
1 minute read
BIM Modeling Facilitating Mechanical & Plumbing Contractors in the USA
from BIM Modeling Facilitating Mechanical & Plumbing Contractors in the USA | Tejjy Inc.
by Tejjy Inc
3D BIM Modeling with Constructability Review BIM Mechanical & Plumbing Design Validation BIM Clash Detection & Coordination BIM Shop Drawings & Fabrication Drawings BIMQuantity Take-off
Advertisement
Click to read more on BIM Services
3D BIM MODELING WITH CONSTRUCTABILITY REVIEW
HVAC Sheet Metal Model Creation for all trades of MEP/FP with Hangers, Trapeze & Seismic
Restrains Clash Removal through re-routing ductwork, changing elevation & duct re-sizing BIM Value Engineering & MEP Design
Validations
BIM MECHANICAL & PLUMBING DESIGN VALIDATION
HVAC Design Validation Heat Load Calculation Duct Sizing & Routing for HVAC Systems External Static Pressure Calculations Equipment Selection & Schedule Pipe Sizing & Routing for Chilled Water Systems Pump Head Calculations for Chilled Water Systems
Plumbing Design Validation Pump Head, Water Demand & Storage Tank Calculations Pipe Sizing & Routing for Water Supply Systems Designing Drainage System Layout Generation as per standards Hot/Cold Water Distribution System & Water Demand Calculations Selection & Schedules of Fixtures & Fittings
BIM CLASH DETECTION & COORDINATION
Resolve issues during the pre-construction stage, saving cost & time Verify space allocated for services with 3D BIM Model, checking interference with other services Detect collisions with structural, ceiling, framing, partitions, equipment, electrical, mechanical, plumbing, lights, conveying systems & other services
BIM SHOP DRAWINGS & FABRICATION DRAWINGS
Installation Shop Drawings to help contractors plan, execute & install mechanical work Block-Out Drawings aligning with architectural grids Sleeve, Insert & Hanger Drawings, producing accurate
Sleeve, Insert & Hanger positions from 3D BIM Model to help construction team before plumbing installation Spool Drawings to create plumbing segments from the model for accurate off-site or on-site pre-fabrication Equipment Detailing & Pad Layout referencing architectural grids & structural drawings for proper installation of HVAC equipment from Approved Submittals in appropriate locations, coordinating accessibility
BIM QUANTITY TAKE-OFF
Detailed & Tabulated Quantity Take-off for
Procurement, Fabrication & Installation Accurate Quantity Information & Cost Estimate throughout Project Lifecycle Quantity
Generation for a specific time period or project a rea (4D/5D) for material management, procurement & saving inventory costs
PRESENTED BY TEJJY INC.
Contact – 202-465-4830/ info@tejjy.com https://www.tejjy.com/ Our Services Click to read more - https ://www.tejjy.com/our-services/