City For All - Presentation '' Informal Settlement Upgrading Project ''

Page 1

BOENG TOMPUN COMMUNITIES PREK TAKONG 1, CHERNG EK GROUP 3, CHERNG EK GROUP 4, PHNOM PENH, CAMBODIA

PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

1


RAPID URBAN GROWTH ABOUT

1,952,239

3.16% ANNUALLY

POPULATION GROWTH

PHNOM PENH POPULATION

PHNOM PENH ADMINISTRATIVE SECTIONS

ABOUT

12 KHANS 96 SANGKATS 909 VILLAGES

ABOUT

23.4%

URBANIZATION NATIONAL LEVEL

UN World Urbanization Prospects: The 2018 Revision Annual Percentage Of Population In Urban Areas 1979

6%

1999

18.5%

2018

2035

2050

23.4% 31.8% 41.2%

SOURCES: 1. WORLD POPULATION REVIEW. 2. URBAN DEVELOPMENT IN PHNOM PENH, THE WORLD BANK GROUP 2017. 3. WORLD URBANIZATION PROSPECTS, THE 2018 REVISION. BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

2


PHNOM PENH EXPANSION

SOURCES: URBAN DEVELOPMENT IN PHNOM PENH, THE WORLD BANK GROUP 2017 BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

3


INFORMAL SETTLEMENTS

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

4


INFORMAL SETTLEMENTS BARRIER - Low quality housing materials - Limited access to water and sanitation - Limited access to public services - Limited access to infrastructure such as road access, drainage and sewage systems - Hazard and disaster challenges - No land tittle and other legal documents.

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

5


URBAN POOR SETTLEMENT IN PHNOM PENH YEAR

NUMBER OF SETTLEMENT

8 KHANS SURVEYED

1997

379 settlements

2003

569 settlements

2009

410 settlements

2013

340 settlements

12 KHANS SURVEYED

2017

277settlements 18% decresed

Reason of settlement decreased: 1. Settlement getting smaller ( less than 10 houses ) 2. Better living condition 3. Settlements vanished due to development by Government or Private sector 4. Considered as part of larger settlement.

SOURCES: THE PHNOM PENH SURVEY, A STUDY ON URBAN POOR SETTLEMENT IN PHNOM PENH, STT, JULY 2018. BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

6


DOES DECREASE NUMBER MEANS NO MORE INFORMAL SETTLEMENT ?

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

7


URBAN POOR SETTLEMENT IN PHNOM PENH

5 NEW settlements WHERE DOES IT COME FROM? - 2 settlements from relocation sites ( settlement evicted from past location ). - 2 newly formed settlements. - 1 settlement from 4 adjacent established settlements had grown in size. WHERE IS THE INFORMAL SETTLEMENT LOCATED? - 47% Community living close to the body of water ( river, canal, lake and pond - natural or artifical ). - 17% Next to railway. - Vcant land - Old building structure - Official dumping site and so on. SOURCES: THE PHNOM PENH SURVEY, A STUDY ON URBAN POOR SETTLEMENT IN PHNOM PENH, STT, JULY 2018. BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

8


WHAT ARE THE CAUSES OF INFORMAL SETTLEMENTS? - Urban Sprawl - Improper city planning - Complex settlement issues after khmer rouge regime. - Poverty - Rural migration for jobs in the city - No legal documents - Eviction and so on. YEAR OF SETTLEMENTS - Majority of settlements were established between 1979 - 2001. - Small proportion of the outer Khans settlements were established after 2002. - Inner Khans settlement increased its size due to high density.

SOURCES: THE PHNOM PENH SURVEY, A STUDY ON URBAN POOR SETTLEMENT IN PHNOM PENH, STT, JULY 2018. BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

9


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

10


HOUSING DEMAND 9.8 million Cambodians lack to decent housing. 1 million more homes by 2030.

SOURCES: HOUSING DESIGN CHALLENGE 2018 BY UNDP, PPSEZ AND BUILDING TRUST INTERNATIONAL BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

11


ADEQUATE DECENT HOUSING IN NEED

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

12


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

13


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

14


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

15


BOENG TOMPUN COMMUNITIES PREK TAKONG 1, CHERNG EK GROUP 3, CHERNG EK GROUP 4, PHNOM PENH, CAMBODIA

PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

16


LOCATION OF COMMUNITIES

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

17


PREK TAKONG 1 COMMUNITY - PROFILE Prek Takong 1 is the biggest out of the three target groups. It is not clear, when the community has settled by Boeung Tumpun lake, but according to the villagers, it was before 1960s. Due to a development of the construction of Hun Sen Boulevard and the largest development project of ING city, this community has been living under threat of eviction, and these threats have so much influence on the settlement dwellers life (this information has been communicated among their neighbors /villagers through rumor/ hearsay since 2009). Since infilling with the sand into to the lake, flooding in the community has intensified year by year, and residents in the communities suffered from water pollution and the crop yield decrease (water morning glory, water mimosa).​ *STT documents BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

18


PREK TAKONG 1 COMMUNITY - PROFILE Community area:

16 hectars Population:​

2628 people 1287 women 532 Families

7 community

groups

70% state water 30% private water 90% has toilet 10% no toilet 90% state electricity 10% private electricity * Based on STT community profiles BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

19


CHERNG EK GROUP 3 COMMUNITY - PROFILE This community is located on the public pond which was established during the early 1980s.The village head suggested that during the early 1980s, the village authority decided to dig a pond, with the size of about 1 hectare of land, for villagers to raise cattle. By the late 1980s, some villagers got married and formed new families. These new families decided to live on the public pond because the rest of the land had already been possessed. The village head suggested that most outsiders moved into Cheung Ek 3 community in earlier 2000s. Some bought the land from the earlier settlers and some claimed the land themselves. *STT documents

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

20


CHERNG EK GROUP 3 COMMUNITY - PROFILE Community area:

5.2 hectars Population:​

236 people 156 women 155 Families NO clean water 30% drink dwell water 10% drink boiled water 60% drink 20 litre bottle water type 40% has toilet 60% no toilet 50% state electricity 40% private electricity 10% candle light * Based on STT community profiles BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

21


CHERNG EK GROUP 4 COMMUNITY - PROFILE There are 45 families in the community. Main occupation of people in community are vendor, factory worker, motor-taxi driver etc.The community has a number of key challenges such as bad condition homes, toilet and sanitation, domestic violence, drug and land tenure. According to the village head, the land has been sub-divided over time due to the increase of the family members of the land owners and in-migrants. Some families have strong document (SlabMean) to prove their possession of land prior to 2001. Some families are still unclear about the legal rights to housing in the area. The community may also be vulnerable to satellite city development. *STT documents

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

22


CHERNG EK GROUP 4 COMMUNITY - PROFILE Community area:

2.5 hectars Population:​

157 people 95 women 45 Families NO clean water 50% drink unboiled water 40% drink boiled water dwell water 10% drink clean water 30 families has toilet 10 families has no toilet 40% state electricity 50% private electricity 10% candle light * Based on STT community profiles BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

23


PHNOM PENH LAND USE MASTER PLAN 2035 PRESERVATION ZONES, NATURE AND AGRICULTURE LOW DENSITY ZONE PARK AND ENTERTAINMENT prek takong

cherng ek group 4

1

cherng ek group 3

BUILDING AREAS

HIGH DENSITY HIGH DENSITY, ALONG THE ROAD AVERAGE DENSITY LOW DENSITY

PUBLIC BUILDINGS

LARGE SCALE PUBLIC BUILDING PAGODA PRESERVED LAKE

PRESERVATION ZONES, NATURE AND AGRICULTURE

LOW DENSITY ZONE PARK AND ENTERTAINMENT

FUNCTIONS

CULTURAL ENTERTAINMENT TREE PLANTATION AND CONSERVATION ព្រំប្រទល់បឹងទំពុន

ផ្លូវអភិវឌ្ឍប៉ះពាល់ដល់សហគម

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

BOENG TOMPUN LAKE BOUNDARY - STATE PUBLIC LAND ROAD DEVELOPMENT AFFECTING COMMUNITIES

24


SATELITE CITY DEVELOPMENT PLAN

prek takong

cherng ek group 4

1

cherng ek group 3

ING Holding Co., Ltd. was granted the major satellite city development project which is part of Phnom Penh municipal 2035 development plans. The master plan concerns Boeung Tumpun lake and the area south and east of it. Prek Takong1 and Cheung Ek group 3 communities are located within the plan’s boundary. Cheung Ek group 4 is not included in the zoning plan, however new planned road developments will definitely affect this community as well. ING Holding master plan development boundary ​road developments affecting Communities communities

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

25


LAND CATEGORY AND DEVELOPMENT IMPACT BOUNDARIES community boundary according to STT documentation ING Holding Co. satellite city development plan boundary Beung Cheung Ek classified state-public land boundary New road development AREAS - ASSUMPTIONS OF 2035 MASTER PLAN 30m wide road development area of public park LAND STATUS state-public land LAND CATEGORIES A-D - 121 households located on state-private land E - 3 households located on state-public land boundary F - 191 households located on state-public land BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

26


LAND CATEGORY AND DEVELOPMENT IMPACT BOUNDARIES community boundary according to STT documentation Beung Cheung Ek classified state-public land boundary New road development LAND STATUS state-private land occupied by non-community state-private land occupied by community ASSUMPTIONS OF MASTER PLAN FOR PHNOM PENH CITY 2035 30m wide road development area of public park LAND CATEGORIES B-D - 26 households located on state-private land F - 74 households located on statepublic land BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

27


LAND CATEGORY AND DEVELOPMENT IMPACT

BOUNDARIES community boundary according to STT documentation New road development LAND STATUS private land non-community ASSUMPTIONS OF MASTER PLAN FOR PHNOM PENH CITY 2035 30m wide road development LAND CATEGORIES A-D - 25 households, Community private land C-D - 13 households, Community private land

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

28


FIRST CONSULTATION

PREK TAKONG 1 GROUPS 5-7 CHOOSING THEIR PREFERENCES

PREK TAKONG 1 GROUPS 5-7 BUILDING A DREAM HOUSE

PREK TAKONG 1 GROUPS 5-7 VOTING FOR THE MOST IMPORTANT

LITTLE DESIGNERS

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

PREK TAKONG 1 GROUPS 1-4 DURING THE AFTERNOON SET

29


FIRST CONSULTATION

PREK TAKONG 1 GROUPS 5-7 - SECOND HOUSE MODEL

PREK TAKONG 1 GROUPS 5-7 - FIRST HOUSE MODEL

PREK TAKONG 1 GROUPS 1-4 - FIRST HOUSE MODEL

CHERNG EK GROUP 4 - SECOND HOUSE MODEL

PREK TAKONG 1 GROUPS 1-4 - SECOND HOUSE MODEL

CHERNG EK GROUP 4 - FIRST HOUSE MODEL

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

30


SECOND CONSULTATION

PREK TAKONG ANALYSING THE OPTIONS

PREK TAKONG VOTING FOR ITS PREFERENCES

CHERNG EK GROUP 4 ANALYZING THE STRATEGIES

CHERNG EK GROUP 3 DISCUSSING THE PROJECT

PREK TAKONG COMMENTING THE CHOICES

CHERNG EK GROUP 3 WRITING​THE FEEDBACK

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

31


THIRD CONSULTATION

THREE COMMUNITIES IN THIRD CONSULTATION

PRESENTATION OF THE PROJECT STRATEGY AND DEVELOPMENT OPTIONS

សហគមន៌ទាង ំ បីនៅក្នុងការពិភាក្សាល�ើកទីបី

ការធ្វើបទបង្ហាញអំពីយុទ្ធសាស្ត្រគម្រោងនិង ជម្រើសអភិវឌ្ឍន៌

PREK TAKONG AT THE PRESENTATION

COMMUNITIES LISTENING TO THE PRESENTATION

FINANCIAL DISCUSSION

សហគមព្រែកតាគង់នៅពេលធ្វប ើ ទបង្ហាញ

សហគមនៅពេលធ្វប ើ ទបង្ហាញ

ការពភា ិ ក្សាអំពីហរិ ញ្ញវត្ថុ

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

32


THIRD CONSULTATION

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

33


1 BOENG TOMPUN - FULL OF .

ATTRACTIONS, GREEN PUBLIC AREA IN THE CITY

2 CONNECTING .

COMMUNITITES

MAIN PROJECT ASSUMPTIONS 3. COMMON BUSINESS PLAN

$ 4

AFFORDABLE, VERSATILE, ADAPTED TO LOCAL CLIMATE HOUSING MODEL .

5 FINANCING FROM VARIETY 6 ARCHITECTURE AS A KEY .

.

FOR A SOCIAL CHANGE

OF SOURCES COMMUNITY COOPERATIVES

PRIVATE BUDGETS

DONATIONS

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

EDUCATION

PRIVATE SECTOR

$

LOANS

COMMUNITY BUSINESSES

MEDICAL CARE COMMUNITY GATHERINGS

SPORTS

WORKSHOP AREAS

PLAYGROUNDS COMMUNAL GARDENS

34


1. GREEN PUBLIC AREA IN THE CITY BOENG TOMPUN - FULL OF ATTRACTIONS, GREEN PUBLIC AREA IN THE CITY TOURISTS អ្នកទេសចរណ៌

PHNOM PENH AIRPORT អាកាសយាន្តដ្ឋាន

CITY CENTER HIGH INCOME

BOENG TOMPUN IN THE CENTRE OF ATTENTION, NEW FUNCTIONS FOR WIDE RANGE OF RECIPIENTS

កណ្ ដា លទីក្រុង

ប្រាក់ចំណូលខ្ពស់

LOW INCOME ប្រាក់ចំណូលទាប

CAMBODIANS ប្រជាជនកម្ពុជា NEW BUSINESS CENTER តំបន់អាជីវកម្មថ្មី

CITIZENS

The project faces current Phnom Penh’s problems as lack of public spaces and green areas. General concept is to preserve the natural character of the lake and create a multifuncional space open to public use. The project aims to attract people of diverse backgrounds, incomes and nations. It suggests new places to do sports outdoor and relax.

ប្រជាជន

OUTSKIRTS OF PHNOM PENH តំបន់ជាយភ្នំពេញ BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

FOREIGNERS ជនបរទេស

35


2. CONNECTING COMMUNITIES CONNECTING COMMUNITIES - ផ្សារភ្ជាប់សហគម MULTIFUNCIONAL PATH ABOVE THE LAKE The main attractive point of the lake development might be a multifuncional path connecting northern and southern lake shores. It provides transition for pedestrians only. While crossing the lake, the visitors will find variety of different activities on the way. Not only sports activities, but also many places to have rest and relax in natural, clean environment will be provided. The path is designed as a wooden pier on different levels in a shape inspired by scattered morning glory fields below. communities’ boundaries conceptual course of the path suggested platforms as lookingout points or activities areas

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

36


DO SPORTS - កីឡា

RELAX - លំហែ

DISCOVER - ស្វែងរក

WORK IN NATURAL ENVIRONMENT - ធ្វកា ើ រក្នុងបរស្ថា ិ នធម្មជាតិ

EXPERIENCE SOMETHING NEW - ទទួលបទពសោធ ថ្មី ិ

GET INSPIRED - ទទួលយកការបំផុសថ្មី

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

37


3. COMMUNITY BUSINESS PLAN COMMON BUSINESS PLAN COMMUNITIES AS MAIN POINT OF THE PROJECT prek takong groups

1-4

1

ព្រែកតាគង់ 1 ក្រុម 1-4

m M b A r a

prek takong groups

5-7

1

ព្រែកតាគង់ 1 ក្រុម 5-7

M A B

c m b c B br m m a r

cherng ek

cherng ek group

a

group

3

ជ�ើងឯកក្រុម 3

4

ជ�ើងឯកក្រុម 4

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

r

SUGGESTED DIVISION OF LAKE AREA morning glory cultivation no cultivation MORNING GLORY BUSINESS INFRASTRUCTURE morning glory center port A - Prek Takong 1 port B - Cherng Ek group 3 trip transfer cooking class local markets - morning glory distribution common areas for building boats and plastic bottle rafts canal system accomodation for rent restaurant

38


M

MORNING GLORY CENTER - មជ្ឈមណ្ឌលដាំត្រកួន កញ្ឆែ ត

learn in theory about morning glory - រ�ៀនអំពីការដាំដុះត្រកួន កញ្ឆែ ត

c

TRIPS WITH LOCAL GUIDES - ដំណ�ើរកំសាន្តជាមួយមគ្គុទ្ទេសក៍ feel as a morning glory cultivator - មានអារម្មណ៌ដូចជាអ្នកធ្វើចំការ

m

COOKING WORKSHOPS - ថ្នាក់បង្រៀនធ្វើម្ហូប

LOCAL MARKETS - ផ្សារ

morning glory distribution - បោះដុំត្រកួន

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

TRIPS ON PLASTIC BOTTLE RAFTS - ដំណ�ើរកំសាន្តជាមួយក្បូនធ្វពី ើ ផ្លាស្ទីក

eco alternative for traditional wooden boats - ជួយបរស្ថា ិ នអាចប្រើប្រាស់ជំនួសទូកឈ�បា ើ ន

r

RESTAURANTS - ភោជនីយដ្ឋាន

39


4. AFFORDABLE HOUSING MODEL

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

40


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

41


5. FINANCING FROM VARIETY OF SOURCE prek takong

prek takong

1

groups

1 groups 1-4

WHOLE AREA EARMARKED FOR REDEVELOPMENT 22 672.40m2 - 100% COMMUNITY REDEVELOPMENT 20 317.30m2 89,61% PRIVATE SECTOR 2 355.10 m2 - 10,39%

5-7

LOCATED ON STATE PUBLIC LAND - NO PRIVATE SECTOR INVOLVED % cherng ek group

3

WHOLE AREA EARMARKED FOR REDEVELOPMENT 25329m2 - 100% COMMUNITY REDEVELOPMENT 12 258m2 - 62,69% PRIVATE SECTOR 7 295 m2 - 37,31%

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

cherng ek group

4

WHOLE AREA EARMARKED FOR REDEVELOPMENT 3 865 m2 - 100% COMMUNITY REDEVELOPMENT 2 477 m2 - 64,09% PRIVATE SECTOR 1 388.13 m2 35,91% 42


6. ARCHITECTURE , FACILITIES FOR SOCIAL CHANGE PROJECT ASSUMPTIONS - FUNCTIONS ADAPTED TO REAL NEEDS

prek takong groups

1-4

prek takong groups

5-7

1

1

1

FACILITIES FOR THE COMMUNITITES The fundamental thing in improving living standard is to satisfy basic human needs. Beside adequate housing conditions, these are undobtedly access to education and medical care. On the second place, these would be areas to excercise, which enables maintaining a healthy lifestyle. Basing on the collected data, in each location, the project suggests community centres with functions and size adapted to the proper needs. There are also communal gardens, playgrounds for children and sports courts provided in each community. It is undoubtedly the case, that common activities leads to integration which will afterwards empower communities’ position in the society.

2 3

cherng ek group

4

cherng ek group

3

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

43


6. ARCHITECTURE , FACILITIES FOR SOCIAL CHANGE

COMMUNITY CENTERS

COMMUNITY GARDENS

KIDS PLAYGROUND

DANCING PLAZA

SPORTS COURTS

SKATE PARK

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

44


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

45


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

46


BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

47


THANK YOU!

BOENG TOMPUN COMMUNITIES - PARTICIPATORY INFORMAL SETTLEMENT UPGRADING PROJECT

48