4D BIM Enabling Improved Planning & Cost-Effective Construction Across the Globe |BIM Services in US

Page 1

4D BIM Enabling Improved Planning & Cost-Effective Construction Across the Globe Want to know how 4D& 5d BIM technologiesare enabling improved planning and costeffective construction? The additional dimensions of material calculation and cost estimation coming with augmented BIM Models help in making better plansfor the construction industry. Delve deep into how the digitizedworld of 4D BIM is adding to the upsurgeof the BIM technology, revolutionizing the AEC sector. Integrating the information enriched3D BIM models with added dimensions of schedule, cost and material estimation, 4D & 5D BIM modules can manage the concern of change orders on project costs & scheduling in an improved way. The process promises to reverse the construction industry’s annual losses nailed at $177B because of poor communication, rework and inefficient data management. Causes of Cost & Schedule Overrunin Construction include: • • • • •

Inaccurate Project Planning during the PreliminaryStages of Construction Incorrect Project Estimate during the Initial Stages owing to Data Inadequacy No Preparation or Promptness for Change Orders Administration Errors Occurredfrom System Flaws or Human Mistakes Inefficient Operational Workflow & Absence of Streamlined Processes

As per Industry Research, it is found that due to Cost & Schedule Overrun: • • •

A typical construction job wastes around 65% of the time 90 minutes per day is wasted by employees searching for stuff 57% of the US Construction spending gets wasted

Reasons for Considering 4D BIM Technology Contractors & Builders have several construction sequencing alternatives to choose from, such as the 4D BIMtechniques, which help them to keep construction projects on schedule. The 4D BIM provides prominent substitutes for addressing project requirements and overcoming challenges. With several capabilities, 4D BIM supports the accurate information collection process. 4D BIM Support for Construction Industry: •

Clash free Schedulingwith 4D BIM – 4D BIMproduces information about the schedules of building products and systematically creates a visual. 4D BIM incorporates time-related information such as lead-time, construction & installation time, and allowances for drying & mixing period.The £8.4bn worth Greenwich