free exam HP0-P14 dumps

Page 1

Test4pass

Expert

In

IT

Certification

Exams

Exam

:

HP HP0-P14 Exam

Title

:

Planning & Design of HP Integrity Server Solutions

Version :

Demo

http://www.test4pass.com Leading the way in IT Certification Exams


Test4pass

Expert

In

IT

Certification

Exams

Top 3 Customers in Test4passs - Best IT certifications Team

HOT Certifications On Test4pass Cisco Certifications CCNA CCDA CCNP

CCDP

CCVP

CCSP

CCIP

CCIE

CCDE

Data Center

Sales Expert

Microsoft Certifications MCP

MCSE

MCSE2003 Security

MCITP MCTS MCSE2003 MCSE2003 Messaging

MCPD

MCSD.NET

MCDST

TS Exchange Server2007

Microsoft Business Solutions

IBM Certifications Certified Administrator DB2

Certified Systems Expert

Certified Advanced Technical Expert

Lotus Certification

Solutions Expert System Administator

Certified Advanced System Administrator

WebSphere Cognos 8 BI

Certified Associate Developer Tivoli Software

CompTIA Certifications A+ Server+

CDIA+

PDI+

CTT+

e-Biz+

Convergence+

CompTIA HTI+ i-NET+ Linux+

Network+ Project+

RFID+

Security+


Test4pass

Expert

In

IT

Certification

Exams

1. Your customer has been running HP-UX High Performance Technical Computing applications on Integrity rx8640 servers. They are trying to decide whether certain workloads will fit on one server, based on past performance. Which HP tool should they use to make this detemination? A. Insight Control performance management B. Capacity Advisor C. Integrity VM Sizer D. Performance Quick Reference Tool (PQRT) Answer: B

2. The ISV Application Status Report Tool keeps a record of the ISVs that have made commitments to support applications on which Integrity operating systems? A. HP-UX and Linux B. HP-UX and Windows C. HP-UX, Linux, and Windows D. HP-UX, Linux, Windows, and OpenVMS Answer: D

3. Which features arenew with iLO 3 on Integrity servers? (Select three.) A. Insight Power Manager is supported through iLO 3 Advanced. B. System firmware can be upgraded directly through iLO 3. C. The power state of multiple Integrity server blades within the enclosure can be controlled from a single iLO 3. D. Multiple iLO 3 processors are supported in a single scalable Integrity system. E. The iLO 3 Advanced Pack license is included on all new Integrity servers. F. Dynamic Power Capping is supported through iLO 3 Standard. Answer: B,D,E

4. Which priorities would motivate a customer to install a rackmount Integrity rx8640 instead of an Integrity BL870c server blade? (Select two.) A. improved power and cooling efficiency B. a need for virtual partitioning C. SMP instances of more than four processors D. low installation cost and TCO E. streamlined management and setup Answer: B,C

http://www.test4pass.com Leading the way in IT Certification Exams


Test4pass

Expert

In

IT

Certification

Exams

5. Your customer wants to move processor usage rights from servers in production to servers at their disaster recovery site in the event of a disaster. Which type of licensing is needed? A. Dynamic nPars B. TiCAP C. vPar CPU migration D. GiCAP Answer: D

6. Which component of server performance does Intel Hyper-Threading technology increase? A. error correction B. throughput C. redundancy D. energy efficiency Answer: B

7. Which components are necessary to provide high availability in a failover server cluster? (Select two.) A. remote management software B. service level objectives (SLOs) defined for all workloads C. one external storage device with no shared drives D. cluster-enabling software E. two or more server nodes with a common subnet Answer: D,E

8. Which HP software should you recommend for a customer who wants to replicate data between a remote data center running HP-UX 11i on Integrity servers and their HP StorageWorks EVA storage system? A. Business Copy B. Continuous Access C. Secure Path D. Storage Essentials SRM Answer: B

9. You are planning a BladeSystem solution for a customer who wants to populate a c7000 enclosure with one Integrity BL86c server blande and one BL870c server blade. The customer also wants one SB600c storage blade, and one StorageWorks Ultrium tape blade to provide direct attach tape backup capability for

http://www.test4pass.com Leading the way in IT Certification Exams


Test4pass

Expert

In

IT

Certification

Exams

the BL860c. A. The tape blade must be adjacent to the BL860c server blade in the enclosure. B. You must connect the SB600c storage blade and the Ultrium tape blade to the same server blade. C. HP Data Protector Express Single Server Edition must be purchased separately. D. You must install a PCIe Mezzanine Pass-Thru Card for HP BladeSystem c-Class to connect the storage blade to the BL870c server blade. Answer: A

10. Which statement describes what HP standard server warranties provide? A. installation services and support B. Hardware protection against manufacturer defect C. guaranteed software and operating system support D. flexible support leve;s Answer: B

11. A customer is installing new Integrity BL870c server blades in their data center. Where will they set dynamic power caps? A. at each of the c7000 enclosure power supply modules B. through the HP Intelligent Rack PDU C. at each of the server Insight Display panels D. through HP Insight Control features Answer: D

12. What enables multiple Integrity server blades to be combined into two-, four-, and eight-socket cache-coherent NUMA(ccNUMA) systems within a BladeSystem c-Class environment? A. Virtual Connect Flex-10 B. xFabric C. Domain Management Processor D. Scalable Blade Link Answer: D

13. Which part of the site survey should you and a customer perform 60 days before installtion of a new solution? A.Power system and lighting requirements B. floor plan design

http://www.test4pass.com Leading the way in IT Certification Exams


Test4pass

Expert

In

IT

Certification

Exams

C. telephone, data cable, and fire protection installation D. distribution hardware Answer: B

14. How can you design a practical solution that builds availability into the customer’s data center? A. by ordering duplicate hardware components to keep as apares for redundancy B. by ensuring that the data center’s floorplan and electrical system are properly configured C. by establishing a planned downtime schedule with a maximum of 20 hour per week D. by configuring the Integrity server in the data center with vPars for electrical isolation Answer: B

15. As a result of server consolidation in a nonclustered environment, total cost of ownership (TCO) is lower. What are the possible reasons foe this? (Select two.) A. faster return on investment (ROI) B. increased ease of management C. higher security D. reduced hardware support costs E. reduced downtime Answer: B,D

http://www.test4pass.com Leading the way in IT Certification Exams


Contact Test4pass

We are proud of our high-quality customer service, which serves you around the clock 24/7.

To get your problem resolved instantly, live support Read Our Frequently Asked Questions (FAQs) We have gathered the most frequently asked questions for you. Please read our list of FAQs.

Contact us by Live Messenger Sales:

Test4pass(at)hotmail.com

You can reach us at any of the email addresses listed below Please allow up to 24 hours for us to respond

•

MSN:

Test4pass@hotmail.com

http://www.Test4pass.com

help you 100% pass your IT certifications Exams on the first try


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.