Trevor Christopher Blenman Architectural Portfolio
Trevor Christopher Blenman tcblenman710@gmail.com
(347) 370-2921
Profile
Experience
Motivated Junior Architect with nearly four years of experience on both large-scale and complex projects with the ability to collaborate and work well in team environments as well as independently. Dedicated professional who exhibits patience in problem solving and produces construction drawings as well as 3D models in an efficient manner.
Acheson Doyle Partners Architects | New York, NY Junior Architect July 2016 - Present
Skills • • • • • • • •
AutoCAD Autodesk Revit Sketchup Pro Rhinoceros 3D V-Ray Adobe Illustrator Adobe InDesign Microsoft Office
Affiliations National Organization of Minority Architects | Member
• Developed construction drawings at all phases of design for various projects (CAD & Revit) • Led the schematic design phase of the swing space portion of one of the firm’s largest projects. Clients praised and approved the layouts. • Created and managed 3D Revit model and drawings for one of the firm’s first Revit projects. Collaborated and coordinated Revit model with consultants (BIM 360) • Organized and managed Revit standards for the office after completing licensed Revit training and working on both of the firms projects • Produced presentation quality renders for clients (Sketchup & Revit models) John H. Hatheway Jr., Architects | Brooklyn, NY Intern Summer 2015 • Completed and revised construction drawings for multiple projects. • Generated 3D models (SketchUp) for projects.
Education Syracuse University - School of Architecture | Syracuse, NY 2011-2016 • Bachelor of Architecture • Thesis: Rethinking Urban Stadium Typology
Table of Contents 01
Public’s Stadium Garden
02 Terence Cardinal Cooke Hospital 03 Custom Kitchen Design 04 Bellevue Men’s Shelter 05 Liberty Island Lockers Enclosure 06 Elements Fitness
Public’s Stadium Garden 2016 Thesis Project Location: St. Louis, MO Software: Rhino, VRay, AutoCAD, Illustrator, Photoshop This thesis focused on rethinking the urban stadium and its place in relation to the city. The project featured a redesigning of the existing Edward Jones Dome in St. Louis, Missouri for a new MLS franchise while also serving as a public park for the community’s use on non-game days. Rather than having the stadium sit awkwardly within the city, left empty most days, this thesis intends to rethink how this space can be utilized on a daily basis, connecting fragments of space and linking different parts of the city together for an ‘open’ stadium which has the capacity to lure new groups of people to the neighborhood.
4
130
131
5
6
7
8
There is a common stadium problem in the world nowadays as many stadiums are heavily funded by the public, yet members of the community can only inhabit the venues on game-day or event-day. This should be challenged and rather than having the stadium sit empty on most days, we should rethink how the space can be utilized daily. By integrating a renovated stadium with the city and implementing parks and green spaces, the community’s daily use of the stadium is facilitated.
9
Terence Cardinal Cooke Hospital Status: 2019 - On-going Location: New York, NY Software: Revit, AutoCAD, EnScape
This project consisted of renovations to multiple floors of the hospital wing of the Terence Cardinal Cooke Health Care Center, in collaboration with another architecture firm, Dalpos Architects. Our focus was on the basement and first floor of the hospital wing with the project including a kitchen relocation at basement level, a lobby renovation, and restroom renovations at first floor. The first floor design aims to create a more inviting and appealing entrance to the lobby space with respect to the original design by picking up on existing material usage as well as design characteristics.
10
11
3
2
A-330.00
A-330.00
CENTER LINE CONCEALED SPRINKLER HEAD ON PILASTER (TYP.) - SEE SPRINKLER DWGS
8 A-630.00
PAINT REBUILT PLASTER CORNICE 3 A-630.00
6 A-531.00
PENDANT LIGHTING - SEE LIGHTING DWGS
SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING TRANSOM WINDOW FRAME
TERENCE C HEALTH
PAINT EX. PLASTER CEILING - PTX - SEE SPEC
CLEAN EX. GUASTAVINO TILE AND STONE CEILING - SEE SPEC
WOOD CROSS TO BE REMOVED AND REINSTALLED
MARBLE INFILL PANEL - SEE SPEC
1240 - 124 NEW Y
CUSTOM LIGHT RING SUPPORTED FROM STRUCTURE ABOVE - SEE LIGHTING DWGS EXISTING MARBLE PANEL TO REMAIN (TYP., U.O.N)
2nd Floor 16' - 0"
AR
ACHESON D ARCHI
REPLACE ALL GLAZING
226 W 26TH NEW Y
SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING METAL GRILLE SEE SPEC
IN ASSO
D ARCHITECTS
1' - 3"
MARQUEE ALTERATIONS N.I.C. PAINTED GWB PTX
H2 & H3 1 A-903.00
MEPF
OLA C EN
50 B HAWTH
SIGNAGE BY OTHERS
SIM OPEN
8 WEST 38TH NEW Y
4
4
A-531.00
A-531.00
OPEN
STRUCTU
OLD ST ENGINE
7' - 3"
DOOR AUTO OPENER (110B) - SEE SPEC
A-531.00
8' - 11"
RECOAT CONC. PLANTER
101 N. C S SYRAC
2
11' - 4"
13' - 6"
ALUM AND GLASS BALANCED DOORS - SEE SPEC
2
SIM A-531.00
REMOVE PAINT AND CLEAN EX. LIMESTONE
3 A-531.00
METAL HANDRAIL
90 BROA NEW Y
LIGHT
2 A-530.00
1st Floor 0' - 0" SUPPLY REGISTER - SEE SPEC AND MECHANICAL DWGS
GRANITE LANDING AND STEPS - SEE STRUC DWGS
PATCH MARBLE - SEE SPEC
OPTICAL TURNSTILES - SEE SPEC
ALUM AND GLASS BALANCED DOORS SEE SPEC
PATCH MARBLE - SEE SPEC
NEW RECEPT. AT EXIST. COVER PLATE EX. HAND SANITIZER DISPENSER TO BE REMOVED AND REPLACED IN KIND
SOLID SURFACE RECEPTION DESK WITH MARBLE COUNTERTOP - SEE DWGS A-333 AND A-540 FOR DETAILS
FRAMED PICTURE BY OTHERS
DECORATIVE METAL GRILLE
TCC RE HOSPIT
MARBLE BASE INFILL AT OPENING. USE SALVAGED MARBLE - SEE SPEC
LOBBY R
SECTION ENTRY VESTIBULE / RECEPTION / LOBBY - SECTION LOOKING NORTH 1 A-331.00
LIG
165 BROAD NEW Y
SCALE: 1/2" = 1'-0"
2
1
A-332.00
A-332.00
PAINT EX. PLASTER CEILING - PTX - SEE SPEC PAINT REBUILT PLASTER MOLDING
TELEVISION MONITORS BY OTHERS ( 2 TOTAL)
4
3
A-332.00
A-332.00
CUSTOM LIGHT RING - SEE LIGHTING DWGS
CENTER LINE CONCEALED SPRINKLER HEAD ON PILASTER (TYP.) - SEE SPRINKLER DWGS
8 A-630.00
2
3
A-330.00
A-330.00
CLEAN EX. GUASTAVINO TILE AND STONE CEILING - SEE SPEC
PENDANT LIGHTING. LOCATE NEW PENDANT FIXTURE TO BE MOUNTED IN EXISTING LOCATION - SEE LIGHTING DWGS MARBLE INFILL PANEL
PLAQUE BY OTHERS
EXISTING MARBLE PANEL TO REMAIN (TYP., U.O.N.)
2nd Floor 16' - 0" SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING TRANSOM WINDOW FRAME
3 A-630.00
+/- 1' - 3"
REPLACE ALL GLAZING SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING METAL GRILLE - SEE SPEC
PAINTED GWB PTX
MARQUEE ALTERATIONS N.I.C.
OPEN
CRASH RAIL/ HANDRAIL SEE SPEC
DOOR AUTO OPENER (110A) - SEE SPEC
METAL HANDRAIL SEE SPEC
2 A-530.00
SIM OPP
1st Floor 0' - 0" PATCH MARBLE. - SEE SPEC
PATCH MARBLE - SEE SPEC
PLAQUE BY OTHERS
OPTICAL TURNSTILES - SEE SPEC
TERRAZZO TILE BASE - SEE SPEC
DOOR AUTO OPENER (109A) - SEE SPEC
TB
81817.05
A-3 e r u t a n g i S & l a e S
FRAMED PICTURE BY OTHERS S. STL CORNER GUARDS
02/14/20
: . o N g n i w a r D
LOBBY TO RECEIVE NEW TERRAZZO FLOOR DESIGN, WIDENED OPENING AND NEW ELLIPTICAL LIGHT
: . o N t c e j o r P
NEW DECORATIVE GRILLES TO REPLACE WALLCOVERING AT OPENINGS
: y b n w a r D
12
EXISTING ENTRY TO BE WIDENED AND EXISTING GRILLES REMOVED
EX. ELEVATOR
ELEVA SE
ALUM AND GLASS BALANCED DOORS SEE SPEC
: e t a D e u s s I
EX. ELEVATOR
REMOVE PAINT AND CLEAN EX. LIMESTONE
+/- 11' - 4"
OPEN
100% CD 95% CD DD Subm
s n o i s i v e R : e l t i T g n i w . a o r N D
ALUM AND GLASS BALANCED DOORS SEE SPEC
13' - 6"
3 A-531.00 OPP
GRANITE LANDING AND STEPS - SEE STRUC. DWGS
TERRAZZO TILE TT2 (NOTE 1)
CORRIDOR H-107
STAIR E ELEV #3
TERENCE CARDINAL COOKE HEALTH CARE CENTER
5 A-531.00
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029
CORRIDOR H-187
RIDOR 187 CORRIDOR H-127
ARCHITECT:
VEST H-108D
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
TERRAZZO TILE TT2 (NOTE 1)
(EX. RF)
VEST H-108A
(EX. RF)
226 W 26TH STREET, 5TH FLOOR NEW YORK, NY 10001 IN ASSOCIATION WITH
TERRAZZO TILE TT2 (NOTE 1) JAN CL H-169
DALPOS ARCHITECTS & INTEGRATORS
JAN CL H-169
101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202 MEPFP ENGINEER:
V #2 ELEV #2 LOBBY H-108
THINNER LINE REPRESENTS 1/16" JOINT, TYP.
TERRAZZO TILE TT2 (NOTE 1)
OLA CONSULTING ENGINEERS 50 BROADWAY HAWTHORNE, NY 10532
8 WEST 38TH STREET, SUITE 501 NEW YORK, NY 10018 STRUCTURAL ENGINEER:
OLD STRUCTURES ENGINEERING, P.C.
NURSE STATION H-130
(SEE FINISH SCHEDULE)
HEAVIER LINE REPRESENTS 1/8" JOINT, TYP.
90 BROAD STREET, #1501 NEW YORK, NY 10004 LIGHTING DESIGN:
TERRAZZO TILE TT1 (NOTE 1)
V #1
ELEC H-149
TERRAZZO TILE TT2 (NOTE 1) ELEC H-149
TERRAZZO TILE TT2 (NOTE 1)
TCC RENOVATIONS HOSPITAL WING A --LOBBY RENOVATION
VEST H-108C
VEST H-108B
RIDOR
-163
LIGHTCRAFT 165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
ELEV #1
CORRIDOR H-143
CORRIDOR
(SEE FINISH SCHEDULE)
(EX. RF)
H-163
TERRAZZO TILE TT2 (NOTE 1) TERRAZZO TILE TT2 (NOTE 1)
RECEPTION H-109 CLEAN UTILITY H-150
(EX. RF)
OILET 152A
TOILET H-152A
EX. GRANITE AND TRAVERTINE FLOOR THIS ROOM
2 BED ROOM H-133
2 BED ROOM H-152
2 BED ROOM H-152
ENTRY VESTIBULE H-110
02/14/20 01/31/20 11/01/19 e t a D
s n o i s i v e R : e l t i T g n i w . a o r N D
100% CD Submission 95% CD Submission DD Submission
ENLARGED PLANS AT FIRST FLOOR
: e t a D e u s s I
: . o N g n i w a r D
81817.05
CK/MB
3/8" = 1'-0"
A-140.00
DN DN
n o i t a n g i s e D t n e m u c o D B O D C Y N
e r u t a n g i S & l a e S
DN
: e l a c S
: . o N t c e j o r P
TB
: y b d e k c e h C
: y b n w a r D
02/14/20
. NEW SIDEWALK BY OWNER.
2 A-140.00
ENLARGED LOBBY FLOOR PATTERN PLAN SCALE: 3/8" = 1'-0"
FIRST FLOOR FINISH PLAN
r e k c i t s b o j N A C S B
NEW GRANITE STEP AND LANDING
13
1
2
A-331.00
A-331.00
TERENCE CARDINAL COOKE HEALTH CARE CENTER
EXISTING LIMESTONE (TYP.)
EX. LIMESTONE ARCH
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029
2nd Floor 16' - 0"
ARCHITECT:
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING METAL GRILLE - SEE SPEC
226 W 26TH STREET, 5TH FLOOR NEW YORK, NY 10001 IN ASSOCIATION WITH
MARQUEE ALTERATIONS N.I.C.
DALPOS ARCHITECTS & INTEGRATORS 101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202 MEPFP ENGINEER:
EXISTING MOTION SENSOR TO REMAIN. RELOCATION OF WIRING TO NEW LOCATION AT RECEPTION DESK BY OWNER. (DOOR 110B)
ACTIVE LEAF ALUM AND GLASS BALANCED DOOR
EX. RAILING
INACTIVE LEAF
ALUM AND GLASS BALANCED DOORS SEE SPEC
110B
OLA CONSULTING ENGINEERS 50 BROADWAY HAWTHORNE, NY 10532
SCRAPE AND CLEAN , ELECTROSTATICALLY PAINT EXISTING ALUM WINDOW FRAME - SEE SPEC
8 WEST 38TH STREET, SUITE 501 NEW YORK, NY 10018
REPAIR LIMESTONE AT PLANTER REMOVAL - SEE SPEC
110A
STRUCTURAL ENGINEER:
DECORATIVE METAL HANDRAIL SEE SPEC
OLD STRUCTURES ENGINEERING, P.C.
AUTO DOOR OPENER BOLLARD (110A) - SEE SPEC
90 BROAD STREET, #1501 NEW YORK, NY 10004
1st Floor 0' - 0"
LIGHTING DESIGN:
LIGHTCRAFT 165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
3 A-530.00
GRANITE LANDING AND STEPS - SEE STRUC. DWGS
PATCH AND REPAIR CONCRETE. PROVIDE NEW MASONRY COATING - SEE SPEC
TERENCE CARDINAL COOKE HEALTH CARE CENTER
EXTERIOR ELEVATION
ERIOR ELEVATION LE: 1/2" = 1'-0"
TERENCE CARDINAL COOKE HEALTH CARE CENTER
TCC RENOVATIONS HOSPITAL WING A --LOBBY RENOVATION
EX. LIMESTONE (TYP.)
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029 ARCHITECT:
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029
226 W 26TH STREET, 5TH FLOOR NEW YORK, NY 10001
ARCHITECT:
PAINT REBUILT PLASTER CORNICE
NEW LIGHT FIXTURES. SEE LIGHTING DRAWINGS.
7" MAX
REMOVE PAINT AND CLEAN EX. LIMESTONE
8' - 11"
3" 1 _" 2
16' - 0"
5 A-531.00
PATCH MARBLE - SEE SPEC
13' - 6"
AUTO DOOR OPENER BOLLARD - SEE SPEC
RECONSTRUCT MARBLE AT CORNER - SEE SPEC
90 BROAD STREET, #1501 NEW YORK, NY 10004
3 A-531.00
PAINTED METAL ANGLE THINNER LINE REPRESENTS 1/16" JOINT, TYP. NEW CAST-STONE LINTEL TO MATCH EXIST. LIMESTONE. SEE STRUC DRAWINGS HEAVIER THINE REPRESENTS AUTOMATIC SWING 1/8" JOINT, TYP. OPERATOR - SEE SPEC
90 BROAD STREET, #1501 NEW YORK, NY 10004
STRUCTURAL ENGINEER:
ALUMINUM AND GLASS BALANCED DOORS AS SCHEDULED, SEE SPEC
OLD STRUCTURES ENGINEERING, P.C.
THINNER LINE REPRESENTS 1/16" JOINT, TYP.
90 BROAD STREET, #1501 NEW YORK, NY 10004
HEAVIER THINE REPRESENTS 1/8" JOINT, TYP.
TCC RENOVATIONS HOSPITAL WING A --LOBBY RENOVATION
DOOR STOP
NEW YORK, NY 10006
8 WEST 38TH STREET, SUITE 501 NEW YORK, NY 10018
LASER JET CUT TILES (TYP.) WITH TINTED MORTAR
LIGHTCRAFT
LIGHTING DESIGN:
ENTRY DOOR HEADER DETAIL SCALE: 1 1/2" = 1'-0"
50 BROADWAY HAWTHORNE, NY 10532
165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
ALUM FRAME - SEE BALANCED DOOR SPEC 12' - 6"
MEPFP ENGINEER:
OLA CONSULTING ENGINEERS
OLD STRUCTURES ENGINEERING, P.C.
LIGHTING DESIGN:
FASTEN TO CAST STONE LINTEL ABOVE
LIGHTCRAFT LOBBY ELLIPSE TILE DETAIL (1 QUADRANT SHOWN, TYP. OF 4) 165 BROADWAY, 22ND FLOOR SCALE: 1/2" = 1'-0"
PATCH MARBLE - SEE SPEC
TT2 (TYP.)
STRUCTURAL ENGINEER:
16' - 0"
1 2_" 8 6"
+/- 1' - 3" +/- 11' - 4"
LOBBY SECTION
2 A-332.00 ENTRY VESTIBULE - SECTION LOOKING WEST SCALE: 1/2" = 1'-0"
e t a D
3 A-330.00
A-330.00
EX. FIN. FLOOR
TCC RENOVATIONS HOSPITAL WING A VESTIBULE 1 --- SECTION A-531.00 SCALE: 3/4" = 1'-0" LOBBY SECTION LOOKING NORTH LOBBY RENOVATION SCALE: 1/2" = 1'-0"
OLD STRUCTURES CENTER OF ELLIPSE ENGINEERING, P.C.
CK/MB
1/2" = 1'-0"
n o ti a n g i s e D t n e m u c o D B O D C Y N
STAIR DETAIL SCALE: 1 1/2" = 1'-0"
: e l a c S
AUTO DOOR OPENER BOLLARD - SEE SPEC
PATCH MARBLE - SEE SPEC
: y b d e k c e h C
11" MIN.
EXISTING MARBLE PILASTER
LOBBY SECTION LOOKING SOUTH SCALE: 1/2" = 1'-0"
4 A-903.00
ENTRY DOOR HEADER DETAIL EX. GRANITE BASE SCALE: 1 1/2" = 1'-0"
81817.05
101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202
1 4_" 2
STRUCTURAL ENGINEER:
r e k c ti s b o j N A C S B
1 A-332.00 RY VESTIBULE - SECTION LOOKING EAST LE: 1/2" = 1'-0"
5 A-530.00
OPTICAL TURNSTILES SEE SPEC
TB
e r u t a n g i S & l a e S
HANDRAIL DETAIL SCALE: 1 1/2" = 1'-0"
LIGHTCRAFT 165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
3 A-531.00
1_ " 2
2
SECTION AT ENTRY DOOR HEADER
VESTIBULE SECTION SCALE: 3/4" = 1'-0"
EXISTING MARBLE PILASTER AUTO DOOR OPENER BOLLARD SEE SPEC
FRAMED PICTURES BY OTHERS ALUM AND GLASS BALANCED DOOR OPEN
LIGHTING DESIGN:
50 BROADWAY HAWTHORNE, NY 10532
8 WEST 38TH STREET, SUITE 501 NEW YORK, NY 10018 41_" 02/14/20
.: .: o o N N g t n c i e w j a o r r D P
PATCH MARBLE - SEE SPEC
ALUM AND GLASS BALANCED DOORS SEE SPEC
SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING ALUM WINDOW FRAME - SEE SPEC
1 6_" 2
MEPFP ENGINEER:
DALPOS ARCHITECTS & INTEGRATORS
TT1 (TYP.)
8 WEST 38TH STREET, SUITE 501 NEW YORK, NY 10018
LASER JET CUT TILES (TYP.) WITH TINTED MORTAR
NEW LIGHT FIXTURES. SEE LIGHTING DRAWINGS.
OLA CONSULTING ENGINEERS
ELEVATIONS AND SECTIONS
DOOR STOP
ALUMINUM AND GLASS BALANCED DOORS AS SCHEDULED, SEE SPEC
110B
: y b n w a r D
PITCH 1/8" PER FT
ALUM WINDOW WITH APPLIED FILM AT BACK OF INTERIOR GLAZING IN EXISTING OPENING - SEE SPEC
METAL GRILLE. SEE SPEC. EX. STONE LINTEL
ALUM FRAME - SEE BALANCED DOOR SPEC
S. STL. CORNER GUARDS
AUTOMATIC SWING OPERATOR - SEE SPEC
IN ASSOCIATION WITH
: e t a D e u s s I
ENLARGED MASONRY OPENING - SEEEX. STRUC FIN. FLOOR DRAWINGS
1/2" COMPRESSIBLE JOINT FILLER, ALL AROUND
1"
4 A-530.00
90 BROAD STREET, #1501 110A NEW YORK, NY 10004
EX. GRANITE BASE
NEW GRANITE STEPS
1 A-531.00
TAIL
OLD STRUCTURES INACTIVE LEAF ENGINEERING, P.C.
4
FASTEN TO CAST STONE LINTEL ABOVE
EX. SECURITY3 JOINT SEALANTS (AT BOTH ENDS) AT CAMERA NEW CAST STONE LINTEL - SEE STRUC A-903.00 DWGS
PARTITION AT WINDOW TYPE B. PAINT MATTE ACTIVE BLACK. SEE CONST. LEAF PLAN A-130
A-903.00 1/4" X 1/4" GROOVES @ 1" O.C.
B
ALUM AND GLASS BALANCED DOORS SEE SPEC
1_ " 2 1 4_" 2
STRUCTURAL ENGINEER: LINE OF NEW GWB
109A
0' - 3"
1 4_" 2
12 EAST 49TH STREET, 11TH FLOOR NEW YORK, NY 10017
AUTOMATIC SWING OPERATOR - SEE SPEC
1" 1" 1"
COVER BASE FLANGE
A
50 BROADWAY HAWTHORNE, NY 10532
A-903.00
IN ASSOCIATION WITH
MEPFP ENGINEER:
50 BROADWAY HAWTHORNE, NY 10532
101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202
100% CD Submission 02/14/20 95% CD Submission SCRAPE. 01/31/20 CLEAN, AND ELECTROSTATICALLY11/01/19 PAINT EXISTING DD Submission
226 W 26TH STREET, 5TH FLOOR NEW YORK, NY 10001
OLA CONSULTING ENGINEERS
DALPOS ARCHITECTS & INTEGRATORS
SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING TRANSOM WINDOW FRAME. SEE SPEC.
AUTOMATIC SWING OPERATOR - SEE SPEC
ELECTROSTATICALLY PAINT EXISTING TRANSOM WINDOW FRAME - SEE SPEC
EXIT SIGN
NEW METAL HANDRAIL
DOOR ER BOLLARD
3
NEW CAST-STONE LINTEL TO MATCH EXIST. LIMESTONE. SEE STRUC DRAWINGS
2 A-903.00
s n o i s i v e : R e l it T g n i w . a o r N D
EX. FRIEZE
ND ING IN GRETE EC
PAINTED METAL ANGLE
OLA CONSULTING SCRAPE AND CLEAN, ENGINEERS
TT2 (TYP.)
226 W 26TH STREET, 5TH FLOOR NEW YORK, NY 10001
1 2_" 8
1 6_" 2
METAL GRILLE. SEE SPEC.
EX. STONE LINTEL MEPFP ENGINEER:
LINE OF NEW GWB PARTITION AT WINDOW TYPE B. PAINT MATTE BLACK. SEE CONST. PLAN A-130
ARCHITECT:
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
SPOT LIGHTING (TYP. OF 2) - SEE LIGHTING DWGS
101 N. CLINTON STREET SUITE 300 SCRAPE. CLEAN, AND SYRACUSE, NY 13202 ELECTROSTATICALLY PAINT EXISTING
3 A-630.00
WEDGE ORS, TYP.
CENTER LINE CONCEALED SPRINKLER HEAD ON PILASTER (TYP.) - SEE SPRINKLER DWGS
LINEAR LIGHT - SEE LIGHTING DWGS
3 A-630.00
+/- 1' - 3"
2 A-903.00
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202
6"
CUSTOM LIGHT RING SUPPORTED FROM DALPOS STRUCTURE ABOVE - SEE LIGHTING DWGS SCRAPE, CLEAN, AND ELECTROSTATICALLY PAINT EXISTING EX. MARBLE & PANEL TO REMAIN (TYP. U.O.N.) ARCHITECTS INTEGRATORS TRANSOM WINDOW FRAME. SEE SPEC.
CLEAN EX. GUASTAVINO TILE AND STONE CEILING (TYP.)
PENDANT LIGHTING (TYP. OF 2). LOCATE NEW PENDANT FIXTURE TO BE MOUNTED IN EXISTING LOCATION - SEE LIGHTING DWGS
MARBLE INFILL ST2
+/- 11' - 4"
CUSTOM LIGHT RING SUPPORTED FROM STRUCTURE ABOVE - SEE LIGHTING DWGS
ARCHITECT:
DALPOS ARCHITECTS & INTEGRATORS
TT1 (TYP.)
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029
PAINT EX. PLASTER CEILING - SEE SPEC
IN ASSOCIATION WITH
DECORATIVE TRANSFER GRILLE - SEE SPEC. AND MECHANICAL DWGS
PAINTED PLASTER CORNICE TO MATCH EXISTING
1 A-531.00
TERENCE CARDINAL COOKE HEALTH CARE CENTER
44 W 18TH STREET, 8TH FLOOR NEW YORK, NY 10011
AUTOMATIC SWING OPERATOR - SEE SPEC
1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029
IN ASSOCIATION WITH
ACHESON DOYLE PARTNERS ARCHITECTS, P.C. PAINT EX. PLASTER CEILING - SEE SPEC
TERENCE CARDINAL COOKE HEALTH CARE CENTER
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
LIGHTING DESIGN:
LIGHTCRAFT 165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
CENTER OF ELLIPSE
TCC RENOVATIONS HOSPITAL WING A --LOBBY RENOVATION
12' - 6"
TCC RENOVATIONS HOSPITAL WING A --LOBBY RENOVATION
5 A-531.00
LOBBY ELLIPSE TILE DETAIL (1 QUADRANT SHOWN, TYP. OF 4) SCALE: 1/2" = 1'-0"
EXIST. CONCRETE SLAB
EXISTING WIRE HANGER TO REMAIN.
RECESSED LED DOWNLIGHTS - SEE LIGHTING DWGS PAINTED GWB SUSPENDED CEILING
NEW STRUCTURAL STEEL TUBE BEYOND IN TWO LOCATIONS. REFER TO STRUCTURAL DRAWINGS TO COORDINATE FRAMING
EXIT SIGN
1'-0"
PAINTED GWB
RECESSED LED DOWNLIGHTS - SEE LIGHTING DWGS
LOBBY H-108
PAINTED GWB SUSPENDED CEILING
SEE SPEC AND MECHANICAL DWGS
NURSE STATION H-130
EXISTING CONCRETE PLANTER
LOBBY H-108
PARTITION AS SCHEDULED
1"
OPEN
c
3'-0" 7" EQ.
c
3' - 0"
3'-2" c
TYP
LOBBY GRILLE PLAN SCALE: 1 1/2" = 1'-0"
6 A-531.00
RECEPTION CEILING DETAIL SCALE: 1 1/2" = 1'-0"
r e k c ti s b o j N A C S B
4 A-531.00
FLAT HOOK ANCHOR AND DOWEL
n o ti a n g i s e D t n e m u c o D B O D C Y N
EL. +9'-0 (VIF)
1 _" 2
SEALANT 1'-4"
: e l a c S
B.O.S
SEALANT
CK/MB
As indicated
A-531.00
EXIT SIGN - SEE ELECATRICAL DWGS AND SPECS FINISH EDGE OF PANEL TO ALIGN WITH CENTER LINE OF EXISTING PANEL JOINT
SEALANT
: y b d e k c e h C
1 5_8" METAL TRACK
e r u t a n g i S & l a e S
SEE STRUCTURAL DRAWINGS
TB
.: o .: N o N g t n c i e w j a o r r D P
6 A-531.00
: y b n w a r D
TERRAZZO TILE BASE - TT1 - SEE SPEC
5/8" GYPSUM CEILING
5 A-532.00
02/14/20 81817.05
4" HEAVY GAUGE METAL TRACK
FURRING CHANNELS
RECEPTION CEILING DETAIL SCALE: 1 1/2" = 1'-0"
: e t a D e u s s I
n o ti a n g i s e D t n e m u c o D B O D C Y N
EXTERIOR STAIR SECTION SCALE: 1" = 1'-0"
LOBBY GRILLE SECTION SCALE: 3/4" = 1'-0"
GROUT AT JOINT, TYP.
4" HEAVY GAUGE METAL STUD
r e k c ti s b o j N A C S B
2 A-530.00
2 A-531.00
SECTION AT LOBBY GRILLE
SELF-TAPPING SCREWS AND FENDER WASHER
1 5_8" METAL STUD
FLATBASE HOOK ANCHOR MARBLE INFILL SALVAGED FROM EXISTING AND DOWEL REMOVED MARBLE TO MATCH ADJ.
e t a D
: e l a c S
e r u t a n g i S & l a e S
1'-4"
RECEPTION SECTION LOOKING NORTH SCALE: 1/2" = 1'-0"
r e k c ti s b o j N A C S B
SECTION AT EXTERIOR STAIR
NEW MARBLE CLADDING , SEE MATERIALS SCHEDULE AND SPEC.
COPPER WIRE
SEALANT
SEALANT
1 7_ " 2
14
SEALANT
MORTAR SPOTS
DIRECT HANG CLIP CAR #548-58-SM, OR APPOVED CLIP, TYP
DETAILS
NEW CAST PLASTER MOLDING TO MATCH EXISTING PROFILE
CK/MB
02/14/20 01/31/20
s n o i s i v e R : e l it T g n i w . a o r N D
: y b d e k c e h C
.: .: o o N N g t n c i e w j a o r r D P
SEE STRUCTURAL DRAWINGS
GAT CLIP 4 B1.5L, CAT# 16-59-SM, OR OTHER APPROVED MEANS, TYP
100% CD Submission 95% CD Submission
REMOVE AND REPLACE PLASTER ON METAL LATH CEILING, 5'-0" AROUND ENTIRE PERIMETER TO MATCH EXITING, SEE REFERENCE
As indicated
A-531.00
EXIT SIGN - SEE ELECATRICAL DWGS AND SPECS FINISH EDGE OF PANEL TO ALIGN WITH CENTER LINE OF EXISTING PANEL JOINT 30" LENGTH RADIATOR PAINTED MATTE BLACK B.O.S SEE MECH DWGS EL. +9'-0 1_2" (VIF)
SEALANT
LINE OF WALL ABOVE
OPTICAL TURNSTILES - SEE SPEC CRASH RAIL/ HANDRAIL - SEE SPEC
: y b n w a r D
SOLID SURFACE RECEPTION DESK WITH MARBLE COUNTERTOP - SEE DWGS A-333 AND A-540 FOR DETAILS
2 A-531.00
TB
11_2" COLD ROLLED . 475# NOT TO EXCEED 4'-6" O.C.
DECORATIVE METAL GRILLE - SEE SPEC 1 5_8" METAL STUD
3"
02/14/20 81817.05
n o ti a n g i s e D t n e m u c o D B O D C Y N
4 A-332.00
LOBBY GRILLE PLAN SCALE: 1 1/2" = 1'-0"
: e t a D e u s s I
4 A-531.00
1 7_ " 2
1/2" = 1'-0"
A-332.00
4"
n o ti a n g i s e D t n e m u c o D B O D C Y N
A-530.00
MARBLE-FACED CABINET DOORS SEE DWG 6/A-532
e r u t a n g i S & l a e S
RECEPTION SECTION LOOKING SOUTH SCALE: 1/2" = 1'-0"
SOLID SURFACE RECEPTION DESK WITH MARBLE COUNTERTOP - SEE DWGS A-333 AND A-540 FOR DETAILS
As indicated
: e l a c S
2 A-531.00
LOBBY GRILLE SECTION SCALE: 3/4" = 1'-0"
30" LENGTH RADIATOR PAINTED MATTE BLACK - SEE MECH DWGS MARBLE BASE INFILL TO MATCH ADJ.
81817.05
CK/MB
EXISTING RIBBED CEILING STRUCTURE TO REMAIN.
NEW BLOCKING TO SUPPORT NEW MOLDING
1/4" DIA. GAL STL HANGING ROD 4'-6" O.C. MAX
r e k c ti s b o j N A C S B
CRASH RAIL/ HANDRAIL - SEE SPEC
AUTO DOOR OPENER SEE SPEC
Checker
1/8" SHEET METAL PANEL WITH MATTE BLACK FINISH - LOBBY SIDE
1 5_8" METAL TRACK
FURRING CHANNELS
e r u t a n g i S & l a e S
TERRAZZO TILE BASE - TT1 - SEE SPEC
: e l a c S
: . : o . o N N g t n c i e w j a o r r D P
81817.05
: y b d e k c e h C
: y b n w a r D
Author
TB
5/8" GYPSUM CEILING
DECORATIVE METAL 5 GRILLE - SEE SPEC A-532.00
GROUT AT JOINT, TYP.
1"
4" HEAVY GAUGE METAL TRACK : y b d e k c e h C
MARBLE BASE INFILL SALVAGED FROM EXISTING REMOVED MARBLE TO MATCH ADJ. 1/8" SHEET METAL PANEL MECH PLENUM BOX ABOVE - SEE MECH WITH MATTE BLACK DWGS FINISH
NEW MARBLE CLADDING , SEE MATERIALS SCHEDULE AND SPEC.
SELF-TAPPING SCREWS AND FENDER WASHER 4" HEAVY GAUGE METAL STUD
DIRECT HANG CLIP CAR #548-58-SM, 02/14/20 OR APPOVED CLIP, TYP .: .: o o N N g t n c i e w j a o r r D P
109B
MECH DUCT ABOVE - SEE MECH DWGS
NEW PARTITION
GAT CLIP 4 B1.5L, CAT# 16-59-SM, OR OTHER APPROVED MEANS, TYP
ELEVATIONS AND SECTIONS
EXISTING WIRE HANGER TO REMAIN.
NEW STRUCTURAL STEEL TUBE BEYOND IN TWO LOCATIONS. REFER TO STRUCTURAL DRAWINGS TO COORDINATE FRAMING
H-108 SEALANT
MORTAR SPOTS COPPER WIRE
: y b n w a r D
MARBLE SURROUND - SEE SPEC
30" LENGTH RADIATOR PAINTED MATTE BLACK SEE MECH DWGS
HANGING ROD 4'-6" O.C. MAX 11_2" COLD ROLLED . 475# NOT TO EXCEED 4'-6" O.C.
02/14/20 01/31/20
DETAILS
NEW CAST PLASTER MOLDING TOLOBBY MATCH EXISTING PROFILE
e t a D
ENLARGED MASONRY OPENING - SEE STRUC. DWGS
LINE OF WALL ABOVE
01/30/20
PARTITION AS SCHEDULED
2 A-531.00
SHELVING, CABINETRY, AND EQUIPMENT TO BE REMOVED AND REINSTALLED
H.M. DOOR AND FRAME
GLASS WINDOW SEE SPEC
EX. RUBBLE FOUNDATION WALL
3 A-332.00
01/30/20 OPEN
EXTERIOR STAIR PLAN AND DETAILS
30" LENGTH RADIATOR PAINTED SIGNAGE BY MATTE BLACK - SEE OTHERS MECH DWGS MARBLE BASE INFILL ALUMINUM AND TO MATCH ADJ.
ALUM AND GLASS BALANCED DOORS - SEE SPEC
CLEAN UTILITY ROOM
EX. ACT SUSPENDED CEILING
: e t a D e u s s I
A
95% CD Set
MECH PLENUM BOX ABOVE - SEE MECH DWGS
DECORATIVE METAL GRILLE - SEE SPEC
: e t a D e u s s I
T.O. SIDEWALK
DECORATIVE METAL GRILLE - SEE SPEC
e t a D
109A
FINISH
s n o i s i v e R : e l it T g n i w . a o r N D
MARBLE INFILL 1/8" SHEET METAL PANEL PANEL - SEE WITH MATTE BLACK DWG 6/A-532
T.O. EXISTING VESTIBULE SLAB
NEW 6" CONC. SLAB SEE STRUC DWGS
NEW GRANITE STEPS
7 (TYP.) GWB A-532.00 PT-X 4" 3"
NEW GRANITE LANDING 11"
PAINTED
PAINTED GWB (TYP.) PT-X
MECH DUCT ABOVE - SEE MECH DWGS
NEW PARTITION
4 A-530.00
02/14/20 01/31/20 11/01/19
s n o i s i v e : R e l it T g n i w . a o r N D
SHELVING, CABINETRY,PAINTED GWB (TYP.) AND EQUIPMENT TO BEPT-X REMOVED AND REINSTALLED
100% CD Submission 95% CD Submission DD Submission 1/4" DIA. GAL STL
100% CD Submission 95% CD Submission
REMOVE AND REPLACE PLASTER ON METAL LATH CEILING, 5'-0" AROUND ENTIRE PERIMETER TO MATCH EXITING, SEE REFERENCE
NEW BLOCKING TO SUPPORT NEW MOLDING
LOBBY H-108 1/8" SHEET METAL PANEL WITH MATTE BLACK FINISH - LOBBY SIDE NURSE STATION H-130
8"
NURSE STATION H-130
s n o i s i v e R : e l it T g n i w . a o r N D
NEW METAL HANDRAIL
e t a D
7 A-532.00
EX. ACT SUSPENDED CEILING
EXIST. CONCRETE SLAB
EXISTING RIBBED CEILING STRUCTURE TO REMAIN.
8"
NURSE STATION MARBLE SURROUND - SEE SPEC H-130 DECORATIVE TRANSFER GRILLE -
TERENCE CARDINAL COOKE HEALTH CARE CENTER 1240 - 1249 FIFTH AVENUE NEW YORK, NY 10029 ARCHITECT:
ACHESON DOYLE PARTNERS ARCHITECTS, P.C. 44 W 18TH STREET, 8TH FLOOR NEW YORK, NY 10011 IN ASSOCIATION WITH
DALPOS ARCHITECTS & INTEGRATORS 101 N. CLINTON STREET SUITE 300 SYRACUSE, NY 13202
DELIVERY DOCK B01
MECH B70
GENERATOR B69
DELIVERY DOCK B01
MECH B70
MEPFP ENGINEER:
GENERATOR B69
OLA CONSULTING ENGINEERS RECEIVING B01A
OXYGEN STORAGE B06
VEST. B04
STORAGE B02
OFFICE B11
REF B16A FOOD PREP B16
OFFICE B05B
POT WASH B17
KITCHEN B09
CORRIDOR B31
DISHWASHING B28
CLOSET B34
STORAGE B29
DRY STORAGE B28A
REFRIG B20
OFFICE B60B
STORAGE B17
ELECTRICAL B66 B68
LOCKER/ TOILET B67
JC B38
STAIR B
ELEC B65A
STORAGE B26
WOMEN'S LOCKER ROOM B22 ALCOVE B23
CLERICAL B42A
FOOD SVCE CLOSET B43
FOOD SVCE OFFICE B41
CLEAN LINEN/ LAUNDRY B26
11/15/19
FOOD SVCE DIRECTOR B41B
FOOD SVCE ASST. DIR. B41A
MEN'S LOCKER ROOM B24
BASEMENT FLOOR CONSTRUCTION PLAN
ALCOVE B23
ELECTRICAL B68
LOCKER/ TOILET B67 POTWASH B49
SOILED LINEN B36
CATERING PREP B46
DISPOSABLES STORAGE B47
ELEC B65A JAN. CL. B38
CL. B40
ELECTRICAL B65B
FOOD SVCE CLOSET B43
DRY STORAGE B45
ELECTRICAL B65
TOILET B24A
11/15/19 TB
CK/MB 1/8" = 1'-0" TOILET B22A
TOILET B22A
A-121.00 BASEMENT CONSTRUCTION PLAN - PHASE 02 c
BASEMENT CONSTRUCTION PLAN - PHASE 01
c
ELEV #1
CORRIDOR B33 CORRIDOR B25
COLD FOOD PREP B48
ELEV #2
CORRIDOR B31 TEL/DATA CL B34
WOMEN'S LOCKER ROOM B22
ELECTRICAL B65
81817.02
BASEMENT FLOOR CONSTRUCTION PLAN SCALE: 1/8" = 1'-0"
JAN. CL. B28C
FOOD STORAGE B42
DD Submission
DRY STORAGE B45
HOT FOOD PREP B51
FOOD SVCE OFFICE B50
EXIT CORR. B21
ELECTRICAL B65B
TOILET B24A
1 A-121.00
DISHWASHING B28
ELEC SWITCH BOARD B56
CL. B32
CL. B30
SOILED CART B28B
CLEAN CART B28A
FOOD STORAGE B42
JC B27
FOOD SVCE CL. B50A
STORAGE B19
PURCHASE OFFICE B42
MEN'S LOCKER ROOM B24
CL. B05A
1489 BALTIMORE PIKE, SUITE 109 SPRINGFIELD, PA 19064
STAIR B
EXIT CORR. B21
STAIR E
CL B03A
ELEV #3
CL. B40 CORRIDOR B25
STORAGE B05
CL. B09A
TCC RENOVATIONS STORAGE B09 HOSPITAL WING A --MISC. ALTERATIONS BASEMENT AND FIRST FLOOR
LONG TERM STORAGE B66
SEWING & LAUNDRY STORAGE B64
SOILED LINEN B62
CL. B05B
STORAGE B18
CLEAN LINEN B61A
ELEV #1
CORRIDOR B33
STORAGE B41
FOOD SERVICE CONSULTANT:
CLEAN LINEN B61
TRAY ASSEMBLY B53 OPEN TO BELOW
CL. B11
CORSI ASSOCIATES
STORAGE B46
CORRIDOR B03
165 BROADWAY, 22ND FLOOR NEW YORK, NY 10006
STORAGE B16
OFFICE B60A
HOUSE KEEPING SUPPLIES B60
ELEV #2
ELEV #4
CORRIDOR B07
LIGHTING DESIGN:
OFFICE B58B
LOCKER B58C
STOR. B30
CL. B02
90 BROAD STREET, #1501 NEW YORK, NY 10004
LIGHTCRAFT
CLOSET B34
PAPER GOODS B19
OLD STRUCTURES ENGINEERING, P.C.
STORAGE B15
OPEN TO BELOW
STAIR E
ELEV #3
VEST. B04
STRUCTURAL ENGINEER: PHARMACY B58
ELEC SWITCH BOARD B56
OFFICE B09A
PAPER GOODS B18
VESTIBULE B58A
OFFICE B05A
STAFF B05
OXYGEN STORAGE B06
12 EAST 49TH STREET, 11TH FLOOR NEW YORK, NY 10017
CORRIDOR B03
CORRIDOR B07
STORAGE B15
EXIT HALL 50 BROADWAY B08 HAWTHORNE, NY 10532
ELEV #4
1 A-121.00
BASEMENT FLOOR CONSTRUCTION PLAN SCALE: 1/8" = 1'-0"
As for the basement level, the relocation of the kitchen was the driving factor in the layout along with spaces required for the renovation work at the 7th and 8th floors by another firm. Along with the design scope of the project, the construction timeline and client’s wishes created additional coordination efforts for us to accurately represent the work in multiple phases and construction packages.
15
Custom Kitchen Design Status: 2019 (Complete) Location: Barbados Software: SketchUp
Designing a kitchen renovation for my grandmother, who lives in Barbados, was both a professional as well as a personal achievement. As an elderly woman, moving in and out as well as within the existing kitchen was uncomfortable and certainly not ideal. The design prioritized accessibility and a more spacious layout as opposed to the previous congested design. Relocating the refrigerator and removing the cabinetry subdividing the kitchen and dining space were the basis for design.
Millwork design and finishes were provided to and installed by Smart Kitchen, a kitchen Barbados.
manufacturer in
16
17
18
19
20
21
OF NEW YORK ENT OF DESIGN AND CONSTRUCTION
OF PUBLIC BUILDINGS Bellevue Men’s Shelter
TITLE: S : 2016 - O tatus
n going
Location: New York, NY Software: AutoCAD
FACADE REPAIR & WINDOW REPLACEMENT BELLEVUE MEN’S SHELTER
The Bellevue Men’s Shelter is New York City’s largest homeless men’s shelter accommodating approximately 850 men per night. The building opened in 1933 and initially housed the psychiatric ward of the Bellevue Hospital before becoming the homeless shelter it is today in PHOTO #1 – NORTH CENTRAL VIEW 1984 once the psychiatric ward moved into the new Bellevue Hospital next door.
LOCATION:
PHOTO #2 – NORT
PHOTO #1 – NORTH CENTRAL VIEW
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
PHOTO #2 – NORTH EAST VIEW
400 EAST 30th STREET NEW YORK, NY 10016
Bellevue was a major project for the firm given the political ramifications and scope of the project. Inspections have shown the building to have multiple unsafe conditions and safety violations, including one incident where a piece of the terra cotta cornice fell onto the sidewalk. The scope of this project includes restoration and renovation of the building’s facades and cornices including brick, limestone, and terra cotta replacements, as well as a separate package for the roof replacement work.
:
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
MANHATTAN
AGENCY 22
PHOTOS
EXISTING CONDITIONS P
NTS
PHOTO #4 – SOU
PHOTO #3 – EAST CENTRAL VIEW
DEPARTMENT OF HOMELESS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
23
DAMAGED EXISTING ROOFING
DAMAGED EXISTING ROOFING
DAMGED TERRACOTTA (T.C) CORNICE (TYP)
NOT IN CONTRACT
CRACKED BRICK MASONRY (TYP.) RUSTED CAST IRON PANEL (TYP.) DAMAGED T.C. CORNICE (TYP.) DETERIORATED EXISTING WINDOWS (TYP.) EFFLORESCENCE STAINING, TYP- SEE PHOTO AT LEFT DAMAGED PARAPET DAMAGED T.C. CORNICE WORN BRICK JOINTS “WASHED OUT” L.S. WATER TABLE JOINTS WORN BRICK JOINTS “WASHED OUT” L.S. WATER TABLE JOINTS
WORN BRICK JOINTS WORN LIMESTONE JOINTS
A
A
24
NORTH ELEVATION - EXISTING SCALE: NTS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
EXISTING ELEVATION
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
ELEVATION
NEW CLAY TILE ROOFING
NEW CLAY TILE ROOFING NOT IN CONTRACT
RESTORE CRACKED BRICK MASONRY RESTORE CAST IRON PANEL INSTALL NEW WINDOWS (TYP.) RECONSTRUCT EXTERIOR MASONRY WALL AND REPAIR STEEL STRUCTURE NEW MASONRY PARAPET RESTORE T.C. CORNICE RESTORE BRICK MASONRY RESTORE L.S. WATERTABLE RESTORE BRICK MASONRY RESTORE L.S. WATERTABLE
RESTORE BRICK MASONRY RESTORE LIMESTONE
A
A
NORTH ELEVATION – PROPOSED SCALE: NTS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
PROPOSED ELEVATION
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
ELEVATION
25
NEW CLAY TILE ROOFING DAMAGED EXISTING ROOFING
NEW CLAY TILE ROOFING
RESTORE CRACKED BRICK MASONRY
NOT IN CONTRACT
NOT IN CONTRACT
INSTALL NEW WINDOWS (TYP.) CRACKED BRICK MASONRY (TYP.)
RECONSTRUCT EXTERIOR MASONRY WALL AND REPAIR STEEL STRUCTURE NEW MASONRY PARAPET RESTORE L.S. WATERTABLE RESTORE BRICK MASONRY RESTORE T.C. CORNICE
DETERIORATED PARAPET CUT T.C. CORNICE WORN BRICK JOINTS “WASHED OUT” L.S. WATERTABLE JOINTS
RESTORE BRICK MASONRY
WORN BRICK JOINTS
RESTORE L.S. WATERTABLE
“WASHED OUT” L.S. WATERTABLE JOINTS
RESTORE BRICK MASONRY WORN BRICK JOINTS
WORN LIMESTONE JOINTS
RESTORE LIMESTONE(L.S.)
B
B
WEST ELEVATION – SECTION THROUGH BUILDING
C
SCALE: NTS
D
BELLEVUE MEN’S SHELTER
PROPOSED ELEVATIONS
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
EXISTING LIMESTONE
2
SCALE: NTS
D
SCALE: NTS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
1
C
EAST ELEVATION – SECTION THROUGH BUILDING
EXISTING LIMESTONE
2
SCALE: NTS
EAST ELEVATION SCALE: NTS
ELEVATIONS THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
EXISTING ELEVATIONS
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
PROPOSED LIMESTONE (IN KIND )
1
SCALE: NTS
EXISTING TERRA COTTA
2
SCALE: NTS
ELEVATIONS
PROPOSED TERRACOTTA CORNICE (IN KIND) SCALE: NTS
NEW WINDOW COLOR TO MATCH ORIGINAL EXISTING WINDOWS
VANDAL SCREEN OVER LOWER SASH
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
MATERIALS- LIMESTONE
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
MATERIALS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
MATERIALS- TERRACOTTA
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
NTS
2
26
PHOTO #7 – EXISTING DOOR CONDITION
PHOTO #8 – EXISTING WINDOW AND BRICK CONDITION
1
TYPICAL PROPOSED WINDOW SCALE: NTS
3
EXISTING ORIGINAL WINDOW SCALE: NTS
PROPOSED ELEVATION SCALE: NTS
THE CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION
BELLEVUE MEN’S SHELTER
ACHESON DOYLE PARTNERS ARCHITECTS, P.C.
9/18/2017
TYPICAL DOUBLE HUNG WINDOW WITH EXTERIOR APPLIED MUNTINS NTS
MATERIALS
MATERIALS
Giants Engin
JFK&M Con
Starr Whiteho
ZI Engineeri
Jablonski Bu
Berzak Schoe
Accu-Cost Co
REVISIONS: NUMBER
CAPITAL PROJE
HH112B PROJECT
BELLEV ROOF R
400 EAS NEW YO FOR THE:
27
DEPARTMENT
DRAWING TITLE
The roof project for Bellevue was completed and filed as a separate package from the overall facade restoration package. This consisted of repairs and reconstruction of approximately 31 roofs, with varying roofing types and existing conditions needing to be addressed.
D O
B
D O
D O
A1
H
A1
R
H
B
J
BB
D O
J X X A2 B1
B1
X
X
D O
B
B D O
H
H
A1
A1
D O
D O
Giants Engineering
Giants Engineering
JFK&M Consulting Group
JFK&M Consulting Group
Starr Whitehouse
Starr Whitehouse
ZI Engineering, P.C. 8" minimum
ZI Engineering, P.C.
Jablonski Building Conservation
4"
Jablonski Building Conservation
Berzak Schoen Consultants, Ltd.
Berzak Schoen Consultants, Ltd.
4"
1"
Accu-Cost Construction Consultan
Accu-Cost Construction Consultants
REVISIONS:
REVISIONS: NUMBER
DESCRIPTION
NUMBER
DATE
NOTES:
1. ROOF DRAIN COMPONENTS AND INSTALLATION GUIDELINES ARE SUPPLIED BY THE DRAIN MANUFACTURER. 2. REQUIREMENTS AND RECOMMENDATIONS DETAILED IN SPECIFICATIONS AND INSTALLERS GUIDE SHALL APPLY IN ADDITION TO THE ABOVE DRAWING. 3. LIQUID WATERPROOFING CANNOT BE APPLIED IN THE ABOVE CONFIGURATION OVER MEMBRANES OR OTHER MATERIALS CONTAINING UNCURED, SOLVENT-BASED MATERIALS. CONTACT ROOFING MANUFACTURER FOR FURTHER INFORMATION. 4. REFER TO MANUFACTURER FLEECE CUTTING RECOMMENDATIONS FOR CONFIGURATIONS, CUTTING, FOLDING, AND LAPPING TECHNIQUES. 5. WHERE PRIMER IS INDICATED TO MAINTAIN PROPER ADHESION, TA-119 PRIMER IS REQUIRED FOR ALL FLASHING REINFORCING AND STRIPPING PLY APPLICATIONS. CONTACT ROOFING MANUFACTURER FOR SPECIFIC REQUIREMENTS.
DESCRIPTION
OVERHEAD VIEW 1 2
3
4
5
CAPITAL PROJECT NUMBER:
HH112BLRR
3
400 EAST 30TH STREET NEW YORK, NY
1"
3"
2
4
1
CAPITAL PROJECT NUMBER:
HH112BLRR PROJECT
BELLEVUE MEN'S SH ROOF REPLACEMENT APPROVED COVERBOARD RIGID INSULATION
400 EAST 30TH STREE NEW YORK, NY
FOR THE:
FOR THE:
DEPARTMENT OF HOMELESS SERVICES
DEPARTMENT OF HOMELESS SERVICES
DRAWING TITLE:
DRAWING TITLE:
SEAL & SIGNATURE
DATE: PROJECT NO: DRAWN BY: CHECKED BY:
28
NTS
5
PROJECT
BELLEVUE MEN'S SHELTER ROOF REPLACEMENT
JUNE 5, 2017 HH112BLRR TB MG,MB
CADO FILE No: _________________
SEAL & SIGNATURE
DATE:
PROJECT
DRAWN B
CHECKED
DRAWING
DRAWING NUMBER:
CADO FIL 22 OF
60
________
Giants Engineering
JFK&M Consulting Group
Starr Whitehouse
ZI Engineering, P.C.
Jablonski Building Conservation
Berzak Schoen Consultants, Ltd.
Accu-Cost Construction Consultants
REVISIONS: NUMBER
DESCRIPTION
CAPITAL PROJECT NUMBER:
HH112BLRR PROJECT
BELLEVUE MEN'S SHELTER ROOF REPLACEMENT 400 EAST 30TH STREET NEW YORK, NY FOR THE:
DEPARTMENT OF HOMELESS SERVICES DRAWING TITLE:
SEAL & SIGNATURE
DATE: PROJECT NO:
JUN HH
DRAWN BY: CHECKED BY: DRAWING NUMBER:
29
CADO FILE No: _________________
As a result of the implications the facade reconstruction work would have on the interior of the building, residents needed to be relocated according to the areas of construction. I led the design efforts of this phase of the project, while presenting the schematic designs to clients and being approved with the layouts. With this being a homeless men’s shelter with the aim of remaining open while under construction, certain wings and floors of the building needed to be refitted and designed to
30
house the residents during the phases of work.
JFK&M Consulting Group
Accu-Cost Construction Consulta
REVISIONS: NUMBER
DESCRIPTION
CAPITAL PROJECT NUMBER:
HH112BLRR PROJECT
BELLEVUE MEN'S SH SWING SPACE DESIG
400 EAST 30TH STREE NEW YORK, NY FOR THE:
DEPARTMENT OF HOMELESS SERVICES DRAWING TITLE:
DATE:
SEAL & SIGNATURE
PROJECT
DRAWN B
NOT FOR CONSTRUCTION
31
CHECKE
DRAWING
CADO FIL
________
Liberty Island Lockers Enclosure Status: 2019 (Unbuilt) Location: New York, NY Software: SketchUp
For this project, ADP was asked to develop a few conceptual designs for a lockers area Liberty Island. The client’s goal was to present a conceptual design to the National Park Service as an alternative to what has been installed currently on site. The designs aimed to provide weather protection for visitors, while allowing clear visibility of the lockers from the exterior of the enclosure. enclosure on
32
CONCEPT 1
33
CONCEPT 1
34
CONCEPT 2
CONCEPT 2
CONCEPT 3
CONCEPT 2
CONCEPT 3
35
Elements Fitness Status: 2018 (Unbuilt) Location: New York, NY Software: SketchUp, AutoCAD
Elements Fitness is a health and fitness brand which combines barre, dance and stretch into total body fusion workouts. With one studio currently residing in East Hampton, NY the company was interested in opening another studio in the Upper East Side of Manhattan. The existing 2nd floor location was designed to include a reception area with retail space for company apparel, an office, break room for instructors, a secondary office with the flexibility of being used as a studio, and the main studio. The main studio is an open fitness area including light weights, floor mats, barres, and wall hung mirrors along with features from the company’s existing studio.
36
37
DN
DN
38
39
Trevor Christopher Blenman tcblenman710@gmail.com (347) 370-2921