CHRISTINA TEFEND undergraduate portfolio | 2015
I AM committed to finding workable solutions to design problems, finding joy in both progress and product.
I BRING a consistently positive attitude, a willingness for collaboration, and a passion for exceeding expectations.
I WILL be diligent and eager, devote myself to my work, and put in any amount of effort to continuously improve.
01 : SAFE HAVEN multi unit housing complex : Over the Rhine, Ohio
02 : MISBEHAVED TECTONICS kung-fu summer camp : Cincinnati, Ohio
03 : HIP HOP + ARCHITECTURE residential row house : Covington, Kentucky
04 : LANGREE HOUSE residential row house : Covington, Kentucky
05 : STADIUM EAST live work community : Seattle, Washington
06: KUWAIT CANCER CENTER cancer hospital : Abdali, Kuwait
04
01 SAFE HAVEN manifesting physical and mental comfort
This multi-unit apartment complex was designed on a triangular shaped site in Over-The-Rhine, Cincinnati. The site provided an interesting challenge, with a 16’ elevation change between the two streets, allowing for entrance into the tenant spaces at two different levels. With the site being located in such a historic as well as up-and-coming area, each student was urged to take a look at how our designs can affect, influence, and benefit the existing culture. The focus of my design revolved around creating a safe and comfortable space, both mentally and physically, for women and children affected by domestic violence. After researching the history of the site, it was clear to me that domestic violence was an issue that needed attention. The architecture of the space instilled the idea of comfort and safety at every turn, through metaphorical leaps like the “hugging� of the units that puzzled together, to more practical ways like yoga studios, doctors office, and educational centers for the residents. The facade undulates in and out, mimicking the rise and fall of the topography and providing sun shading where needed. Spring 2015 : Rhino / Grasshopper / V-Ray / Photoshop
05
THE UNITS A compilation of spacious 1,2 and 3 bedroom units play with the idea of safety by puzzle piecing together, giving the neighboring unit a metaphorical “hug.� Every other unit juts out slightly from the next and has a wooden panel cladding, showing this puzzle piece effect on the exterior facade.
06
THE RESIDENTS Safe Haven serves to reach out to members of society that have been affected by domestic violence or any sort of turmoil in their lives and are seeking help in a community who understands their situation. By providing 24-7 support for the residents, an immense comfort and bond is formed.
07
aBIKE. FRIENDLY PATHS
BUS ROUTES
b.
NEIGHBORHOODS
c.
a. b. c. d. e.
d.
POSITIVE / NEGATIVE NODES
e. PARKS
bike friendly routes bus routes neighborhoods positive + negative nodes parks
THE SITE Over - the - Rhine is an up and coming neighborhood near downtown Cincinnati where craft brewing and farm-to-table restaurants are thriving. However, it was not always this way. As the neighborhood becomes more popular with young, wealthy adolescents, it is still occupied by many homeless and less fortunate people. The goal of this multiunit housing project was to try and mesh these two worlds seamlessly and give thought to how to better the community.
SECTION 02
10
11
12
02 MISBEHAVED TECTONICS a folded plate interactive space for collaboration and focus
The site for this kung fu camp is on Mt. Airy State park in Cincinnati, Ohio. It’s vast, green landscape provided an elegant backdrop for this very modern design. The space provided a quiet, focused space for practice and performance. The design involved a plastic, easily manipulated, folded plate system that crawled throughout the site, either providing shade over indoor areas, or private walls between outdoor areas. The nature of the material allowed for transparency in spots where it was stretched, and a more opaque feel when it is bunched. The two piers at the east and west ends of the site serve to provide housing, and collaborative indoor space throughout the summer months. The pre-cast concrete mimics the folds of the plastic, bringing the idea of support throughout the entire design. Summer 2014 : Rhino / Grasshopper / Photoshop
13
THE FORM The form of the final design was inspired by an early paper folding effort at the beginning of concept design. This particular fold allowed for easy manipulation, interaction, compression and expansion, depending on the specific program that fell under it.
14
THE SPACE The intent of this karate camp was to create an interactive, social environment during the summer, as well as to allow for a functional, warm space in the winter. The undulating, plastic roof structure bolts into each of the concrete piers and can be moved around as well as removed based on the season and the function.
15
16
THE TECTONICS The form all started from a simple paper folding exercise. As I studied how to merge a diagrid structure with a folded plate system, this pre-fab tilt up system emerged. It is made up of simple eight sized units that hinge together and give structure and rigidity to the unit next to it. Strengthening the idea of unity and collaboration, this tectonic system was the perfect solution for this summer camp.
17
LINES OF SIGHT
a.
18
TREE LINE
b.
TREE LINE
c.
PEDESTRIAN MASSING
PUBLIC VS. PRIVATE
a. b. c. d. e.
d.
lines of sight tree line summer sun path pedestrian massing public vs. private
e.
19
20
21
22
03 HIP HOP + ARCHITECTURE
a design-build community outreach endeavor In the fall of 2015 I was placed into UC’s MetroLAB, a program within the School of Architecture and Interior design that pairs students with local non-profits to design and construct innovative projects that support the infrastructure and development of the built environment through the design-build and rapid prototyping process. This semester UC MetroLAB paired with the not-for-profit organization Elementz, a local Urban Arts Center that serves as a catalyists for change in Cincinnati’s inner-city youths. Through collaboration with both the students and partners at Elementz, the MetroLAB team was able to partake in a design process informed by hip hop culture. We viewed and used Hip Hop as a form of art that can give voice to the issues that plague the “inner city” so that we can offer proactive solutions. Each student was called to design and fabricate a piece for Elementz that simultaneously provided a solution as well as thought to the current studio culture there. My personal project was a cubby wall with drawers that provided safe storage space as well as a division within the studio that created a quiet collaboration nook on one side and an open lobby on the other. Fall 2015 : Rhino / Grasshopper / Woodshop
23
THE DRAWERS There are 25 PETG drawers that slot into the cubby wall, locking into a hole that is prefabricated into the plywood. The design on the front and back of the shelves, as shown above, is a pattern derived from a piece of art that we fabricated with the students at Elementz early in the semester.
24
THE SHELF The cubby wall, 10’ long x 4’ high in total, is made out of units that notch firmly together. There are two basic elements to the design - a 4’ high vertical member and smaller horizontal pieces. By rotating every other piece, the shelf undulates back and forth, providing an interesting sculptural element.
25
26
27
28
29
30
31
32
04 LANGREE HOUSE a harmonic space for family, play, and rest The core of this design revolves around the idea that music and sound should be celebrated, not contained. The main spaces of the house are strategically placed so that the music will envelop the user, providing an atmosphere where the design not only reflects the priorities of the user, but revolves around them. The spatial strategy emphasizes the areas in the house that feature musical instruments, providing a double height area where music is to be performed. With this architectural move, the sound is carried throughout the home, celebrating what is truly core to the Langree family. The architecture also speaks to the cultural background of the family, providing indoor/outdoor space on every floor, gently reminding them of their previous home in France. The grandest example of this is the 10’ high sliding glass pocket doors at the south end of the first floor. This move will not only affect the performance space, but the fresh air will also travel up to the kitchen and dining area. With a fresh, neutral color palate featuring white oak floors, eggshell walls and charcoal accents, the atmosphere is clean yet inviting. The whites, blacks, and wood in the interior subtlety mimic the aesthetics of a piano, in order to root the user back to the core of this house: music.
Spring 2015 : Rhino / V-Ray / Illustrator / Photoshop
33
01: SEMI OPEN STAIRCASE
01: WHITE QUA COUNTERTO
02: WHITE WASHED O
03: CHARCOAL GREY MA T
04. TAUPE MATTE T
01: WHITE QUARTZ COUNTERTOPS
01: FLOOR TO CEILI SHELV
02: WHITE WASHED OAK
THE BALANCE The idea of the layout of this row house began by studying yin and yang. Not only does the form resemble the general shape and balance of yin and yang, but the sound does as well. The simplicity and harmony within this house are evident through the architecture of the form and also through the movement of sound. 03: CHARCOAL GREY MATTE TILE
02: GLAZI
03: EGGSHELL WHITE PAI
04. TAUPE MATTE TILE
34
03: CHARCOAL GREY PA
01: FLOOR TO CEILING SHELVES
01: WHITE QUA COUNTERT
03: EGGSHELL WHITE 03: CHARCOAL GREY MATTE TILE
03: CHARCOAL GREY 04. TAUPE MATTE TILE
01: WHITE COUNT
01: FLOOR TO CEILING SHELVES
02: GLAZING
03: EGGSHELL WHITE PAINT
02. CHARCOAL GREY
03: CHARCOAL GREY PAINT
01: WHITE QUARTZ COUNTERTOPS
THE MATERIALS The neutral color palate within this house further emphasizes the harmonic note that the Langree family relies on. Soft tones of eggshell white, charcoal grey, and bleached wood surround the house and emit a calming sense of peace. 02. CHARCOAL GREY MATTE TILE
35
Spaces
Services Parks Banks
Resturants Services Parks
Resturants Services
Resturants
Entertainment Gathering Spaces Retail
Schools/Day Care Entertainment Retail
Schools/Day EntertainmentCare
Schools/Day Care
Paths Paths
Resident Reserve Street Parking 2hr Residential Guest Street Formal Paths Parking (Except Permit)
Bike-Friendly Roads
Bike-Friendly Roads
Bike-Friendly Roads
InformalParking Paths lots and Garages
Positive Nodes
Positive Nodes
Positive Nodes
Negative Nodes
Negative Nodes
Negative Nodes
g
7n 1 6 2
7 1 17,590 1
6
a.
Newport-Cincinnati-Covington Southbank Shuttle Routes Inbound Bus Routes Outbound Bus Routes Shuttle and Bus Stops
% % %
%
YEAR
POP.
1830 1840 1850 1869 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
743 2,026 9,408 1,870 29,720 37,371 42,938 53,270 57,121 65,252 62,018 64,452 60,376 52,535 49,585 43,264 43,370 40,640
b.
Resident Reserve Street Parking 2hr Residential Guest Street Parking (Except Permit)
Parking lots and Garages
RIVER CITIES Population: Male Female Age 25+
89,907 44,981 44,926 60,562
Dwellings: 42,127 Owner Occupied 19,791 Renter Occupied 17,590 Total Occupied 37,381
d.
Labor Force Positive Nodes Negative Nodes
riendly Roads
47,276
Incomce Distribution: $0-$30K 36.3% $30K-$60K 30.1% $60K-$100K 18.2% $100K+ 15.4% Race Distribution White Black Multirace Hispanic Other
84.6% 6.8% 4.1% 3.1% 1.4%
Age Distribution 0-19 20-39 40-64 64+
26.5% 30% 32.2% 11.3%
e.
Newport-Cincinnati-Covington Southbank Shuttle Routes Inbound Bus Routes Outbound Bus Routes Shuttle and Bus Stops
Positive Nodes Negative Nodes
36
c. a. b. c. d. e.
formal + informal paths bike friendly roads positive + negative nodes bus routes parking garages
THE SITE This row house is located on the banks of the Ohio River, looking towards the skyline of downtown Cincinnati. It sits on a narrow, 30’ flat site, and sits in between to existing residential houses. There is an alley that runs behind with a connection to a garage. The challenge for this site was to find a strategy that incorporates light and green space into the house while dealing with such a small lot.
37
38
39
40
05 STADIUM EAST
a seven acre campus that celebrates live-work-play In the southeast of downtown Seattle, we worked with a seven acre site that was to be a campus for retail and office space, outdoor activities as well as a destination for evening hang outs. It was our goal to make this a place that people not only went to work, but to play. In addition, we worked to try and achieve the Living Building Challenge. Through this, I learned a large amount about sustainable systems and how to design a space in a mindful way. My role in this project was as part of the facade development team. We ran through many iterations of creating a cost effective model that blocked the sun when it wasn’t needed, and celebrated it when it was. As all six buildings in this campus were all oriented in different directions, this provided an interesting challenge. I worked mainly in grasshopper to create an optimized fin system that rotated as the faces of the buildings did. This was a team effort as part of my co-op at NBBJ and all renderings and diagrams were built as part of this team. All renderings were outsourced and are placed to serve as a visual for the project, not to represent my own work. Summer 2015 : Rhino / Grasshopper NBBJ
41
00:BASE CASE
02: VERTICAL FINS
03: HORIZONTAL FINS
04: OPTIMIZED FINS
ANNUAL RADIATION ANALYSIS AVERAGE BTU / SF
02: VERTICAL FINS
00:BASE CASE
56.67 N 106.00
172.00 THE S.
49.33 N 78.25
143.75
42
98.00
194.33 163.50 07.29.2015
100.50
124.75 119.00
155.50
175.00 141.50
04: OPTIMIZED FINS
48.00 N 66.00
140.50 126.50
a. base case
THE S.
03: HORIZONTAL FINS
47.67 N 62.00
95.50
60.00
122.25 126.50
146.50
168.33 132.50 FIN ANALYSIS - ANNUAL RADIATION
125.00
140.75
175.00 139.00
TOTAL b . v e r%t iCHANGE c a l f i n FROM s u n BASE: cTOTAL . h o r i%z oCHANGE n t a l f iFROM n s u nBASE: TOTAL d . o p%t iCHANGE m i z e d FROM f i n s uBASE: n
s t u d y : 12.09% 12.09% change from base case
07.29.2015
s t u d y : 115.01% 5.01% change from base case
FIN ANALYSIS - ANNUAL RADIATION
s t u d y :15.49% 16.49% change from base case
THE FACADE We r a n t h r o u g h m a n y i t e r a t i o n s o f t h e f a c a d e during the initial stages of design, maintaining a 4 0 % o p a c i t y g u i d e l i n e . We w o r k e d i n g r a s s h o p p e r , Rhino, and V-Ray to achieve this and presented our ideas not only to the rest of the studio, but to the client himself. The Grasshopper script and sun study diagrams shown to the left were my specific contributions to the team.
43
44
45
46
47
48
06 KUWAIT CANCER CENTER bringing hope and relief to all users
During my co-op at NBBJ Columbus, I was part of a team who was given the challenge of designing a Cancer Center in Kuwait. As a healthcare project, this design held many obvious challenges, but one that I didn’t expect was that of culture. As this was the first project out of the United States that I had ever worked on, it was fascinating for me to learn about the culture of Kuwait, and the priorities that came with it. Factors like cleanliness and gender segregation were to large ideas that we worked with. The schedule was also extremely pressing, and many tasks had to be extremely quickly. I became very comfortable with Revit during this process. I w a s p a r t o f t h e M e d i c a l P l a n n i n g Te a m d u r i n g t h i s p r o j e c t , a n d w o r k e d m a i n l y with healthcare planners to create thoughtful, logical layouts for this 18 story c o m p l e x . Ta s k s v a r i e d t h r o u g h o u t t h e b r e a d t h o f t h i s p r o j e c t , r a n g i n g f r o m bringing layouts up to egress code or adjusting size based on client needs. This project was a team effort and all renderings and floor plans shown were created as part of a team. All renderings were outsourced and are placed to serve as a visual for the project, not to represent my own work.
Fall 2014 : Revit NBBJ
49
THE PLANNING As part of the medical planning team, I worked on configuring layouts for all departments of this c a n c e r h o s p i t a l . We d i d o u r b e s t t o m a x i m i z e v i e w s to the bay to the east and sunlight into the patient rooms. The two story atrium provided a wonderful source of natural light into the departments, as well. The contents shown on this page were part of a collaborative effort and are shown to serve as a visual for this project.
50
G
F
E
D
C
A
B
دولــة الكـويــت وزارة الصحة
CLIENT:
STATE OF KUWAIT MINISTRY OF HEALTH PROJECT TITLE:
DESIGN, CONSTRUCTION, EQUIPMENT, FURNITURE AND OPERATIONAL MAINTENANCE FOR THE
KUWAIT CANCER CENTER
1
CONTRACT NO. 28-2012/2011/17
KEY PLAN - CAMPUS:
KEY PLAN BUILDING :
JAMAL ABDUL NASSER (85)
TLT PAT 02-023.T
1
1
-EKG TEST 02-623
WAIT 02-615
COR 02-C05.1 -HK 02-619
COR 02-C10.1
-CUBE 02-645
CUBE TECH 02-701.9 CUBE TECH 02-701.11
CUBE TECH 02-701.12
COR 02-C12.1
WAIT 02-729
-HIC 02-755
EXAM TRT 02-720
-TLT STF 02-753
-TLT 02-743
CLEAN EL ELS2.6
TLT STF F 02-825.2
CONS BOOTH 02-822.1 CONS BOOTH 02-822.2
BULK STOR 02-832
PAT ELEV ELP1.3
PAT ELEV ELS1.6
PAT ELEV LOBBY 02-ELP1
PAT ELEV ELP1.2 ABLU M 02-839
PAT ELEV ELP1.1
PRAYER M 02-835
TEMP CON STOR 02-838
COR 02-C50.2
-CONSULT 02-840.7
PAT ELEV ELS1.4
VEND 02-841
1
COR 02-C31
MAMM RM 02-901
? _PROC ULTRA 02-919
1
?
SECOND FLOOR PLAN - NORTH
G
F
1
-ELEC 02-911.E
-HISTORY PHYSICAL 02-913
-TEL 02-908.T
-MAMMO 02-918
E -ROOM 02-931
-REG 02-912.1
-WAIT 02-353
D
-WAIT 02-389
TLT PAT 02-926
_STAFF LOUNGE 02-958
ATRIUM OPEN TO BELOW
CHANGE PAT 02-932
? ?
-RECEPTION 355.1
STAIR 15 02-1932
CUBE SEC 02-411
- ULTRA SOUND 02-413
- ULTRA SOUND 02-415
PREP RECOV 02-465
02-421.2
CT CON RM 02-523
TLT PAT 02-541.1 CHANGE PAT 2-541.2
- TLT 02-520.3
MRI CON RM 02-543
MRI SYS RM 02-549
-CONTRAST 02-619
1
TLT PAT CHANGE 02-551.1 PAT
1
A3-223 CHANGE PAT 02-551.3 MRI CON RM 02-553
A3-219
1 A3-224 1 A3-225
MRI RM 02-532
-4 02-338.4
-OFF 02-340
-CUBE 02-356.2 -CUBE 02-356.4 -CUBE 02-356.3
-CUBE 02-360.2
COR 02-C70.7
-CUBE 02-360.1
-CUBE 02-360.3 -CUBE 02-360.4
-CUBE 02-358.3
-CHIEF TECH 02-362
STAIR 16 02-1933
-REF 02-346
-CUBE 02-348.3
COR 02-C92
-CUBE 02-350.1
-CUBE 02-354.1
-CUBE 02-348.5 -CUBE 02-350.2
-CUBE 02-350.3 -CUBE 02-350.4
-CUBE 02-354.2
-CUBE 02-354.3
-CUBE 02-358.1 -CUBE 02-358.2
-CUBE 02-348.4
-CUBE 02-352.1 -CUBE 02-352.3
-CUBE 02-356.1
-CUBE 02-354.4
-CUBE 02-358.4
-TLT 02-362.1 -TLT 02-426.1
-CHAIR 02-426
-FILE 02-434
-IT PACS 02-448.3 COR 02-C93
-IT PACS 02-448.5
-IT PACS 02-448.4 -IT PACS 02-448.6
PHASE 2: SCHEMATIC DESIGN COORDINATION
-TELE 02-460.T - CT CONTROL 02-506
-OFF 02-462 -LOUN 02-464
PAT 02-508.2
- TLT 02-500.3 - TLT 02-508.3
STAIR 18 02-1936
COR 02-C70.9
REV DATE
CT CON RM 02-510
MRI CON RM 02-530
-CUBE SEC 02-330.5 -CUBE SEC 02-330.6
-CUBE 02-348.6
DESCRIPTION
Issued by
DESIGN VERIFICATION & SUPERVISION CONSULTANT OF MOH:
CHANGE PAT 02-528.3 MRI SYS RM 02-536
NOTES/LEGENDS:
CT RM 02-512
IN JV WITH
- TLT 02-538.2 CHANGE PAT 02-538.1
MRI SYS RM 02-546
Alghanim International
1 A3-221
General Trading & Cont. Co. W.L.L P.O Box 2118 - Safat 13022 KUWAIT Tel. +965 2225 8360 Fax. +965 2226 1933
DESIGN CONSULTANT:
XRAY ALCOVE 02-544
MRI RM 02-542
International
CONTRACTOR: CHANGE PAT 02-538.3 MRI CON RM 02-540
LOCAL CONSULTANT:
LEAD DESIGN CONSULTANT: SUB-CONSULTANT: E 4.0 02-550.E
ENGINEERING CONSULTANTS
TEL 20.0 02-548.T
The FUTURE . Built SMARTER .®
BUILDING NAME:
KCC - HOSPITAL 7
DRAWING TITLE:
SECOND FLOOR PLAN - SOUTH
1 G
SECOND FLOOR PLAN - SOUTH
SCALE:
F
DATE: 19-12-2014 DRAWN BY:
1 : 200
MT
CHECKED:
CONTRACT REF. DRAWING NO.
III-7.2 01330
1 : 200
E
D
C
B
JR
APPROVED: REVISION:
-3 02-338.3
-COMPU 02-455
CT RM 02-502
CHANGE PAT 02-508.1 CHANGE
CT CON RM 02-526
COR 02-C91
- TLT 02-528.1 CHANGE PAT 02-528.2
MRI RM 02-555
6
02-521.1
-TLT 02-336.1
CHECKED:
-TI PACS 02-448.1
IT PACS 02-448.2 PACE DIGIT 02-452
TLT STF S 02-466.3
-CHANGE 02-500.2
STOR EQ 02-518
-PACE ADMIN 02-442
-PACS FILE 02-446 PACS 3D 02-450
TLT STF S 02-466.2
-1 02-338.1
-TLT 02-340.1
MT
2- AE102-N 2 DISCIPLINE: A
COR 02-C70.8
PACS DIGIT-ARC 02-456
-CHANGE 02-500.1
02-551.2
MRI SYS RM 02-559
COR 02-C87
-EQ 02-516
COR 02-C89 CT RM 02-522
COR 02-C85
-OFF 02-336
-CUBE SEC 02-344.2
-2 02-338.2
* - KCC SITE OFFICES
PAT ELEV ELP6.3
STAIR 17 02-1934
-CHANGE STF -CHANGE STF 02-521.2
COR 02-C87.1
CHANGE PAT 02-541.3
-MRI RM 02-545
TLT STF S 02-521.3
COR 02-C86
- SOILED 02-615
- CLEAN 02-511 CHANGE PAT CHANGE 02-520.1 PAT 02-520.2
- EQUIP 02-551
CUBE SEC 02-344.1
-CUBE SEC 02-330.3 -CUBE SEC 02-330.4
3 - KCC KITCHEN & LAUNDRY
2 - KCC NEW HOSPITAL
COR 02-C94
PAT ELEV ELS6.6
PAT ELEV ELP6.2 PAT ELE LOBBY 02-ELP6
- TLT 02-468.2 LOCKER STF 02-468 -CHANGE -CHANGELOCKER 02-468.3 02-466.1 STF 02-466
STAIR 19 02-1935
MRI GAS 02-533
5 COR 02-C80.4
CT RM 02-525
TLT PAT 02-443
- HK 02-509
- ALC 16.112
1 A3-217
COR 02-C90.2
- TLT 02-468.1
TLT PAT P 02-445
- TLT 02-505
- CT STAFF 02-529
-MRI VIEW CONS 02-539
CHANGE PAT 02-429.1
-FILE 02-332
-KIT 02-316
-CUBE -CUBE 02-348.1 02-348.2
PUB ELEV ELP5.6
-CUBE 02-352.2
-TLT STF S 94.79
-CUBE 02-360.5
-CHUTE 02-426
SOIL EL LOBBY 02-ELS6.2
PAT ELEV ELS6.5
PAT ELEV ELP6.1
- SOILED 02-431
HAZ HOLD 02-433
COR 02-C80.3
- ANESTH WORK 02-531
LOUNGE 02-435
HK RM 02-439
COR 02-C81
CLEAN EL LOBBY 02-ELS6.1
PAT ELEV ELS6.4
02-423.2
CUBE SEC 02-330.2 COPY PNT 02-318
1 - KCC PARKING GARAGE
COR 02-C70.6
-ROOM 02-375 PUB ELEV LOBBY 02-ELP5
-CUBE 02-352.4
TEL 20.0 02-408.T
TLT PAT CHANGE 02-423.1 PAT
PORTER 02-379
PUB ELEV ELP5.3 PUB ELEV ELP5.2
-INTV RM 02-372 TLT STF S 02-368.2 TLT STF S 02-368.1
WAIT 02-310
TLT STF S 02-342.1
PUB ELEV ELP5.5
HK RM 94.161
-XRAY, C-ARM, EQ 94.276
- ULTRA SOUND 02-423
-PAT PREP RECOV 02-339
PUB ELEV ELP5.4
E 11.5 02-376.E
1
A3-212
DATE: 19-12-2014 DRAWN BY:
3
III-7.2 01330
AL-JAHRA ROAD (80)
-4 02-328.4
1 : 200
CONTRACT REF. DRAWING NO.
2
-3 02-328.3
-TLT PUB 02-371
-TLT STF S 02-366.2 -ROOM 02-368.3 02-366 TLT STF S 94.96 -TLT STF S 02-366.1
STF WORK 02-402
RAD RM GEN 02-425
RAD RM FLOUR 02-429
- NURSE STN 02-441
MED RM 02-513
- CT VIEW 02-503
COR 02-C83
TLT PAT 02-429.2
PREP RECOV 02-471
-FILE 02-363
-TLT STF S
RAD RM GEN 02-409
-1 02-328.2
OFF DIR 02-342
HK RM 02-370
COR 02-C90.1
RAD RM GEN 02-405
COR 02-C79
STRESS TST 02-335
PAT DOSE INJCT 02-341
COR 02-C75.3
BONE DEN PRO 02-399
CHANGE PAT 02-419.1
TLT PAT - ULTRA 02-415.1 - CHANGE SOUND PAT -TLT PAT 02-421 02-415.2 PREP 02-449.1 TLT PAT RECOV PREP 02-421.1 02-455 RECOV CHANGE 02-449 PAT
PREP RECOV 02-459
PREP RECOV 02-469
CHANGE PAT 02-403.1 CHANGE PAT 02-425.1
- ULTRA SOUND 02-419
- CHANGE PAT 02-455
PREP RECOV 02-461
- NURSE STN 02-501
CHANGE PAT 02-409.1
TLT PAT 02-419.1
COR 02-C80.2
1
-PAT PREP RECOV 02-345
BONE DEN 02-397
COR 02-C77.2
KEY PLAN BUILDING :
SECOND FLOOR PLAN - NORTH
*
SCALE:
-2 02-328.1
-FILE 02-326
-SEC 02-322.1
OFF DIR 02-320
-STRESS TST 02-343.1
-FILM 02-380
-CLEAN SUPPLY 02-382
CHANGE PAT 02-401.1
RAD RM GEN 02-403
COR 02-C82.1
KEY PLAN - CAMPUS:
B
COR 02-C73
WORK RECPT 02-361
-TLT PUB 02-369
CHANGE PAT 02-405.1
- WAIT 16.90
A3-215
TLT STF M 02-320.1
CUBE SEC 02-330.1
PUB ELEV ELP5.1
RAD RM GEN 02-401
3
PREP RECOV 02-463
CONTRACT NO. 28-2012/2011/17
-MEETING 02-308
PAT INTV 02-331
-ROOM 02-339.1
-TLT PUB 02-367
COR 02-C77.1
- WAITING 02-457
7 02-268.7
The FUTURE . Built SMARTER .®
KUWAIT CANCER CENTER KCC - HOSPITAL DRAWING TITLE:
-INTR 02-312
-REGIS 02-359.3
TLT PAT 02-393
4
8 02-268.8
ENGINEERING CONSULTANTS
BUILDING NAME:
6 02-268.6
COR 02-C70.5
-TLT 02-343
-TLT PUB 02-365
HK RM 02-946
TLT PAT 02-451
DESIGN, CONSTRUCTION, EQUIPMENT, FURNITURE AND OPERATIONAL MAINTENANCE FOR THE
-CLASSROOM 02-306
-ROOM 02-333
-REGIS 02-359.4
-REGIS 02-359.5
TLT PAT 02-391
A3-213
TLT PAT 02-453
-WAIT 02-256
-KIT 02-329
C
-CLEAN 02-349
COR 02-C80.1
1
-TLT STAFF 02-942
TEL 20.0 02-948.T
4 02-268.4
-TEL 02-325
-SCHED 02-359.2
-WORK 02-382
TLT PAT 02-381
-TLT STAFF 02-940
-CLEAN 02-950
-ROOM 02-385.3
-SCH 1 02-385.2
-ROOM 02-385.1
CHANGE PAT 02-922
CHANGE PAT 02-928
COR 02-C46
-ROOM 02-385.5 _RLE 1 -ROOM 02-385 02-385.4
LOCAL CONSULTANT:
PROJECT TITLE:
6 7 02-268.6 02-268.7
STAIR 14 02-1931
-RECEPTION 02-389.1
-STAFF CONNECTOR 3934
TLT PAT 02-930 TLT PAT 02-938
دولــة الكـويــت وزارة الصحة
STATE OF KUWAIT MINISTRY OF HEALTH
SUB-CONSULTANT:
3 02-268.3
5 02-268.5
-CHUTE 02-305
-M GAMMA CAMERA BAR 02-319
-HK 02-351
-SCHED 02-359.1
-RECEPTION 02-355
TLT PAT 02-936
MAMM QA 02-966
SOIL LIN 02-952
2 02-268.2
-FILE 02-266
JAMAL ABDUL NASSER (85)
-NURSE STATION 02-323
-RECP 02-920.1
-HK 02-956
DESIGN CONSULTANT:
LEAD DESIGN CONSULTANT:
-CHUTE 02-305
-CH PAT 02-319.1
EXAM NMED 02-301.1
COR 02-C75.2
-EQUIP 02-962
COR 02-C35
A CLIENT:
-CLASS 02-250
5 02-268.5
COR - HAZ 02-C71 WASTE 02-305 - HAZ WASTE 02-305
International
General Trading & Cont. Co. W.L.L
B
-SEC 02-258.2
SOIL EL LOBBY 02-ELS4.2
EXAM NMED 02-311
TLT PAT 02-301.2
IN JV WITH
Alghanim International P.O Box 2118 - Safat 13022 KUWAIT Tel. +965 2225 8360 Fax. +965 2226 1933
COR 02-C60.4
-ROOM 03-C80.6 -REG 02-912.2
MAMM BIOPSY 02-968
-HISTORY PHYSICAL 02-966
COR 02-C44
-MAMMO QA 02-939
PAT ELEV ELS4.6
Issued by
CONTRACTOR:
1
-P TUBE 02-914 H WASH 02-910
COR 02-C33
1
-MAMMO PROCES 02-935
TLT PAT 02-301.3
TLT PAT 02-301.4
PAT ELEV ELP4.3
PAT ELEV ELS4.5
DESCRIPTION
DESIGN VERIFICATION & SUPERVISION CONSULTANT OF MOH:
-WAIT 02-238
-OFF 02-246
COR 02-C71
-KIT 02-315
EXAM UNIV 02-906
-US 02-916
A3-211
-ROOM 02-933 TLT SUP STF 02-941
-MRI STF 02-535
WAIT OP HOT 02-301 WAIT OP HOT 02-301
ATRIUM OPEN TO BELOW
-TLT 02-246.1
-CLASS 02-252
-STRCH HLD 02-309 -STRCH HLD 02-309
A3-209
MAMM TMSY 02-909
-ROOM 02-929
-TLT PAT 02-943 STAFF WORK 02-945
COR 02-C75.1
REV DATE
-DIRECTOR 02-242
1 02-268.1
TLT STF S 80.7
-PATIENT CONF. 02-902
1-US 02-905
-NURSE STATION 02-915
A3-210
VIEW CONS 02-944
-CONSULTANT OFF 02-951
2
TLT PAT 02-301.5
-OFF 02-266
-KIT -TLT 02-240 02-226.1
-TLT 02-242.1
CLEAN EL LOBBY 02-ELS4.1
-NURSE STN 02-259 -NURSE STN 02-259
COORDINATION
-OFF 02-222
-SEC 02-220.2
-SEC -SEC 02-220.4 02-220.3
-OFF 02-230
-OFF 02-248
PAT ELEV ELP4.2
PAT ELEV ELS4.4
TLT PAT 02-301.5
LOCKERS 02-842
COR 02-C42 PAT MED HIST 02-925
COR 02-C40.4
CUBE RAD 02-953.2
CUBE RAD 02-953.1
EXAM UNIV 02-900
_US 02-903
STEREO MAMM 02-921
-PROC 02-923
1 : 200
A3-190
PAT ELEV ELP4.1
COR 02-C64.2
- PAT HOLD 02-261
- PAT HOLD 02-255
1
TLT STF S 80.7 COR 02-C75.1
-W.C. ACC 02-837
? 7
TLT SUP STF 80.8 TLT SUP STF 80.8
COR 02-C31
A3-208
-OFF 02-236
PAT ELEV LOBBY 02-ELP4
-INFUSION THRR 02-251
COR 02-C66
- PAT HOLD 02-253
LOCKERS 02-842
1
A3-207
1
C
1 A3-189
WAIT 02-844
COR 02-C70.4
-CONTROL 02-227
UTIL SOIL 02-227
- PAT HOLD 02-251
ATRIUM OPEN TO BELOW
-WIN 02-840.5 -CASHIER 02-840.6
-SEC 02-220.1 -OFF 02-228
-SEC -SEC 02-220.5 02-220.6
COR 02-C69
D
-WIN 02-840.4
SCRIPT FILLING 02-836
PAT ELEV ELS1.5
-FILE 02-218
-OFF 02-232
-CONTROL 02-229
- PAT HOLD 02-249
PHASE 2: SCHEMATIC DESIGN
20 19 02-212.5 02-212.6
16 15 02-210.7 02-210..8
-TLT 02-216.3
11 02-212.2
18 COR 17 02-212.4 02-C78 02-212.3
14 13 02-210.5 02-210.6
-TLT 02-222.1
CHANGE PAT 02-231.1
PAT D INJCT 02-225
- PAT HOLD 02-245
-WIN -WIN 02-830.2 02-830.1
-WIN -P TUBE 02-830.3 02-834
-TLT 02-216.2
-TLT 02-248.1
CUBE INVEN 02-822.3
COR 02-C76
-TLT -TLT 02-200.2 02-200.3
-TLT 02-216.1
COR 02-C64.1
-SPECT 02-231
PAT DOSE INJCT 02-223
REFRIG STOR 02-828
PRAYER F 02-831 COR 02-C32
-TLT 02-200.1
1 A3-206
COR 02-C30.3
CON SUB STOR 02-826
9 -10 02-208.502-208.6
12 02-212.1
7 8 02-210.3 02-210.4
1
A3-204
-SPECT 02-233
-HOT LAB 02-219
-RADIO-I 02-221
3 4 02-208.4 02-208.3
-CONTROL 02-235
-WASTE 02-205
STAIR 03 02-1927 -STF LOUNGE 02-824
TLT M 02-833.4
COR 02-C29
-ANTE 02-203
1 2 02-208.1 02-208.2
-TLT PHYS 02-206
-TLT 02-142.3
6 02-210.1 7 02-210.2
-SPECT 02-239
-NURSE WORK 02-812
STOR FLAM 02-820
CHANGE PAT 02-239.1
CHANGE PAT 02-241.1
CHANGE PAT 02-233.1
OFF PHY 02-209
RECEIVING 02-816
A3-203
-SPECT 02-241
-QA\QC 02-201
TEAM WORK 02-810
-TLT -TLT 02-142.1 02-142.2
-SPECT 02-145
CHANGE PAT 02-145.1
STOR 02-213 COR 02-C62
-EXAM TRT 02-816
-TLT PHYS 02-202
-TLT -TLT 02-140.2 02-140.3
-TLT 02-140.1
COR 02-C70.3
1
TLT SHW 02-211
-EXAM TRT 02-766
-EXAM TRT 02-808
DISP HOLD 02-818
-CONTROL 02-143
-CONTROL 02-243
TLT 02-215
COR 02-C60.3
-STOR EQ 02-806
TLT F 02-825.4
TLT STF F 02-825.3
ABLU F 02-.829
-STAFF WORK 02-155
-ANTE 02-161
COR 02-C23
-CLEAN UTIL 02-802
COR 02-C27.2
-EMS STOR 02-821
TLT TLT STF M 02-833.2 02-833.3
-ANTE 02-165
-STAFF WORK 02-151
EXAM TRT 02-758
-EXAM TRT 02-762
-EXAM TRT 02-800
-HK 02-811
-TLT HK 02-809
-CHUTE 02-805
COR 02-C27.1
PORTER 02-815
COR 02-C63
COR 02-C21
COR 02-C25.2
6
COR 02-C22
COR 02-C19
CLEAN EL LOBBY 02-ELS2.1
SOIL EL LOBBY 02-ELS2.2
-SUPP TLT -TLT 02-823 02-825.1
COR 02-C61
COR 02-C30.2
-TLT PAT 02-742
EXAM TRT 02-756
EXAM TRT 02-752
-EXAM TRT 02-760
PAT ELEV ELP2.3
CLEAN EL ELS2.5
COR 02-C25.1
HK 02-819
STAIR 12 02-1925
-CLEAN 02-147
EXAM TRT 02-748
PAT ELEV ELP2.2
SOIL EL ELS2.4
-WHLCH 02-813
ELEV ELU3.3
COR 03-C80.8
EXAM TRT 02-726
COR 02-C20.4
PAT ELEV LOBBY 02-ELP2
OFF NIC 02-803
COR 02-C74
STAIR 11 02-1922
-HEMATOLOGY 02-169
COR 02-C50.1
LIBRARY 02-801
COR 02-C59
ELEV ELU3.2
COR 02-C17.2
STAIR 05 02-1923
-ADMIN 02-769
COR 03-C80.7
-TLT STF 02-751
-TLT 02-745.3
-ADMIN 02-765
RECPT STN 02-732
EXAM TRT 02-750
COR 02-C17.1
STAIR 04 02-1926
CUBE SEC 65.48
A3-202
-P TUBE 02-734
COR 02-C15
1 EXAM TRT 02-746
PAT ELEV ELP2.1
E
CUBE SEC 65.42
-NURSE STATION 02-736
A3-185
-TLT -TLT 02-761.2 02-761.3
COR 02-C40.3
CUBE SEC 02-116
COPY PNT 65.119
-FILE 02-109
-PAT CONF 02-718
-SOILED 02-710
CLASS RM 24 02-763
F
CUBE SEC 02-048.1
A3-184
-TLT PAT 03-C80.15
TEL 20.0 02-719
CLASS RM 02-749
LOUNGE 02-759
G
-MED 02-066
COR 02-C57
COR 02-C60.2
-HISTORY PHYSICAL 02-712
LOCKERS 02-761
TLT STF M 02-833.1
COR 02-C72
-PAT D UP 02-081
-PAT TLT 02-658
-COPY/ PRINT 02-728
-TLT 02-739
LOCKERS 02-745
COR 02-C40.2
-PAT D UP 02-075
COR 02-C70.2
-TLT 02-731
-TLT 02-733
TLT STF F 02-745.2 TLT STF M 02-745.1
-ROOM 02-028.10
COR 02-C13
-TLT 02-735
COR 02-C12.2
-ROOM 02-028.8
-ROOM 02-028.9
1
E 11.5 02-713
MTG 16 02-723
LOUNGE 02-741
-TLT 02-761.1
-PAT D UP 02-071
-RECEP 02-105
COR 02-C20.3
-KIT 02-721
5
-PAT D UP 02-065
-PAT D UP 02-061
TEL 20.0 02-672
STOR EQ 02-711
STOR TEMP 02-709
WAIT 02-729.1
COR 02-C40.1
-ROOM -ROOM 02-030.9 02-030.10
1
COR 02-C10.3
-ROOM 02-028.6
-ROOM 02-028.7
1
WOR RM REPAIR 02-705
RECEIVING 02-703
CUBE TECH 02-701.10
A3-187
-ROOM 02-030.8
COR 02-C55
COR 03-C80.9
RECPT STN 02-670
-COPY 02-668
4
1
1
-ROOM 02-028.4
-ROOM 02-028.5
A3-182
-WAITING 02-680 CUBE TECH 02-701.6 CUBE TECH 02-701.8
-ROOM 02-030.7
* - KCC SITE OFFICES
-ROOM 02-028.2
02-028.3
-ROOM -ROOM 02-030.502-030.6
A3-201
-PAT CONF 02-652
-ROOM 02-028.1
2 3 - KCC KITCHEN & LAUNDRY
1 A3-196-ROOM
-ROOM -ROOM 02-030.302-030.4
1 A3-198
CUBE PROG 02-651.8
CUBE TECH 02-701.4
CUBE TECH 02-701.5 CUBE TECH 02-701.7
-ROOM -ROOM 02-030.1 02-030.2
-PET MRI 02-010
PET MR COMP 02-012
COR 02-C70.1
PAT D UP 02-079
-PAT TLT 02-660
-PAT TLT 02-662
3
2
2 - KCC NEW HOSPITAL
NOTES/LEGENDS:
EQ CALIB 02-026
COR 02-C51.3
1 - KCC PARKING GARAGE
STAIR 06 02-1920
COR 02-C20.2
CUBE PROG 02-651.7
CUBE TECH 02-701.2
-NS 02-650
-PAT TLT 02-656
CUBE PROG 02-651.6
CUBE TECH 02-701.3
PAT MED HIST 02-646
1
TLT PAT 02-45 A3-200
PAT D UP 02-073
PAT D UP 02-069
COR 03-C80.10
MAIN COMPUTER RM 02-639
CUBE PROG 02-651.5
1
TLT PAT 02-43
PAT D UP 02-49
PAT D UP 02-51
PAT D UP 02-063
KIT 02-009
EXAM UNIV 02-638
EXAM UNIV 02-632
PAT MED HIST 02-648
-STAFF TLT 02-676
CUBE PROG 02-651.4 STAIR 07 02-1919
PAT D UP 02-059
COR 02-C09 -EXAM UNIV 02-628
EXAM UNIV 02-642
CUBE PROG 02-651.2
BIO STY LAB 02-022 STAIR 10 02-1924
COR 02-C53
COR 02-C11
CUBE PROG 02-651.1 COR 02-C10.2
PAT D UP 02-53
PAT D UP 02-55
READ CON RM 02-005
EXAM UNIV 02-640 COR 02-C30.1
EXAM UNIV 02-622
CUBE PROG 02-651.3
CUBE TECH 02-701.1
-TLT PAT 02-636
TLT PAT 02-630
-CUBE 02-649
CUBE HELP 02-643.8
TLT STF S 02-653.1
COR 02-C60.1
COR 02-C07 EXAM UNIV SH 02-626
EXAM UNIV SH 02-620
1
COR 02-C51.2
STOR EQ NM 02-003
1
OFF HEAD 02-653
3
COR 02-C20.1
A3-177
A3-181
CUBE HELP 02-643.7
PET CT 02-016
A3-195
1 A3-194
AL-JAHRA ROAD (80)
EXAM UNIV 02-618
EXAM UNIV SH 02-612
1
CUBE CUBE HELP HELP 02-643.5 02-643.6
CUBE HELP 02-643.4
PET MR CONT 02-002
PET CT 02-39
1 A3-192
PET MAM CONT 02-008
EXAM UNIV SH 02-608
EXAM UNIV SH 02-602
-TLT STAFF 02-631
-PROC 02-635
STOR DATA 02-641
CUBE HELP 02-643.3
PET CONT 02-33
1 A3-191 COR 02-C51.1
COR 02-C05.3
COR 02-C05.2 -TLT STAFF 02-629
-SOIL 02-625
-MED 02-621
-PROC 02-633
CUBE HELP 02-643.2
-UPTAKE 02-31
WORK TEAM 02-616
-DIETITIAN 02-614
1
-TLT HK 02-617
CUBE HELP 02-643.1
WORK NURSE 02-610
-EQUIP 02-606
-ROOM 02-001
A3-175
-PRE/ POST 02-611
-TLT PAT 02-611.1
CLEAN UTIL 02-600
STAIR 08 02-1938
*
TLT PAT 02-25
A3-179 -NURSE STATION 02-613
COR 02-C01
-TLT PAT 02-609.1
TLT PAT 02-31.1
1
E 4.0 02-601
-PRE/ POST 02-609
2
PAT D UP 02-023
A3-178
A3-176 TEL 20.0 02-603
CC ALCOVE 02-605
-ROOM 02-020.T
-ROOM 02-018.E
JR
APPROVED: REVISION:
2- AE102-S DISCIPLINE: A
51
52
53
54
55
56