Hospitality
Marriott-Ultra Luxury Collection Hotel, Sindalah Island, NEOM, Saudi Arabia
70 keys, Destination Focused
Hospitality
Red Palace Boutique Hotel, Riyadh, Saudi Arabia
71 keys, Heritage building conversion
Medical Planning
The Security Forces Medical Center – Jeddah
300 hectare site master plan,1250 beds hospital, medical planning
High-Rise
Paramount Tower Hotel & Residences, Burj Area, Dubai- UAE
867 keys, 5 star- Hotel-Paramount, High rise
Master Planning
Deyaar Midtown Master Plan, IMPZ, Dubai-UAE
Masterplan comprising 6 districts with 24 housing buildings
Urbanscape Design
Business Bay Promenade-Park
Urban Planning and Streetscape
Hospitality
Deyaar Hotel and Serviced Apartments, Al Barsha, Dubai- UAE
426 keys, 4 star- Hotel-Millennium, Staycation Luxury
Residential
Emaar Golf Villas – Emaar South Masterplan, Dubai- UAE
Villa masterplan, Luxury Living
Rosebay Residences – Meydan Avenue, Dubai- UAE
High end Residential living
Commercial
The U+A OFFICE Interiors, Emaar Business Park , Dubai-UAE Office Interiors, Commercial design
Masterplan Massing
Al Raha Beach Project
Summer Internship
Rooshad Shroff - Bungalow Design
LAB (Language Architecture Body) - Apartment Refurbishment
THESIS Design Dissertation
Urban Transformation (OLD Dubai to NEW)
Urban Studies
University Scheme Design
Non standard Housing Development
DE
GN
O RTF O LI O P & T Architects U+A Architects JACOBS AEDAS University Projects
S I
P
RMJM
Intership
L-0G
L-01
L-02
Hospitality
Marriott-Ultra Luxury Collection Hotel, Sindalah Island, NEOM, Saudi Arabia
70 keys, Destination Focused
Planning to follow Approved Renders
- Value-engineering of Concept design while suggesting sustainable & efficient solutions for further development.
-Creating zoning strategies & design solutions for the working hotel as per operator guidelines and limitations
-Instructing and organizing the entire team in another country with the production and QAQC of Drawings and Details.
- Being part of Client meetings to understand requirements and suggesting quick solutions to mitigate the concerns.
-Fully coordinating a group of internal and external Subs to achieve a deadline with great and happy solutions.
S nd C Snd ahC go S da h Ca S A d nd F e App
L-0B
Typical Wall Section Detailing
Solutions to match the existing Heritage wall buildup
Hospitality
Red Palace Boutique Hotel, Riyadh, Saudi Arabia
71 keys, Heritage building conversion
- Complete coordination and execution of Detail design for the SPA Retreat Building.
-Assisting the junior architects with QAQC of drawings and understanding of details for DD and IFC stage.
-Suggesting organization of BIM execution plans along with standardization and management of project detailing and technicality.
-Actively strategizing efficient and better planning of project execution along with team satisfaction and happy environment.
-Initiating efficient and value engineering solutions towards successful project exceution.
Standard Cafe/Pantry
Casework Detailing
Furniture Plan-Casework
Engineering-Details
Medical Planning
The Security Forces Medical Center – Jeddah
300 hectare site master plan,1250 beds hospital, medical planning
-Assisted in planning medical departments in accordance to ADA standards and medical regulations.
-Suggested planning modifications of non clinical areas(public toilets and prayer rooms) as per site conditions and Client requirements.
-Managed overall coordination and QAQC checks for MEP, Kitchen and Structural packages for site related queries.
-Involved in generating detail package submissions for Caseworks and nonclinical area ENLs.
-Assisted the Design manager with organisation of overall project reports, docs and team efficiency as per Office PMP standards .
985 2675 675 560 1955 1840 100 460 1060 1070 985 435 550 240015010001015 700 700 2200 150 1985 Public Toilet Female 116.31.008 (P-T.01) Vestibule 116.31.006 (P-T.01) Public Toilet 116.31.007 (P-T.01) BASIN LENGHT 2015 150 2400 150 585 SP SP CONCRETE SLAB REFER STRUCTURE) E 1 -PUBLIC TOILET PLAN CEILING HANGERS Public Toilet Female 116.31.008 Public Toilet 116.31.007 CONCRETE SLAB REFER STRUCTURE) 2 0 0 165 2 4 0 0 3 0 0 2 0 0 240 3 0 0 2 0 0 190 F.F.L. +00.000 F.F.L. +00.000 CEILING HANGERS S90 W10 W10 W50 2 4 0 0 W50 Vestibule 116.31.006 Public Toilet Female 116.31.008 CONCRETE SLAB REFER STRUCTURE) 175 2 0 0 2 2 5 0 1 5 0 F.F.L. +00.000 F.C.L. +02.400 T ELEVATION A ET ELEVATION B
Medical Planning
The Security Forces Medical Center – Jeddah 300 hectare site master plan,1250 beds hospital, medical planning
-Involved in generating Composite, FF & E , Finishes and enlarged drawings for medical areas of the entire hospital.
-Actively organized a thorough QAQC check for documents, drawings and reports prior to client submissions. Also ensured minimum errors and best results by generating checklist and quality modelling within the software.
-Created software generated schedules/lists for finishes, quantity and overall area calculations as per hospital zoning for easy access to other sub-consultants.
-Worked from a Macro to Micro detailed drawing submissions.
26.33 m² PATIENT ROOM -IPU 100 132 116 760 4 3920683 2765 450 24.52 m² PATIENT ROOM -ICU (Type 10 00 15 498 250 0 0 1803 Levi Andrij 0.000 m 0.400 m 0.150 m 0.900 m 0.760 m 1.500 m 2.200 m 1.800 m 1.200 m 1.350 m 2.500 m 2.700 m 0.000 m 0.400 m 0.150 m 0.900 m 0.760 m 1.500 m 2.200 m 1.800 m 1.200 m 1.350 m 2.500 m 2.700 m Levi Andrij 0.000 0.400 0.150 0.900 0.760 1.500 2.200 1.800 1.200 1.350 2.500 2.700 110011001504060965300 1697 1697 150 150 190 133133170425 425170133133133 150106 275375 EQEQ 0.000 m 0.400 m 0.150 m 0.900 m 0.760 m 1.500 m 2.200 m 1.800 m 1.200 m 1.350 m 2.500 m 2.700 m Levi Andrij 100125 830 730 0.000 0.400 0.150 0.900 0.760 1.500 2.200 1.800 1.200 1.350 2.500 2.700 150 220 100 376 0.000 0.400 0.150 0.900 0.760 1.500 2.200 1.800 1.200 1.350 2.500 2.700 0.000 0.400 0.150 0.900 0.760 1.500 2.200 1.800 1.200 1.350 2.500 2.700 150 190 0.000 m 0.400 m 0.150 m 0.900 m 0.760 m 1.500 m 2.200 m 1.800 m 1.200 m 1.350 m 2.500 m 2.700 m
Typical IPU Ward Room Engineering Drawing
Typical ICU Ward Room Engineering Drawing
High-Rise
Paramount Tower Hotel & Residences, Burj Area, Dubai- UAE
867 keys, 5 star- Hotel-Paramount, High rise
-Involved in the design evolution for overall concept planning incorporating restriced plot boundaries and site conditions.
-Coordinated high level of Structural and MEP modifctions as per high rise requirements yet maitaining 5 star suite standards for layout area requirements.
-Created high resolution marketing layouts as per approved interiors colour schemes for Clients publications and overall presentations.
-Involved in creating weekly reports for design progress and process for Clients satisfaction and financial approvals.
Master Planning
Deyaar Midtown Master Plan, IMPZ, Dubai-UAE Masterplan comprising 6 districts with 24 housing buildings
-Involved in team discussions of complex functional, technical & business requirements into architectural design strategy for overall master planning and individual tower layouts.
-Assisted the team in creating revit tables related to area calculation and zone planning for programmatic distributions.
-Creating daigramatic illustrations for schematic reports and community distribution approvals.
-Generated Revit modelling for overall tower layouts with standardizing units as per area restrictions for varied bedroom typologies.
Urbanscape Design
Business Bay Promenade-Park
Urban Planning and Streetscape
-Actively participated in the overall concept for Business Bay promenade streetscape planning which involved programmatic zoning and public distributions.
-Created study drawings and illustrations for varied zones as per public requirements and urban strategies.
-Involved in planning strategies for retail, streetscape and urban landscape forms.
-Created hand sketch visuals to define urban feel for each zone type along with mood boards for the street sections and public interctions.
-Invoved in the team for concept detailing and zone planning for Business Bay interjunction.
-Generated Revit modeling for the entire zone detailing streetscape and retail clusters.
-Produced drawings set for DM approvals and authority submissions.
-Created visually appealing revit generated plans by experiementing templates and visual scales to create conceptual plan standards.
-Generated steet sections for Urban public studies and facade modelling.
K BOH BOH ENTRY EXIT R A M P B A S M N E R O U N D RAMP UP TO LEVEL 1 BLDG 8 UNIT-1 VENT SHAFT VENT SHAFT TX RM TX RM RMU RM BOH BOH BLDG UNIT-2 BOH BLDG 5 UNIT-2 BOH BOH BOH 4A 4B 4C 4D 4E 4F 4G 4H 4J 4K 4'1 4'2 4'3 4'4 4'5 3M 3L 3K 3J 3H 3G 3F 3E 3D 3C 3B 3A 3'1 3'3 3'4 3'5 3'6 2K 2J 2H 2G 2F 2E 2D 2C 2B 2A 2'1 2'2 2'3 2'4 2'5 2'6 2'7 2'8 2'9 1P 1N 1M 1L 1K 1J 1H 1G 1F 1E 1D 1C 1B 1A 3'2 2L 5800 5800 5800 6000 3475 5000 5000 5000 5000 69002795 4600 7200 4900 4900 6000 6000 6000 6000 4600 6000 6000 6000 6000 5000 5000 5000 5000 5000 3800 6800 5500 RMU RM BLDG 6 UNIT-2 LV RM BLDG. 6 UNIT-1 / 1 A01 0 02 / 1 A01 0 03 1 A01 0 02 / 1 A01 0 04 / 1 A01 0 03 / 1 A00015 / 1 A00014 / 1 A01 0 01 / 1 A01001 / 1 A00015 1 A-0-300 2 A-0-300 3 A-0-300 PARKING PARKING ENTR R MP FROM GROUND TO BA EMEN DROP OFF 5A 5'2 5'3 +3.660 FFL +3.703 FFL +3.678 FFL BOH BOH BLDG 1 UNIT-1 BLDG UNIT-2 BOH BLDG UNIT-3 BLDG 05 UNIT-1 BLDG 5 UNIT-3 BOH BOH BLDG UNIT-2 BLDG UNIT-1 +3.750 FFL +3.750 FFL LV ROOM BLDG 2 UNIT-1 +3.550 FFL +3.550 FFL +3.500 FFL +3.500 FFL +3.500 FFL BLDG 4 UNIT-1 +3.750 FFL BOH BLDG 6 UNIT-3 GARBAGE ROOM BLDG 07 UNIT-1 +3.650 FFL +3.900 FFL +3.900 FFL +3.900 FFL +3.550 FFL +3.750 FFL +3.850 FFL +3.850 FFL 1'1 1'2 1'3 1'4 K K K K 6000 6000 6000 6000 6000 6000 6000 6000 5 3 7 0 5000 5000 5000 5000 5 3 7 0 10000 6400560050005000420046856000600060006000 6800 5500 5000 5000 5000 5000 5000 5400 4600 7200 LIFT 01 F. STAIR 01 LIFT 02 F. STAIR 02 SERVICE LIFT 01 LIFT 04 F. STAIR 04 F. STAIR 03 BOH BOH MALE TOILETS FEMALE TOILETS GARBAGE ROOM 5'4 5'1 78 m² ESCALATOR 72 m² ESCALATOR +3.750 FFL +3.850 FFL +3.750 FFL +3.900 FFL +3.750 FFL +3.750 FFL +3.450 FFL +3.750 FFL +3.832 FFL +3.750 FFL +3.665 FFL +3.792 FFL +3.808 FFL +3.819 FFL +3.828 FFL +3.649 FFL +3.627 FFL +3.609 FFL +3.836 FFL +3.844 FFL +3.789 FFL +3.900 FFL A-0-850 2 8150 5570 5370 PARKING BLDG 2 UNIT-2 OUT SEA TERRACES TERRACES 5470 1300 PARKING BLDG UNIT-2 BLDG. 6 UNIT-1 13250 TERRACE +10.75 LVL +13.25 LVL +7.33 LVL Urbanscape Design Business Bay Promenade-Park Urban Planning and Streetscape
Hospitality
Deyaar Hotel and Serviced Apartments, Al Barsha, Dubai- UAE 426 keys, 4 star- Hotel-Millennium, Staycation Luxury
-Assisted the Design manager for concept massing and layout planning.
-Involved in stanardising the room layouts as per area requirements.
-Suggested Interior colour and texture schemes for final Client approval.
-Created Concept and Schematic reports with Final drawing set submissions for DM approvals.
-Actively participated in Landscape design for creating Cabanas and outdoor seatings.
-Attended site visits and meetings related to facade material and colour dyeing selections, structural decisions and layout modifications.
Residential
Emaar Golf Villas – Emaar South Masterplan, Dubai- UAE Villa
masterplan, Luxury Living
-Single handedly designed 5-bedroom luxurious Villas with high end contemporary living styles.
-Created BIM models for individual Villa designs having parametric furnishing families involving operations related to sizes and finishes.
-Involved in Exterior facade meetings to create overall material pallete and Window options.
-Redefined style of luxurious living with classy interiors and pastel colour schemes.
Residential
Rosebay Residences – Meydan Avenue, Dubai- UAE
High end Residential living
-Assisted Design manager for creating luxurious layout plans for contemporary style living.
-Created high living British style with clean edges, open kitchens and wide interior spaces.
-Involved in drawing set submissions for DM and FLS authority approvals.
-Highy participated in discussions related to efficient layout planning with structural and MEP constraints to attain maximum area satisfaction.
-Designed basic sections to create spatial quality visuals with public and community interactions.
The U+A OFFICE Interiors, Emaar Business Park , Dubai-UAE
Office Interiors, Commercial design
-Shortlisted in final team for conceptualising and executing the office interiors involving colour schemes and final wall / frame poster designs.
-Assisted the manager to create highly efficient seating layout interiors for the New U+A office.
-Created standardised casework shop drawings with detailing for individual end user.
-Generated tender documents of interior office drawings sets for DM approvals.
-Involved in site visits with supplier and contractor for final casework executions and furniture detailing.
Commercial
Masterplan Massing Al Raha Beach Project
Community Planning & Concept massing
-Assisted the master planning team for overall building massing of Al Raha Beach ,Abu Dhabi.
-Suggested strategies for designing and planning of individual island plots to create a community living.
-Created GPA calculations and Pie Charts for area consumption of island plots.
-Created civil defence CAD files for overall design plot involving vehicular access and emergency routes.
-Participated in report making material for concept planning to submit the AbuDhabi Governement for approvals.
Rooshad Shroff - Bungalow Design
LAB (Language Architecture Body) - Apartment Refurbishment
Amby Valley Bungalow
-Assisted the Architect in concept designing a private luxurious bungalow that included voidal elements of courtyards and waterbodies.
-Generated Rhino modelling that involved rendered layouts and visually appealing sectional drawings.
Luthria Residence
-Involved in the complete refurbishment of the Interiors of Luthria house.
-Suggested the proposal of additional structural support requirement to allow extra interior lounging space.
-Created personalised shop drawings for customised wardrobe designs and details.
UP accessories/cosmetics DB.BOX 1'-8" 12'-4" 6" 11" 11" 1' 1' 8" 6" 6" 6" 6" 6" 1'-2" 1'-2" 9" 9" 6" 6"6" 6" 7" 9" 6" 1'-2" 1'-2" 6" 6" 6" 6" 6" 6" 6'-11" 2'-11" 6" 2'-11" 1'-5" 3' 5'-4" 8'-1" 2'-2" 1'-6" 1'-11" 1' 2' 4'-9" 1'-1" 3'-4" 3'-4" 4'-10" 7' 2'-6" 2'-6" 2'-6" 1'-6" 2'-11" 1'-9" 5'-5" 1'-11" 2'-10" 5'-2" 1'-2" 1'-2" 11" 1'-8" 1'-8" 2'-11" 5'-7" 4'-4" 3'-1" 3'-1" 1' 1'-8" 1'-3" 2' 2' 3' 2' 2' 3' 2'-1" 1'-7" 1'-9" 3'-8" 3'-8" 1'-9" 4'-2" 5'-4" 7" 4"4" 2'-4" 2'-1" 6" 7'-3" 2'-3" 7'-7" 2'-7" 5'-4" 2'-4" 7'-3" 6" 6'-5" 6'-1" 2'-2" 4'-4" 5'-8" 1'-3" 11" 11" 6" 2'-11" 1'-8" 1'-7" 1'-8" 1'-8" 10" 6" 6" 3'-8" 5'-8" 1'-8" 1'-7" 4'-8" 5'-6" 4'-6" 6" 6" 11" 11" 2'-8" 9" 2'-10" 3'-9" 2'-4" 2'-4" 1'-2" 1'-5" 4'-1" 5'-1" 8'-6" 3'-10" 5'-1" 3'-10" 8'-6" 2'-6" 2'-6" 5' 8'-5" 2'-3" 2'-5" 2'-10" 2'-5" 2'-5" 5'-2" 2'-4" 9'-1" 6'-7" 4'-3" 7'-7" 2'-1" 11" 6'-11" 5'-5" 4 nos Electrical plug points at 2'11" 2 plug points, one at 4'10.5"(aqua guard)and the other at 5'10.5"(water heater) t.v. cable to be given besides the plug point 6" 2'-3" 2' 3' 3' 3' 1'-6" 5" 2'-4" 2'-4" 1'-8" ht of S.B. (grandfather) at level i.e. 3'10.5" ht of S.B.in kids toilet at 2'8" 4'-11" 6" 3'-6" 2'-6" 2'-6" 4'-10" ht of S.B.in master toilet at 2'9.5" ht of S.B.in maids toilet at 3'6", (starting from the edge of the wall) 1'-2" 11" 1'-8" 1'-10" SUITS/JACKET 1'-10" 3'-9" 5'-7" 3'-5" 3'-4" 2'-7" 7' 2'-9" NIGHT WEAR NIGHT WEAR SOCKS RACKETS SPORTS EQUIPMENTS WATCHES STORAGE DRAWER LINEN LINEN LINEN LINEN STORAGE STORAGE STORAGE STORAGE STORAGE 6'-9" 7"
Summer Internship
TOWARDS ABU DHABI 0 50 100 200 Masterplan In metres Site 1 Urban Majlis Site 2 : Public Parkade SHEIKH ZAYED ROAD ENTRY FROM THE BUR DUBAI AREA SHADE LIGHT VENTILATION PRIVACY USER + OBJECT = COMFORTABLE INTERFACE FORMATION OF SPACES BASED ON FACTORS BY MODULATING THE BASIC ELEMENTS INORDER TO SUITE THE CLIMATE AND LOCATION. TRAFFIC WALKING IN THE HARSH CLIMATE MEETINGS AND DISCUSSIONS FORMAL LUNCH SLEEPING IN WORKSPACES INFORMAL CALLS CORPORATE WORLD STARING AT THE STREET VIEW SILENT LOBBIES AND STAIRWELLS DEAD ROADS WITH SPEEDING CARS IN a c d e b Type 1 (Canopy /counters) Type 2 (Partitions /Niches) Type 4 (Partitions/Balcony) Type 4 (Louvers/Doors) Type 3 (Glass wall)
THESIS Design Dissertation
Urban Transformation
OLD Dubai to NEW
-Urban study strategies on the dynamics of the commercial road strip which behaves like a major tear along the site trying to create its own presence with a drastic contrast to the existing fabric over the years.
An ideal proposal of prototypes along the entire road stretch to create a public forum for a dailogue between different kinds of public users.
The idea of a traditional ‘MAJLIS’ which is a place to invite varieties of discussions between people to create an interaction or a dailougue to maintain certain kind of a gesture of oneness.
Urban Studies
University Scheme Design
Non standard Housing Development
Urban Agglromeration
-The concept of interweaving of spaces leading to formation of knots within the weevs dipicting urban forms to create an expereince of an urban university encomprising complex circulation and deformed interactions.
Non Standard Housing
-Studying the concept of natural ventilation a prototype is designed keeping in mind green spaces and waterbodies for the invite of winds and larger voids for the exit of used winds.Combinations of joint housing and sharing common courtyards becomes the major guide to design.