free flow of pedestrian traffic through site to reduce obstruction created by new development Open Views Open facade to distant views from South Gate Bridge to the East and high views from Fort Elizabeth to the South River Lee Cantilever over river to extend site and further emphasize site views Strengthen community by lowering cantilever at river to form outdoor performance space
08
MODEL // SPACE STUDIES 09
Pedestrian Underpass Design Exploration Space Design Exploration Pedestrian Underpass Visualizations 1:100 Study Model Stair Design Exploration Pedestrian Underpass 1:100 Study Model
10 Tanner Ulrich Portfolio
Ground Floor East // West Section
Second
Floor
Third
Floor
Fourth
Floor North // South Section
11 Keys on the Quay
Assembly Studies
12
Tanner Ulrich Portfolio Workshop Visualization
13
Keys on the Quay Showroom Visualization

“...Waterford Walls is an international street art festival that transforms Waterford City into an open-air gallery, founded in 2015 by a small team looking to bring some much-needed colour back to the city, the project is now in its fifth year and is continuing to make Waterford an essential cultural attraction and international go-to street art destination...”

Entrants were asked to design a facility to function as the headquarters for the staff, volunteers, and artists involved on a day-to-day basis with Waterford Walls and with the annual festival run by the organization every August.

The clients stressed the need for a design that would attract pedestrians passing by as they believed the current design at the exterior felt closed off and unwelcoming. This inspired me to propose removing the existing ground floor and unused basement to truly create an entrance that pops out. My proposal was chosen as the winning design in the competition.

03
First Place Design Location: Waterford, Ireland Year: Winter 2018 Course: ARCH 0019 // Architectural Studio 6 Role: Individual Studio Project Duration: 2 Weeks WATERFORD WALLS DESIGN COMPETITION 14 Entry Example 1 ANNUAL COMPETITION Entry Example 2 Main Entrance Visualization
15
Meeting Room Visualization Ground Floor Second Floor Third Floor Artist Studio Visualization Cross Section

SOBEYS)

Role: Overall design of each spoke facility, all drawing production from sketch design stage to working drawings, all contract administrative work, and coordination with in-house team and other Consultants.Allworkshownwasdonebymyselfundertheguidance of the Principal Architect. Additionally, I am leading the team as we rebrandtoMETHODArchitects(logodesign,standards,etc.)

Location: Showcasing Burlington & Scarborough Spokes Year: 2021 - Present Type: Professional
04 VOILÀ (BY
METHOD ARCHITECTS 16 Design Iterations Meeting Room Visualization
Entry Foyer Visualization

CROSS-BRACE FEATURE

What’s

T/O F.F.E. (106.75) 0' 0" A WOOD PANEL, FIBERBOARD, 19mm MEDIUM DENSITY (MINIMUM DENSITY OF 770kg/m RECOVERED BY A PLASTIC LAMINATE SHEET (REGULAR GRADE, 1.15mm THICK) (COLOR: NEW WHITE (7223C-58)), (MATTE FINISH FORMICA) (FINISH ALL EXPOSED EDGES) PLASTIC HOMOGENOUS COMPOSITE PANELS, 12mm HOMOGENOUS, NONPOROUS PANEL OF DENSE METHYL METHACRYLATE MINERAL FILLER, SMOOTH FINISH, STAIN RESISTANT "CORIAN" BY DUPONT CANADA INC. (COLOR: GLACIER WHITE OF CORIAN) WOOD PANEL, FIBERBOARD, 19mm MEDIUM DENSITY (MINIMUM DENSITY OF 770kg/m RECOVERED BY A PLASTIC LAMINATE SHEET (REGULAR GRADE, 1.15mm THICK) (COLOR: NEW WHITE (7223C-58)), (MATTE FINISH FORMICA) CAULK AT ALL VISIBLE JOINTS TYP. WELD ANGLE ALL AROUND TO HSS GIRT (BEYOND (REFER TO STRUC.) 1/2" 1/2" 1/4" @ +/-34.75" -37.5" O.C. WELDED TO H.S.S. GIRT CROSS BRACE (REFER TO STRUCTURAL) G.C TO SITE VERIFY CROSS BRACE LOCATION AND SPACE ANGLES AS REQUIRED TO LINE UP WITH CURTAIN WALL GLAZING. HSS GIRT (REFER TO STRUC.) 474mm x 80mm BASEBOARD HEATER DIFFUSER GRILL BEYOND BY 'RICHELIEU' (TYP.) LEAVE CAVITY @ U/S OF COUNTER TO ALLOW PROPER VENTILATION; REFER TO ELECTRICAL AND 1/A630 FOR PLACEMENT W1 CW1 T/O MASONRY SILL 3' 0" 3'-0 7/8" PAINTED CROSS BRACE THAT SPANS FROM GRIDLINE 4 TO COORDINATE ALL ELECTRICAL AND MILLWORK REQUIREMENTS WITH STRUCTURAL TO ENSURE NO INTERFERENCE FROM INTERIOR FACE OF EXT. WALL 3'-0" FDN. WALL 1'-5" GLAZING 1'-3" MASONRY 1'-5 1/2" 2" RIGID INSULATION AT U/S OF SLAB CAULK AT ALL VISIBLE JOINTS TYP. BASEBOARD HEATER (REFER TO ELECTRICAL) 4 3/4" 10 13/16" DUAL RECEPTACLE FLIP-UP UNIT WITH USB BY 'LEGRAND'. CENTRE WITH ELECTRICAL CHASE BELOW; REFER TO ELECTRICAL 1/4" 4 3/4" 1'-1" ELECTRICAL CHASE BUILT-OUT WITH METAL STUDS @ 16" O.C. FINISH WITH FIBREBOARD PLASTIC LAMINATE SHEET TO MATCH; SEE ELECTRICAL EXTENT OF ELECTRICAL CHASE BEYOND; ENSURE ADEQUATE SPACE FOR CONDUIT AROUND CROSS BEAMS FROM FACE OF FRAME 3'-3" ℄ ELECTRICAL CONDUIT CAVITY +/- 3/4" PROVIDE BLOCKING AS REQ'D TO FASTEN FIBREBOARD P.LAM TO U/S OF COUNTERTOP FOR SMOOTH/SEAMLESS TRANSITION ℄ 1'-1 5/8" POLY VAPOUR BARRIER PREFORMED FLASHING CONTINUOUS PEEL & STICK AIR/WATER BARRIER (VAPOUR PERMEABLE) UP AND OVER PREFORMED FLASHING JUNCTION BOX. PROVIDE 1/2" PLYWOOD OR SIMILAR BACKING TO ENSURE JUNCTION BOX CAN BE PROPERLY MOUNTED; REFER TO ELECTRICAL PROVIDE MIN. 6" FLIP COVERS TO ENSURE EASE OF ACCESS AT ALL TABLE BOXES AND JUNCTION BOXES; SEE 1/A630 1'-2 1/4" 11 3/4" 1/2" 1/2" 4 5/8" 2' 7 1/2" T/O F.F.E. (106.75) 46 U/S CEILING 12' A200A500 A200A500 A500A630 T/O MASONRY SILL BASEBOARD HEATER BELOW (REFER TO ELEC.) PAINTED CROSS BRACE THAT SPANS FROM GRIDLINE TO COORDINATE ALL ELECTRICAL AND MILLWORK REQUIREMENTS WITH STRUCTURAL TO ENSURE NO INTERFERENCE BASEBOARD HEATER BELOW (REFER TO ELEC.) 1/2" 1/2" 1/4" @ +/ WELDED TO H.S.S. GIRT CROSS BRACE (REFER TO STRUCTURAL) G.C TO SITE VERIFY CROSS BRACE LOCATION AND SPACE ANGLES REQUIRED TO LINE UP WITH CURTAIN WALL GLAZING. ELECTRICAL CHASE BUILT OUT WITH METAL STUDS @ 16" O.C. FINISH WITH FIBREBOARD AND PLASTIC HOMOGENOUS COMPOSITE PANELS TO MATCH COUNTERTOP (SEE 2/A630). EXTRUDE CHASE AS REQUIRED CROSS BEAMS 8" ELSEWHERE; ELEC. CHASE CHASE 1'-4" 1'-4 3/4" 3'-0 3/4" 8'-10" 1'-4 3/4" 1'-0" 1'-4 3/4" 8'-9" 3'-0 3/4" 2'-5" 1/2" INCOMING POWER THRU SLAB SEE ELECTRICAL ELECTRICAL CHASE ELECTRICAL CHASE BUILT OVER CROSSBRACE; 3/4" 10 13/16" DUAL RECEPTACLE FLIP UP UNIT WITH USB BY 'LEGRAND'. CENTRE WITH ELECTRICAL CHASE BELOW; REFER TO ELECTRICAL 474mm 80mm DIFFUSER GRILL BY 'RICHELIEU' 1/2" 1/2" 1/4" WELDED TO H.S.S. GIRT CROSS BRACE (REFER TO STRUCTURAL) G.C TO SITE VERIFY CROSS BRACE LOCATION AND SPACE ANGLES AS REQUIRED TO LINE UP WITH CURTAIN WALL GLAZING. 3/4" 10 13/16" FLIP UP UNIT WITH USB BY 'LEGRAND'. CENTRE WITH ELECTRICAL CHASE BELOW; REFER TO ELECTRICAL 474mm 80mm DIFFUSER GRILL BY 'RICHELIEU' 1/2" 1/2" 1/4" +/ WELDED TO H.S.S. GIRT CROSS BRACE (REFER TO STRUCTURAL) G.C TO SITE VERIFY CROSS BRACE LOCATION AND SPACE ANGLES AS REQUIRED TO LINE WITH CURTAIN WALL GLAZING. 3/4" 10 13/16" FLIP UP UNIT WITH USB BY 'LEGRAND'. CENTRE WITH ELECTRICAL CHASE BELOW; REFER TO ELECTRICAL 474mm 80mm DIFFUSER GRILL 'RICHELIEU' CHANGE CHASE DEPTH;ELEC. ELEC. FLIP COVER; 2/A630 FLIP COVER; SEE 2/A630 FLIP COVER; SEE 2/A630 FLIP COVER; SEE 2/A630 SUBMIT SHOP DRAWINGS FOR ALL ITEMS EACH SIDE TO HAVE UNIQUE CENTRE TO ABLE TO CORRESPOND WITH AND BE CENTRED BASED ON THE CROSS BEAM INTERSECTION WHILE AVOIDING SMALL SECTION OF SEE A701 FOR MORE INFORMATION 4 6 12'-0" 9'-0" 3'-0"℄ OF CROSS BEAM; GC TO SITE VERIFY ℄ EQ-2 EQ-2 EQ-3 EQ-3 EQ-3 EQ-3 EQ-1EQ-3 EQ-1 EQ-1 EQ-1 EQ-1 17Elevations
Cross-Brace Visualization
Interior Elevation // Services Coordination
commonly an interference now informs the design
Exterior
Elevation Workstation Millwork Section Detail
Burlington Spoke Visualization

GREAT LAKES

PANEL

The acoustic panel project involves the design and construction of an acoustic panel to be installed inside the Waterford Institute of Technology studios to reduce noise levels. The design draws inspiration from the largest supply of freshwater on the planet, the Great Lakes. Having grown up on Lake Huron, I was fortunate to learn from an early age that living in such an amazing location should not be taken for granted.

The acoustic panel reduces sound transmission by introducing all three main types of absorbers: frictional, flexural, and resonant. The main method of absorption on this panel is through resonant absorption which is generated by allowing sound to travel between the openings in the foam strips, to a large void at the back of the panel. The void is created by lifting each foam strip from the soft fabric at the back by fastening all 48 foam strips with two dowels.

05
Year: Fall 2017 Course: ARCH 0079 // Acoustics in the Built Environment Role: Two Person Collaboration - Design & Build
ACOUSTIC
18
Concept Development Exploded Axometric
19 Side Views Front View

PERSPECTIVE

REALISM DRAWING

06 SKETCH SERIES 20
//
Samples from various works completed (2011-2017) Graphite // Colour Pencil

EUROPE FIELD SKETCHING

St. Peter’s Basilica - The Vatican, Rome, Italy Ink // Marker Neuschwanstein Castle - Bavaria, Germany Ink // Watercolour The Parthenon Athens, Greece Ink // Watercolour St. Peter’s Basilica InteriorThe Vatican, Rome, Italy Ink // Marker
21
From travels while living abroad in Ireland (2017-2019) The Colosseum Rome, Italy Ink // Marker

NORTH

SKETCHING

22
Tanner
Ulrich Portfolio
AMERICA FIELD
Samples from various works completed (2021-2022)
“Nicest House in Town” Forest, ON, Canada Ink // Watercolour Schiller Park Columbus, OH, United States Ink // Watercolour Backyard Doodling - Forest, ON, Canada Ink // Watercolour Legislative Assembly of Ontario - Queen’s Park, Toronto, ON, Canada Ink // Watercolour
23 Sketch Series
Conservation Area - Forest, ON, Canada Ink // Watercolour Wind Turbines of South-Western Ontario - Middlesex County, ON, Canada Ink // Watercolour Trinity Bellwoods Park - Toronto, ON, Canada Ink // Watercolour Bluewater Bridge - Sarnia, ON, Canada // Port Huron, MI, USA Ink // Watercolour

PHOTOGRAPHY 07

24
25
Mary Street
Canon AT-1 // 50mm f/4 // Ilford XP2 Super 400
26
Tanner
Ulrich
Portfolio
Black & White Wedding Canon AT-1 // 50mm f/1.8 // Ilford XP2 Super 400
27 Photography Golden Hour Canon AT-1 // 50mm f/4 // Portra 800

08

CURRICULUM VITAE

28
29

YOU tannerulrich5@hotmail.com

THANK

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.