1
2
3
4
ROOF
SCHOOL OF ARCHITECTURE ARCHITECTURE 342: BUILDING TECHNOLOGY III CONSULTANTS:
SALUKI ENGINEERING, INC. CARBONDALE, ILLINOIS
C
MIDWEST MECHANICAL ENGINEERS
SKIN
MARION, ILLINOIS
SKIN NATIONAL FIRE PROTECTION, LLC CARBONDALE, ILLINOIS
SERVICE
SOUTHERN CONSULTING, INC. MT. VERNON, ILLINOIS
B
Project Name ACCESS Enter address here
FRAME STUDENT:
TAYLOR POMAHATCH
A
ACCESS
SKIN
Project Number Author Checker
PROJECT MANAGER: PROJECT ARCHITECT:
COPYRIGHT: BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY SHEET TITLE
BIM EXPLOSION BASE
2/4/2016 4:24:44 PM
CREATED FOR EDUCATIONAL USE ONLY.
SKIN
PROJECT NO: DRAWN BY: CHECKED BY:
A901 SHEET
1
2
3
4
OF
1
2
1
2
3
3
4
4
5
6
1 30 mm Spray On Fire Proofing 2 Hour Fire Rated 32 mm GWB on 92 mm Metal Stud Layer on 2 Hour Fire Raited 32 mm GWB Steel Column 12 mm for Column Torrance
45850
R.O.
2 A101
2 A101
24
580
L
2 A401
16
9
10
8980
3 A301
9580
310
E Break Room 16
Women's Restroom 13
5 A101
18
27
Area of Refuge
5 A101
17
28
1 A301
UP
5710
8
4580
5 A101
420
2020
29
REF.DW
2800
31
2
32 B.F.
6610
6500
B.F.
18
5 A101
Vault 19
5 A101
3. Teller Counter
7 A101
K
3 A101
35
Loan Office
Loan Office
4
4000
38
1330
480
7920 8980 R.O.
9000
37
1520
1520
1520
R.O.
R.O.
R.O.
Comm. Room
1
2
H
1520
1520
R.O.
R.O.
1350
3420
880
330
R.O.
3300
390
5
Column Detail 4 1 : 20
2 9000
9000
420
380
45850
First Floor Plan 1 : 100
710
G
3 mm Aluminum Composite on 20 mm Air Gap on 50 mm Rigid Insulation on 2 mm Air Retarder on 13 mm Plywood Sheathing on 150 mm Metal Stud Layer with Batt Insulation on 12 mm GWB 2 Hour Fire Rated 32 mm GWB on 92 mm Metal Stud Layer on 2 Hour Fire Raited 32 mm GWB
Outline of Beam Fire Protection CREATED FOR EDUCATIONAL USE ONLY.
330
General Notes:
280
Column Detail 5 6 1 : 20
1. All dimensions in millimeters unless otherwise noted 2. Interior wall dimensions taken to face of studs 3. All door returns are 100 millimeters unless otherwise noted in dimensions 4. All bathrooms, elevators, and stairs are dimensioned on their corresponding detail sheet
Project Number Author Checker
PROJECT MANAGER: PROJECT ARCHITECT:
COPYRIGHT:
300
2/25/2016 5:39:23 PM
PROJECT NO: DRAWN BY: CHECKED BY:
295 mm Concrete Wall 30 mm Spray On Fire Proofing
BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY SHEET TITLE
Steel Column
J 550
7 3
4
Plan Sheet
180
1. ATM 2. Customer Reception Desk 3. Teller Counter 4. Drinking Fountain
2
Steel Column 12 mm for Column Torrance Light Weight Steel Stud
6
Sheet Keynotes:
1
A
Rain Leader 30 mm Spray On Fire Proofing
330
1
Taylor Pomahatch
R.O.
R.O.
9000
STUDENT:
Steel Column
720
R.O.
9000
Southern Illinois University Carbondale
12 mm for Column Torrance Light Weight Steel Stud
4400
36
30 mm Spray On Fire Proofing 2 Hour Fire Rated 32 mm GWB on 92 mm Metal Stud Layer on 2 Hour Fire Raited 32 mm GWB
330
3 A101
Conference Room
4430
3 A101
B
3 A101
3 A101
3 A101 3 A101
3
4
2
MT. VERNON, ILLINOIS
660
5
3
SOUTHERN CONSULTING, INC.
Plan Sheet
330
4
CARBONDALE, ILLINOIS
5
2500
2
1. ATM
NATIONAL FIRE PROTECTION, LLC
Column Detail 3 1 : 20
410 840
Lease Space
2. Customer Reception Desk
8430
2 A101
E
A
34
5760
5 10810
4000
F C.1
6180
1 1
D C
2700
6 A101
B.F.
560
5 A101
6
G
9620
5 A101
R.O.
8450
4
R.O.
5270
MARION, ILLINOIS
B
4000
B.F.
20
2300
2 A301
330 730
6500
Dashed Lines Indicate Atrium Above
MIDWEST MECHANICAL ENGINEERS
3 mm Aluminum Composite on 20 mm Air Gap on 50 mm Rigid Insulation on 2 mm Air Retarder on 13 mm Plywood Sheathing on 150 mm Metal Stud Layer with Batt Insulation on 12 mm GWB
1220
6 4320 A101
33 5930
R.O.
1830 2810
6500
7
2 A101
Loan Office
21
C
Steel Column 12 mm for Column Torrance Light Weight Steel Stud
360
Lobby
8
CARBONDALE, ILLINOIS
30 mm Spray On Fire Proofing 2 Hour Fire Rated 32 mm GWB on 92 mm Metal Stud Layer on 2 Hour Fire Raited 32 mm GWB
1020
6
SALUKI ENGINEERING, INC.
700
4560
Teller Counter
5 A101
Women's Restroom
H
5
CONSULTANTS:
370
2 A101
B.F.
Plumbing and AHU Shaft 4. Drinking Fountain
10780
2 A101
Baby Station
Hand Dryer
Column Detail 2 1 : 20
330
5 A101
9 1 A401
4420
7 A101
3
22
11
1320
40
R.O
10
6 A101
5 A101
2180
4300
1990 910
Area of Refuge
6500
34910
B.F.
17
30830
3 A401
Electrical Shaft
Bookkeeping
R.O.
12
30
5460
11
5780
Teller Privacy
12
J
21
Janitor's Closet
Baby Station
6 A101
2 A101
Exterior Aluminum Composite Wall Connection to CUrtain Wall 3 mm Aluminum Composite on 20 mm Air Gap on 50 mm Rigid Insulation on 2 mm Air Retarder on 13 mm Plywood Sheathing on 150 mm Metal Stud Layer with Batt Insulation on 12 mm GWB
6500
7
2 Hour Fire Rated 32 mm GWB on 92 mm Metal Stud Layer on 2 Hour Fire Raited 32 mm GWB 30 mm Spray On Fire Proofing Steel Column 12 mm for Column Torrance Light Weight Steel Stud
440
Men's Restroom
2860
R.O.
1830
13
1940
6500
20 Hand Dryer
SCHOOL OF ARCHITECTURE ARCHITECTURE 342: BUILDING TECHNOLOGY III
B
6150
25 3
14
Column Detail 1 1 : 20
3 A101
26
6560
23
2
2
19
4430
330
280
1920
15
Electrical
Light Weight Steel Stud 3 mm Aluminum Composite on 20 mm Air Gap on 50 mm Rigid Insulation on 2 mm Air Retarder on 13 mm Plywood Sheathing on 150 mm Metal Stud Layer with Batt Insulation on 12 mm GWB
670
740
K
AHU
15
3440
4 A101
2 A101
Lease Space 8640
7330
6500
14
340
1580
Men's Restroom
1480
B.F.
F
3 A101
Storage B.F.
610
2 A101
420
310
3 A101
13060
550
R.O.
3 A101
910
330
22900
9000
6500
7200
9000
R.O.
9000
870
1350
9000
580
9000
Column Detail 6 1 : 20
3 mm Aluminum Composite on 20 mm Air Gap on 50 mm Rigid Insulation on 2 mm Air Retarder on 13 mm Plywood Sheathing on 150 mm Metal Stud Layer with Batt Insulation on 12 mm GWB
A101 SHEET
OF
1
2
1 A501
1
1
6 Stories @ 26820 9000 mm to column 2
T.O. Flat Roof 35100
17
2
Roof 26500
019
3
3
020 021 Thyssen and Krupp Elevator
009
A403
3060
009 004
1
3
1 1 014
560
004
004
003
300
2080
7
R.O.
5
710
2
A403
3
1170
3
650
6
8
J
3.5
6
1
2
530
1260 3020
1260
30
B 16
560
Egress and Elevators
15
720
First Floor Stair Plan 1 1 : 50
1
2
Southern Illinois University Carbondale
11 T @ 280 =3070 3
014
1 51 STUDENT: 50 70
UP
370
Taylor Pomahatch
6 15 16
3
13
4 A403 13
015 005
003
004
12
003
12 T @ 280 =3360
H
009 003
3 940
4640
013
Reference Keynotes: 001: Compacted soil 002: Compacted gravel 003: Structural concrete 004: Structural steel 005: Steel angle 006: C channel 007: Gap for deflection 008: C stud 009: Spray on fire proofing 010: 100 mm perforated drainage pipe 011: Liner panel 012: Steel hanger rod 013: 10 mm anchor bolt 014: 2 Hour fire rated walls 015: Steel nosing 016: Pour stop 017: Fire stop 018: Water stop 019: EPS styrofoam insulation 020: Water proofing 021: Vapor barrier 022: Steel cantilever
Basement -4300
002
4090 8280
A
720
7
Basement Stair Plan 5 1 : 50
First Floor Elevator Plan 4 1 : 50
Elevator Shaft Back Wall 1 : 10
3270
8450
9790
Sheet Notes: 1. Partially recessed fire extinguisher 2. 2-Way communication phone 3. Sump Pump 4. Elevator Mechanical Equipment 5. Elevator Car 6. Elevator guardrail 7. Elevator door 8. Elevator bumper 9. Steel cables 10. Hoist mechanism 11. Service ladder 12. Area of refuge 13. Steel pan stairs 14. 26K6 K Joist Series 15. Handrail @ 914 mm 16. Guardrails @ 1070 mm 17. Green Roof
140
9580
Stair Section 1 : 50
General Sheet Notes: 1. Drawings not to scale. 2. All dimensions in millimeters unless otherwise noted. 3. Exterior wall dimensions to face of masonry. 4. Interior wall dimensions to face of stud. 5. Openings in wall are M.O. or R.O. as appropriate. 6. All door returns are 100 mm unless otherwise noted or dimesioned. 7. All manuel fire alarm boxes 304 mm from exit doors unless otherwise noted or dimensioned. 8. All handrails are 914 mm AFF unless otherwise noted or dimensioned. 9. All guardrails are 107 mm AFF unless otherwise noted or dimensioned. 10. Flat roof is no less than 2% grade
12
B.O. Beam
B.O. Stair 1 : 10 PROJECT NO: DRAWN BY: CHECKED BY:
See plan for tread dims
Second Floor 5000 015 016 006 009 004
012 005 015
006
PROJECT ARCHITECT:
016
T.O. Beam -200 mm
BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY SHEET TITLE
004
009
Egress and Elevators
009 13 100
13
Intermediate Stair 1 : 10
PROJECT MANAGER:
COPYRIGHT:
016
13
9
8
B.O. Beam
Hanger Rod 1 : 10
10
T.O. Stair 1 : 10
A403 SHEET
3
Project Number Author Checker
200
2080
CREATED FOR EDUCATIONAL USE ONLY. 3/29/2016 3:25:41 PM
15 T @ 280 =4200
5450
See section for riser dims
Elevator Section 2 1 : 50
4
009
790
4
3040
1
560
2980
11
008
20
1840
007
280
Basement -4300
3
6
16
100 50
002 003
300
004 009
H
12 R @ 172 = 2064
15
1
MT. VERNON, ILLINOIS
15
004
4300
16
2060
1860
7 A403
001 018 010
UP
1260
13
Basement -4300
11
A403
13 R @ 172 = 2236
2240
012
SOUTHERN CONSULTING, INC.
13
4
3020
3530
R.O.
7
2130
2
009
5
First Floor 0
022
T.O. Beam -200 mm
7000
5940
3
1
5 004
CARBONDALE, ILLINOIS
100 50 70 50
1
15
NATIONAL FIRE PROTECTION, LLC
9010
500
16
9
016
1260
9 A403
2420
8 A403
First Floor 0
14 T @ 280 =3920
14 R @ 172 = 2408
750
First Floor 0
MIDWEST MECHANICAL ENGINEERS
9
BF
5010
6
C
008
004
10
15 R @ 172 = 2580
2590
13
R.O.
2130
7
004 009
Elevator Shaft Front Wall 1 : 10
MARION, ILLINOIS
3
012
11
12
004 10 A403
CARBONDALE, ILLINOIS
2270 mm to column J
2
Second Floor 5000
10
SALUKI ENGINEERING, INC.
014
3
12900 3 Stories @ 12900
004
13
011
004 009
Floor 5 17900 004
CONSULTANTS:
160
200
Roof 26500
30
3260
2060
1
15
ARCHITECTURE 342: BUILDING TECHNOLOGY III
008
Typical Floor Plan 1 : 50
J
B.O. Beam
470
1
12 R @ 172 = 2064
3570
16
R.O.
2160
7
8500 9530
6
4300
13
007
3750
500
012
2240
004
3
3380
560
13 R @ 172 = 2236
730
Floor 6 22200
12 T @ 280 =3360
004
004
560
Penthouse Roof 30800
1380
46
009
014
15
H
SCHOOL OF ARCHITECTURE
DN
560
R.O.
16
1260
4
530
1260
40
4130
16
7
11 A403
3
15
T.O. Beam -200 mm
3580
500
3020
13
2160
12
004 1
12 A403
First Floor 0
1
1260
004
4370 to next column CL
2180
005
7
270
016
14
4
5
11 T @ 280 =3070
3410
17
4
720
J
3
4
OF
1
2
3
G
F
2
4
022 042 044 043 008 027
CL 6
A303 T.O. Parapet 110
10 A303
410
520
6
011 008 019 004 006 001
026 028 025
6 CL
Extensive Green Roof 26500 022 004 011 002 012
T.O. Beam 240
006 001
1660
Extensive Green Roof 26500
10 200
250
Aluminum Composite at Roof 1 : 10
CL 6
004
450
025 026 028
200
200
008
Sixth Floor 22200 1770
Sixth Floor 22200
250
Sixth Floor 22200
045 003
044 024 007 058
T.O. Beam
014 008 004 011 002 012 057
Beam Lays Behind 006 001 013
025 026 028
Aluminum Composite at Floor 1 : 10
250 200
Window Sill
Second Floor 5000
Second Floor 5000
T.O. Beam
008 004 011 002 012
5010
033 025
520 029 045 024
First Floor 0
180 034
Basement -4300
005
STUDENT:
008 004 011 002 012
003 035 006 001
9
Taylor Pomahatch
Aluminum Composite Connection 1:5
2
052 046 047
PROJECT NO: DRAWN BY: CHECKED BY: PROJECT MANAGER:
Project Number Author Checker
PROJECT ARCHITECT:
COPYRIGHT:
033 033 051 054 053 025
BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY SHEET TITLE
Wall Sections 80
50
90
220 360
055 034 360
Curtain Wall Elevation 1 : 50
033 048
056 009 010 044 016
Foundation Footing 3050 mm
1
056 009 010 008 004 011
059 002 012
20
4060 600
Southern Illinois University Carbondale
40
180 4130
Wall Sections
028 026 050 049
026 028
First Floor 0
Basement -4300
360
CREATED FOR EDUCATIONAL USE ONLY. 4/12/2016 8:34:21 PM
B
A
035 012
1
MT. VERNON, ILLINOIS
024 058
Curtain Wall to Floor 1 : 10
CL 6
008
Curtain Wall Section 1 : 50
SOUTHERN CONSULTING, INC.
CL 6
8 A303
2
CARBONDALE, ILLINOIS
035
7
034 016 015 023 032 027 005 017
NATIONAL FIRE PROTECTION, LLC
057
004 025 026 028
018 008
Second Floor 5000
T.O. Beam
058
006 001
007 055 014 010 013
MARION, ILLINOIS
10
024 007
007
First Floor 0
MIDWEST MECHANICAL ENGINEERS
20 045 003
Beam Lays Behind
004 024 003
C
007
9 A303
035 012
20
20
Second Floor 5000
20 180
008
220
045
200
4290 R.O.
2430
025 026 028
7 A303
026 028 010 056 019 002 020
CARBONDALE, ILLINOIS
CL 6
056 009 010
580
004
014 010 013 006 057 025
SALUKI ENGINEERING, INC.
450
Third Floor 9300
035 013
004 024 003
CONSULTANTS:
60
200
026 028 033 025
057 026 028 010 056 019 002 020
ARCHITECTURE 342: BUILDING TECHNOLOGY III
450
007 001 014
006
SCHOOL OF ARCHITECTURE
6 CL
2 Stories Floor to Floor
Third Floor 9300
8600
024 006 001
2 Stories Head to Sill
Fifth Floor 17900
10470
5
150
R.O.
2470
4300
004
20
006 001 013 057 011 035 026 028 010 056 019 002 020 012 008 004
001: Structural Steel 002: Batt Insulation 003: Composite Metal Decking 004: Alucobond on Exterior Sheathing 005: Cast in Place Concrete 006: Spray on Fire Proofing 007: Fire Stop 008: Rigid Insulation 009: Weep Hole 010: Aluminum Flashing 011: Metal Stud Wall 012: Gypsum Board 013: Suspended Acoustical Ceiling 014: Suspension Wire 015: Water Stop 016: Compacted Gravel 017: Compacted Soil 018: Drainage Mat 019: Air Barrier 020: Vapor Retarder 021: Aluminum Coping 022: Treated Wood Blocking 023: 100 mm Perforated Drainage Pipe 024: Oak Flooring 025: Aluminum Rail 026: Aluminum Mullion 027: Cant Strip 028: Insulated Glass Unit
30
R.O.
2430
10
029: Anchor Bolt 030: K-Series Steel Joist 031: Water Proofing Membrane 032: Compacted Sand 033: Sealant 034: Precast Concrete 035: Plenum Space 036: Root Barrier 037: Protective Membrane 038: Drainage Layer 039: Filter Membrane 040: Substrate - Growing Media 041: Planting 042: Sheet Metal Capping 043: Exterior Sheathing 044: C Stud 045: Pour Stop 046: Exterior Cap 047: Pressure Plate 048: Glazing Cavity 049: Exterior Gasket 050: Glazing Unit 051: Interior Gasket 052: Pressure Plate Screw 053: Thermal Break 054: Frame Cavity 055: Shelf Angle 056: Backerod 057: Fire Safe Insulation Foil 058: Slip Clip 059: Strip Bar with Fastening
40
4300
6
004 024 003 012 007
0 20 5
450
025
026 028 010 056 019 002 020
150 10 50
Reference Notes:
60
Extensive Green Roof 26500
1. Drawing Not to Scale 2. All Dimensions in Millimeters unless otherwise noted
180
021 022 027 041 040 039 038 037 036 008 031 003 001 030 006 014 013
041 040 039 038 037 036 031 008 043 003 055
General Notes:
8
Foundation Wall to Curtain Wall 1 : 10 3
017 018 008
Mullion Connection to Slab - Batten Glazing 1:5
10 4
A303 SHEET
OF
1
2
1
2
4
3
1
4
5
6
1
300
1
3
1960 1960
L
General Notes:
2
LP
1090
2
2
LP
1. Written dimensions govern 2. All dimensions in millimeters unless otherwise noted 3. Green Roof 2% minimum slope 4. All ceiling heights to be 3000 minimum above finshed floor 5. All ceilings are GWB
BF
LP F
1
HP
3
3
3
HP
F
6910 8000
Sheet Keynotes :
K
HP
HP
S
HP
SCHOOL OF ARCHITECTURE
1. Scupper 2. Rood Drain 3. Overflow Drain 4. Stack Vent
D
ARCHITECTURE 342: BUILDING TECHNOLOGY III
F F
F
2
HP
LP
LP
2
HP
001: steel beam 002: batt insulation 003: steel deck 004: aluminum composite 005: exterior sheathing 006: metal stud wall 007: air barrier 008: spray on fire resistance 009: rigid insulation 010: aluminum scupper 011: aluminum drain cover 012: drain pipe to central chase 013: stack vent 014: aluminum coping 015: treated wood blocking 016: k series steel joist 017: roofing membrane 018: overflow drain 019: steel flashing 020: shelf angle 021: root barrier 022: protective membrane 023: drainage layer 024: filter membrane 025: substrate - growing media 026: planting 027: sheet metal capping 028: spray insulation 029: C stud 030: gravel
F
LP 4
3
3
5670 6700
HP
HP
HP S D 4
2
1
HP
LP
930
34960
2
LP
2
HP
BF
LP
D F
3
3
3
S
5370 6300
HP
HP
D F
HP
F
2
HP
1 1140
LP
2
HP
2
LP
3
LP
3
S
G
HP
HP
D
BF
HP
2
HP LP
2
2440
2
NATIONAL FIRE PROTECTION, LLC CARBONDALE, ILLINOIS
SOUTHERN CONSULTING, INC. MT. VERNON, ILLINOIS
Air Return
F D
S D
F
Ceiling Mounted Pendant Sprinkler Globe Fire Sprinkler R=12.5mm
F
S
3
D
3
Southern Illinois University Carbondale
Smoke Detector w/ Audible Device Fire Alarm w/ Visible Light
F 1
STUDENT:
Taylor Pomahatch
Wall Mounted Exit Sign
3
1720
2600
880
LP
MARION, ILLINOIS
Roof Plan and RCP F
2470
LP
E
MIDWEST MECHANICAL ENGINEERS
Air Supply
8260
F
C
B
HP
S
D C.1 C B A
600x600 Light
F
F
1
CARBONDALE, ILLINOIS
3
F
9400
S
F
D
H
BF
S
SALUKI ENGINEERING, INC.
1
014 027 005
1 11800
9000 22680
2
60
CL 6
Penthouse Roof Plan and RCP of First Floor 1 : 100
029 026 025 024 023 022 021
200
Minimum thickness of rigid insulation 50 mm Waterproofing hot-welded
A
019
T.O.Roof Slab
015 110
009
003
120
003 004 006 007 028
016
013
10 200 60
4 1
520
740
150 10 50 250
0 20
002 008 001 005
10
110
2
Project Number Author Checker
PROJECT MANAGER: PROJECT ARCHITECT:
3
COPYRIGHT: BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY SHEET TITLE
Roof Plan and RCP
550
A108
Detail of the Scupper, Roof Drain, and Over Flow 3 1 : 10
Stack Vent 1:5
T.O. Roof Slab 26500
PROJECT NO: DRAWN BY: CHECKED BY:
T.O. Beam
003 028
T.O. Extensive Geen Roof
020
160
005
030 017 009 005 012 390
009
4/19/2016 5:10:58 PM
CREATED FOR EDUCATIONAL USE ONLY.
T.O. Roof Varies 35100
170
018 011
017
T.O. Parapet
010
880
1880
180
300
260
J
D
210
1030
1
Reference Keynotes:
S
3 2
CONSULTANTS:
SHEET
4
OF
DOCK STAIR SECTION SEE 8 ON A-1
8
7
6
7' - 0"
5
1' - 6"
EXTERIOR LOUNGE, RESTROOMS, AND SHOP FOUNDATION WALLS ARE AT ELEVATION 97'-0" FOOTINGS ARE AT ELEVATION 96'-0" AND ARE 1'-0" THICK AND 2'-0" WIDE UNLESS OTHERWISE NOTED
---
SET NO.
20' - 0"
9
25' - 6"
LOADING DOCK CONCRETE SLOPED AWAY FROM BUILDING AT 1/8"
25' - 0"
1' - 8" 4" THICK 8'X26' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING FROST WALLS ARE 8" THICK AND 3' DEEP
-
B
15' - 4"
67' - 7 5/8"
06.13.15
1' - 4"
37' - 0 3/8"
11' - 4"
14' - 4 3/8"
IN REVISION & DATE
AC
9 5/8"
A-1 DN
52' - 0"
B
DOCK LEVELER SECTION SEE 1 ON A-1
8
25' - 0"
DATE
A
14
15' - 0"
25' - 0"
TYPE B CORNER PIERS ARE 3'-6" X 3'-6" X 2'-0
3' - 0"
1 A-1
3
1' - 0"
2
2' - 0"
1
4" THICK 8'X7' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING FROST WALLS ARE 8" THICK AND 3' DEEP
A-1 04
03
02 1' THICK AND 1'-4" WIDE THICKENED SLAB UNDER ALL INTERIOR BASEMENT WALLS
EL. 87'-8"
3
89' 90' 91'92'93' 94'95'96'
4
A-5
53' - 4 3/8"
2' - 0"
9 5/8"
C
ENLARGED DOCK PLAN 1/4" = 1'-0"
C
6" 3 5/8"
DEPTH
3' - 6" 3' - 9" 3' - 6" 3' - 9" 4' - 0" 3' - 9" 3' - 9" 4' - 0" 3' - 9" 3' - 6" 3' - 9" 3' - 6"
2' - 0" 2' - 6" 2' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 0" 2' - 6" 2' - 0"
ELEVATION 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 87' - 8" 82' - 10" 87' - 8"
REINFORCING 4 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR 5 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR 5 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR 4 - #4 REBAR
01 1' - 6"
19' - 2" B
D
A
A-1
1' - 0" A-1
C DOOR POCKET ELEVATION 99'-4"
EL. 87'-8"89'90'91'92'93'94'95'96'
ELEVATION 82'-10" 9' - 10"
1
THE ELEVATOR B.O. FOOTINGS ARE AT ELEVATION 82'-10" THE B.O. FOUNDATION WALLS AROUND THE ELEVATOR ARE AT ELEVATION 83'-8" - THE FOOTINGS ARE 10" THICK AND 1'-8" WIDE 4 STEP FOOTINGS ON BOTH SIDES OF ELEVATOR AND FROM THE EGRESS STAIRWAY TO THE ELEVATOR LEADING FROM ELEVATION 87'-8" TO 83'-8" - 1' RISE TO 2' RUN
EL. 82'-10" 83'-8" 84-'8" 85'-8" EL. 86'-8" C
A-5
2'
EL. 95' 94' 93' 92'
2' 2' 2'
4 STEP FOOTINGS FROM B.O. DOOR POCKET SHOP FOOTING AT ELEVATION 96' ELEVATION 99'-4" TO RETAINING WALL FOOTING AT ELEVATION 92' - RISE 1' TO RUN 2'
2' 2' 2' 2'
EL. 95' 94' 93' 92'
STAIR SECTION DETAIL SEE 8 ON A-1
4" THICK 8'-9"X36'-8" CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING FROST WALLS ARE 8" THICK AND 3' DEEP ENLARGED DOCK PLAN SEE ON A-1
4 STEP FOOTINGS FROM B.O. SHOP FOOTING AT ELEVATION 96' TO RETAINING WALL FOOTING AT ELEVATION 92' - RISE 1' TO RUN 2'
DOCK LEVELER SECTION SEE 1 ON A-1
B
2' 2' 2' 2'
2' 2' 2' 2'
52' - 0"
4" THICK 8'X7' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING - FROST WALLS ARE 8" THICK AND 3' DEEP
3
103' - 8"
2' 2' 2' 2' 2' 2' 2' 2' 2'
2' 2' 2' 2'
3' - 0"
3' - 6" 3' - 9" 3' - 6" 3' - 9" 4' - 0" 3' - 9" 3' - 9" 4' - 0" 3' - 9" 3' - 6" 3' - 9" 3' - 6"
WIDTH
25' - 0"
B C B C A C C A C B C B
LENGTH
25' - 0"
A1 A2 A3 B1 B2 B3 C1 C2 C3 D1 D2 D3
TYPE
9 5/8"
8
4" WIDE LEDGE FOR WAFFLE SLAB TO SIT ON AT ELEVATION 98' 6" LEDGE IS AT ELEVATION 100' EL. 86'-8"85'-8"84-'8" 83'-8"
COLUMN FOOTING SCHEDULE GRID REFERENCE
50' - 4 3/4"
JOB NO: 1
EDGE OF ROOF OVERHANG
STEP FOOTING - FIRST ONE ONLY IS 1'-2" RISE TO 2'-0" RUN
36' - 8"
40' - 0"
2
STEP FOOTING
28' - 0"
156' - 8"
A-5
92' 93'94'EL. 95'
FOUNDATION PLAN 1/8" = 1'-0"
7 5/8" CONCRETE SLAB IN SHOP
5"
1' - 4"
1-1/2" CIRCULAR STEEL PIPE HAND RAIL CONNECTED TO PIPE GUARDRAIL 3' - 11 1/2"
3' - 11 1/2"
FIRST FLOOR PLAN 100' - 0"
FIRST FLOOR PLAN 100' - 0"
4"
4' WIDE STAIR 3" 1 9/16"
#4 REBAR AT 24" O.C 8"
9
THICKENED SLAB A 3/4" = 1'-0"
A-1
8
11 5/8"
4"
4"
CONCRETE SLAB IN LOUNGE
2' - 0"
4" WEEP HOLES 4' O.C.
10
DOCK STAIRS 1/4" = 1'-0"
A-1
10"
TRENCH BOX
5 A-1
GENERAL NOTES • THE FOUNDATION PLAN VIEW IS A HORIZONTAL SECTION CUT THROUGH ELEVATION 100' • T.O. FOUNDATION WALL IS AT ELEVATION 100' UNLESS OTHERWISE NOTED • FIRST FLOOR SLAB IS AT ELEVATION 100' UNLESS OTHERWISE NOTED • GRADE IS AT ELEVATION 99'-4" • ALL FOOTINGS AND FOUNDATION WALLS ARE POURED CONCRETE • ALL T.O. FOUNDATION WALLS ARE AT ELEVATION 100' UNLESS OTHERWISE NOTED • DASHED LINES ARE THICKENED SLABS • B.O. FOOTING IS ELEVATION 96' UNLESS OTHERWISE NOTED • OFFICE AND LOUNGE SLABS ARE 4" THICK - SHOP AND DOCK SLABS ARE 5" THICK • THERE IS 4" CRUSHED ROCK UNDER ALL SLABS • THERE IS 2" RIGID INSULATION ON THE EXTERIOR FACE OF ALL FOUNDATION WALLS
TRENCH DRAIN DETAIL 1" = 1'-0"
USE AT NONBEARING MASONRY PARTITION WITH 2 #4 REBARS CONTINUOUS #4 REBAR AT 24" O.C
THICKENED SLAB B 3/4" = 1'-0"
RETAINING WALL DETAIL SEE 4 ON A-1
SLOPED 8" CONCRETE SLAB TO DRAIN WATER INTO TRENCH ON 4" CRUSHED ROCK CAST IRON TRENCH DRAIN
T.O. FIRST FLOOR WALL 110' - 0"
DOUBLE TEE JOIST 4" SLAB WITH 6" RIBS
4"
4"
A-1
8 TREADS AT 1' LONG - 8 RISERS AT 6-1/12" DEEP 3 SPLICE SLEEVES ANCHORED IN SLEEVES THAT ARE SET IN CONCRETE 1/2" OVERHANG
4
FIRST FLOOR PLAN 100' - 0"
CRUSHED ROCK FOR DRAINAGE
1/2" ISOLATION JOINT CONCRETE TRUCK RAMP
A-1
4" BRICK ON 8 ' CMU
TRENCH DRAIN AT ELEVATION 94'-10-1/4"
CONCEALED INTEGRAL ANCHOR - SPACED 10" O.C. SEE SPECS 1' - 0"
T.O. RETAINING WALL IS AT ELEVATION 103'-6"
USE AT NONBEARING MASONRY PARTITION WITH 2 #4REBARS CONTINUOUS 3'-6" GUARDRAIL HANDRAIL 3' HIGH FROM NOSING
32' - 9"
8" CMU
FIRST FLOOR PLAN 100' - 0"
CRUSHED ROCK
2-5/8" BOLT PROJECTION
RETAINING WALL FOOTING 7'-3"
A-1
RETAINING WALL 1" = 1'-0"
5"
5" 1' - 2"
STEP FOOTINGS LEADING FROM SHOP TO RETAINING WALLS EL. 96' 95' 94' 93' 92'
A-1
7' - 0" BUMPER DETAIL SEE 6 ON A-1
BUMPER DETAIL 1" = 1'-0"
1' - 0"
20' - 0"
TRENCH DRAIN DETAIL SEE 5 ON A-1
1 A-1
DOCK SECTION 1/4" = 1'-0"
10' - 0"
FIRST FLOOR PLAN 100' - 0"
1" WEEP HOLES 4'-0" O.C. 5 A-1
4" 2"
6 4
8" WALL
8"
1' - 0"
#5 REBAR REINFORCING
RETAINING WALL FOOTINGS - ELEVATION 91'
5" CONCRETE SLAB
3"
3/4" X8" LONG ANCHOR BOLT WITH WASHERS 3"X3"X1/4" STEEL ANGLE WITH WELDED 1/4"X1"X8" STRAPS AT 2' O.C.
6 A-1
3"
2' - 4"
TYPE T RUBBER DOCK BUMPER
B.O. RETAINING WALLS 92' - 0"
GUARDRAIL RETAINING WALL 103' - 6"
FIRST FLOOR SLAB AT ELEVATION 100'
CONCRETE
SPLICE SLEEVE WITH #5 REBAR
DOCK STAIRS - SEE SECTION 8 ON A-1
FIRST FLOOR PLAN 100' - 0"
CHECKED BY: NL
---
A-5
A-1
DRAWN BY: TP
23' - 6"
DOOR POCKET ELEVATION 99'-4"
4 1
1'-4" THICK AND 2' WIDE THICKENED SLAB ON NORTH AND EAST WALL OF LOUNGE
FOUNDATION PLAN AND LOADING DOCK DETAILS
-
25' - 0"
TRENCH DRAIN - SEE DETAIL 5 ON A-1
9 STEP FOOTINGS ON BOTH SIDES OF OFFICE BASEMENT TO LOUNGE WALLS - ALL FOOTINGS BUT FIRST ONE ARE 1'-0" RISE TO 2'-0" RUN
OFFICE AND VESTIBULE FOUNDATION WALLS ARE 10" THICK BASED AT ELEVATION 87'-8" TO THE TOP AT ELEVATION 100' UNLESS OTHERWISE NOTED EXTERIOR OFFICE AND VESTIBULE FOOTINGS ARE 10" THICK AND 1'-8" WIDE UNLESS OTHERWISE NOTED TYPE C EXTERIOR PIERS ARE 3'-9" X 3'-9" X 2'-6"
1' - 10"
A-1
77' - 0"
7' - 0"
BUMPER - SEE DETAIL 6 ON A-1
1' - 0" 1' - 0"
7
4' - 0"
MR. NORM LACH
5' - 0"
1' THICK AND 1'-4" WIDE THICKENED SLAB UNDER EAST WALL OF JANITOR'S CLOSET AND EAST AND WEST WALLS IN BOTH RESTROOMS
T.O. FOOTINGS 97' - 0" B.O. DOCK STAIRS 95' - 6"
SOUTHERN ILLINOIS PRECAST CONCRETE INSTITUTE - 101 1ST STREET CENTRALIA ILLINOIS 62801DAWN PARKER
9' - 0"
1' - 6" 10' - 0"
8' - 0"
1' THICK AND 1'-4" WIDE THICKENED SLAB UNDER ALL INTERIOR SHOP WALLS
2' 2' 2' 2' 2' 2' 2' 2' 2'
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341SECTION 001
1' - 0" 9' - 0"
C
TYPE A INTERIOR PIERS ARE 4'-0 X 4'-0 X 2'-6"
SHEET TITLE
2' - 0"
A
TAYLOR POMAHATCH
1
DOCK LEVELER
EXTERIOR OFFICE AND VESTIBULE FOUNDATION WALLS ARE AT ELEVATION 87'-8" EXTERIOR OFFICE AND VESTIBULE WALL FOOTINGS ARE AT 86'-10" UNLESS OTHERWISE NOTED
C
78' - 0"
B
2
CONCRETE STAIRS
1' - 0"
3
SHEET NO.
TRENCH DRAIN
B.O. RETAINING WALLS 92' - 0"
A-1 OF 4 SHEETS
STWY 1 - CONCRETE STAIR DETAIL SEE 6 ON A-3
11 12
114 19 18 17 16 15 14 13
12
DIMENSION TAKEN TO FACE OF STUD, 2X4 STUD 16" O.C. WITH 5/8" GWB, ALIGN WAFFLE SLAB CENTER
STORAGE
7
14' - 4"
JANITOR CLOSET
VESTIBULE
107
3 A-2
2
103
6' - 0"
RECEPTION AREA 102 19' - 10"
20
13 14 15 16 17 18 19 12 11
STWY 2
10 9
8
7
6
5
4
115
3
Concrete
5" PRECAST CONCRETE 10" THICK FRAME ANCHORED TO 10" WALL WITH 2 EXPANSION SHEILDS 2" RIGID INSULATION ROLLING DOOR
7 5/8"
ELEVATOR DETAILS SEE 5 ON A-3
L5
STWY 2 - CONCRETE STAIR DETAIL SEE 6 ON A-3
DOOR TYPE 7 8 1" = 1'-0"
9' - 10"
4" BRICK ON 2" RIGID INSULATION ON 8" CMU AROUND EXTERIOR OF OFFICE UNLESS OTHERWISE NOTED
2
2 HOUR FIRE RATED 8" CMU AROUND INTERIOR STAIR WELLS AND HOISTWAY
D
HOISTWAY
L4 4" BRICK ON 2" RIGID INSULATION ON 4" AIR SPACE ON 8" CMU AROUND EXTERIOR STAIRWELLS
4 A-2
16' - 6"
21 3' - 4"
CONFERENCE ROOM ALIGN 8" CMU WALL AND 2X4 STUD WALL ON THIS PLANE
110
6 A-2
108
L7
L7
4" THICK 8'X7' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING 15' - 4" 52' - 0"
7 5/8"
14' - 0"
12' - 0"
14' - 0"
REVISION & DATE IN 26' - 0"
17
1
---
---
L6 15 9 A-2
L1 8 A-2 14 DN
LOADING DOCK
CONCRETE STAIR DETAIL SEE 6 ON A-3
8 7 6 5 4
DOCK LEVELER
DOCK DETAIL SEE 5 ON A-3
3 2 1
WHITEBOARD WALL
STORE FRONT WINDOW SYSTEM SEE 2 ON A-4 12' - 0"
Concrete
BUMPER UP
TRENCH DRAIN
--4' - 10"
14' - 0"
1' - 4"
6' - 8"
1' - 4"
13' - 4"
14' - 0"
8' - 0"
36' - 8"
13' - 4"
3' - 4"
40' - 0"
0" 28' - 0"
156' - 8"
DOOR TYPE 8 9 1" = 1'-0"
5" 2" 5"
-
16
4" BRICK ON 2" AIR SPACE ON 2" RIGID INSULATION ON 4" GLAZED BRICK
STOREFRONT DETAIL SEE 5 ON A-3
4" GLAZED BRICK ON 8" CMU TACKBOARD WALL STORE FRONT L8 WINDOW SYSTEM SEE 1 ON A-4
4" THICK 8'-9"X36'-8" CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
101
11
4" GLAZED BRICK 9 ON 8" GLAZED CMU 10 10' - 8" 1' - 4" 8' - 0"
LOUNGE 18
ALL INTERIOR SHOP WALLS ARE 8" CMU UNLESS OTHERWISE NOTED
L5
L8 4"
15' - 4"
L2
---
8" PLUMBING WALL CHASE WITH 8" GLAZED CMU ON BOTH SIDES
4'0" - 10"
10"
DOOR TYPE 6 7 1" = 1'-0"
19
ALL OFFICE WALL INTERIOR PARTITIONS ARE 2X4 STUDS 16" O.C WITH 1/2" GWB UNLESS OTHERWISE NOTED 19' - 10 3/8"
109 L8
4" 4" 4"
L3 5" PRECAST CONCRETE ON 2" RIGID INSULATION ON 5" PRECAST CONCRETE
14' - 8"
C
11' - 0"
6' - 0" 1' - 8"
DOOR TYPE 5 1" = 1'-0"
5 A-2
4" GLAZED BRICK ON 2" RIGID INSULATION ON 8" CMU
WOMEN'S RESTROOM
10' - 8"
4" 2" 4" STORE FRONT WINDOW SYSTEM SEE 3 ON A-4
MEN'S RESTROOM
4" GLAZED BRICK ON 8" CMU
8
-
6
7 A-2
L8
L2 ---
KITCHENETTE
L5
L5
111
EXTENDS UP TO A 32' RAMP
FIRST FLOOR PLAN 1/8" = 1'-0"
POURED CONCRETE FLEXIBLE VINYL SPLINE ISOLATION JOINT ALUMINUM THRESHOLD EXPANSION SHEILD
2"
10
EXTERIOR CONCRETE TO INTERIOR CONCRETE THRESHOLD 11 3" = 1'-0"
TYPE A DOOR 1/4" = 1'-0"
4"
-
DOORWAY WITH CONTINUOUS CONCRETE - NO THRESHOLD ISOLATION JOINT
---
14
TYPE B DOOR 1/4" = 1'-0"
12
INTERIOR CONCRETE NO THRESHOLD 3" = 1'-0"
1/4" CERAMIC TILE
SHEET NO.
TILE REDUCER GLUED IN PLACE
A-2
POURED CONCRETE
16
TYPE C DOOR 1/4" = 1'-0"
SOUTHERN ILLINOIS PRECAST CONCRETE INSTITUTE - 101 1ST STREET CENTRALIA ILLINOIS 62801DAWN PARKER
6' - 0"
MECHANICAL
6" PRECAST CONCRETE ON 2" RIGID INSULATION ON 4" GLAZED CMU MEN AND WOMEN'S RESTROOM DETAIL SEE 7 ON A-3 ---
L3 16' - 0"
113
2 A-2
4" BRICK ON 2" RIGID INSULATION ON 8" CMU L2
13
TOOL ROOM
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341SECTION 001
6
L3
14' - 0"
112
JOB NO: 1
STWY 1
OFFICE 3
4" BRICK ON 2" RIGID INSULATION ON 4" AIR SPACE ON 8" CMU AROUND EXTERIOR STAIRWELLS
10
106 4" 2" 4"
1
WH
---
9
CHECKED BY: NL
8
DRAWN BY: TP
7
FIRST FLOOR PLAN, ROOM SCHEDULE, DOOR SCHEDULE, FINISH SCHEDULE
6
MR. NORM LACH
5
SHEET NAME
4
L5
7' - 4"
STORE FRONT WINDOW SYSTEM SEE 4 ON A-4
3
TAYLOR POMAHATCH
4
2
78' - 0"
3
L3
10' - 8"
2 HOUR FIRE RATED 8" CMU AROUND INTERIOR DN STAIR 20 WELLS
38' - 0"
5" PRECAST CONCRETE ON 2" RIGID INSULATION ON 5" PRECAST CONCRETE
SET NO.
5
2' - 0"
DIMENSION TAKEN TO FACE OF STUD, 2X4 STUD 16" O.C. WITH 5/8" GWB, ALIGN WAFFLE SLAB CENTER
5" PRECAST CONCRETE ON 2" RIGID INSULATION ON 5" PRECAST CONCRETE AROUND ALL EXTERIOR SHOP WALLS
38' - 0"
4" THICK 8'X26' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
ALIGN 8" CMU WALL AND 2X4 STUD WALL ON THIS PLANE
46' - 0"
16' - 4 3/8"
105
2' - 0"
18' - 0"
104
19' - 7 5/8"
18' - 7 5/8"
OFFICE 2
37' - 0 3/8"
L4
14' - 5"
OFFICE 1
11' - 2"
05.29.15
4" THICK 8'X7' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
4' - 8"
24' - 0"
1' - 8" 6' - 0"
B
DOOR TYPE 4 5 1" = 1'-0"
3' - 4"
DATE
8' - 0"
1' - 0"
6' - 0"
19' - 2"
8' - 0"
67' - 7 5/8"
4" 2" 6"
6' - 0"
37' - 0 3/8"
4"2" 4"
2" RIGID INSULATION 5" PRECAST CONCRETE EXPANSION SHEILD
4' - 10"
4" BRICK ON 2" RIGID INSULATION ON 8" CMU AROUND EXTERIOR OF OFFICE UNLESS OTHERWISE NOTED
8' - 0"
8 3/4" THICK DOOR FRAME GROUTED SOLID AND ANCHORED TO 8" CMU WITH WIRE STRAPS 12" WALL - 8" CMU ON 4" BRICK 8 3/4" THICK FRAME ANCHORED TO 10" WALL WITH 2 EXPANSION SHEILDS
25' - 0" 52' - 0"
FRONT FACE 8" CMU
25' - 6"
DOOR FRAME FILLED WITH GROUT 12" WALL
25' - 0"
8' - 8"
DOOR TYPE 3 1" = 1'-0"
4 1/2" WALL
8 3/4" DOOR FRAME FRAME ANCHORED TO 4" BRICK WITH WIRE STRAPS 2" RIGID INSULATION WIRE STRAP
156' - 8"
23' - 8"
4
25' - 6"
25' - 0"
DOOR TYPE 2 3 1" = 1'-0"
25' - 0"
4 3/4" THICK DOOR FRAME ANCHORED TO 2X4 STUD WALL WITH 1/2" GWB ON BOTH SIDES BY LOCK IN ANCHOR DOUBLE 2X4 STUD
3
A
25' - 0"
8 3/4" THICK DOOR FRAME ANCHORED TO 4" BRICK BY WIRE STRAPS AND GROUTED SOLID 14" WALL - 4" BRICK ON 2" RIGID INSULATION ON 4" AIR SPACE ON 4" CMU
2
10"
10" WALL - 4" BRICK ON 2" RIGID INSULATION ON 4"3/4" CMU 8 THICK DOOR FRAME ANCHORED TO 4" BRICK BY WIRE STRAPS AND GROUTED SOLID
1
11' - 7"
DOOR TYPE 1 2 1" = 1'-0"
FIRST FLOOR PLAN NOTES • WEST STORE FRONT EXTERIOR DOORS ARE U.S. ALUMINUM • ALL EXTERIOR WINDOWS ARE ALUMINUM WITH MULLIONS • ALL INTERIOR DOORS ARE STEEL • OFFICE HAS WAFFLE SLAB CEILING • FIRST FLOOR PLAN ELEVATION SLAB AT 100' • ALL ROUGH OPENINGS ARE MASONRY OPENINGS • EXTERIOR CONCRETE SLABS HAVE 1/8" SLOPE AWAY FROM BUILDING AND THICKNESS OF 4" • ALL COLUMNS ARE 1'X1' WITH REINFORCED CONCRETE • ALL FLOORS ARE CONCRETE EXCEPT RESTROOMS RESTROOMS ARE CERAMIC TILE
77' - 0"
8 3/4" THICK DOOR FRAME ANCHORED TO 8" CMU WALL WITH WIRE STRAPS AND GROUTED SOLID
CONCRETE TO CERAMIC TILE THRESHOLD 13 3" = 1'-0"
OF 4 SHEETS
7"
11 3/4"
11' - 5 3/4" STAIR MEETING LANDING SEE DETAIL 10/A-4
4 A-4
A-4
4" CONCRETE SLAB ON 2" RIGID INSULATION ON VAPER BARRIER ON 4" CRUSHED EL. 87'-8" ROCK
001
2' - 7"
9
-
108
10
120
A-1
---
96'
T.O. FOOTINGS 97' - 0" T.O. BASEMENT PAD 88' - 0" B.O. FOUNDATION WALL 87' - 8"
93' 92' 91' 90' 89'
STEP FOOTINGS FROM BASEMENT EXHIBITION SPACE TO LOUNGE
US ALUMINUM STOREFRONT DOORS AND WINDOWS DETAIL
4
3
A-3
A-4
T.O. FIRST FLOOR WALL 8 110' - 0"
2
HANDRAIL 3' HIGH FROM NOSING
8" 4" 2" 4"
22 TREADS AND 22 RISERS
LOWER LANDING ELEVATION 93'
A-4 2' - 1" 1
2
3
4
5
6
7
8
9
1-1/2" CIRCULAR STEEL PIPE HAND RAIL CONNECTED TO PIPE GUARDRAIL RAILS ARE ANCHORED IN SLEEVES THAT ARE SET IN CONCRETE
1-1/2" CIRCULAR STEEL PIPE HAND RAIL CONNECTED TO PIPE GUARDRAIL
CONCEALED INTEGRAL ANCHOR - SPACED 10" O.C. SEE SPECS
RAILS ARE ANCHORED IN SLEEVES THAT ARE SET IN CONCRETE 3/4" OVERHANG CONCEALED INTEGRAL ANCHOR - SPACED 10" O.C. SEE SPECS
4
STAIR MEETS FIRST FLOOR SLAB ELEVATION 100'
6
12 19
18
17
16
15
14
13
COLUMN CENTERLINE DN
9
2
SECTION DETAIL @ VERTICAL
3/4" OVERHANG
A-4
4' WIDE STAIR
7"
20
4' - 0"
21
FIRST FLOOR SLAB 7 100' - 0"
5
1' - 2 1/2"
11
1
SECTION DETAIL @ STOREFRONT HEAD 3
WAFFLE SLAB 10
FIRST FLOOR SLAB 100' - 0"
EXTERIOR
STOREFRONT DETAILS 1/4" = 1'-0" MASONRY OPENING: 10' TALL AND 10' WIDE UNIT OPENING: 9'-11 1/2" TALL AND 9'-11 1/2" WIDE
INTERIOR
SINGLE ACTING DOOR 4' WIDE STAIR
CONCRETE
6
A-4
12
STAIR MEETING LANDING 1 1/2" = 1'-0"
A-4
STAIR MEETING FIRST FLOOR SLAB 1 1/2" = 1'-0"
1-1/2" CIRCULAR STEEL PIPE HAND RAIL CONNECTED TO PIPE GUARDRAIL
RAILS ARE ANCHORED IN SLEEVES THAT ARE SET IN CONCRETE
CONCEALED INTEGRAL ANCHOR - SPACED 10" O.C. SEE SPECS
3/4" OVERHANG
SECTION DETAIL @ DOOR JAMB
CIRCULAR STEEL HANDRAIL IN CONCRETE STAIRS HANDRAILS ARE PLACED IN SLEEVES AND GROUTED SOLID
TOGGLE BOLT IS ANCHORED INTO 8" CMU STEEL HANDRAIL BRACKET 4' O.C.
4" BRICK ON 2" RIGID INSULATION ON 4" AIR SPACE ON 8" CMU
4"
2"
4"
CONCRETE STAIRS HANDRAILS PLACED INTO SLEEVE AND GROUTED SOLID
8"
8
JAMB IS ANCHORED INTO PRECAST CONCRETE WALL BY EXPANSION SHEILD
EXTERIOR
INTERIOR
ALUMINUM THRESHOLD
1 1/4"
ALUMINUM SILL
EXTERIOR
T.O. BASEMENT SLAB ELEVATION 88'
SECTION DETAIL AT JAMB
STAIR SITS IN KEY HOLE
LANDING JUTS INTO CMU 2" FOR SUPPORT
THICKENED SLAB UNDER STAIRS 1' - 6"
A-4
SECTION DETAIL AT INTERMEDIATE HORIZONTAL
LOWER LANDING ELEVATION 93'
2' - 0"
4
4
INTERIOR
4' WIDE STAIR
BASEMENT SLAB MEETING STAIR 1 1/2" = 1'-0"
SECTION DETAIL @ DOOR HEAD WITH PIVOT
M-550
HANDRAIL 3' HIGH FROM NOSING
1
M-550
A-4
10
STAIR PLAN 1/4" = 1'-0"
7"
6
5 A-4
HANDRAIL DETAIL 1 1/2" = 1'-0"
11 A-4
WINDOW SILL IS ANCHORED INTO PRECAST CONCRETE WALL BY TWO EXPANSION SHEILDS
6
DOOR SILL IS ANCHORED INTO CONCRETE SLAB BY EXPANSION SHEILD
SECTION DETAIL @ DOOR SILL
5
SECTION DETAIL @ DOOR SILL 7
SET NO.
IN REVISION & DATE
BUILDING DETAILS JOB NO: 1 CHECKED BY: NL
13
T.O. PARAPET 113' - 4" T.O. HOLLOW T.O. WAFFLECORE SLAB 110' 112' - 8" 4" T.O. FIRST FLOOR WALL 110' - 0"
1' THICK PRECAST WALL WITH 2" RIGID INSULATION - WALL ANCHORED WITH SPLICE SLEEVE AND GROUTED SOLID 5" CONCRETE ON 4" GRAVEL
SHOP
BUILDIING SECTION 1/8" = 1'-0"
HANDRAIL 3' HIGH FROM NOSING
08.06.15
26' - 5" 1' - 0" 1' - 0"
1' - 0" 1' - 0" 1' - 0"
27' - 0"
10' - 0"
6' - 6"
11' - 6"
1' - 1" CEILING IS 25'-5" FROM T.0. FIRST FLOOR ELEVATION 100'
DOOR HEAD IS ANCHORED INTO PRECAST CONCRETE WALL BY EXPANSION SHEILD
2
INTERIOR STAIRWELL WALLS ARE 8" CMU
1' - 0"
1' - 0" 1' - 4"
KITCHENETTE
T.O. BASEMENT SLAB ELEVATION 88'
1' BY 1' CONCRETE COLUMN
22
ALL INTERIOR SHOP WALLS ARE 8" CMU UNLESS OTHERWISE NOTED
SLOPED GRAVEL ROOF ON 2" LIGHT WEIGHT CONCRETE TOPPING ON 4" RIGID INSULATION
3
EXTERIOR WALL AROUND STAIRWELL IS 1'-6" - 4" BRICK ON 2" RIGID INSULATION ON 4" AIR SPACE ON 8" CMU
5' - 6"
8 A-4
A-2 A-1
2" RIGID INSULATION ON VAPOR BARRIER
SHOP CEILING - DOUBLE TEE JOISTS 4" SLAB WITH 2' RIBS WITH 2" LIGHTWEIGHT CONCRETE TOPPING SIPPORTED BY 10" LEDGE ON PRECAST PANEL
PARAPET CAP SITS ON PRECAST PANEL GRAVEL DRAINAGE ON BUILT UP ROOFING
LOUNGE
94' 95'
3
10 A-4
5
7 A-4
16 A-2
EXHIBIT ROOM
T.O. BASEMENT PAD 88' - 0" B.O. FOUNDATION WALL 87' - 8"
T.O. SHOP WALLS 126' - 0"
DOUBLE TEE ANCHORAGE TO PRECAST PANEL DETAIL SEE 8/A-3
CANT STRIP ADDED TO DROP DOWN ROOF OVER LOUNGE WITH SLOPED GRAVEL LEADING TOWARDS NORTH ELEVATION OF BUILDING FOR DRAINAGE
102
4" THICK 8'X26' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
2' - 0"
7' - 3"
RECEPTION AREA
STAIR SECTION 1/4" = 1'-0"
A-4
2' - 0"
A-2
STAIR MEETING BASEMENT SLAB SEE DETAIL 4/A-4
10' - 0"
1' - 6"
3
11
12' - 0"
12' - 0"
04
3/4"
2
WAFFLE SLAB - SITS ON 4" LEDGE OF 10" OFFICE WALL ABOVE CMU
VESTIBULE
FIRST FLOOR SLAB ELEVATION 100'
12 A-4
STAIR MEETING WALL SEE DETAIL 11/A-4
3' - 0"
2
SHELF ANGLE IS ANCHORED TO SHELF ANGLE INSERT IN WEDGE INSERT -ANCHORS WAFFLE SLAB TO 4" BRICK
RETAINING WALLS
STEP FOOTINGS FROM BASEMENT EXHIBITION SPACE TO LOUNGE ALLL LOUNGE FOOTINGS ARE 1' THICK AND 2' WIDE CONCRETE
WAFFLE SLAB
5 A-4
11 A-4
EL. 87'-8"
DOCK LEVELER
DRAWN BY: TP
STAIR MEETING FIRST FLOOR SLAB SEE DETAIL 12/A-4
1' THICK BEAM IN CONCRETE HANDRAIL DETAIL SEE 5/A-4
1
STORE FRONT WINDOW SYSTEM SEE 9 ON A-4
COLUMN CENTERLINE
90' 89'
SOUTH ELEVATION 1/8" = 1'-0"
VESTIBULE EXTERIOR WALLS ARE 5" PRECAST CONCRETE ON 2" RIGID INSULATION ON 5" PRECAST CONCRETE
6
92' 91'
DOCK AREA
MR. NORM LACH
11' - 10"
2 HOUR FIRE RATED 8" CMU AROUND INTERIOR STAIR WELLS
96'
---
SOUTHERN ILLINOIS PRECAST CONCRETE INSTITUTE - 101 1ST STREET CENTRALIA ILLINOIS 62801DAWN PARKER
T.O. FIRST FLOOR WALL 110' - 0"
WAFFLE SLAB
4" THICK SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
LOADING DOCK AREA
A-1
9 14 A-2 A-1
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341SECTION 001
1 A-4
10
ALUMINUM ROLLING DOOR
SHEET NAME
A-4
13
4' - 0"
3' - 4"
ENLARGED ROOF DETAIL BETWEEN LOUNGE AND SHOP 3/4" = 1'-0"
8
A-1
A-2 A-1 94' 95'
2' - 0"
1
T.O. WAFFLE SLAB 112' - 4" GUARDRAIL RETAINING WALL 103' - 6" FIRST FLOOR SLAB 100' - 0" T.O. FOOTINGS 97' - 0" STEP FOOTINGS LEADING DOWN TO RETAINING WALL - B.O. RETAINING ALL SHOP FOOTINGS ARE 1' WALLS THICK AND 2' WIDE CONCRETE 92' - 0"
TAYLOR POMAHATCH
A-4
T.O. FIRST FLOOR WALL 110' - 0"
4" THICK SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
93'
FOUR STEP FOOTINGS DOWN ON EACH SIDE TO ELEVATOR PIT - FOOTINGS AROUND BASEMENT ARE 10" THICK AND 1'-8" WIDE EXCEPT AROUND STAIRWELL WALLS WHICH ARE 1'-6" THICK AND 3' WIDE
PRECAST CONCRETE PANELS AROUND SHOP
8
A-2
10"
SLOPED GRAVEL ON 2" CONCRETE TOPPING ON 4" RIGID INSULATION ON HOLLOW CORE CEILING
ENLARGED ROOF DETAIL BETWEEN OFFICE AND LOUNGE 3/4" = 1'-0"
7
8' - 0" 1' - 0" 3' - 0"
7"
FLOOR WALL 110' - 0"
T.O. HOLLOW CORE 110' - 8"
1' - 8" 1' - 0" 1' - 6"
2" RIGID T.O. FIRST INSULATION ON 4" BRICK
CANT STRIP
11
ENLARGED ROOF DETAIL BETWEEN THE LOUNGE AND SHOP SEE 8/A-4
1' - 0"
T.O. HOLLOW CORE 110' - 8" 4" CMU ON
SLOPED GRAVEL ON 2" CONCRETE TOPPING ON 4" RIGID INSULATION ON HOLLOW CORE CEILING
ENLARGED ROOF DETAIL BETWEEN OFFICE AND LOUNGE SEE 7/A-4
--US ALUMINUM STORE FRONT WINDOW SYSTEM
1' - 6"
7"
3X6 CAP WITH 3/8" CARRIAGE BOLT 7" PARAPET
1' - 0" 3' - 0"
CANT STRIP
4" THICK 8'X26' CONCRETE SLAB WITH 1/8" SLOPE DOWN AWAY FROM BUILDING
8' - 0"
3
13' - 4"
T.O. PARAPET 113' - 4"
WAFFLE SLAB
10 A-2
1' - 0" 1' - 0"
3X6 CAP WITH 3/8" CARRIAGE BOLT 7" PARAPET
US ALUMINUM STOREFRONT DOORS AND WINDOWS
5' - 4"
T.O. PARAPET 113' - 4"
---
3
PRECAST CAP AROUND OFFICE AND LOUNGE TO MAINTAIN THE SAME HEIGHT
8' - 0"
2
7' - 2"
1
1' - 0" 5' - 5"
PRECAST CAP OVER THE EXPOSED DOUBLE TEES OVER THE DOCK AREA
DATE
7"
T.O. SHOP WALLS 126' - 0"
SHEET NO.
A-4
LANDING MEETING WALL 1 1/2" = 1'-0" OF 8 SHEETS