15'-10"
11'-4"
10'-2"
COMMERCIAL KITCHEN layout by others; access to be confirmed
BED
3'-6"
9'-0"
BATH
LIVING
WC / SHWR
13'-0"
8'-0" 1" 8'-82
15'-10" 23'-6"
9'-4"
6'-11"
OFFICE
GYM
19'-9" 17'-6"
7'-0"
13'-0"
RECEPTION 5'-0"
8'-7"
6'-0"
STORE
13'-3"
COLD ROOM
5'-8"
WC
4'-0"
washer / dryer
5'-6"
1" 16'-12
closet
KITCHEN
fridge freezer
storage
15'-10"
11'-4"
10'-2"
COMMERCIAL KITCHEN layout by others; access to be confirmed
BED
3'-6"
9'-0"
BATH
LIVING
13'-0"
8'-0" 1" 8'-82
15'-10" 23'-6"
WC / SHWR
9'-4"
6'-11"
OFFICE
GYM
19'-9" 17'-6"
7'-0"
13'-0"
RECEPTION 5'-0"
8'-7"
6'-0"
STORE
13'-3"
COLD ROOM
5'-8"
WC
4'-0"
washer / dryer
KITCHEN
fridge freezer
1 160
RECEPTION AND GYM PLAN 1/4" = 1'-0"
revisions A - 13.11.17 - First Issue (CCRD)
5'-6"
1" 16'-12
closet
2 160
storage
MANAGERS APARTMENT PLAN 1/4" = 1'-0"
client
TCI Beach Developments Ltd
project
Grace Bay Villas - Communal Facilities
drawing
Floor Plan
C O A S T
architects
po box 941 - providenciales - turks & caicos islands - british west indies
scale
drawn
1/4"=1'-0"
ak
checked
status
Preliminary
drawing #
A-320-160
rev
A
e-mail: info@coasttci.com www.coasttci.com
Main ridge line
Main ridge line cedar shingle roof
Eaves
Eaves
white render wall cladding
aluminium frame windows and doors
L1 FFL
1 311
L1 FFL
NORTH ELEVATION
2 311
3/16" = 1'-0"
?
Main ridge line
EAST ELEVATION 3/16" = 1'-0"
Main ridge line
)
A
? )
A
?L
?L
t
t
M
M
X
X
X
X
F
F
Eaves
Eaves
A
access to communal kitchen o be confirmed
t
L1 FFL
3 311
SOUTH ELEVATION 3/16" = 1'-0"
revisions A - 13.11.17 - First Issue (CCRD)
A
t
L1 FFL
4 311
WEST ELEVATION 3/16" = 1'-0"
client
TCI Beach Developments Ltd
project
Grace Bay Villas - Communal Facilities
drawing
Managers Apartment Elevations
scale
drawn
3/16"=1'-0" @ 24" x 36"
mjb
checked
C O A S T
architects
po box 941 - providenciales - turks & caicos islands - british west indies status
Preliminary
drawing #
A-320-311
rev
A
e-mail: info@coasttci.com www.coasttci.com
Main ridge line
Main ridge line cedar shingle roof
Eaves
Eaves white render wall cladding
aluminium frame windows and doors
L1 FFL
1 310
L1 FFL
NORTH ELEVATION
2 310
3/16" = 1'-0"
cedar pergola over reception
? )
Main ridge line
EAST ELEVATION 3/16" = 1'-0"
?
?
)
)
A
Main ridge line
A
?L
?L
t
t
M
M
A ?L t M
X
X
X
X
cedar pergola to shelter gym windows
X
F
X
F
Eaves
F
A
t
Eaves
A
A
t
t
L1 FFL
3 310
SOUTH ELEVATION 3/16" = 1'-0"
revisions A - 13.11.17 - First Issue (CCRD)
L1 FFL
4 310
WEST ELEVATION 3/16" = 1'-0"
client
TCI Beach Developments Ltd
project
Grace Bay Villas - Communal Facilities
drawing
Reception and Gym Elevations
scale
drawn
3/16"=1'-0" @ 24" x 36"
mjb
checked
C O A S T
architects
po box 941 - providenciales - turks & caicos islands - british west indies status
Preliminary
drawing #
A-320-310
rev
A
e-mail: info@coasttci.com www.coasttci.com