Best of Tejjy Inc. BIM Service Projects in 2020 COVID Not a Set Back for Tejjy Inc. – Moved Ahead with a Bunch of BIM Projects even during Pandemic
Implemented BIM for Water Purification Plant Expansion in Houston, USA
BIM (Building Information Modeling) came in handy for Northeast Water Purification Plant (NEWPP) Expansion in Houston, USA. Tejjy Inc. used Revit for creating 3D BIM Model to meet various project objectives. The purpose of construction for expanding NEWPP, enhanced capacity to support residential & commercial growth by reducing dependency on groundwater. NEWPP is a leading progressive design-build project under construction in United States on 90-acre site.
Know more about our BIM case study
Used BIM for Clash Detection of DC Courthouse
Tejjy Inc. worked with Revit & NavisWorks software platforms for 3D Modeling of Mechanical, Electrical, Plumbing & Fire Protection services of DC Courthouse project. Created 3D Model Creation for MEPFP trades for clash detection, mitigation, and visualization. Constructability Review through BIM Model Update helped to reflect changes from Design, RFI Generation & As-Built Update. BIM professionals of Tejjy Inc. delivered Coordinated Service Drawings, facilitating complete coordination among all trades using Autodesk NavisWorks to generate clash reports. Tejjy Inc. extracted Detailed Quantity Take-Off (QTO) incorporating manufacturer's reference. Check out our BIM services
Revit BIM Modeling Saved Time, Delivered Efficiency for MFSS II
Intelligent Revit BIM (Building Information Modeling) implemented by Tejjy Inc. brought efficiency to Medical Facilities Support Services (MFSS II) by US Army Corporation of Engineers. Tejjy Inc. enabled flawless collaboration among stakeholders, reducing errors and improving building performance through • Quality output with less effort • Enhanced Production at lesser time • Ease of access for maintenance provisions & facility management Our Case Study on BIM Community
Facilitated Construction of Day Care Design in DMV Area, Washington DC
Tejjy Inc. facilitated small businesses to understand their dreams for Day Care Establishment in DMV area! Tejjy Inc. has designed and constructed over four daycares in Montgomery County, Takoma Park, and Washington DC areas. Resolved project challenges entrenched in Day Care Establishment through Careful Inspection of Code Compliance with BIM as required by county officials, considering latest & greatest safety measures before the jurisdiction.
Take a look at the Case Study
Revolutionized the way of Planning & Project Execution for Signal House
Signal House, at Union Market, Washington, D.C. - an award winning project by Gensler Design Excellence Award. 225,000 RSF structure will pay accolade to traditional industrial environs with an exclusive metal, terracotta and glass. Purpose of constructing Signal House is to serve private terraces, windowed conference centre with hi-tech fitness facilities, below-grade parking, retail, & a roof swaggering a DJ booth, karaoke room, kitchen, bar, etc. Tejjy Inc.’s BIM usage revolutionized the way of planning & executing construction project. BIM facilitated in creating a model & common data environment for all AEC project stakeholders BIM implementation in operational phase facilitated a sensible step throughout the building lifecycle
Created Structural Steel Frames for Tall City at 104 Delancy Street, New York
Tall City at 104 Delancy Street, New York is a residential & commercial project that required full technical understanding of hip and valley, with requirements of stair & trash enclosures. The project is completed by BIM Engineers of Tejjy Inc. in 2.5 weeks in a flawless manner. The challenge was to detail shopping members with the details of a stair with mezzanine. Structural BIM Engineers of Tejjy Inc. created the detail of structural frames, avoiding field welding with BIM.
Know more about Tejjy Projects
Accomplished Tall City Gun Club at Mid land
Tall City Gun Club at Mid land, Texas is a commercial project having a wide array of structural items like Trash gate, dog lag stair, ladder, hip & valley canopy, and wall panel embeds. Tejjy Inc. completed BIM project in just about 2 weeks time by coordinating with joist suppliers as in the new millennium.
Take a look at our BIM Blogs
Presented by Tejjy Inc. ď ˝
Call the BIM Consultants at 202-465-4830 or info@tejjy.com for BIM Services in USA
Construction Site
Clash Detection and Coordination