Alterations and Additions (Renovation) at Park Central Shopping Mall by AGC Design Ltd

Schematic Proposal

The rennovation of shopping mall occupies in mixed use building which upper part is high-rise residential building, lower part is shopping mall and car park complex and it connects to other shopping mall by footbridge.

Location : Retail Shopping Mall Project - T.K.O. (Hong Kong) Context : Project Architect - AGC Design LTD Credits : Team Director - Grace Cheng, Project Director - Mathew Chong, Architect - Ashley Or Client: Sun Hung Kai Properties LTD Contractor: Teamflied Building Contractors LTD Quanitity Surveyor: RLB Group Limited LTD Consultant : C.M.Wong & Associates Limited (Strcutural Engineering), Arup Group Limited(E&M)

1 Footbridge connect at L1

Due to the large size of the shopping mall and the work should be minimize the inconvenince of constrcution to nearby residents. The construction site will be divided to 2 phases, the first phase started at Oct,2015 and targets to commence operation in Feb 2017. The second phase will start at Feb 2017.

1 Existing Layout

Footbridge connect at L2 Entrance at B1 Level

2 Location Plan 1:5000

5

Footbridge connect at L1

4

1

Location : T.K.O. (Hong Kong) GFA : 86,608 sqm Storey of shopping mall : 4 Main Works: A&A Rennovation and Reconstructed Layout Plan and Structure Design Development: Schemtics Design - Graphic Presentation, Tender Drawing and Specification Statutory Approval: General Building Plans, Structural and Drainage Plans Construction Stage (Phase1): 10/2015-2/2017 (Phase2) 2/2017-4/2018 Architect Inspection, Corrdinate Structural & Building Service matters

6 3

Footbridge connect at G/f

Limitation on Existing Layout 1. 2.

Connection needed for new footbridge Two main entrance at North & East comers only

3. 4. 5. 6. 7.

Simple efficiency plan and shops are too deep Long back corridors at both sides Mono-type of shopfront Old facilities of E&M and fire service Keep 24hours walkway for resident

8

Entrance at B1 level

2 Phase 2 Constrction Area

Schemetic Layout

3

Schematic Proposal 1. 2. 3. 4. 5. 6. 7. 8. 9.

Completed footbridge network Atrium simplified with better visibility and aesthete shape Secondary corridor with different size shops Create double height shop front Shorten back corridors to increase shop area Event Space Food Village Create prominent entrance point at street level Alfresco Dining

Phase 1 Constrction Area

Intended future connection

9

LATEST DESIGN SCHEME

1

5

1

Alterations and Additions at Park Central, Area 57 & 57A, 9 Tong Tak Street, Tseung Kwan O, N.T.

FootBridge connect at L1

Connect to other shopping mall

2

1

7

4

Intended future connection

6 5

B/F Entrance

LATEST DESIGN SCHEME

The intension of design is catering for the customer to stay into casual environment such as park. The interior and categories of shops are related to movement and tree shadow. The new design will take new elements into simultaneous scheme for example entrance types of shopfront and divides walkways for customers to explore this design.

8 Create prominent entrance point Sketchup modelling indicates the organic shop and void opening layout where creates dymanic movement and connection all arcade area.


Lift to Retail Floors, Carpark & Residential Podium (B1, G/F, 1/F, 2/F & Podium)

PHASE 2

PHASE 1

Q3 2018

Q1 2017

1 Freeform shop with lager shop front

Lift to Retail Floors, Carpark & Residential Podium (B1, G/F, 1/F, 2/F & Podium)

3

2 Projected shop with extended shopfront to spandrel

4 Duplex shop with double hight shopfront

Feasibility Sketches

Kisok in arcade defines shop area

CARPARK ENTRANCE

CARPARK ENTRANCE Lift to Retail Floors (B1, G/F, 1/F & 2/F)

DUPLEX SHOP CONNECTION VIA FOOTBRIDGE Baby Care Area KIDS ZONE

Lift to Retail Floors (B1, G/F, 1/F & 2/F)

Lengend: Foot & Beverage Retail Lounge 24 hrs walkway Phasing line Fire shutter

ENTRANCE VIA ALFRESCO DECK

First Level 1:2000

Zoning Plan Lift to Retail Floors,Carpark & Residential Podium (B1, G/F, 1/F, 2/F & Podium)

STREET ENTRANCE

Lift to Retail Floors (B1, G/F, 1/F & 2/F)

CARPARK ENTRANCE

CARPARK ENTRANCE

ARRIVAL ATRIUM

EVENT ZONE

DUPLEX SHOP ANCHOR SHOP

HIGH SHOP FRONT CONNECTION VIA FOOTBRIDGE

1. SPATIAL EXPERIENCE

DROP-OFF ENTRANCE

 ARCADE AND SHOP INTEGRATON AND IDENTITY

COSMETIC ZONE STREET ENTRANCE Lift to Retail Floors (B1, G/F, 1/F & 2/F)

Lengend:

ENTRANCE VIA ALFRESCO DECK

Foot & Beverage Retail Lounge 24 hrs walkway Phasing line Fire shutter

Zoning Plan

 ARRIVAL AMBIANCE/ DIRECTORY GUIDE / AD.

ENHANCEMENT

ENTRANCE FROM SUPERMARKET

 SHOPS VISIBILITY / SIGHTLINE

2. FEATURED ZONES 

EVENT ZONE

COSMETIC ZONE

KIDS ZONE

TUTORIAL ZONE

DUPLEX ZONE

REFRESHING LOUNGE (INTEGRATED WITH LAVATORY/ WAIT AREA/ DIRECTORY/ AD./ CARPARK ENTRANCE/ CHARGING STATION)

INCREASED L.F.A. (+6%)

INCREASED NUMBER OF SHOPS (+64 SHOPS, +45%)

INCREASED TOTAL LENGTH OF SHOPFRONT (+ 480 m, +34%)

CONSTRUCTION COST CONTROL

The simple and regular layout plan of old design led to unattrative experenice for customers. The design new layout increase the interactions between shop and customers. Comparing the old design, the commercial value are rised up by incresing visibilities of shops like breaking up deeper shops to more smaller shops. It also creates new catrgories of shopfront to enhace shops’ integrations and identities and journal experience in arcade.

Construction Stage

Ground Level 1:2000

Proping and stregthening works under reconstructed slab

Schemetic Layout on Void Refining Layout on Void After Corrdinated With Structural Engineer

3. COMMERCIAL VALUE

First Level Part Plan 1:1000

Steel works for extended slab

Hoarding and 24 hrs workway for resident

Due to the cost control ,load-bearing ability and existing condition reasons, by coordinating with structural engineers, the refining void will be allowed (extended and substracted) not more than 4m away from the existing beams. It aslo need to have additional fire shutters and temporary refuge spaces for fulfilling latest regulations and increased number of shops.


Tender Drawings

Sun Po Kong Hotel by AGC Design Ltd

N

Location : Sun Po Kong - Hong Kong Context : Project Architect - AGC Design LTD Credits : Team Director - Grace Cheng, Project Director - Vincent Wong, Architect - Bret Chiu Client : Uppermax Group LTD Quanitity Surveyor: R&LGroup LTD Consultant : MeinHardt Group Limited (Strcutural Engineering & E&M)

Coloured Lengend: Reinforced Concrete Solid Concrete Block Sanitary Fitment Cement Rendering Tember Glass Mosaic or other non-absorbent floor tiles Half/ Soft Landscaped Area Steel Work Stone Vertical Green

Basement

Sun Po Kon Site Plan 1:5000

G/F

L1 A

Location : Sun Po Kon, Kowloon (Hong Kong) GFA : 241,1380 sqm Storey : 32 Capacity: 880 guests Duty of work: Tender Drawings and Schemetic Presentation (All less than 100hrs) Current Stage: Tender and construction (Fundation) Construction Stage : Targets to commence operation in the mid-year of 2018

Overall Scheme

L2

The building was designed to acheive “Beam Plus” award from Hong hong Green Building Council (HKGBC).The main scores to fulfill “Beam Plus” in this building are green features of facade and highly performance of indoor environemtal quality The outdoor terrace in level1 form as farming flied and backyards for farming and gardening fresh food to the restaurant. The glass cladding in hospitable zone at southern elevation reduces use of artifical light and more likely nature enivronment. The E&M rooms are located at 4-6L reduces structural loadings at the roof. The efficient arrangment and managment of the building serivce can gain extra scores by architects to further coordinate with building service engineer and layout plan arrangement.

B

Refuge Floor

L3

B

L7-L29 Typical Floor

R/F

A Lourvre for heat rejection at servant floors Curtain Wall facing north allows sufficient lighting to guest rooms Emulaified paint on concrete in black, low cost and induces self cleaning Aluminium cladding mounted on the concrete structure Outdoor Green Terrace

7/F – 29/F Guestrooms (23 Storey)

Outdoor Terrace at 2/F

A portion of headroom -7m approx. at transfer plate and e&m floor to be amended at next GBP submission 4/F – 7/F BOH/E&M/Refuge 3/F All Day Dining

2/F Checkin 1/F Restaurant

N

G/F – 3/F Podium

G/F Lobby Basement (1 storey) Car Park

Big Opening facing on street

Rhinoceros Model for studying material identity on building facade and each feature spaces

Piling Plan Provided By Meinhardt Group for foundation works

SECTION A

SECTION B

The thickness of precast concrete will be specified to 400mm to produce sufficent load-bearing ability for plant rooms