How the As Built Drawing Services Help Building Owners, Architects, Contractors & Buyers?

Page 1

How the As Built Drawing Services Help Building Owners, Architects, Contractors & Buyers? As built drawings include precise information on the modifications made at any project-interim stage. It enables simple visualization of the following processes, the ability to see difficulties, and early problem-solving. The owner, surveyors, and facility managers can include project components including location, size, and other pertinent metrics with the use of as-built drawings. Furthermore, it contains other crucial information for the project, such as specifications for the walls, doors, HVAC systems, electrical fixtures, and more. Once a project is finished, a contractor completes and submits as-built drawings. To reflect any changes made on-site, such as component relocations for coordination or rerouting of distribution systems, drawings are updated from the original design drawings. All the buildings and components that fall under the purview of the construction project are specified in as built drawing services. Modifications and adjustments, as well as a record of approvals are also included. How are Building Owners, Architects, Contractors and Buyers benefited from as built drafting services? Owners: It is crucial for the owners since it can be used in the future to understand any changes to the created model or to restructures that have already been made. It is essential because it provides a representation of the complete project after it is finished. These are the updated designs that are submitted following the completion of a building project. It contains every modification and alteration made to the project's overall pilot drawing. Architects & Designers: The initial drawing plans, which serve as the foundation for the as-built drawings, are created by architects and designers. These are the best candidates to make as-builts. These people's greatest obstacle is the changing landscape. Final as-built drawings are the responsibility of the contractors. Contractors: The actual construction is the sole responsibility of the contractor, who is also able to document adjustments and revisions as they take place. The final construction drawing services on-site are marked up with revisions by the contractor. The consultant team uses these drawings later to assess issues and create record drawings of the built projects. After the project is finished, it is typically used for client maintenance and health and safety requirements. Earlier versus BIM and construction management software In-Building Records: As a result of the lack of sufficient documentation for an existing building, its change orders, and as-built drawings evaluation, the conventional method was ineffective for project management,


building rehabilitation, and renovation in the future. Traditional as-built drawings posed numerous problems and difficulties for managing and sustaining construction projects during the course of a project. Rework was a frequent issue that resulted in project delivery delays and added time and expense for upgrading the construction data. Rework is decreased through the communication that takes place at various project phases. Numerous professionals are employed on the construction project, which employs a dispersed management approach. Any phase where the information is not accurate can result in errors and inaccuracies in the documentation. As-built drawings are a conventional practice; however there have been many failures that have reduced the accuracy and precision of construction projects. However, with the introduction of BIM and construction management software, we can get past the problems and difficulties associated with the built environment. Construction productivity has increased thanks to the development of technologies that combine collaborative work and automate procedures. It facilitates achieving the shortest possible project duration, reducing laborious workflow, managing concerns for several projects, etc. By limiting the primary construction parameters, project managers, surveyors, or foremen may be able to make precise decisions within a specific time frame. Making quality judgments in real time is possible if you choose the right construction management software. Your project will be completed if construction management is successful. By reducing the unnecessary paper waste of conventional documentation, construction management software and BIM can detect problems and resolve them. With BIM Services, asbuilt drawings can assist clients in visualizing the building and offer a virtual tour of all its features. It contributes to the sustainability and productivity of buildings built within a specific time frame. Who benefits from as built drawings and why are they important? Construction projects are not always as perfect and precise as a model created before it was built or planned. Changes made to the model assist the contractors in gathering data for component installations that differ from the original design, allowing the contractors to keep track of plan or drawing changes. As-built services are crucial data for all construction projects and serve two major purposes. 

Using the information from the designs, we can make modifications to buildings or renovate existing ones in the future. The contractors can more quickly and easily access information on drainage systems, ducts, etc. by retrieving as-built papers. The facility managers can precisely describe key goods and objects with the help of useful tools.

All investors in the construction project rely on the as-built drawings: Working with: As-built drawings are a crucial tool for documenting modifications made during construction. It is simpler for the contractors to see the essential action in the various phases as


the construction transitions from one stage to the next. Problems and difficulties can be quickly found and fixed before they arise during the construction process. Owners/Clients: Due to installations and item records that are essential if the owner has to swiftly address a problem or alter any future building designs, as-built documentation is essential for building owners and clients. Property Buyers: It is essential for buyers of real estate because it represents the final sale of the property. It provides important details about what is being sold and purchased and serves as the foundation for upcoming improvements and advancements. How might as-built be beneficial to the construction industry's future & its effects on the environment? How are As-Built Drawings handled? The information in as-built drawings is crucial for construction projects. On construction sites, the as-built drawing must always be accessible whenever someone requires accurate information. It also understands how to handle it and is recognized to be a part of the commissioning process: 

All modifications made during the construction process are documented in the as-built drawings, which include all the specifications of any changes or additions to earlier data or information, including materials, measurements, etc. Updated revisions must be made to the drawings, and outdated data should be crossed out. This will help to construct a trail of changes, their specifics, and their causes.

The as-built drawings contain a brief summary of the changes made, the date that it was modified, correction, and updating. If something needs to be deleted or is crucial, it needs to be coded or colored marked so that it is easy to understand. The creation of accurate as-built drawings can be accomplished by comparing manual as-built drawings with actual installations: • After a building's construction is complete, a walkthrough is crucial to ensure accuracy in the examination of ceilings and other inaccessible aspects. • To prevent delays in the construction process, which comes before installing systems, it helps to coordinate installers and reviewers to ensure that inspectors can examine finished installations before hiding systems? Multiple reviews must be conducted at various stages of the building. • Throughout the building phase, reviews must be completed monthly, quarterly, or as needed by the schedule. The best way to guarantee that systems are documented without schedule risk is through regular evaluations. Building Projects Can Be Sustainable with As-Built Social, economic, and environmental factors are used to evaluate the sustainability of the project as depicted in the As-Built drawing.


Social: By providing better-facilitated design through as built drawings that focuses on the conveniences of building users, BIM Services can help to improve the project's social sustainability. Before it is built, owners can examine the design model and take a virtual tour of it. With BIM Services, the working model can be collaborative, facilitating correct information flow between stakeholders and resulting in enhanced model-based decision-making. Economic: As-built drawings help increase economic sustainability by precisely estimating the materials needed and tracking changes during the construction process. Through BIM-based cost-estimation software, cost estimates and bills are automated throughout the whole building process. Impact on the Environment: BIM Workflow and As-built drawings have made it possible to increase energy consumption and reduce a building's environmental effect. As-Built data can be utilized in collaborative BIM design to improve and monitor the model's development. Additionally, it provides precise information that aids in decision-making. Drawings of as-built in the digital age: Pen and paper were used to document construction procedures in the past, but the advent of digital documentation has reduced costs and delays. The as-built drawings used to create more effective construction procedures are frequently seen on mobile devices. Few software programs come with a ready-made setup for drawing creation and editing on any mobile device. It enables precise and effective construction. As-built drawings demand a significant amount of labor and promote accuracy and precision. Tasks can now be standardized, digitalized, and automated for simpler review and record processes. Thanks to mobile technologies and as-built software. Better construction projects and as-builts may result from it. Final Thought Facility managers, owners, surveyors, and contractors can use as built drawing services to collect any changes made to the building's constructed model and record those revisions in the documentation. In order to make the model and use the as-built drawing of it for upcoming reconstruction or new construction projects, contractors use the architects and designers' creations. The as-built drawings are more precise, accurate, and economical for the owners to understand and keep track of any changes made by anyone in the construction process. To know more about as built drawing cost, get in touch with Tejjy Inc. BIM & as built company in USA providing as built services at 202-465-4830 or info@tejjy.com.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.