REPUBLIC OF KENYA
MEDIUM TERM EXPENDITURE FRAMEWORK 2006/2007-2008/2009
REPORT FOR THE AGRICULTURE AND RURAL DEVELOPMENT (ARD) SECTOR
(Final Draft)
FEBRUARY 2006
TABLE OF CONTENTS LIST OF TABLES ...............................................................................................................................................III ACRONYMS AND ABBREVIATIONS..............................................................................................................V 1.0 INTRODUCTION............................................................................................................................................1 1.1 COMPOSITION OF THE SECTOR............................................................................................................1 1.2 SUB-SECTORS’ CONTRIBUTION TO THE ECONOMY .......................................................................1 1.2.1 Agriculture......................................................................................................................................1 1.2.2 Livestock Development ........................................................................................................................1 1.2.3 Fisheries Development.........................................................................................................................1 1.2.4 Co-operatives..................................................................................................................................2 1.2.5 Lands ..............................................................................................................................................2 1.2.6 Environment......................................................................................................................................2 1.2.7 Forestry.............................................................................................................................................3 1.2.8 Mining..................................................................................................................................................3 1.2.9 Regional Development....................................................................................................................3 2.0 VISION, MISSION ..........................................................................................................................................4 2.1 VISION ..........................................................................................................................................................4 2.2 MISSION........................................................................................................................................................4 3.0 KEY STRATEGIES AND ERS PRIORITIES FOR THE SECTOR ...............................................................4 3.1 KEY STRATEGIES ..........................................................................................................................................4 3.1.1 Agriculture, Livestock Development, Fisheries Development and Cooperatives ................................4 3.1.2 Lands....................................................................................................................................................5 3.1.3 Environment and Natural Resources ...................................................................................................5 3.1.4 Regional Development .........................................................................................................................5 3.2 PRIORITIES FOR THE SECTOR ........................................................................................................................6 3.2.1 Agriculture ...........................................................................................................................................6 3.2.2 Livestock and Fisheries Development..................................................................................................6 3.2.2.1 Livestock Development................................................................................................................................. 6 3.2.2.2 Fisheries Development.................................................................................................................................. 6
3.2.3 Cooperatives ........................................................................................................................................6 3.2.4 Environment and Natural Resources ...................................................................................................7 3.2.5 Lands....................................................................................................................................................7 3.2.6 Regional Development Authorities ......................................................................................................7 4.0
PERFORMANCE AND ACHIEVEMENT OF THE SECTOR IN 2003/04 TO 2004/05.......................8
4.1 FINANCIAL PERFORMANCE ...........................................................................................................................8 4.2 ACHIEVEMENTS OF THE SUB-SECTORS IN 2003/04 TO 2004/05 ..................................................................10 4.2.1 Agriculture .........................................................................................................................................10 4.2.2 Livestock and Fisheries......................................................................................................................11 4.2.3 Cooperatives Development and Marketing........................................................................................12 4.2.5 Environment and Natural Resources .................................................................................................12 4.2.6 Regional Development Authorities ....................................................................................................13 4.3 CHALLENGES AND CONSTRAINTS ...............................................................................................................13 4.3.1 Agriculture .........................................................................................................................................13 4.3.2 Livestock and Fisheries Development................................................................................................14 4.3.3 Cooperatives ......................................................................................................................................14 4.3.4 Lands..................................................................................................................................................14 4.3.5 Environment and Natural Resources .................................................................................................14 4.3.6 Regional Development Authorities ....................................................................................................15 5.0 OBJECTIVES, TARGETS, EXPECTED OUTPUTS AND OUTCOMES FOR 2006/07 AND THE MEDIUM TERM .................................................................................................................................................15 5.1 SECTOR OBJECTIVES ...................................................................................................................................15
5.1.1 Agriculture .........................................................................................................................................15 5.1.2 Livestock and Fisheries Development................................................................................................16 5.1.3 Cooperatives Development and Marketing........................................................................................16 5.1.4 Environment and Natural Resources .................................................................................................16 5.1.5 Lands..................................................................................................................................................17 5.1.6 Regional Development .......................................................................................................................17 5.2 TARGETS, EXPECTED OUTPUTS AND OUTCOME FOR 2006/07 – 2008/09 ....................................................17 5.2.1 Agriculture .........................................................................................................................................17 5.3.2 Livestock and Fisheries Development................................................................................................20 5.3.3 Cooperatives ......................................................................................................................................22 5.3.4 Lands..................................................................................................................................................22 5.3.5 Environment and Natural Resources .................................................................................................24 5.3.6 Regional Development Authorities ....................................................................................................28 6.0 FINANCIAL REQUIREMENTS FOR MEETING THE SECTOR’S PRIORITIES & PROGRAMMES....31 6.1 RESOURCE REQUIREMENTS FOR THE WHOLE SECTOR, 2006/07 – 2008/09.................................................31 6.2.1 Agriculture .........................................................................................................................................32 6.2.2 Livestock and Fisheries Development................................................................................................34 6.2.3 Cooperatives Development and Marketing........................................................................................35 6.2.4 Lands..................................................................................................................................................36 6.2.5 Environment and Natural Resources .................................................................................................37 6.2.6 Regional Development Authorities ....................................................................................................39 6.2.7 Additional Resource Requirements ....................................................................................................42 7.0 CONCLUSIONS AND WAY FORWARD ...................................................................................................43 7.1 THE WAY FORWARD FOR THE ARD SECTOR ..............................................................................................44 ANNEX I: CORE POVERTY PROGRAMMES.................................................................................................45 ANNEX II: LIST OF STATE CORPORATIONS AND PROPOSED ALLOCATION TO THEM ...................51 ANNEX III: LIST OF DEVELOPMENT PROJECTS AND PROPOSED ALLOCATION...............................55 ANNEX IV: LIST OF PENDING BILLS............................................................................................................62 ANNEX V: LIST OF COMPLETED PROJECTS IN THE SECTOR SINCE THE BEGINNING OF MTEF IN 2001/02.................................................................................................................................................................68 ANNEX VI: LIST OF PROPOSED NEW PROJECTS IN THE SECTOR.........................................................72
ii
LIST OF TABLES TABLE 1: TOTAL SECTOR BUDGETS AND ACTUAL EXPENDITURES DEVELOPMENT + RECURRENT, 2003/04-2004/05 (IN KSHS. MILLIONS) .........................................................................8 TABLE 2: TOTAL SECTOR BUDGETS AND ACTUAL EXPENDITURES (RECURRENT) 2003/04 – 2004/05 (IN KSHS. MILLIONS) .................................................................................................................9 TABLE 3: TOTAL SECTOR BUDGETS AND ACTUAL DEVELOPMENT EXPENDITURES 2003/04 – 2004/05 (IN KSHS. MILLIONS) .................................................................................................................9 TABLE 4: MOA – ACTIVITIES, EXPECTED OUTPUTS/OUTCOME ...........................................................17 TABLE 5: LIVESTOCK PRODUCTION DEPARTMENT - SUB-VOTE19.....................................................20 TABLE 6: VETERINARY SERVICES DEPARTMENT SUB VOTE 193 ........................................................21 TABLE 7: FISHERIES DEPARTMENT – SUB-VOTE 192 ..............................................................................21 TABLE 8: COOPERATIVES – ACTIVITIES, TARGETS.................................................................................22 TABLE 9 : LANDS – ACTIVITIES, TARGETS ................................................................................................22 TABLE 10: MENR – ACTIVITIES, EXPECTED OUTPUT/OUTCOME .........................................................24 TABLE 11: MRDA – ACTIVITIES, EXPECTED OUTPUT/OUTCOME FOR 2006/07 - 2008/09..................28 TABLE 12: SUMMARY OF TOTAL RESOURCE REQUIREMENTS FOR THE SECTOR, 2006/07 – 2008/09 .......................................................................................................................................................31 TABLE 13: RECURRENT RESOURCE REQUIREMENTS (SECTOR WIDE), 2006/07 – 2008/09...............31 TABLE 14: DEVELOPMENT RESOURCE REQUIREMENTS (SECTOR WIDE), 2006/07 – 2008/09 .........32 TABLE 15: MOA –RECURRENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09.................................32 TABLE 16: MOA –DEVELOPMENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09...........................33 TABLE 17: MOA – TOTAL RESOURCE REQUIREMENTS, 2006/07 - 2008/09 ...........................................34 TABLE 18: MOLFD –RESOURCE REQUIREMENTS (RECURRENT & DEVELOPMENT), 2006/07 2008/09 .......................................................................................................................................................34 TABLE 19: MOCDM – RECURRENT REQUIREMENTS, 2006/07 - 2008/09 ..............................................35 TABLE 20: MOCDM – DEVELOPMENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09.....................35 TABLE 21: MOCDM – TOTAL RESOURCE REQUIREMENTS, 2006/07 - 2008/09 .....................................36 TABLE 22: MOL – RECURRENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09 .................................36 TABLE 23: MOL – DEVELOPMENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09 ...........................36 TABLE 24: MOL – TOTAL RESOURCE REQUIREMENTS, 2006/07 - 2008/09............................................37 TABLE 25: MENR – RECURRENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09 ..............................37 TABLE 26: MENR – DEVELOPMENT RESOURCE REQUIREMENTS, 2006/07 - 2008/09.........................38 TABLE 27: MENR – TOTAL RESOURCE REQUIREMENTS, 2006/07 - 2008/09.........................................39 TABLE 28: MRDA - RECURRENT BUDGET FOR THE MINISTRY HQS....................................................39 TABLE 29: MRDAS - RECURRENT TRANSFERS TO REGIONAL DEVELOPMENT AUTHORITIES ....40 TABLE 30: MRDA – RESOURCE REQUIREMENTS (DEVELOPMENT ACTIVITIES), 2006/07-2008/09.41 TABLE 31: MRDA – TOTAL RESOURCE REQUIREMENTS, 2006/07-2008/09 ..........................................41 TABLE 32: MOA – PROPOSED DONOR FUNDED PROGRAMMES, 2006/07 - 2008/09 ............................42 TABLE 33: MENR – RESOURCE REQUIREMENTS (DEVELOPMENT BUDGET - NEW 100% GOK) ....42 TABLE 34: MRDA – ADDITIONAL RESOURCE REQUIREMENTS ............................................................43 TABLE 35: MOA – PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES (KSHS) ................................45 TABLE 36: MOLFD – PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES BOTH RECURRENT AND DEVELOPMENT (KSHS) .......................................................................................46 TABLE 37: MOCDM – PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES.......................................46 TABLE 38: MENR PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES (RECURRENT)47 TABLE 39: MENR – PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES (DEVELOPMENT) ....................................................................................................................................48 TABLE 40: MOL - PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES...........................48 TABLE 41: MRDA – PROPOSED ALLOCATIONS TO CORE POVERTY PROGRAMMES ..........................................49 TABLE 42: MOA – PROPOSED TRANSFERS TO STATE CORPORATIONS, 2006/07 – 2008/09 ...................................................................................................................................................52 TABLE 43: MOLFD – PROPOSED TRANSFERS TO STATE CORPORATIONS, 2006/07 – 2008/09 ..52 TABLE 44: MOCDM – PROPOSED TRANSFERS TO STATE CORPORATIONS, 2006/07 – 2008/09........52 TABLE 45: MENR – PROPOSED TRANSFERS TO STATE CORPORATIONS, 2006/07 – 2008/09............53 TABLE 46: MRDA – PROPOSED TRANSFERS TO STATE CORPORATIONS (RECURRENT), 2006/07 – 2008/09 .......................................................................................................................................................54 TABLE 47: MRDA – PROPOSED TRANSFERS TO STATE CORPORATIONS (DEVELOPMENT), 2006/07 – 2008/09 ....................................................................................................................................................54
iii
TABLE 48: MOA – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS................................55 TABLE 49: MOLFD (LIVESTOCK PRODUCTION DEPARTMENT) – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS ...................................................................................................................55 TABLE 50: MOLFD (VETERINARY SERVICES DEPARTMENT) – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS ...................................................................................................................56 TABLE 51: MOLFD (FISHERIES DEPARTMENT) – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS.........................................................................................................................................57 TABLE 52: MOCDM – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS..........................57 TABLE 53: MOL – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS ................................58 TABLE 54: MENR – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS..............................59 TABLE 55: MRDA – DEVELOPMENT PROJECTS AND PROPOSED ALLOCATIONS .............................60 TABLE 56: PENDING BILLS FOR THE ARD SECTOR..................................................................................62 TABLE 57: MOA - PENDING BILLS ................................................................................................................62 TABLE 58: MOLFD – PENDING BILLS...........................................................................................................63 TABLE 59: MOCDM - PENDING BILLS..........................................................................................................63 TABLE 60: MOL – PENDING BILLS (DEVELOPMENT)...............................................................................64 TABLE 61: MENR – PENDING BILLS .............................................................................................................64 TABLE 62: MRDA – PENDING BILLS.............................................................................................................67 TABLE 63: MOCDM – LIST OF COMPLETED PROJECTS SINCE 2002/03 (A) ..........................................69 TABLE 64: MOCDM – LIST OF COMPLETED PROJECTS SINCE 2002/03 (B)...........................................69 TABLE 65: MOA - PROPOSED PROGRAMMES (100% GOK FUNDED)..........................................72 TABLE 66: MOA - PROPOSED PROGRAMMES (DONOR FUNDED)................................................72 TABLE 67: MOLFD - PROPOSED PROJECTS (DONOR FUNDED)..............................................................72 TABLE 68: MOLFD – PROPOSED PROGRAMMES (NEW 100% GOK).......................................................73 TABLE 69: MOCDM – PROPOSED NEW PROJECTS ....................................................................................73 TABLE 70: MENR – PROPOSED PROJECTS ..................................................................................................74 TABLE 71: MRDA – PROPOSED NEW PROJECTS, 2006/07 - 2008/09.........................................................74
iv
ACRONYMS AND ABBREVIATIONS AIA ARD ASCU CAIS CDA DEAP EC EEC EIA ENNDA ENSDA ERS FAO GDP GoK HCDA HIV/AIDS IFAD IP-ERS KAPP KARI KCC KEPHIS KFA KVDA LBDA LVEMP MCS MENR MOA MOCDM MOL MOLFD MRDA MTEF NDTDB NEAP NEMA NEPAD NMK NSDI PCPB PEAP PER RDAs v
Appropriations in Aid Agriculture and Rural Development Agricultural Sector Coordination Unit Central Artificial Insemination Service Coast Development Authority District Environment Action Plan European Commission European Economic Commission Environment Impact Assessment Ewaso Ng’iro North Development Authority Ewaso Ng’iro South Development Authority Economic Recovery Strategy for Wealth and Employment Creation Food and Agriculture Organization Gross Domestic Product Government of Kenya Horticultural Crops Development Authority Human Immunodeficiency Virus/Acquired Immune Deficiency Syndrome International Fund for Agricultural Development Investment Programme for Economic Recovery Strategy for Wealth and Employment Creation Kenya Agricultural Productivity Project Kenya Agricultural Research Institute Kenya Cooperatives Creameries Kenya Plant Health Inspectorate Service Kenya Farmers Association Kerio Valley Development Authority Lake Basin Development Authority Lake Victoria Environment Management Project Monitoring, Control and Surveillance Ministry of Environment and Natural Resources Ministry of Agriculture Ministry of Cooperatives Development and Marketing Ministry of Lands Ministry of Livestock and Fisheries Development Ministry of Regional Development Authorities Medium Term Expenditure Framework National Digital Topographical Database National Environment Action Plan National Environment Management Authority New Partnership for Africa’s Development Njaa Marufuku Kenya National Spatial Data Infrastructure Pest Control Products Board Provincial Environment Action Plan Public Expenditure Review Regional Development Authorities
SACCOs SRA TARDA
vi
Savings and Credit Cooperatives Strategy for Revitalizing Agriculture Tana and Athi River Development Authority
1.0 INTRODUCTION 1.1 COMPOSITION OF THE SECTOR The Agriculture and Rural Development Sector is comprised of the following sub-sectors: • Agriculture • Livestock Development • Fisheries Development • Cooperatives • Lands • Environment • Forestry • Mining • Regional Development 1.2 SUB-SECTORS’ CONTRIBUTION TO THE ECONOMY The role of each of the sub sectors in economic growth and development is as outlined below. 1.2.1 Agriculture The role of agriculture in the Kenyan economy is very significant. About 80% of the population derive their livelihood from agricultural activities. Agriculture directly contributes 26% of GDP and a further 27% indirectly through linkages with manufacturing, distribution and other service related sectors. About 45% of government revenue is derived from agriculture while the sub-sector contributes over 75% of industrial raw materials. Of more importance is its contribution to achievement of national food security, foreign exchange earnings and as a stimulus to create off-farm income generating activities. 1.2.2 Livestock Development The livestock sub-sector is estimated to account for about 7 percent of GDP in addition to contributing to national food security. The sub sector accounts for about 40% of the Agricultural GDP and about 30% of the farm gate value for agricultural commodities. It employs about 50% of the agricultural labour force. Within the ASAL areas, it accounts for nearly 90% of the employment opportunities and nearly 95% of the family incomes. 1.2.3 Fisheries Development The fisheries sub-sector is estimated to contribute about 3% of the GDP and is the major source of livelihood for communities living around Lake Victoria and the coastal regions of Kenya. Fish provides an alternative source of protein to a large portion of the population in addition to emerging as an important source of revenue to the government as a result of improved surveillance activities and resultant license fees. It employs over 60,000 fishermen directly. Indirectly, over 600,000 people depend on this sub sector for their livelihood through fish processing and trade. Kenya is currently earning an average of Kshs 4 billion
1
annually through fish exports. Fisheries have a growth potential if the activities are fully commercialised. 1.2.4 Co-operatives The co-operative movement cuts across the entire economy as cooperatives have been formed to take care of agricultural production, processing and marketing; and service industry through SACCOs. The major benefits that accrue to Kenyans through cooperatives include creation of employment, settlement of the people, generation of income and acquisition of property. Indeed, there are over 10,642 cooperative societies with a membership of over 6.0 million. The co-operatives have been able to mobilize domestic savings which are currently estimated to be Kshs. 105 billion. Today, over 250,000 people are employed in co-operatives besides co-operatives providing opportunities for self-employment. A significant number of Kenyans, approximately 63% draw their livelihood either directly or indirectly from cooperatives-based enterprises and cooperatives contribute to supply of agricultural and livestock inputs, participate in marketing of commodity outputs besides providing opportunity for introduction of new technologies. 1.2.5 Lands The sub sector contributes directly to poverty reduction, socio-cultural, economic and political growth and development through facilitation of housing needs, informal settlements improvement, security of tenure, and access to land by the poor and efficient land management practices. Land also plays a significant role in the socio-economic development of the country since most of its services benefit landless, poor, small-scale farmers, investors and urban development agencies. The Lands sub-sector contributes indirectly to food security, on and off-farm employment, foreign exchange earnings, agro-based industries and socio-economic growth through guaranteeing security of tenure to the landowners and territorial integrity of the Nation. Land as a factor of production is a necessary resource for development and all efforts should be made to make it available together with its quality services and management. 1.2.6 Environment Economic development and environment are inseparable. Consequently, for sustainable development environmental issues have to be taken into account. Degradation of the environment in the country due to development would compromise the same development and the livelihoods of the people. Environmental conservation in the country is a sure way of having a healthy nation (due to a lower incidence of diseases), increased food production, industrial growth and increased foreign exchange earnings, among others. Benefits to be derived from these include employment creation, increased incomes and poverty reduction. The Government is committed to environmental management and sustainable development as demonstrated by the enactment of the Environmental Management and Coordination Act (1999) and the establishment of the National Environment Management Authority (NEMA) 2
in 2002. Through the Sessional Paper No. 6 on Environment and Development (1999), the Government has emphasised the need for conservation, sustainable utilization and management of environment and natural resources. 1.2.7
Forestry
The forest sub-sector is often overlooked in resource allocations despite its enormous contribution and support to other economic activities such as agriculture, rural and urban water supply, power generation, tourism, building, construction, herbal medicine and food security. It is estimated that forest products and services contribute about Kshs 7 billion annually to the economy and employ directly 50,000 and indirectly another 300,000 people. The timber industry alone is estimated to have investments of over Kshs 44 billion. In addition, over 530,000 households living within a radius of five kilometres from the forest estates depend on forests for cultivation, grazing, fishing, fuel wood, honey, herbal medicine, water and other benefits. Gazetted forests managed by the Forest Department currently contribute 80 per cent of timber, 93 per cent of poles and posts, and 25 per cent of fuel wood requirements. Sale of these forest products from gazetted forests generates about Kshs 320 million annually to the Exchequer. In addition, the value of the 24 million cubic metres of fuel wood materials sourced from farmlands is estimated at Kshs 4.8 billion. Sustainable utilisation of these farmland resources would require improved extension support by the Forest Department, which is only possible through improved funding. 1.2.8 Mining Minerals contribute less than one per cent of the GDP. However, mineral exports contribute 2-3 per cent of total export earnings. In 2003, soda ash accounted for over 60 per cent of the mineral production followed by fluorspar. The planned Titanium mining in Kwale District will increase its contribution to the sub-sector and also enhance minerals’ contribution to the economy. The minimal performance of the sub-sector can be attributed to limited official attention. However, this is now set to change as the Government embarks on the formulation of a minerals and mining policy together with a comprehensive review of the Mining Act. 1.2.9 Regional Development The sub-sector contributes to poverty reduction in Kenya through effective planning and implementation of multi-sectoral programmes and projects that create a regional balance in development. In support of this, the Ministry of Regional Development Authorities provides policy guidance, support capacity building and management of Regional Development Authorities. The RDAs were established by the Government from the 1970s with a common mandate to plan and coordinate the implementation of regional development activities, ensure mobilization of resources and promote regional socio-economic development through integrated planning and management. These RDAs are: Tana and Athi River Development 3
Authority (TARDA), Kerio Valley Development Authority (KVDA), Lake Basin Development Authority (LBDA), Ewaso Ng’iro North Development Authority (ENNDA), Ewaso Ng’iro South Development Authority (ENSDA) and Coast Development Authority (CDA). 2.0 VISION, MISSION 2.1 Vision To be the engine of growth of economic recovery through appropriate land use, conservation methodologies and integrated regional development for increased production and marketing. 2.2 Mission To promote consolidation and conservation of land, the environment and coordination of regional development for enhanced production and marketing of agricultural products for increased income and employment creation. 3.0 KEY STRATEGIES AND ERS PRIORITIES FOR THE SECTOR 3.1 Key Strategies The strategies for the various sub-sectors are indicated below. 3.1.1 Agriculture, Livestock Development, Fisheries Development and Cooperatives The Ministries of Agriculture, Livestock and Fisheries Development, Cooperative Development and Marketing and Regional Development Authorities have commenced implementation of the Strategy Revitalising Agriculture. An implementation framework has been developed and adopted. Work plans have subsequently been developed, especially to ensure implementation of the following six fast track activities: • • • • • •
Reviewing and harmonizing the legal, regulatory and institutional framework. Improving delivery of research, extension and advisory support services. Restructuring and privatising non core functions of parastatals and ministries to bring about efficiency, accountability, and effectiveness. Increasing access to quality farm inputs and financial services. Formulating food security policy and programmes. Taking measures to improve access to both domestic and external markets including improvement of rural roads and negotiation for a favourable external tax regime.
In order to ensure effective implementation of the SRA, the three Ministries in 2004 set up an Agricultural Sector Coordination Unit (ASCU) whose duties include coordinating implementation of the SRA, facilitating identification of priority areas for policy reform, identifying gaps for capacity building within the departments, and proving technical support to the whole process.
4
3.1.2 Lands • Preparation of a comprehensive National Land Policy • Establishment of an integrated National land Information System based on National Spatial Data Infrastructure (NSDI) and involving as may stakeholders as possible • Introduction of professionalism in the management of the land resource planning , management and service delivery • Review and harmonization of land laws and regulations • Re-establishment and training of land boards and Tribunals to manage land disputes at district level • Revitalization of the land adjudication programme in trustland and settlement of the poor landless 3.1.3 Environment and Natural Resources • • • • • • • • • • •
Institutional, legal and policy reforms Protection and conservation of catchments areas Sustainable management and utilization of forests and forest resources Forestry technology development and information dissemination Conservation, sustainable utilization and management of the environment and natural resources Regulation of mining activities related to the sustainable utilization of known mineral deposits for the benefit of the nation Development of geo-scientific database which will facilitate responsible utilization of natural resources and enhance safety Implementation of national plans and enforcement of environmental legislation Awareness creation on the environment Coordination of International Conventions, Agreements & Treaties on environment Resource surveys
3.1.4 Regional Development Authorities • • • • • • •
5
Formulation of a Regional Development Policy Review of legislation of the six RDAs and undertake Institutional Reforms and Restructuring Promote catchments conservation, rehabilitation and protection in order to enhance sustainable utilization of the natural resources and thereby sustain biodiversity in the regions Implement integrated development programmes and activities to create employment opportunities and wealth and thereby reduce poverty levels in the regions Conduct studies and draw up to date long range development plans for the area to facilitate and coordinate project implementation in the region. Clear backlog of statutory pending bills for RDAs Coordinate dry lands (ASAL) development programmes
3.2 Priorities for the Sector 3.2.1 Agriculture The following sectoral priorities in agriculture are stipulated in the SRA. It is expected that they will facilitate a quick recovery of the economy and stimulate generation of more jobs and incomes to the rural poor: • • • • • •
Improving delivery of research, extension and advisory services; Review and harmonization of legal, institutional and regulatory framework; Restructuring and privatization of non-core functions of parastatals and other government departments to bring about efficiency, accountability and effectiveness; Increasing access to quality inputs and financial services; Formulating food security policy and programmes; and Measures to improve access to markets.
3.2.2 Livestock and Fisheries Development Policy priorities of the sub-sector are stipulated in the Ministry’s Strategic Plan (2005 -2009) and in the Strategy for the Revitalizing Agriculture and are meant to enable the sub-sectors to realize the objectives as set in the ERS and Millennium Development Goals No. 1 of reducing poverty and hunger by half by the year 2015. 3.2.2.1 Livestock Development
Improved extension delivery services particularly in the ASAL areas Disease and Pest control Quality assurance and promotion of export trade in livestock and livestock products
3.2.2.2 Fisheries Development • • •
Management, conservation, control and utilization of fishery resources to support economic growth through the establishment of a monitoring, control and surveillance (MCS) system. Promotion of aquaculture development to increase fisheries resource base. This will reduce over-reliance on the existing natural water bodies. Management and control of fish quality and safety; and promotion of fish marketing systems to reduce post harvest losses.
3.2.3 Cooperatives The main policy objective for the development of the cooperative sub sector is to revitalize the cooperative movement to spur sustainable socio-economic growth and development in Kenya. The focus is on achieving desired outcomes through strengthening cooperative management, improving cooperative extension service delivery, and improving corporate governance of cooperatives. Therefore priority areas of expenditure in the sub sector that are included in the IP-ERS include;
6
• • • • • •
Streamlining of co-operative society’s management – through the cooperatives Societies Act (revised 2004) and revised cooperative development policy. Improving corporate governance in the operations of the cooperative movement. Streamlining education and training in the movement. Regulation of SACCO societies Improving market access and marketing efficiency of co-operatives by building their capacity to undertake effective marketing. Promotion of cooperative ventures and research for value addition processing.
3.2.4 Environment and Natural Resources • • • • • • • • •
Sustainable management, conservation, protection and development of the environment and natural resources; Institutional, legal and policy review and formulation and regulation of a new mineral policy and legislation to promote mining and geological activities. Development of geo-scientific database which will facilitate responsible utilization of mineral resources; The protection, management conservation and rehabilitation of water catchment and natural forest areas as well as Dry land forestry and forestry plantations; Restructuring the Forest Department and retraining the staff. Forest Research for sustainable forest management and development Seedlings production and procurement of planting materials Promote development of agro-forestry and encourage community participation in efficient management of forests Develop a mining policy to guide decisions on project proposals, compensation for people displaced by mining projects, environment protection, technology transfer requirements and determination of efficient royalties to cover the costs of mining
3.2.5 Lands • Preparation of a comprehensive National Land Policy • Establishment of an integrated National land Information System based on National Spatial Data Infrastructure (NSDI) and involving as may stakeholders as possible • Introduction of professionalism in the management of the land resource planning , management and service delivery • Review and harmonization of land laws and regulations • Re-establishment and training of land boards and Tribunals to manage land disputes at district level • Revitalization of the land adjudication programme in trustland and settlement of the poor landless 3.2.6 Regional Development Authorities The main priority areas for the sub-sector that aim to strengthen and facilitate focused regional development and enhanced service delivery are: • 7
Formulation of a regional development policy
• • • • •
Review of legislation and the institutional reforms and restructuring Catchment management and conservation Rural Micro enterprise development and marketing services Clear huge backlog of pending bills for Regional Development Authorities particularly statutory obligations ASAL resources promotion and development for drought mitigation and food security
4.0 PERFORMANCE AND ACHIEVEMENT OF THE SECTOR IN 2003/04 TO 2004/05 4.1 Financial Performance The Sector received a total of Kshs.15.69billion in 2003-04 and utilized Kshs. 13.22billion – a share of 84.28% of the total resources allocated to the Sector. In 2004/05 the Sector utilized 73.75% of the Kshs.19.63billion for its activities under both recurrent and development. This therefore means that the unexpended resources on the Sector were Kshs.2.46billion and Kshs.5.15billion in the last two financial years respectively with over 98% of these funds being development resources. Table 1 shows the total sector budgets and actual expenditures for both recurrent and development votes for 2003/04-2004/05. Table 1: Total Sector Budgets and Actual Expenditures Development + Recurrent, 2003/04-2004/05 (in Kshs. Millions) 2003-04 Ministry
Budgeted
Actual
MOA MOLFD MENR MRDA MOL MOCDM TOTAL
6,560 2,938 6,145 695 1,615 743 15,696
5,039 2,563 2,847 665 1,460 652 13,228
2004/05 % variance 76.81 87.24 46.33 95.68 90.40 87.75 84.28
Budgeted
Actual
6,263 6,022 2,689 630 2,049 1,977 19,630
5,129 2,762 2,237 781 1,911 1,658 14,478
% Variance 81.89 45.87 83.19 123.97 93.27 83.86 73.75
As Table 2 below indicates, under the recurrent budget, the sector has been able to utilize well over 95% of its allocated budgets.
8
Table 2: Total Sector Budgets and Actual expenditures (Recurrent) 2003/04 – 2004/05 (in Kshs. Millions) 2003/04 Ministry
Budgeted
Actual
MOA MOLFD MOCDM MOL MENR MRDA TOTAL
3,403 2,419 683 1,454 2,598 646 11,203
3,404 2,398 602 1,361 2,391 617 10,773
2004/05 % variance 100.03 99.13 88.14 93.60 92.03 95.51 96.16
budgeted
Actual
3,561 2,024 532 1,773 2,233 630 10,753
3,425 2,267 544 1,711 2,198 616 10,761
% variance 96.18 112.01 102.26 96.50 98.43 97.78 100.07
Table 3: Total Sector Budgets and Actual Development Expenditures 2003/04 – 2004/05 (in Kshs. Millions) 2003/04 Ministry
Budgeted
Actual
MOA MOLFD MENR MRDA MOLS MOCDM TOTAL
3,121 519 546 48 161 59 4,454
2,645 164 456 48 101 49 3,463
2004/05 % variance 84.75 31.60 83.52 100.00 62.73 83.05 77.75
Budgeted
Actual
2,786 3,992 456 44 275 1444 8,997
1,623 495 399 165 200 603 3,485
% variance 58.26 12.40 87.50 375.00 72.73 41.76 38.74
Table 3 above shows that utilization levels for the development budgets within the Sector has not been good due to several factors as in the rest of government. Whereas during 2003/04 the Sector utilized over 77% of the total development budget, this high level of utilization dropped significantly in the subsequent year when the Sector only utilized just over 38% of the allocated budget. This trend is indeed worrying as the implications on the development momentum may not be favourable. The reasons are varying from one sub-sector to another. However, the following are some of the reasons for the reduced utilization of development funds: • • • •
9
Under-utilisation of budgeted funds on projects where delays in procurement and recruitment of personnel resulted in low utilisation of funds for both revenue and direct payments (especially in Ministry of Agriculture). Lack of adequate information on expenditures under direct payments by development partners. The information necessary in budget process was not readily available and this affected the timetable and quality of reports. Weak understanding of the budget process especially the PER and MTEF exercise.
•
The mechanism of capturing the expenditures is weak hence allowing a possibility of orders to be processed and approved without confirming the availability of funds. Of significance is the inability to evaluate the expenditure element of the budget implementation process.
•
The mechanism for allocating resources at itemization stage is weak: it is still influenced by past allocations thus departments are inward looking making objective planning difficult. Allocations are also motivated by the need to distribute resources equitably among the spending units rather than address unique situations at the District level.
•
Bottle necks in the procurement process to requisition core items.
•
Inadequate human capacity to implement programmes identified during the budget process thus undermining budget absorption capacity District allocations not reflected in the budget requested for due to uncoordinated work plans Cash float problems especially at the District Treasuries
• •
4.2 Achievements of the Sub-Sectors in 2003/04 to 2004/05 4.2.1 Agriculture • Reviewing the institutional structure of the Ministry with the aim of setting up a more effective institutional framework. This review has been completed and is being implemented. So far, the post of Agriculture Secretary has been created and competitively filled. At the same time the new posts of Directors of: Land and Crop Management; Extension, Technical Training, and Research Liaison Services; Agribusiness, Markets Development and Agricultural Information; and Agricultural Policy and Development Coordination have been created and competitively sourced; • Improving extension delivery services to ensure that the rate of adoption of new technologies is enhanced. This will also ensure that productivity and competitiveness in production is increased. This was done through increased funding to the field offices to facilitate their mobility. Consequently, extension activities were scaled up in all districts and divisions. The extension staff were also provided with uniforms to enhance their visibility; • Setting up agricultural information desks and re-engineering the Agricultural Information Resource Center (AIRC) to effectively provide information services to the sector. This has already been achieved. However, the AIRC still requires funds to enable them purchase equipments that will facilitate improvement of their services; • Review of legal and institutional framework – this includes looking into modalities of harmonizing over 163 statutes to come up with fewer umbrella legislation for the sector. This harmonization is ongoing under the Agricultural Sector Coordination Unit (ASCU); • Popularization of the Strategy for Revitalizing Agriculture (SRA) with the aim of ensuring that stakeholders adopt it for implementation. This exercise has been undertaken in all regions of the country; • Restructuring and review of policies in the coffee, pyrethrum, sugar, cereals and cotton industries to ensure that these sub-sectors are completely revitalized and are back on the right footing. The draft policies and Bills were produced for these commodities, discussed with the Parliamentary Committee of Agriculture and now await presentation to the Cabinet; and 10
•
Promoting food security initiatives, including completing and implementing the draft National Food and Nutrition Policy. This document is still under discussion with the stakeholders.
4.2.2 Livestock and Fisheries Dairy Industry • The implementation of reforms in the dairy sub-sector that includes regularization of informal milk sector, revival of KCC and improved extension services has led to a growth of milk out put by 3.5% in 2005. The dairy cattle farmers produced milk worth Ksh. 42 billion. The country also exported 125 dairy cattle to Uganda earning the farmers Ksh. 9 million. • Dairy Commercialization Project to be funded by IFAD was formulated to facilitate operation of dairy production as a business, enhance milk value addition among others. The project is scheduled to be implemented in 2006/07 financial year • The Government has initiated the review and formulation of various policies and bills aimed at streamlining the dairy industry. Reviewing of most policy documents has been done and is in third draft status, namely: the Dairy policy and Dairy industry bill, Animal feed policy and bill and National Livestock Development policy. Beef Industry • A significant progress was made in enhancing local and international market access. At local level two international level abattoirs were constructed (one at Mombasa and another at Lokichogio). An aggressive promotional exercise was launched by the ministry in order to improve external markets, particularly Middle Eastern Markets. In 2004, the country produced beef valued at Ksh. 73 billion. As a result, the country sold 5,128 beef cattle to Middle East earning the farmers Ksh. 112 million. • Disease free Zones that are to improve access to international markets were also created at Coast and Rift Valley. • The lifting of KMC receivership was done in September 2005. A Board of commissioners is in place and a Managing Commissioner was appointed in December 2005. The process of rehabilitating the facility is ongoing and is scheduled for completion by June 2006. Disease Control • Control and eradication of notifiable epizootic diseases in collaboration with stakeholders was undertaken to facilitate local and international trade. Achievement of 89% of the planned target was recorded in the reduction of Foot and Mouth Disease (FMD). • Vaccination against FMD was carried out and only 10% of the set target of 20% decline was achieved. This was due to shortage of FMD vaccine in the country. • 90% of the proposal on creation Disease Free Zones was done and the remaining 10% will be done in the current financial year. Fisheries Development • Under fisheries a number of activities were implemented to improve on fisheries development. These included: Monitoring, Control and Surveillance of the Exclusive Economic Zone been intensified. The department acquired 9 patrol boats during the reporting period. This translated into increased collection of AIA from the previous 30 11
million to 117 million by June 2005. The target set for 2004/05 was 104 million and 117 million was collected. • The developments of the fisheries sub-sector policy preparations have also been ongoing. Several taskforce meetings were held and a draft fisheries review document is ready. 4.2.3 Cooperatives Development and Marketing • Draft Cooperative Development Policy finalized; awaits submission to Sessional Committee of Parliament • Co-operative Societies Act No. 12 of 1997 amended vide the CSA (Amendment) Act No. 2 of 2004 and New Societies Rules 2004 made there-under. • Draft SACCO bill developed and presented to AG chambers for legal drafting • Establishment of 8 Provincial Tribunal Registries in all administrative provinces • Governance & Ethics Secretariat Established/Ethics Code of Conduct for cooperatives societies developed. • Rationalization of Cooperative Audit Services done. Up to date audits were performed in over 65% of cooperative societies done. • Cooperative Marketing Department established/Rudimentary cooperative market surveys conducted country wide • Policy reforms in Coffee Marketing • Kshs. 842,203,547 KFA debt to Government written off in April 2005 • Government transitory acquisition of New KCC formalized upon payment of 547 Million to KCC 200 Holdings. 4.2.4 Lands • • • • • • •
National Land Policy drafted National Land Information System initiated 16 Adjudication sections, (20,291 parcels, 54,319.34 hectares) completed Two Settlement schemes completed and 3713 families settled 600 members of land boards trained Ksh. 1.57billion revenue collected 269,593 transactions (titles issued, transfers registered, leases and searches) accomplished.
4.2.5 Environment and Natural Resources • • • •
12
Enactment of the Forest Act (2005) Forest Policy was submitted to Parliament and some amendments were proposed; the revised policy will be submitted to Parliament in 2006 Environmental Impact Assessment Regulations published by NEMA Environmental Management and Coordination Act (1999) operationalized and various institutions various institutions under the Act established, namely: the National Environmental Council, NEMA Board of Management, Public Complains Committee, National Environmental Tribunal, Standards Review Enforcement Task Force, Technical Advisory Committee on EIA, Provincial and District Environment Committees, and National Action Plan Committee (NEAP)
• • •
During the Financial Year 2004/2005, the Forest Department raised 46,235,975 seedlings countrywide and an area of 5,970 ha. was planted in gazetted forests The Minerals Policy and review of the Mining Act are in the final stages of drafting with assistance of from the Commonwealth Secretariat A mining lease of Kshs 10 billion investment in Titanium was issued by the Ministry
4.2.6 Regional Development Authorities The ministry through the RDAs was able to attain achievements in the following areas:• Implemented catchment conservation programmes covering Upper Turkwel (KVDA), Upper Masinga/ Kiambere(TARDA) and Mau Summit (ENSDA). CDA has trained communities in afforestation and management in Kwale, Kilifi and Mombasa. ENNDA has successfully negotiated for financial support from ADB to facilitate conservation programmes covering natural resource catchment areas in the Northern ASAL parts of the country. • Initiated long range integrated Regional Development master plan for mapping resources and integrated coastal area management covering Mombasa and Kwale with regard to landing scaping, establishing of market centre, fish landing sight and development of fish depot in Kwale. • Provided clean drinking water to the local communities in Mwingi District through the support of Italian government. CDA has constructed 25 demonstration water tanks for communities in Kwale districts. KVDA has constructed Kimao water dam in Baringo district, one water pans in East Pokot, two water pans in Koibatek and piped water supply in Keiyo and Chemeron. • Promoted high quality and certified seed production where Wei Wei supplies over 2 million kilograms of seed to Kenya Seed Company, 1,200 ha in seed bulking for cane by TARDA and cotton seed in parts of Nyanza and Western province. • Established technology transfer centres related to Agriculture in West Pokot where Wei Wei project supports about 365 households. Established two centres in Nyamira and Isiolo districts on brick manufacture supporting about 2000 people. Honey production of about 10 tonnes supporting over 10,000 people and supplies over 1000 modern beehives annually. One fingerling production centre in Kisumu supporting 2000 people. • Initiated irrigation schemes for instance the Tana Delta irrigation scheme with the potential of enhancing food security through increased agricultural activities such as rice and sugarcane production covering 28,000 hectares of land area.
4.3 Challenges and Constraints The challenges and constraints experienced by each sub-sector in the period under review are shown below 4.3.1 Agriculture • Lack of effective monitoring and evaluation system in the Ministry. This is coupled with inadequate reporting on outputs of planned activities; • Inadequate funding of extension service, especially provision of basic facilities such as transport, ICT, agricultural database, and office accommodation; • Lack of adequate office accommodation both in the headquarters and the districts/divisions/locations; 13
• Sudden freezing of expenditures by Treasury due to lack of liquidity; • Cumbersome financial and procurement procedures; • Inadequate reporting on expenditures by development partners; and • Prevalent top-bottom approaches in project identification. 4.3.2 Livestock and Fisheries Development • Diseases and pest control affecting livestock; these are mainly due to inadequate capacity for diagnosis and surveillance of major livestock diseases; • Cyclical droughts and predictability of droughts threatening livestock farming; • Livestock marketing due to lack of sustainable livestock markets and dilapidated livestock marketing infrastructure; i.e., stock roots and holding grounds; • Maintaining quality standards for fish products to remain unrestricted in the international markets ; • Increasing access to credit to the pastoralists; and • Monitoring and Evaluation being ineffective. 4.3.3 Cooperatives • Strict Budgetary ceilings by the Treasury meant that often resource allocations are far much outmatched by the Ministry’s resource requirements. This leads to inadequate funding of the Ministry’s operation across board; • Cumbersome procedures relating to release of Development Exchequer and subjecting reimbursement to payments after certificates have been issued. This often delays implementation of development activities. Overall, there have been unclear procurement procedures often affecting the efficiency in the utilization of the voted resources; and • Weak Financial control systems leading to diversion of resources to non- budget work. There has been a tendency for the Ministry to spend on ad hoc basis without due regard to set policy objectives and departmental work-plans. 4.3.4 Lands • Lack of a well institutionalized monitoring and evaluation system for projects and activities; • Inadequate human capacity in terms of skills and numbers; • Inconsistent cash flow of funds from the Treasury under the Development Vote; • Resource Requirements for 2004/05 to 2006/07; and • Lack of adequate data and project reports to undertake monitoring and evaluation of programmes within the Ministry. 4.3.5 Environment and Natural Resources • Weak monitoring and evaluation mechanisms; • Inadequate transport facilities; • Under-provisions in the budget on major items that support operations and maintenance e.g. transport expenses, telephone, etc.; • Liquidity problems in the Districts; • Low Operations & Maintenance provisions; • Uncompleted policies, and institutional frameworks; • Lengthy tendering procedures; and • Inadequate institutional and human capacities for example in NEMA and Mines and Geology Department. 14
4.3.6 Regional Development Authorities • Lack of a Regional Development Policy leading to having resources too thinly spread over many projects/projects which take long to complete with little impact on the ground; • Weaknesses in financial allocations to meet statutory obligations such as NSSF, NHIF, PAYE, insurance cover for assets and pension contributions, operations and maintenance; • Accumulating pending bills due to poor financial management, inadequate and untimely exchequer releases, arbitrary budget cuts and lack of bills repayment mechanisms leading to accumulation of pending bills amounting to Kshs 1,104,511,831; • Weak record keeping where extra budgetary receipts are not captured in the estimates as A-in-A but expended by the Authorities; and • Delayed exchequer releases towards the end of the quarters/financial year resulting to delayed implementation of projects and programmes and non-attainment of performance contract targets as planned.
5.0 OBJECTIVES, TARGETS, EXPECTED OUTPUTS AND OUTCOMES FOR 2006/07 AND THE MEDIUM TERM 5.1 Sector Objectives The broad objectives of the Agriculture and Rural Development Sector are as follows: • • • • • • •
Raising agricultural productivity and profitability through efficient allocation of resources and improving access to productive resources such as farm inputs and credit; Commercializing agricultural activities by encouraging private sector participation; Creating an enabling environment through policy and legal framework; Protection, conservation and management of environment and natural resources Improving market access for enhanced incomes; Guaranteeing security of land tenure; and Promoting balanced development across the country through the Regional Development Authorities
Specific sub-sector objectives are as follows: 5.1.1 Agriculture • • • • •
15
Raising agricultural productivity through an efficient allocation of resources and improving access to productive resources such as farm inputs and credit; Commercializing agricultural activities by encouraging private sector participation in line with the ERS; Making agriculture profitable in order to attract private sector investments; Stabilizing the growth of the sector by encouraging farmers to diversify into nontraditional high value products; Working with relevant Government Departments and other stakeholders in improving governance in key agricultural institutions, and putting in place a comprehensive legal
• •
framework to guide development in the sector; Reducing the prevalence of HIV/AIDS in collaboration with other organizations, especially by improving nutrition and creating awareness; and Promoting closer regional cooperation in the management and regulation of the transboundary activities that foster growth of the sector.
5.1.2 Livestock and Fisheries Development The goal of the sub-sectors is to improve food security in the country and increase incomes to Kenyans. In line with this, the sub-sector has two-tier objectives, namely: To develop and implement an enabling policy and legal framework for investment and sustainable management of livestock and fisheries resources; and, To provide, jointly with stakeholders, efficient technical services for increased production, value addition and marketing of livestock and fisheries products. 5.1.3 Cooperatives Development and Marketing The overriding policy objective for the development of the sub-sector is to revitalise the cooperative movement to stimulate cooperative growth for wealth and employment creation. Accordingly, the key policy priorities for the development of the sub sector are espoused in the Ministry’s Strategic Plan and focus towards improving the performance of cooperatives to foster growth in the sub sector. They include:
Streamlining Cooperative management through strengthened cooperative extension service delivery to ensure compliance with the amended Act and subsidiary legislation; Improving Corporate governance of cooperatives by formulating and implementing best management practices and prudential standards; Streamlining cooperative education and training policy; and Improving market access and marketing efficiency by cooperatives and developing institutional capacity for the cooperative movement to meet the challenges of a liberalized economy.
5.1.4 Environment and Natural Resources • • • • • • • • •
16
Policy, legal and regulatory reforms to incorporate communities, private sector and other stakeholders in the management of environment and natural resources; Protection , conservation and sustainable management of environment and natural resources; Enhanced exploitation of mineral resources for national development; Development and advocacy of a regional and global agenda for sustainable management of environment and natural resources; Mainstreaming gender in environment and natural resources management programmes Prevention and control of HIV/AIDS; Institutionalizing reforms in the Ministry ; Improving the management and dissemination of information in the management of environment and natural resources; and Monitoring and evaluation of Ministry’s projects/programmes.
5.1.5 Lands • • • • • • •
Finalization of the formulation of the National Land Policy Review and streamline legal framework in land Provision of National Digital Topographical Database (NDTDB) Preparation of appropriate spatial framework to guide socio-economic Facilitate and enhance settlement of poor landless families by 2008 Accelerate the adjudication programme Establishment of GIS based Land Information Management System to support decisionmaking supported by the National Spatial Data Infrastructure • Institutionalization of an appropriate monitoring and evaluation system in the land subsector 5.1.6 Regional Development • • • •
To review the relevance and sustainability of the Regional Development Authorities; To supervise and coordinate RDAs so as to ensure fulfilment of their mandates; To promote integrated regional development within the river basins; To enhance capacity building for RDAs to ensure maximum exploitation, utilization and conservation of resources; • To develop regional data banks and early warning systems within the river basins; and • Monitoring and evaluation of RDAs’ activities to ensure efficient and effective utilization of resources.
5.2 Targets, Expected Outputs and Outcome for 2006/07 – 2008/09 5.2.1 Agriculture The table below provides a list of activities and expected outputs/outcome for the period 2006/07 – 2008/09 for the Ministry of Agriculture. Table 4: MOA – Activities, Expected Outputs/Outcome Head 191 Agricultural attaches
Activities
193 Development Planning Services
Development Planning Services
195
Agricultural boards & Committee meetings
198 Policy & Agric. Dev't Coordination
Coordination of project planning and management Monitoring of on going programmes/projects
Program management information availed. Improvement in program management at the implementation level
202 Agric. Dep't HQs Technical Services
Technical Services administration Coordinate monitoring and evaluation of Agricultural programmes
Improved implementation of Agricultural programmes
17
Facilitation of trade & collaborative research in Agriculture Act as direct representatives in international organization such as FAO, IFAD AND International Coffee Organization
Expected Outputs/Outcome Increased direct cash flows into the agricultural sector Collaborative agricultural research opportunities Network & Increased trade in Agricultural commodities Policy reviews, policy research, agric planning, WTO, EAC, EPAs, COMESA, ACP-EU, M&E, publications & bulletins, establishing functional M&E structures, data base, ICT Networking, etc. Cater for operations of the Central Agricultural Board (CAB)
Head 228 229 Agricultural Techno. Dev't and Testing Stations
Activities Finance and Accounts Services - Develop, Produce and Promote Technologies that use alternative sources of energy such as solar, wind and biogas -Training Local Artisan on Production of Approved Technologies and Spares production
-Demonstrations on water harvesting for small scale irrigation systems)
Expected Outputs/Outcome - Carry field test to wide-spread adoption for 10 technologies
- Formulate a Training program - Plan for a Training Centre in RTDC Nakuru Establish 8 sites in the regional RTDC stations Develop 3 proto-types
Development, Sourcing, modification and testing of agro -processing technologies. - Demonstrations on value addition & processing
- Establish 8 sites in the regional RTDC stations
230 PCPB
Facilitate operations of the PCPB
Well coordinated inspectorate services
235 HQ Land and Crop Dev't Services
Improve cash and food crops production Review policy and legal framework for specific crops
Improved crop production and incomes
Restructuring & revamping of cotton industry & debts payment
Bills and Sessional papers on cotton, sugarcane, coffee, cashew-nut and coconut reviewed and amended Retained strategic market access (especially European market) new markets accessed.
Address emerging food safety and quality issues pertaining to statutory and commercial market requirements. Review policy and legal framework for horticulture.
Produce standards developed and operationalised
Diversify and enhance production and consumption of high value crops
Improved horticultural crop production and utilization. Export of Horticultural products increased
National Horticultural policy and legal framework reviewed and completed.
238 HCDA
Facilitate operation of HCDA
240 247 Land Dev't and Machinery Services
KEPHIS - Create a revolving fund for running AMS Stations -Establish a new management system for AMS - Review National Agricultural Mechanization Strategy (NAMS)
Provide Phytosanitary services - Hold 2 consultative workshops - Get Cabinet Approval - Legal Framework for new system In place - Establish a Steering committee to review, collate stakeholders views through regional & national workshops - Formulate strategy & - Get Cabinet Approval
1. Maintain plant and equipment Plants in continuous operation Plants to be repaired Farm Tractors in operation
36 5 26
2. Carry out mechanized soil and water conservation and land development activities 254 Agribusiness, Mrkt Dev't & Agric Infor services
18
Promote agribusiness, market development and agricultural information dissemination HQ Administration, coordination and planning
54 dams, 5 w/holes; 100ha bush clearing 40ha levelling; 420 ha ploughing; 20ha planting; 25 ha harvesting; 2000 bags maize shelling & hiring of low loader. Increased farm incomes
Improved coordination of technical and administrative activities
Head 255 HQ Extension, Research Liaison & TT Services
Activities Facilitate leadership in extension policy formulation and implementation Planning execution and supervision of extension service programmes
257 Agic Information Resource Centre
Resources to facilitate Collection, synthesizing and dissemination of Agricultural information through media and training
258 Embu Agric. Staff Training College 259 Bukura Agricultural College 260 FTCs
Capacity building in staff of the ministry in tailor made courses for deficient skills
Increased demand and use for market information by farmers for production and planning Increased availability of market information via print and radio for farmers Skills development to match changing technological advancement
In-service skills upgrading for certificate holders to diploma courses
Frontline certificate staff skills upgraded to Diploma graduates to match farmers demand
Training of farmers on new agricultural technologies in both crop and livestock production. Provide farmers with a show window i.e. having model farm agricultural enterprises within the specific region
Farmers trained Demonstrations plots established Optimize production Introduction of new technologies on the farm.
Offer certificate courses for school leavers in the growing agricultural sector
Graduates of the institutions are relevant for the growing agricultural sector
Capacity building and community empowerment
- Training of Trainers (TOT) 8 regional - Capacity building of 280 stakeholders
261 Kilifi Institute of Agriculture 502 Food Security & Man. Prog. (NMK)
Expected Outputs/Outcome Review and interpret National Agricultural Sector Extension Policy. Formulate and produce National Food and Nutrition Policy. Enhance implementation of extension programmes Review extension materials, approaches and methodologies.
- 800 community groups Processing of NMK Community project investment proposals
638 Provincial Agric Extension Services
Development of concept note on nutrition
- Document
Training of nutrition volunteers
- 150 volunteers
Production of nutrition manuals
- 3,000 manuals
School feeding Offer extension policy implementation leadership at the provincial level
- 12 schools Enhanced contact between extension providers and farmers Resource utilization supervised and field staff backstopped
639 District Agric Extension Services
Resources for facilitation of implementation of agricultural extension programmes at the district Resources for agricultural technology dissemination at the farmer level
Increased farmer-extension-research contact Increased agricultural production Increased household incomes
661 Sericulture Stations - Thika
Promote production of silk in the country Offer alternative crop for the
Increased household incomes
759 KARI
KARI
Undertake research in various crops
Source: MOA
19
5.3.2 Livestock and Fisheries Development Table 5: Livestock Production Department - Sub-Vote19 Head Activities 631 Monitoring and Evaluation of projects and programmes 224 Coordination and management of extension activities at the Province
463
Expected Outputs/Outcome -At least 8 districts per province per year supervised - necessary data inputted into soft wares in time -Each of the eight provinces to have supervised at least 6 Districts per year - timely periodic reports Delivery and supervision of livestock extension extension activities in at least 50 districts enhanced services and supported Maintenance and management of livestock At least three sheep and goat stations should have improvement farms improved infrastructure and pastures Monitoring of food security -early warning systems at the headquarter established -Livestock production activities coordinated at national level (both Government and other extension service providers - livestock census carried out Strengthening quality control for honey Ensure 48% of the honey marketed is of high quality Maintenance and commercialization of Animal At least four livestock improvement farms should production farms have improved infrastructure Coordination of rural dairy services. -dairy activities vibrant in at least 6 provinces -at least 12 districts supervised per year Coordination and Management of range areas and -water pans is carried out by at least 10 districts in resources ASAL De-silted and rehabilitated. - Range management extension - a least 10 districts supervised per year Human resource development -Coordination of capacity building department staff -At least 40 members of staff trained. -supervise livestock training institutions Training of pastoralists at Narok P.T.C 800 farmers trained
465
Training of pastoralists at Griftu P.T.C
200 farmers trained
466
Training of pastoralists at Isiolo Mobile P.T.U
180 farmers trained
473
Dairy Training School – Naivasha
474
Livestock Sector Information Support Services
477
Coordination of Livestock Extension activities.
Students are well accommodated and fed to continue with normal learning. Training and establishment of forum for key players to interact and formulate sustainable livestock marketing system Coordination and institutionalization of National Agricultural and Livestock Extension system
478
Quality control of livestock feeds, breeds, produce, products and inputs
Strengthen Livestock Recording Centre and coordinate breeding activities in the four provinces
543
Coordination of beekeeping services and promotion of honey refineries.
-Promote repair and rehabilitation of at least six refineries in ASAL - supervision and coordination of beekeeping activities nationally -
232 266 280
291 407 408 451
462
National Dairy Development Project 424
20
491 491
Smallholder Dairy Commercialization Programme Promotion of Dairy sub sector ASAL Based Rural Livelihoods Project -livestock productivity increased - increased off take and prices of livestock -improved credit access by pastoralist -improved early warning systems
Source: MOLFD
Table 6: Veterinary Services Department Sub vote 193 Head 445 & 446
Activity Meat Inspection and Hides and Skins Improvement
481 & 549
Veterinary Laboratory Services
467, 468, 471 & 472 290
Training institutions: AHITINdomba Nyahururu, Kabete and MTI Athi River Artificial Insemination Services
426
Tick Control Services
447
Tsetse & Trypanosomes Control
431, 432, 437, 448, 551, 552 & 553
Livestock Diseases Control (strengthening Animal Health Delivery Systems)
Targets -No. of clean slaughter points licensed in 54 districts -Quantity of livestock products exported and consumed locally -No. of timely and accurate diagnosis made - Trainings done for emerging diseases (mad cow, bird flu) -No. of trained personnel - Improved course content
Expected Output/Outcomes Increased export of finished hides and skins leading to improved incomes Improved public health of beef Quality livestock inputs/outputs in the market Improved export marketing of products
- No. of inseminations done per year (86,545) - No. of private A.I operators licensed -% reduction in tick borne diseases - No. of operational communal dips - No. of tsetse control traps
Increased production marketing
-80% of livestock vaccinated per year - Reduction f disease outbreaks by 20%
Increased staff competence
and
Reduced livestock deaths Increased production and marketing Reduced tsetse infection by 20% Creation of Disease Free Zones Animals are healthy and more productive Increased incomes and reduced poverty
Source: MOLFD
Table 7: Fisheries Department – Sub-vote 192 Head
Activity
Targets
Expected Outputs/Outcomes
534
Improvement of landing sites
532
Fish quality assurance
2 cold storage facilities provided (coast, L. Victoria) Established competent quality control authority
533
Monitoring Control &Surveillance (MCS) Fish farming development
Improvement in landed fish output Reduced post harvest losses Secure export market Improved nutritional status and incomes Sustainable exploitation of fisheries resources Improved nutritional status and increased incomes
537
Source: MOLFD
21
3 patrol boats purchased 3 fish farms rehabilitated (Chwele, Kithima, Sagana)
5.3.3 Cooperatives Table 8: Cooperatives – Activities, Targets HEAD ACTIVITIES
TARGETS
571 Provision of ministerial administration, Planning, General administration and planning functions including Monitoring and evaluation of the personnel, finance, accounts and procurement services; Ministry’s Performance contract 673 Operationalization of the activities of the Governance and Ethics Commission for Cooperatives
Administration of Ethics Code of conduct for Cooperative societies and decentralization of Governance and Ethics Commission
705 Policy formulation & analysis, Information management, project development, appraisal, Monitoring & evaluation, 587 Decentralization; publicity and strengthening the Cooperative Tribunal Services
Economic review of cooperative sub-sector, Efficient financial management and budget Development Planning; Conducting Feasibility studies, Programmes/Projects development, appraisal, monitoring & evaluation and Information databank management, Settlement of disputes; Strengthening Tribunal Registry; Advisory services and legal reforms
589 Provision of Cooperative Registration services;
Amendments of societies' by-laws; Charges by cooperatives; Inquiries; Inspections; Investigations; Surcharge; Liquidation; Provision of Legal Services; Normative interventions.
700 Cooperative Marketing and Research development ;
706,
708
709
710
823
824
711
Collecting Marketing Data; Analysis of the data and dissemination; Promotion of Cooperatives to viable Commercial enterprises to provide value adding, farm inputs & credit services to producers Commissioners Office; Coordination of Cooperative Training for Co-operatives; Deployment of Technical Staff; Representation in National Extension Services:Bodies and Boards; HIV/Aids programme in Co-operatives; Formulation of Co-operative Policy; Project Development and Implementation, Monitoring and Evaluation; Provincial Cooperative Management Services; Coordination of training programme/activities & implementing of Cooperative Projects; Overseeing the implementation of Co-operative Societies Act, Represent CCD in Provincial/Regional bodies; Monitoring Co-operative Activities/Training of Co-operators, Implementing Cooperative Development Projects; Provide guidance in Implementation of Co-operative Societies Act; Monitoring Cooperative activities; Monitoring Cooperative livestock activities District Cooperative Management Services; Coordination of training programme/activities & implementing of Cooperative Projects; Overseeing the implementation of Co-operative Societies Act, Represent CCD in Provincial/Regional bodies; Monitoring Co-operative Activities/Training of Co-operators, Implementing Cooperative Development Projects; Provide guidance in Implementation of Co-operative Societies Act; Monitoring Cooperative activities; Monitoring Cooperative livestock activities Provision of Cooperative Audit Services (Head Annual audit; Continuous audit; Registration of audited accounts; Development of quarters):accounting & auditing manuals for coops; Financial advisory services; Taxation Matters for coops Provision of Provincial Cooperative Audit services:Annual audit; Continuous audit; Registration of audited accounts; Development of accounting & auditing manuals for coops; Financial advisory services; Taxation Matters for coops Provision of District Cooperative Audit services:Annual audit; Continuous audit; Registration of audited accounts; Development of accounting & auditing manuals for coops; Financial advisory services; Taxation Matters for coops Training of Cooperatives: 50 short courses, 50 female students accommodated, , Research Provision of cooperative education and training to enrich the cooperative movement and the Government & consultancy; installation of 4 pumps with professional capacity
Source: MOCDM
5.3.4 Lands Table 9 : Lands – Activities, Targets Head
Activities
Expected Output/Outcome
26
Administration and Planning Service Coordinated services
26
Modernization and Storage of land Improved security of land records information Formulation of National Land Policy Comprehensive National Land Policy
26 26 615
22
Integrated Land and Urban Sector Improved livelihoods of Kenyans in rural and urban areas Programme through improved shelter and land information systems Monitoring and evaluation of Efficient implementation of programmes/project projects
30 30,040 40
96,099
Purchase of land for Settlement of poor landless Management of Settlement Schemes Programme
Settlement farms acquired Reduced number of poor landless Settlement of landless, increased productivity and on /off farm employment
Adjudication Programmes, Title Survey and Administration of Group Ranches Administration of Headquarter and District Survey Offices
Adjudication Sections declared, Committee and Arbitration cases heard incorporation of Group Ranches
96
Land Adjudication Programme for Survey
96
Cadastral Services
96
Creation of National Spatial Data Infrastructure
96
Creation of National Spatial Data Infrastructure
Improved Service Delivery and Coordination of services, maintenance of plant and vehicles, sale of survey maps and records, Procure adjudication records to support registration, adjudication programme quality control. Sale of RIMS Production of quality controlled records, field surveying for implementation of Ndung’u report, production of registration documents, improved RIMs and Deed plans, Subdivision of Company and Cooperative Farms, Production of Boundary plans for control boards, forests and administrative boundaries Creation of Geospatial standards, workshops, National Digital Topographic Database, Creation of Geospatial standards, workshops, National Digital Topographic Database,
96
Maintenance of International boundaries
96
Publication of Kenya National Atlas digital atlas produced
99
Mapping Services
99
130 130
130,132
130 277
376,453
376,453 376,453
23
Enhanced Territorial integrity and re-established international boundaries and Exclusive Economic Zone
Provision of mapping information, revision of maps, land use mapping Geodetic Service Geodetic Control Surveys, Remote sensing surveys, Unified National Common Reference Framework, National Calibration Services for survey Equipment, Revision of Global Map Harmonization of Existing land laws Harmonized registration and administration statutes Revenue and AIA Collection (land Improved revenue and AIA collection, finalization all valuation, registration of titles, land applications for change of user, extension of lease and administration and stamp duty issuance of titles and registration of interests in land collection Resolution of land/ boundary disputes Resolution of land/boundary Improved tenure security and investment disputes and management of Land Disputes Tribunals, Land Rent revision Tribunal, Land Arbitration Tribunal and Land Control Boards. Implementation of recommendations Streamlined land administration and management as per the on Ndungu Report recommendations Provision of well trained man -power in the field of Surveying and Mapping Administration, Co-ordination and Planning of National, Regional and Local development activities Operationalization of the Physical Planning Act (1996) Cap. 286
No of personnel trained in surveying and mapping Improved human capacity in Surveying and Mapping Effective land use planning with minimum conflict
Effective land use planning with minimum conflict
Research on Urbanization Strategies Production of a property hierarchy of urban centers and Policies
376,453
Strategic Structure Plan for Nairobi metropolitan area
- Preparation and ratification of study proposal
376
Integrating Environmental consideration in land use planning
Conduct participatory environmental Planning, training
376
Revision of Human Settlement Strategy Document (1978) Studies on wetlands and water catchment areas Provision of basic physical infrastructure settlement schemes
- Provide spatial framework for Human Settlements
376 084, 173,199 96
132 376,453
- Application of appropriate measures for protection and conservation of these resources Improved access and productivity
Office accommodations and records storage Construction of New office Block for national Cadastral Database and NDSI Rehabilitation of District Land Well maintained buildings and improved security of land Registries records. Preparation of land use plan for market centres in all the districts
376,453
Preparation of Regional plans for all districts 277 Kenya Institute of Surveying and Mapping Source: MOL
- Provide framework for orderly development of urban areas - Guidelines for orderly development of rural areas Construction of buildings, equipment and communication facilities
5.3.5 Environment and Natural Resources The table below shows the activities and expected outputs/outcome for MENR in the period 2006/2007-2008/2009 in MENR. Table 10: MENR – Activities, Expected Output/Outcome Head
210-670 Headquarters Administrative Services
210-749 Financial Management and procurement Services
210-885 Central Planning and Project Monitoring Unit
24
Activities Ongoing Activities/Programmes (Recurrent) -Coordination of Parliamentary Business Publicity of Ministerial Functions Provision of Transport Services Provision of General Office Services, Security services, office facilities and conducive working environment Ensuring prudent financial control for voted items under Head 670 - To assist the Accounting officer in the coordination of all services related to budget preparation, implementation and control. - To ensure realization (collection) of projected revenues and local appropriation in aid. - To ensure that management of public funds are in conformity with the laid down financial regulations and procedures. - To ensure that procurement plans are in place and expenditure planned and implemented as per the plans. Planning and Development Coordination Activities
Expected Output/Outcome
Effective and efficient Service delivery in all administrative units of the Ministry for the realization of the Ministry mandate
- Accurate and timely budget as per the Budget Preparation –Calendar - Expenditure that contained within the voted provisions. - Timely and total collection of Appropriation-in-Aid as reflected in the Printed Estimates for the year in review. - Well planned expenditure that matches the procurement plans. - Accurate and sufficient budgetary provision reflected in the Printed Estimates.
Effective and efficient implementation of policies, projects and programmes
Head
Activities
Expected Output/Outcome
211-646 Forestry Research Institute
Operations and Maintenance Natural Forestry Forest Plantations Farm Forestry Dry-land Forestry Service Programme Staff training and General Forestry administration for an effective management of Forest Resources
Facilities maintained Research Reports, Notes etc. Technical notes Foresters and farmers trained Demonstration Plots Established workshops held Staff trained –No.47 N.T.P. Celebrations-2 Vehicles No.10 Policy coordination and supervision Industrial wood and furniture production Seedlings No.1, 000,000 Planting No.120 (ha)
211-672 Headquarter Forestry Development 211-674 Forest Industrial Training Center Nakuru 211-675 Kenya Forestry College Londiani 211-676 Forestry and Plantation Development
Seedling production planting and General maintenance of the institution Sawlogs processing Forestry technical Training, seedling production and planting and general management of the institution Seedling planting, maintenance and General management of plantation in the country
211-678 Catchment and Natural Forest Conservation 211-679 Rural Afforestation Extension Scheme 211-681 Road Construction Unit
Seedling production (indigenous) rehabilitation of degraded areas and General Management of Natural Forests Forest Extension Services, Farmers training, Monitoring and Evaluation; ASK Shows and General administration for the scheme. Maintenance of Forest Roads, Bush clearing, Calvert opening and installation
211-738Arid and Semi Arid Lands Forestry Development 211-748 Forestry Inspection and Protection Unit 212-690 Mines and Geological Department 212-691 Provincial Mines offices 212-692 Mineral Survey and Exploration 214-219 Department of Resource Survey and Remote Sensing
Seedling production in semi arid areas and catchment rehabilitation
215702Environmental
25
Training of Forest Guards, provision of uniforms, firearms and General Patrol of the Forest Improve performance and service delivery
Improve performance and service delivery Facilitate minerals and geological surveys
Wildlife and Livestock aerial surveys (District Aerial surveys Land use and Land cover surveys Crop Yield production forecasting Air services Forest cover assessment and monitoring Biodiversity assessment and monitoring Primary biomass monitoring for livestock and wildlife management and early warning Land information system for urban and rural development Database development and management Training Publication and information Operations maintenance and professional services Facilitate development, implementation and analysis of the environment policies
Seedlings No.1, 500,000 Technical training No.50 Planting-120(ha) Seedlings No.20,000,000 Planting –10,000(ha) Monitoring and evaluation No.6 Supervision No.50 Seedlings No.1,300,000 Rehabilitation 1,000(ha) Monitoring and evaluation –13 Extension visits –10,000 Seedlings production- Purchase –33,000,000 Farmers training –600 Grading –80km Culvert –400 Draining –67km Seedlings –1,900,000 Farmers assisted –1,200,000 Monitoring and evaluation – 4 Forest Guard training –500 National parade –2 Uniforms –1,000 Satisfy customer administrative requirements
Satisfy customer Administrative requirements Acquire mineral geological data
Survey 5 northern rangeland districts Survey 3 districts per year A national crop forecast yearly Maintain 3 aircraft Survey 3 catchments per year 2 Ecosystems per year 2 range districts per year One district per year A functional database Skilled workforce Publish reports on all surveys made Efficient service delivery
To develop and implement environment policies
Head Policy Analysis and Development 215-736 National Environment Management Authority 215-762 Public Complaints Committee 215-766 National Environment Tribunal
Activities
Expected Output/Outcome
National Environmental Management Authority
NEMA fully Operational by 2005
-Investigations -Periodical reports SOE Reports Awareness workshops Review administrative decisions of NEMA, Workshops
- Continuous - Quarterly reports - Annual report - Cover 80% by 2007 Continuous Cover 80% by 2007
Ongoing Activities/Programmes (Development) Co-ordination of NEPAD Environment activities Contributions to EAC Secretariat
210-670 Headquarters Administrative services 210-698 Lake Victoria Implementation of LVEMP II Environnemental Management Project 210-885 Central Data collection and Information dissemination Planning and Project on Water Weeds in the country Monitoring Unit Capacity building for officers involved in management of information and data. Developing Community Action Plans 211-646 Forestry Research Institute Headquarters
Improvement of KEFRI Research and outstations Forestry Research Environmental Project (FORREMS) Arid and semi-arid project (ARIDSAK) Agro forestry network for Eastern and Central Africa (AFRENA) Acacia Operation Support to Food Security Poverty Alleviation Tree seed Technology Improvement Information Dissemination
Strengthening the production and quality control of gums and resins Management and Control of prosopis
672-265 Mt. Elgon Forest Conservation Development Project 672-National Facility Programme 672-283 ArabukoSokoke Forest Conservation and Management
26
- Rehabilitation of Degrades sites, - Community sensitization, - Conservation and sustainable utilization of forest resource and - Development of ecosystem plan - Sensitization on PFM - Rehabilitation of Degraded sites - Boundary realignment - Sensitizing the community
Effective follow up and Implementation of NEPAD environment activities Operational Lake Victoria Commission Implementation of the project as per work plans Water free water bodies in the country Enhanced capacity on information technology and capacity building in the sector Community Action
Offices and Laboratories Buildings Research Reports Sites Rehabilitated Research Reports Farmers trained Research Reports Farmers trained
Quality seed produced No. of improved seeds Demonstration plot Open/Field days Conference and Workshops Local Community trained Tree inventories done Strategic forest Management Plan developed Research reports Technical notes To cover 2 districts Trans-Nzoia and Mt. Elgon
- Improved planning skills To cover 2 districts Kilifi and Malindi
Head
672-285 Aberdare Forest Resource and Wildlife 672-286 Forest Rehabilitation Environmental Management Strengthening 672-400 Construction of Building NonResidential 672-301 Information Communication Technology Capacity 675-400 Construction of Building Nonresidential 681-430 Construction of Bridges, Ferries and Jetties 738 – 288 Dry lands Forest Resource Conservation and Management 738-299 Intensified Social Forestry Project in semi-Arid lands
211-748 Forest Inspection Patrol Unit 938-261 Rehabilitation of Degraded sites in Turkana District 938-262 Development of Conservation and Demonstration Plots 212-692 Mineral Survey and Exploration
Activities
Expected Output/Outcome
- Fence construction within the forest boundary - Tree planting and rehabilitation of sites - Forest Guards training and Forest Policing - Promote agro forestry - Develop, guidelines and plans for participatory for management - Staff training and support to operation
To cover districts in Aberdare region
- To complete 4 district offices - Commence construction of KFS headquarters and renovation of district and conservancy offices - Establishment of database for Forest Department - Establishment of GIS database To renovate dormitories and convert them to barracks for paramilitary training of forest guards. Rehabilitation of forest roads for better access
- The 4 districts are PFO (Eastern), Maragua, Nyando and Suba. - Construction of KFS Hqs
- Research studies - Reforestation - Dry land development
Arid and Semi arid Districts
- Baseline survey - Prepare Forest Extension guidelines - Training of staff and farmers on better forestry management techniques - Facilitate network among farmers - Identify appropriate indigenous knowledge Training of Forest Guards, provision of uniforms, firearms and General Patrol of the Forest - Community Training and Sensitisation on Environmental conservation - Establishment of wood lots - Rehabilitation of Turkwel river bank - Support to Community Action Plan - Rehabilitation of tree nurseries - Woodlots establishment -Review and enactment of New Minerals and Mining Law - Carry out geological surveys and Mineral exploration in Western, Eastern, Rift Valley and Coast Provinces Modernize Dept’s laboratories Set up GIS-based Geoscientific database Rehabilitate disused Mines and Quarries
-improve institutional capacity -improve social forestry extension network -Technology Transfer -Establish information system with stakeholders
Rehabilitate Madini House
214-219 Department of Resource Survey and Remote Sensing 215-611 Climate Change enabling activities
27
- Control road side erosion - Rehabilitation and management of Ecosystem
Conduct Geohazard mapping in Areas prone to geohazard in Central Kenya Replacement of field motor vehicles Environmental Information management system; Forest cover mapping Aircraft purchase Climate Change enabling activities
Forest Department Headquarters
Renovate three dormitories and put a shooting range. To cover the 4 road units in the Forest Department
Forest Guard training –500 National parade –2 Uniforms –1,000 Turkana District
Arid areas
-Have new Minerals and Mining Law by 2005/06 Produce 2 geological reports and maps by 2004/05 and cover 20% groundwork of programme areas annually Procure more lab equipment Have a functioning database by 2004/05 Complete inventory of the disused mines by 2005/06 Complete rehabilitation of the house by 2005/06 Cover 10% of prone areas in central province by 2005/06 Replace 12 vehicles by 2008 A national forest cover assessment survey New aircraft Framework for technology acquisition and adoption
Head
Activities
Expected Output/Outcome
215- 612 Institutional Strengthening to Management of Ozone Depleting Substances 215-702 Environment management and Protection 215-736 NEMA
Institutional Strengthening to Management of Ozone Depleting Substances
Phase out by 2015
Community Development for Environmental Management Programme
Institutional Capacity Building for NEMA
Support to District Environmental Management Programme
Take stock of Forest and Rangeland resources, ,their utilization and conservation needs in selected districts 1 NEAP; 8 PEAP and 70 DEAP by Oct.2004 20 tools per year developed and tested
National Environment Action Plan Development and testing of tools for the implementation of environmental management and coordination Act Partnership in environment Law and institution in Africa (PADELA)
National Facility Programme 690-Titanium Mining Monitoring 690-Geohazard Mapping 690-Environmental Engineering Geology 690- Geodatic Mapping & Research 690-Library &Archival Development 690- community development for Environment management Programme
New Projects/programmes To increase planning capacity within the Forest Department to ensure participatory forest management Setting up titanium mining industry in the country Help in development of a geo-hazard database for the country Look at all environmental and physical planning issues related to geology and mining To carry out geodetic and geophysical mapping for submission of the claim for the additional 150 nautical miles of Kenya’s Continental shelf by 2009 To modernize the Library and Archive in line with current department and mining industry needs To Facilitate reduction of poverty through improved environmental management
Participatory forest management enhanced Monitored resettlement of farmers in Kwale Titanium Project
Investigated effects of use of Mercury in gold mining on environment around lake Victoria geodetic and geophysical mapping carried out for submission of the claim for the additional 150 nautical miles of Kenya’s Continental shelf by 2009 Modernized Mines and Geological Department Library and Archive Improved environmental management
Source: MENR
5.3.6 Regional Development Authorities Table 11: MRDA – Activities, Expected Output/Outcome for 2006/07 - 2008/09 Head / Activity
Activities
Expected output/outcome
523 - General administration services
- Provide general management and administrative related issues - Prepare policy papers for the cabinet and parliamentary business - Coordinate RDAs administrative issues - Coordinate personnel matters, human resource and capacity building related activities - Provide general office and transport services - Provide planning and developments coordination activities. - Formulation, review and analysis of the ministry’s
- Well coordinated rural development activities. - Improve work performance - Improved facilities.
804 - Central Planning and Project Monitoring
28
- Resource directed to priority areas. - Developed multi-sectoral developmental approach.
Services.
573 – Rural Development Services coordination. 753 – Conservation and Resources Development Technical Support Services
455 KVDA
development policies. - Preparation of MPER/MTER budget and other budget processes. - Carry out monitoring and evaluation of the ministry’s programmes and the projects. - Coordinate formation of the ministry’s information web page and the computerisation of functions. - Promote public private partnership. - Coordinate external financial resources for the RDAs. - Coordinate RDAs on financial management matters. - Coordinate annual accounts for the RDAs. - Handle Audit issues and coordinate the resettlement of displaced person. - Preparation of policies on management and resources development. - Develop and promote environmental conservation programmes and projects and EIA. - Advice on the development of commercial forest, agroforestry, ecotourism. - Promote public private partnership investments. - Protection of fragile areas and endangered flora and Fauna. Catchment Conservation, rehabilitation and Maintenance Rural Based Community Projects Planning and Feasibility Studies Dam construction and management Wei Wei Project Arror/Kinyach Construction of infrastructure (Livestock and fisheries development) Chemeron Project Tot Project Rehabilitation of minor Schemes Mineral resources Survey Development River Utilization Studies Upper Turkwel catchment conservation & Dam Monitoring
707 TARDA
989 LBDA
29
Irrigation Programmes Tana Delta, Thanantu Valley, Masinga, Kibwezi and Kiambere Hydrological investigations/Lab investigation Livestock Development & Marketing Planning and Resource Evaluation Kiambere/Mwingi Water (Phase I) Tana Delta Rice Irrigation Project Athi and Tana catchment Rehabilitation Tana Delta Sugar Integrated Irrigation Project Masinga Dam Resort Athi /river and Munyu Basin Studies Thanantu Valley Dam Monitoring High grand Falls Reservoir Kitui Honey refinery Imbeti South Water project Kimira Oluch Smallholder Dev Project Rice Mill Fisheries Development Catchments Conservation and Rehabilitation Machinery Services Crop Production Siaya Edible Oil
- Enhanced project/programme management. - Additional resource mobilized. - Regional development policy developed.
- Resources directed to priority areas.
- Improved utilization of natural resources. - Project proposals and feasibility studies in place. - Improved utilization of Natural Resources for socio-economic development. - Investments in place.
Conserved resources 2000 farmers trained Increased employment at regional levels Available data Increased water supply Improved food security Improved food security Improved food security and balanced diet Conservded environment Available food Increased food security Increased income Available data Conserved environment, 5900 Km2 of upper turkwel conserved No. of trees seedling and sites protected Increased food security Available water Food security Available data increased water supply Food security Conserved Environment Incread income and food Increased income Available data and information for development. Increased food Available water Availability of water for power generation, domestic and animal use. Increased income Available water Food security Food security Food security Conserved Environment Improved services Food security Food security
Livestock/Agricultural Development Effluent Monitoring and health surveillance Brick and tile manufacture Purchase Of Vehicles and Equipment Honey Production(Siaya and Bondo) Integrated Development Programme Water supply and development Livestock Development Programme Irrigation Development and management Horticultural Development Integrated Natural Resources studies Catchment Conservation Programme
993 CDA
HIV and Aids Purchase of plant and equipment Purchase of vehicles Catchment Conservation and rehabilitation Livestock development Fisheries development Minor irrigations Mineral and natural resource development Dam construction Purchase of plant and equipment Building of non-residential houses Tree crop project Integrated coastal area management (ICAM) Farmers field schools
994 ENNDA
Coastal Micro enterprise development programme African indegious vegetables Malindi integrated social health development programmet Trans-boundary integrated water resource management programme Ewaso-Ng’iro North River Catchment Conservation & Water Resource Management Programme Dam construction Minor irrigation Catchment conservation programme Livestock development Mineral/natural resource development Purchase of palnt and equipment Brick and tiles Isiolo Abattoir Agricultural improvement programme Ewaso Nyiro North Natural resources conservation project Small and medium enterprises programme Refugee impact mitigation programme ASAL research and training center project
Source: MRDA
30
Increased income and food security Available data and improved environment Available data Improved working environment Food security and income Increased food security, employment Increased water supply Food security Food security and income Increased income and employment Available data Conserved environment Create awares Improved working environment Improved working environment Conserved environment, 5 conservation projects undertaken, 500,000 tree seedlings supplied to the local communities. Food security Food security Food security Enhanced incomes Increased water supply Improved working environment Improved facilities Increased fruits Increased income, two resources centres built, 10,000 trees planted in the coastal region Technology transfer, 5000 farmers trained Increased income Increased traditional foods Improved facilities Increased water Increased water resources and conserved environment Increased water supply Increased food security Conserved environment Increased food security Increased income Improved working environment Increased income Increased incomes, and employment Food security Conserved Environment Increased employment and income Increased security Technology transfer, food security.
6.0 FINANCIAL REQUIREMENTS FOR MEETING THE SECTOR’S PRIORITIES & PROGRAMMES 6.1 Resource Requirements for the Whole Sector, 2006/07 – 2008/09 Table 12: Summary of Total Resource Requirements for the Sector, 2006/07 – 2008/09 Resource Requirements (Ksh) 2006/07 2007/08 2008/09 11,453,176,565 12,673,721,959 12,907,052,611
Ministry 1
Agriculture
2
Livestock & Fisheries Development Cooperatives Development and Marketing Environment and Natural Resources Lands
4,677,723,558
5,481,557,394
6,136,813,413
877,929,960
941,336,964
974,052,361
3,157,931,467
5,864,155,659
5,891,726,984
2,138,800,000
2,139,100,000
2,234,200,000
Regional Development Authorities Total
1,381,000,000
1,827,071,175
2,128,405,170
23,686,561,550
28,926,943,151
30,272,250,539
3 4 5 6
The table above shows that the whole sector will require Ksh 23,686,561,550 to finance its planned activities in 2006/07. This figure will increase to Ksh 28,926,943,151 in 2007/08 before rising further to Ksh 30,272,250,539 in 2008/09. The budget for the ARD Sector is per the Sector and Ministerial ceilings outlined in the Budget Outlook Paper for 2006/07 to 2008/09. However, some ministries have requested for additional funding as indicated in section 6.2.7. The tables below show the recurrent and development components of the resource requirements for each ministry: Table 13: Recurrent Resource Requirements (Sector Wide), 2006/07 – 2008/09
Ministry 1 Agriculture 2 Livestock & Fisheries Development 3 Cooperatives Development and Marketing
31
Recurrent Resource Requirements (Ksh) 2006/07 2007/08 2008/09 6,845,212,026 7,241,145,887 7,403,648,658 2,882,997,575
3,098,541,784
3,277,556,161
770,139,960
847,153,955
931,869,352
4 Environment and Natural resources 5 Lands 6 Regional Development Authorities Total
2,712,931,467
5,231,284,927
5,216,063,742
1,463,800,000
1,486,100,000
1,523,200,000
589,000,000
648,000,000
713,000,000
15,264,081,028
18,552,226,553
19,065,337,913
Table 14: Development Resource Requirements (Sector Wide), 2006/07 – 2008/09
Ministry 1
Agriculture
2
Livestock & Fisheries Development Cooperatives Development and Marketing Environment and Natural resources Lands
3
4 5 6
Regional Development Authorities Total
Development Resource Requirements (Ksh) 2006/07 2007/08 2008/09 4,607,964,539 5,432,576,072 5,503,403,953 1,794,724,983
2,383,015,610
2,860,257,252
107,790,000
94,183,009
42,183,009
610,000,000
824,870,732
888,663,242
675,000,000
653,000,000
711,000,000
792,000,000
1,179,071,175
1,415,405,170
8,587,479,522
10,566,716,598
11,420,912,626
6.2.0 Requirements by Ministry The resource requirements for each of the ministries in the ARD Sector are detailed below. 6.2.1 Agriculture The following are the tentative resource requirements for the Ministry of Agriculture to enable it effectively implement the SRA while taking into account limitations in resource availability for the period 2006/07 – 2008/09.
Table 15: MOA –Recurrent Resource Requirements, 2006/07 - 2008/09
Head 190 HQs Administration and Planning Services 191 Agricultural attaches 193 Development Planning Services
32
Resource Requirements (Ksh) 2006/07 400,214,245
2007/08 560,381,813
2008/09 568,387,100
57,910,435 46,620,749
59,424,435 37,900,000
62,140,000 39,500,000
Resource Requirements (Ksh)
Head 195 Agricultural Boards and Committee Meetings 198 Policy & Agric. Dev't Coordination 202 Agric. Dep't HQs Technical Services 228 Finance and Accounts Services 229 Agricultural Techno. Dev't and Testing Stations 230 PCPB 235 HQ Land and Crop Dev't Services
2006/07 26,803,998 31,649,941 55,569,304 25,883,183 43,193,852
2007/08 26,448,330 32,732,580 52,181,464 27,177,342 44,714,477
2008/09 27,360,000 34,254,000 48,140,000 28,254,000 49,185,924
23,187,461 286,809,709
24,346,834 585,754,003
25,360,000 644,340,403
122,850,000
128,992,500
130,520,000
381,352,322 113,447,650 73,498,966
400,419,939 117,341,985 80,848,863
402,520,000 129,076,183 88,933,749
141,565,872 17,722,656 29,131,993
146,495,789 18,252,869 290,960,526
151,623,142 19,250,000 30,829,381
53,082,906
54,955,695
56,934,100
90,367,912 44,791,996 148,601,000
93,226,087 46,382,344 150,458,000
96,209,322 48,052,108 153,150,000
124,899,147
127,610,476
130,441,180
2,665,124,781
2,705,352,661
2,747,063,241
59,525,450
60,810,050
63,158,000
1,551,406,500 6,845,212,026
1,628,976,825 7,241,145,887
1,628,976,825 7,403,648,658
238 HCDA 240 KEPHIS 247 Land Dev't and Machinery Services 254 Agribusiness, Mrkt Dev't & Agric Infor services 255 HQ Extension, Research Liaison & TT Services 257 Agic Information Resource Centre 258 Embu Agric. Staff Training College 259 Bukura Agricultural College 260 FTCs 261 Kilifi Institute of Agriculture 502 Food Security & Man. Programme (NMK) 638 Provincial Agric Extension Services 639 District Agric Extension Services 661 Sericulture Stations - Thika 759 KARI Total Source: MOA
Table 16: MOA –Development Resource Requirements, 2006/07 - 2008/09
HEAD
ACTIVITIES
190 198 229 247 258 259 260 261 225 237 502
HQs Admin & Planning Services Dev’t Planning Services (ASCU) Agric Technology Dev. Stations Land Dev. and Machinery Services Embu Agric. Staff Training College Bukura Agric. College FTCs Kilifi Inst. of Agriculture Integrated Dev. Programme (ASPS) Horticulture Crop Production Services Food Security Programme (KSPFS)
33
Resource Requirements (Kshs) 2006/07 2007/08 25,540,000 0 27,280,000 30,008,000 16,386,677 21,651,611 219,997,390 423,086,265 16,885,000 17,229,250 26,000,000 26,800,000 591,160,000 594,383,200 11,890,000 11,984,500 317,814,763 326,360,508 267,192,706 619,969,450 410,964,080 732,512,284
2008/09 0 32,540,000 21,458,000 422,086,265 7,229,250 16,800,000 594,383,200 1,984,500 325,850,000 619,969,450 732,512,284
HEAD
ACTIVITIES
759 760 761 763 764 765 246
KARI (KAPP) Soil & Water Management Research National Horticultural Research Programme Veterinary Research Range and Arid Land Research Animal Production Research National Agriculture and Livestock Extension Project (NALEP) National Extension Project LVEMP Construction of Kilimo House Annex Construction of KESREF Office NALEP, GoK – construction of offices in districts and locations Total
271 698 190 190 246
Resource Requirements (Kshs) 2006/07 2007/08 2008/09 1,239,424,479 1,264,212,968 1,564,212,968 13,885,300 14,499,950 14,499,950 171,644,384 161,312,600 161,312,600 46,045,891 48,665,686 48,665,686 5,826,608 5,415,897 5,415,897 58,200,076 59,017,627 59,017,627 260,017,972 287,022,258 287,022,258 141,780,000 257,029,213 500,000,000 250,000,000 185,000,000
144,615,600 258,828,418 200,000,000 0 185,000,000
144,615,600 258,828,418 0 0 185,000,000
4,607,964,539
5,432,576,072
5,503,403,953
Source: MOA
Table 17: MOA – Total Resource Requirements, 2006/07 - 2008/09 Category Recurrent
Projected Resource Requirements 2006/07 6,845,212,026
2005/06 7,241,145,887
2006/07 7,403,648,658
Development
4,607,964,539
5,432,576,072
5,503,403,953
Grand Total Agriculture
11,453,176,565
12,673,721,959
12,907,052,611
Source: MOA
6.2.2 Livestock and Fisheries Development Table 18: MOLFD –Resource Requirements (Recurrent & Development), 2006/07 - 2008/09 Activities General Administration and Planning
Resource Requirements (Kshs) 2006/07 2007/08 2008/09 354,792,922 365,772,214 414,349,436
Veterinary Services
1,211,502,638
1,280,617,688
1,548,211,000
Livestock Development
1,848,041,518
2,458,793,740
2,691,573,114
Fisheries
898,800,000
910,974,960
1,017,974,960
KEMFRI
308,819,336
308,819,336
308,819,336
KDB
20,320,950
20,320,950
20,320,950
CAIS
15,546,194
15,546,194
15,546,194
KMC
120,000,000
120,000,000
120,000,000
Total
4,677,723,558
5,481,557,394
6,136,813,413
Source: MOLFD
34
6.2.3 Cooperatives Development and Marketing Table 19: MOCDM – Recurrent Requirements, 2006/07 - 2008/09 Resource Requirements (Kshs) Head/Activity 2006/2007 2007/08 2008/09 571General administration and planning(HQTS) 171,762,151 188,938,366 207,832,203 587Cooperative tribunal 12,803,480 14,083,828 15,492,211 589Coopeartive registration services 23,571,720 25,928,892 28,521,781 705Planning and Feasibility Studies 18,767,780 20,644,558 22,709,014 706Cooperative Management Services (Commissioners office) 41,656,850 45,822,535 50,404,789 700Cooperative Marketing Services 21,287,180 23,415,898 25,757,488 673Cooperative Governance and Ethics Commission 16,898,640 18,588,504 20,447,354 708Provincial Cooperative Management Services 51,267,334 56,394,067 62,033,474 709District Cooperative Management Services 246,233,542 270,856,896 297,942,586 710Cooperative Audit Services (HQTS) 64,618,740 71,080,614 78,188,675 823Provincial Cooperative Audit Services 12,131,400 13,344,540 14,678,994 824District Cooperative Audit Services 28,247,000 31,071,700 34,178,870 711Training Development(Grants to Cooperative College of Kenya) 60,894,143 66,983,557 73,681,913 Total (Recurrent) Source: MOCDM
770,139,960
847,153,955 931,869,352
Table 20: MOCDM – Development Resource Requirements, 2006/07 - 2008/09 Programme/Activity General Administration and planning; Head quarters administrative services Cooperative Marketing Capacity Development of Management information system for the Ministry; Kenya – USAID project Provincial/District Cooperative Services: Construction of new offices and renovation of old offices Grants to Cooperative College of Kenya: Construction of Non residential Building (Seminar Centre), women’s' hostel and Construction of Water Supplies and sewerage TOTAL – D22 Source: MOCDM
35
Sub Resource Requirements (Kshs) Head Vote 2006/2007 2007/2008 2008/09 220 703 10,000,000 10,000,000 10,000,000 221 700 221 708/ 709
45,790,000 21,183,009
21,183,009
223 711 11,000,000 52,000,000 107,790,000
63,000,000 94,183,009
42,183,009
Table 21: MOCDM – Total Resource Requirements, 2006/07 - 2008/09
Description
Resource Requirements (Kshs) 2006/2007 2007/2008 770,139,960 847,153,955 107,790,000 94,183,009 877,929,960 941,336,964
Recurrent Development Grand Total MOCDM
2008/09 931,869,352 42,183,009 974,052,361
Source: MOCDM
6.2.4 Lands Table 22: MOL – Recurrent Resource Requirements, 2006/07 - 2008/09 Programme Personal Emoluments and related expenses (Whole Ministry) Administrative Support Services National land Policy and reform Programme Land Adjudication Programme Settlement programme Support Mapping Services Physical Planning Services Land Administration Programmes and service delivery Training Needs Assessment and capacity Building ICT support Services Programmes Planning, Coordination, Monitoring and Evaluations Total Recurrent
2006/07 887,000,000
Resource Requirements (Kshs) 2007/08 2008/09 893,000,000 900,000,000
165,000,000 20,000,000
168,000,000 20,000,000
172,000,000 20,000,000
70,000,000 67,000,000 86,000,000 46,000,000 113,000,000
72,000,000 70,000,000 89,000,000 49,000,000 114,000,000
74,000,000 82,000,000 93,000,000 53,000,000 118,000,000
3,000,000
4,000,000
4,000,000
3,000,000 3,800,000
3,000,000 4,100,000
3,000,000 4,200,000
1,463,800,000
1,486,100,000
1,523,200,000
Source: MOL Table 23: MOL – Development Resource Requirements, 2006/07 - 2008/09 Activity Modernization and Storage of land information Settlement Programme and provision of infrastructure
2008/09 50,000,000
200,000,000
200,000,000
200,000,000
3,000,000
2,000,000
2,000,000
25,000,000
25,000,000
30,000,000
Creation of National Spatial Data Infrastructure Upgrading of Survey Plant and Equipment
150,000,000
100,000,000
150,000,000
50,000,000
50,000,000
50,000,000
Construction of New office Block for national Cadastral Database and NSDI and Rehabilitation of District Registries
70,000,000
70,000,000
70,000,000
Integrated Land and Urban Sector Programme Provision of basic physical infrastructure settlement schemes
36
Resource Requirements (Kshs) 2006/2007 2007/2008 20,000,000 50,000,000
Preparation of Structure, Regional and other land use plan and standards
53,000,000
52,000,000
52,000,000
Capacity Building through Kenya Institute of Surveying and Mapping
104,000,000
104,000,000
107,000,000
Total Development
675,000,000
653,000,000
711,000,000
Source: MOL Table 24: MOL – Total Resource Requirements, 2006/07 - 2008/09
Resource Requirements (Kshs) 2006/2007 2007/2008 2008/09
Description Recurrent Development Grand Total (MOL)
1,463,800,000
1,486,100,000
1,523,200,000
675,000,000
653,000,000
711,000,000
2,138,800,000
2,139,100,000
2,234,200,000
6.2.5 Environment and Natural Resources Table 25: MENR – Recurrent Resource Requirements, 2006/07 - 2008/09 Head / Activity 210-670 Headquarters Administrative Services 210-749 Financial Management and procurement Services 210-885 Central Planning and Project Monitoring Unit 211-646 Forestry Research Institute 211-673 Headquarter Forestry Development 211-674 Forest Industrial Training Center Nakuru 211-675 Kenya Forestry College Londiani 211-676 Forestry and Plantation Development 211-678 Catchment and Natural Forest Conservation 211-679 Rural Afforestation Extension Scheme 211-681 Road Construction Unit 211-738Arid and Semi Arid Lands Forestry Development 211-748 Forestry Inspection and Protection Unit 212-690 Mines and Geological
37
Resource Requirements (Kshs) 2006/07 2007/08 213,266,389 365,000,000
2008/09 370,000,000
1,935,990
2,000,000
2,500,000
6,830,359
8,500,000.00
8,700,000.00
480,629,208
643,000,000
700,000,00
72,114,604
188,479,273
210,000,000
5,809,678
38,303,056
50,000,000
29,055,315
144,442,056
150,000,000
418,868,240.00
664,739,105.00
750,000,000
172,175,641.00
424,042,077.00
550,000,000
246,003,374.00
511,290,259.00
650,000,000
13,033,182.00 47,581,499.00
32,785,881.00 79,022,346.00
45,000,000 100,000,000
376,824,288.00
550,698,572.00
600,000,000
54,229,228.00
208,000,000.00
226,000,000.00
Department 212-691 Provincial Mines offices 212-692 Mineral Survey and Exploration 214-219 Department of Resource Survey and Remote Sensing 215-702Environmental Policy Analysis and Development 215-736 National Environment Management Authority 215-762 Public Complaints Committee 215-766 National Environment Tribunal TOTAL Source: MENR
33,973,798.00 99,126,580.00
62,197,757.00 266,000,000.00
72,723,046.00 287,000,000.00
99,305,165.00
295,601,545.00
322,689,396.00
4,299,750.00
6,500,000.00
6,500,000.00
301,707,179.00
655,683,000.00
721,251,300.00
19,624,500.00
55,000,000.00
60,000,000.00
16,537,500.00
30,000,000.00
33,000,000.00
2,712,931,467
5,231,284,927
5,216,063,742
Table 26: MENR – Development Resource Requirements, 2006/07 - 2008/09 Head / Activity Resource requirements 2006/07 2007/08 2008/09 210-670 Headquarters Administrative 57,000,000 58,000,000 59,535,000 Services 210-698 Lake Victoria Environmental 42,000,000 94,500,000 99,225,000 Management Project Phase II 210-885 Central Planning and Project 17,100,000 17,955,000 18,852,750 Monitoring Unit 211-646 Forestry Research Institute 43,609,880 79,903,772 83,898,960 headquarters 211-672 Headquarters Forestry Development 22,555,000 51,324,000 53,890,200 211-675 Forest Training College, Londiani 1,500,000 1,575,000 1,653,750 211-681 Road Construction Unit 6,800,000 7,140,000 7,497,000 211-738 Arid and Semi Arid lands Forestry 17,000,000 50,702,688 53,237,822 Development 211-748 Forest Inspection and Patrol Unit 10,000,000 10,500,00 11,025,000 211-938 Soil Conservation and Afforestation 12,000,000 12,600,000 13,230,000 212-692 Mineral Survey and Exploration 66,693,850 70,693,938 75,728,634 214-219 Department of Resource Survey and 40,000,000 42,000,000 44,100,000 remote Sensing 215-611 Climate Change Enabling Activities 4,500,000 4,725,000 4,961,250 215-612 Institutional Strengthening Ozone 5,900,000 6,195,000 6,504,750 Depleting Substance Mgt. 215-702 Environmental Policy Analysis and 88,033,352 92,435,020 97,056,771 Development 215-736 National Environment Management 10,307,918 43,110,814 45,266,355 Authority TOTALS 445,000,000 632,870,732 675,663,242 Source: MENR
38
Table 27: MENR – Total Resource Requirements, 2006/07 - 2008/09 Resource Requirements (Kshs) 2006/2007 2007/2008 2008/09
Description Recurrent
2,712,931,467
5,231,284,927
5,216,063,742
445,000,000
632,870,732
675,663,242
3,157,931,467
5,864,155,659
5,891,726,984
Development Grand Total (MENR) Source: MENR
6.2.6 Regional Development Authorities Resource Requirements for Recurrent Budget The table below provides the resource requirements for Ministry headquarters and Regional Development Authorities including various activities undertaken by the Ministry. The Ministry will require Kshs 145,250,000 above the provided ceilings to assist in the formulation of the regional development, restructuring of the RDAs and for clearing backlogs related to statutory obligations.
Table 28: MRDA - Recurrent budget for the Ministry HQs SubVote
Head
SubVote 090 HQS
523 General Admin. Services
- General Management and Administration of the Ministry - Preparation of Cabinet Memorandum Policy Paper, Parliamentary Business - Coordination of the RDAs and other administrative issues - Coordinate personal matters, Human Resource capacity building
804 Planning & Policy Research
- Formulation review and analysis of the Ministry’s Development policy’s, preparation of MPER/M.T.E.F budget, coordination of programme and projects - Monitoring and evaluation of the Ministry’s Programmes and Projects - Coordination of the Mainstrip information web-page, computerization of Ministry’s functions
39
Activities
Resource Requirements (Kshs.) 2005/06
2006/07
2007/08
2008/09
97,390,939
116,023,433
123,725,906
137,108,780
12,508,466
13,768,578
16,606,241
17,954,811
573 Rural Dev. Services Coordinatio n
- Preparation of policies for RDAs - Liaison with the RDAs on management matters including finances - Coordinating annual accounts for RDAs - Handling of Audit issues coordinates resettlement of displaced persons and task forces
- Preparation of policies on 753 Conservatio environmental and Management - Promote partnerships with n networks with Private Sector, RDAs and Dev. partners to promote environmental conservation - Develop commercial forestry, agro forestry, and eco tourism programmes - Protection of fragile areas and endangered flora and fauna Total Sub-vote 090
12,328,984 11.,223,420
11,991,668
12,384,483
9,992,904
14,769,092
17,719,822
20,439,202
132,221,293
155,784,523
170,043,637
187,887,276
Source: MRDA Table 29: MRDAs - Recurrent Transfers To Regional Development Authorities 455
707
989
992
993
994
Kerio Valley Development Authority Grants to Kerio Development Authority Tana & Athi Rivers Dev. Authority Grants to Tana & Athi Rivers Development Lake Basin Dev. Authority Grants to Lake Basin Development Authority Ewaso Ng’iro South Dev. Authority Grants to Ewaso Ng’iro South Development Coast Dev. Authority Grants to Coast Development Authority Ewaso Ng’iro North Dev. Authority Grants to Ewaso Ng’iro North Development Total sub vote 093 Total R 09
Source: MRDA
40
2005/06
2006/07
2007/08
2008/09
89,977,711
95,977,711
97,977,711
110,000,000
127,607,532
132,607,532
135,000,000
145,000,000
104,356,381
109,356,381
110,000,000
129,845,000
19,892,712
24,892,712
27,142,592
35,652,518
36,314,904
41,314,904
43,200,000
48,615,000
25,066,237
29,066,237
64,636,060
56,000,000
403,215,477 535,436,770
433,215,477 589,000,000
477,956,363 648,000,000
525,112,724 713,000,000
The recurrent transfers to the RDAs comprise staff salaries and wages, operations & maintenance and plant and equipments. ENNDA is implementing Ewaso Ng’iro North Natural Resources Conservation project funded by ADB Resource Requirements for Development Activities All the projects and programmes indicated below are 100% GoK funded except for Ewaso Ng’iro North Natural Resource Conservation project which is funded by ADB /GoK and Coast Micro Enterprise project funded by USAID/GoK. Table 30: MRDA – Resource Requirements (Development Activities), 2006/07-2008/09
Authority / Head KVDA 455 TARDA 707 LBDA 989 ENSDA 992 CDA 993 ENNDA 994 Total Development D09
2006/07 75,035,000
Resource Requirements 2007/08 83,242,825
2008/09 85,870,120
91,000,000
140,000,000
165,700,000
38,045,000
45,117,250
54,668,200
42,380,000
51,410,500
53,166,250
83,540,000
110,220,600
120,320,600
462,000,000
749,080,000
935,680,000
792,000,000
1,179,071,175
1,415,405,170
Source: MRDA
Table 31: MRDA – Total Resource Requirements, 2006/07-2008/09
Description
Resource Requirements (Kshs) 2006/2007 2007/2008 2008/09
Recurrent
589,000,000
648,000,000
713,000,000
Development
792,000,000
1,179,071,175
1,415,405,170
1,381,000,000
1,827,071,175
2,128,405,170
Grand Total (MRDA) Source: MRDA
41
6.2.7 Additional Resource Requirements Ministry of Agriculture The following are new donor projects that are likely to be brought on board in 2006/07 when bilateral discussions are completed. Table 32: MOA – Proposed Donor Funded Programmes, 2006/07 - 2008/09 Current Projected Resource Requirements 2006/07 2005/06 2006/07
Priority Ranking Programme/Activity 1 Promoting Farmer Initiative through FFS (UNDP through FAO) 2
5,000,000
Integrated Rural Development Project in the Baringo Area Training in Farm Management and Marketing in Kenya-TCP FAO Development of Community Agriculture in ASAL Areas-JICA Small Holder Horticulture Empowerment ProjectJICA Grant Assistance for Under-privileged farmers-JICA Western Kenya Integrated Ecosystem Man. Project – WB HIV/AIDS studies to identify effective entry points for the Ministry Total
3 4 5 6 7 8
170,000,000
5,000,000
5,000,000
201,000,000 246,000,000
10,000,000
11,000,000
9,000,000
28,000,000
31,000,000 32,000,000
98,000,000 79,000,000
101,000,000 101,000,000 81,000,000 82,000,000
86,000,000
89,000,000 92,000,000
5,000,000 481,000,000
5,000,000 0 524,000,000 567,000,000
Source: MOA
Ministry of Environment and Natural Resources In addition to the above resource requirements on recurrent and development expenditures, the Ministry is proposing to start new programmes that are 100 per cent GoK funded. These new programmes are listed in the table below. Table 33: MENR – Resource Requirements (Development Budget - New 100% GoK) Priority Ranking 1 2 3 4 5 6 7
Head / Programme
National Facility Programme 690-Titanium Mining Monitoring 690-Geohazard Mapping 690-Environmental Engineering Geology 690- Geodatic Mapping & Research 690-Library &Archival Development 690- community development for Environment management Programme TOTAL Source: MENR
42
Resource Requirements (Kshs) 2006/2007 2007/2008 2008/09 7,500,000 7,500,000 7,500,000 5,000,000 5,000,000 5,000,000 10,000,000 15,000,000 20,000,000 15,000,000 4,500,000 3,000,000 12,500,000 6,000,000 4,000,000 15,000,000 4,000,000 3,500,000 100,000,000 150,000,000 170,000,000 165,000,000
192,000,000
213,000,000
Ministry of Regional Development Authorities The Ministry has requested for additional Ksh. 145,250,000 over and above the provided ceiling of Ksh 589,000,000 to specifically address the following priority areas: • Formulation of a Regional Development Policy • Review all of six RDAS ACT • Restructuring and Rationalization of the Ministry and RDAs • To meet statutory obligations • GOK Contribution to Donor Projects. Table 34: MRDA – Additional Resource Requirements
licy formulation eview all of six RDAS ACT stitutional reforms and restructuring: MRDA RDAS otal
2006/07 30,000,000 25,000,000
2007/08 20,000,000 25,000,000
2008/09 10,000,000 10,000,000
20,000,000 15,000,0000 10,000,000 5,000,000 300,000,000 150,000,000 80,000,000 300,060,000 180,000,000
The Ministry requires additional funding to meet its statutory obligations outstanding in 2005/06 to pay, for example, PAYE, NSSF, Pension, hold statutory board meetings. This is as indicated in the table below. : MRDA – Actual RDAs Underfunding on Statutory Obligations - 2005/06
Authority LBDA KVDA ENSDA TARDA CDA Total Ksh
Salaries & Wages 0 10,894,956 1,657,500 25,992,468 0 38,544,924
2%Annual Board Increment Expenses 0 4,500,000 2,019,453 4,500,000 430,404 4,500,000 3,072,000 4,500,000 711,772 4,500,000 6,233,629 22,500,000
Statutory Deductions/ Other Arrears Total Ksh 1,876,640 6,376,640 2,578,289.40 19,992,698 4,209,576 10,797,480 51,918,027.70 85,482,496 16,084,368 21,296,140 76,666,901 143,945,454
To meet these commitments, the Ministry will require Kshs. 70 million in 2006/07 and Kshs. 73,945,4454 million in 2007/08 Financial Years respectively.
7.0 CONCLUSIONS AND WAY FORWARD The Agriculture and Rural Development (ARD) Sector plays a crucial role in Kenya’s economic growth and development. In line with the ERS, the Strategy for Revitalizing Agriculture was formulated in 2004 with the vision of transforming the country’s agriculture into a profitable, commercially oriented and internationally competitive economic activity. 43
The Strategy aims at addressing the challenges facing agriculture in order to boost incomes and employment opportunities for the rural dwellers who constitute the majority of the Kenyan population. Other strategies have also been formulated to address the various subsectors within the ARD Sector. The Sector utilized 84.28 per cent of the resources allocated in 2003/04 and 73.75 per cent in 2004/05. This is mainly attributable to delays in Exchequer releases for planned activities and the slow procurement procedures. There was also lack of capacity in the field stations to spend the allocated amounts due to various reasons. There is also a huge amount of pending bills that need to be cleared before embarking on the programmes that have been planned for the MTEF period. As at 31st December 2005, the total pending bills for the Sector amounted to Kshs 1,104,512,213.70 (see Annex IV). The budget for the ARD Sector is as per the Sector and Ministerial ceilings outlined in the Budget Outlook Paper for 2006/07 to 2008/09. However, some ministries have requested for additional funding to cover some new core poverty projects. The whole sector will require Ksh 23,686,561,550 to finance its planned activities in 2006/07. This figure is expected to Ksh 28,926,943,151 in 2007/08 before rising further to Ksh 30,272,250,539 in 2008/09. 7.1 The Way Forward for the ARD Sector The Sector will continue to play a critical role in the economic recovery of the country. It will also continue reforms towards: ¾ Revitalizing agriculture for food security ¾ Revitalizing the cooperative movement to continue to mobilize domestic savings and streamlining the marketing function in the sector; ¾ Revamping the livestock industry ¾ Developing the fisheries industry ¾ Developing forestry and mining ¾ Reforming land management system ¾ Protection, conservation and management of the environment and natural resources ¾ Revitalizing Regional Development Authorities
44
ANNEX I: CORE POVERTY PROGRAMMES 1. Agriculture The Ministry has the following core poverty programmes: • Agricultural Technology Development. • Extension, Research Liaison & TT Services • Farmers Training Centres • Agricultural Research • Land and Crop Development • Food Security & Management Programme Table 35: MOA – Proposed Allocations to Core Poverty Programmes (Kshs) HEAD PROGRAMME/ACTIVITY 202 Agric. Dep’t Technical Services 229 Agricultural Technology Development Testing Stations 255 HQs Extension, Research Liaison & TT Services 260 FTCs 638 Provincial Agric Extension Services 639 District Agric Extension Services 661 Sericulture Stations – Thika 759 KARI
2006/2007 55,569,304
2007/08 52,181,464
2008/09 48,140,000
43,193,852 44,714,477 141,565,872 146,475,789 90,367,912 93,226,087 124,899,147 127,610,476 2,665,124,781 2,705,352,661 59,525,450 60,810,050
49,185,924 151,623,142 96,209,322 130,441,180 2,747,063,241 63,158,000
1,551,406,500 1,628,976,825
1,628,976,825
235 HQs Land and Crop Development Services
519,809,709
585,754,003
644,340,403
502 Food Security & Management Programme (NMK)
148,601,000
150,458,000
153,140,000
Total Proportion Allocated to Core Poverty Programmes (%) Source: MOA.
5,400,063,527 5,595,579,832 5,712,278,037 77.16
2 Livestock and Fisheries There are four core poverty programmes in the Sub-sector, namely;
45
Livestock Extension services; Disease and pest control; Development of veterinary and animal improvement farms; and, Fisheries development.
77.27
77.15
Table 36: MOLFD – Proposed Allocations to Core Poverty Programmes Both Recurrent and Development (Kshs)
HEAD 532 &534 477 448 490 &266
PROGRAMME/ACTIVITY Fisheries Development
Livestock Extension Services Disease &Pest Control Development of veterinary farms and animal improvement farms TOTAL Source: MOLFD
2006/07 450,000,000
2007/08 495,000,000
2008/09 544,500,000
190,953,838 370,172,854 72,083,853
210,049,222 407,190,139 79,292,238
231,054,144 447,909,153 87,221,462
1,083,210,545
1,191,531,599
1,310,684,759
3 Cooperatives The sub-sector has the following core poverty programmes; •
•
•
Provincial and District Cooperative Management Services; this relates to delivery of cooperative extension services, implementation of legal and institutional reforms, Coordination of Cooperative training programmes, implementation of cooperatives programmes and projects, Provision of guidance on implementation of Cooperative Societies Act and subsidiary legislation and overseeing cooperative activities Cooperative Marketing Services; this relates to market research and development, conducting commodity baseline studies and market surveys, market data analysis and information management plus promotion of cooperative ventures and value addition processing; and Corporate governance of cooperatives; this relates to improvement of corporate governance of cooperatives and forestalling prudential standards and best practices in cooperatives management besides sensitising cooperative societies on their ethics code of conduct.
Allocations to core poverty programmes are comparably very low as indicated in the table below. Table 37: MOCDM – Proposed Allocations to Core Poverty Programmes HEAD PROGRAMME/ACTIVITY 700 Cooperative Marketing and Research; Collecting Marketing Marketing: Data; Analysis of the data and dissemination; Services Promotion of Cooperatives to viable Commercial enterprises to provide value adding, farm inputs & credit services to producers 673 Cooperative Administration of Ethic Commission for Governance and Cooperative Governance; Improvement in the Ethics: corporate, Governance of cooperatives Coordination of training programme/activities & 708 Provincial implementing of Cooperative Projects; Cooperatives Overseeing Management the implementation of Co-operative Societies Act Services:
46
2006/2007
2007/08
2008/09
10,794,256
12,713,116
14,840,650
7,801,627
9,309,551
10,982,822
23,186,393
27,751,508
32,818,063
709 District Cooperatives Management Services:
Training of Co-operators, Implementing Cooperative Development Projects; Provide guidance in Implementation of Co-operative Societies Act; Monitoring Cooperative activities; Monitoring Cooperative livestock activities Total – R22 Source: MOCDM
100,446,021 122,153,625 146,265,249 142,228,297 171,927,800 204,906,784
4 Environment and Natural Resources The sub-sector has the following core poverty programmes: • • •
Protection, Conservation and Rehabilitation of Water Catchments and Natural Forest areas; Accelerated development of the Mining industry; and Environmental Conservation and Sustainable Management of Natural Resources
Table 38: MENR Proposed Allocations to Core Poverty Programmes (Recurrent) Programme/Project
Protection, Forestry and Plantation Conservation and Development Rehabilitation of Catchments and Natural Water Catchments and Forests Conservation Natural Forest areas Rural Afforestation Extension Schemes Arid and Semi Arid Lands Forestry Development Mineral Development Accelerated development of the Mining industry Environmental Environmental Policy Conservation and Analysis and Sustainable Development Management of National Environmental Natural Resources Management Authority (NEMA) Public Complaints Committee (PCC) National Environmental Tribunal (NET) Total Recurrent Grand Total Expenditure
47
Proposed Allocations (Kshs) 2006/07
2007/08
2008/09
490,982,844
853,218,378
960,000,000
172,175,641
424,042,077
550,000,000
246,003,374
511,290,259
650,000,000
47,581,499
79,022,346
100,000,000
187,329,606
348,997,757
585,723,046
4,299,750
6,500,000
6,500,000
301,707,179
655,683,000
721,251,300
19,624,500
55,000,000
60,000,000
16,537,500
30,000,000
33,000,000
1,486,241,893
2,963,753,817
3,666,474,346
Table 39: MENR – Proposed Allocations to Core Poverty Programmes (Development) Programme/Project
Protection, Conservation and Rehabilitation of Water Catchments and Natural Forest areas
Accelerated development of the Mining industry Environmental Conservation and Sustainable Management of Natural Resources Total Recurrent Expenditure
Proposed Allocations (Kshs) 2006/07
2007/08
2008/09
Forestry and Plantation Development Catchments and Natural Forests Conservation Rural Afforestation Extension Schemes Mineral Development
22,555,000
51,324,000
53,890,200
17,000,000
50,702,688
53,237,822
12,000,000
12,600,000
13,230,000
66,693,850
70,693,938
75,728,634
Environmental Policy Analysis and Development Grand Total
88,033,352
92,435,020
97,056,771
206,282,202
277,755,646
293,143,427
5 Lands The main core poverty programme in the Ministry is acquisition of land for agricultural settlement for allocation to the poor. This is achieved as reflected in the Settlement Programme where in the absence of Government land, private land is identified, purchased, planned and subdivided, allocated for settlement purposes. Table 40: MOL - Proposed Allocations to Core Poverty Programmes Project Name
State-land and Shirika Conventional Settlement Schemes Purchase of farms
Objectives
Proper management of settlement schemes To Settle poor landless Kenyans
Funding Agency
Status
Total Costs (Kshs) To Completion
2006/07
2007/08
2008/09
Proposed Allocations (Kshs)
GOK
Continuo us
50,000,000
42,519,133
19,547,540
19,784,173
Donor
Continuo us
600,000,000
200,000,000
200,000,000
200,000,000
650,000,000
242,519,133
219,547,540
219,784,173
Total Cost
6 Regional Development Authorities The Ministry has four core poverty programmes that contribute to employment and wealth creation within the river basins. These include: • Catchments and River basin Areas Conservation and Protection Services in sustaining biodiversity and water regulation and supplies to support socio-economic development including: agriculture, hydro-power generation, tourism, health, shelter (construction industry) • Dry lands (ASALs) Resources Development Program Services in mitigating drought and promoting food security through support to: pastoralists livelihoods; conservation, 48
•
•
marketing access and promotion of dry land plants and products; and minerals exploitation. Multi-purpose Integrated Resources Development Services that support socioeconomic and environmental development through Multi-purpose Dams for floods control and management, Hydro-power generation, irrigation, domestic and livestock water supplies, ecotourism etc Rural Micro-enterprises Development and Marketing Support Services to promote appropriate technologies and market certification in developing cottage industries and other income generating activities. Table 41: MRDA – Proposed allocations to core poverty programmes
Head
Programmes/activities
455 (KVDA)
Catchments and River basin Areas Conservation and Protection Services • Catchment conservation, rehabilitation & maintenance. • Upper turkwel catchments conservation and dam monitoring. Rural Micro-enterprises Development and Marketing Support Services • Wei Wei Project Arror/Kinyech • Arror Kinyench • Chemeron Project • TOT Project Total KVDA Catchments and River basin Areas Conservation and Protection Services • Athi & Tana catchment rehabilitation Rural Micro-enterprises Development and Marketing Support Services. • Masinga, Kibwezi Kiambere • Tana Delta Rice Irrigation Project
707 (TARDA)
• Tana Delta Sugar integrated irrigation project
989 (LBDA)
• Tanantu valley project. • Kitui Honey Refinery • Livestock development & marketing • High grand falls • Kiambere Mwingi Project. Total TARDA Catchments and River basin Areas Conservation and Protection Services Catchment conservation and rehabilitation
2007/08
2008/09
3,860,000
4,053,000
4,255,650
45,000,000
45,000,000
45,000,000
250,000 3,130,000 729,600 1,930,000 54,899,600
992,750 3,286,500 4,282,300 2,800,000 62,414,550
1,092,025 3,450,825 4,710530 3,200,000 58,258,205
265,000,000
110,000,000
105,000,000
203,000,000 5,000,000
393,000,000 165,000,000
678,000,000
2,000,000
10,000,000,000
10,000,000 13,990,000,000
57,700,000 10,000,000 8,000,000 50,000,000 1,600,000 601,600,000
30,000,000 10,000,000 300,000,000 80,000,000 2,000,000 11,090,000,000
27,000,000 10,000,000 20,000,000 150,000,000 2,000,000 16,990,000,000
1,500,000
1,575,000
6,653,750
Rural Micro-enterprises Development and Marketing Support Services. • Kimira Oluch small development project
6,000,000
6,300,000
6,615,000
• Fisheries development • Crop production • Livestock/agricultural development
2,000,000 4,000,000 3,200,000
2,100,000 4,200,000
2,205,000 4,410,000 3,528,000
2,000,000 18,700,000
210,000 17,745,000
• Honey production Total (LDBA)
49
2006/07
3,360,000
220,500 23,632,250
993 (CDA)
Catchments and River basin Areas Conservation and Protection Services • Catchment conservation and rehabilitation • Trans-boundary integrated water resources management programmes Rural Micro-enterprises Development and Marketing Support Services • Livestock development • Fisheries development. • Minor irrigation. • Tree crop project. • Integrated coastal area management (ICAM)
994 (ENNDA)
992 (ENSDA)
• Coastal Micro enterprise development programme. • Africa indigenous vegetables. Total (CDA) Catchments and River basin Areas Conservation and Protection Services • Ewaso Ngiro North River Catchment conservation and water resources management programme. • Catchment conservation programme • Ewaso Ngiro North natural resource conservation project Rural Micro-enterprises Development and Marketing Support Services. • Livestock development • Minor irrigation • Agricultural improvement programme • Small and medium enterprises Multi-purpose Integrated Resources Development Services. • Isiolo Abattoir • Refugee impact mitigation programme Dry lands (ASAL) Resources Development Program Services. • ASAL research & training centre project Total (ENNDA) Catchments and River basin Areas Conservation and Protection Services • Catchment conservation programme Multi-purpose Integrated Resources Development Services. • Integrated development programme • Water supply and development • Irrigation development and management • Horticultural development Total (ENSSA) Grand total
Source: MRDA
50
1,134,750
1,514,891
2,900,000
5,000,000
2,000,000
5,000,000
4,757,450 4,758,450 4,444,130 4,758,540 11,075,600
2,670,000 2,599,120 6,267,940 2,670,000
3,564,450 3,564,450 8,702,664 3,564,450 11,075,600
10,000,000
11,075,600 25,000,000
10,000,000
4,100,000 50,028,920
4,100,000 57,897,551
4,100,000 52,471,614
4,000,000
9,500,000
4,200,000
12,000,000
23,000,000
17,000,000
598,000,000
543,000,000
622,000,000
23,000,000 8,702,664 8,900,000 211,780,000
6,950,000 4,444,130 10,480,000 232,880,000
23,000,000 6,267,940 8.900,000 211,780,000
56,000,000 150,000,000
300,000,000 150,000,000
300,000,000 150,000,000
120,000,000 1,192,382,664
120,000,000 1,400,254,130
120,000,000 1,463,147,940
8,700,000
8,000,000
4,100,000
10,000,000 11,750,000 1,000,000 5,000,000 36,450,000 1,954,761,184
25,000,000 9,830,000 500,000 4,500,000 47,830,000 12,674,141,231
23,000,000 11,900,000 500,000 5,500,000 45,000,000 16,634,510,009
ANNEX II: LIST OF STATE CORPORATIONS AND PROPOSED ALLOCATION TO THEM 1. Agriculture The Ministry has 26 parastatals that are grouped into five broad categories, namely: •
Financial Corporation (1) o Agricultural Finance Corporation
•
Commercial/Manufacturing Corporations (9) o Agrochemical & Food Company Limited o Sony Sugar Company o Busia Sugar Company o Nzoia Sugar Company o Chemelil Sugar Company o Mumias Sugar Company o Kenya Seed Company o Pyrethrum Board of Kenya o National Cereals and Produce Board
•
Service Corporation (3) o Agricultural Society of Kenya o Agricultural Development Corporation o Central Agricultural Board
•
Regulatory Corporation (9) o Coffee Board of Kenya o Tea Board of Kenya o Horticultural Crops Development Authority o Kenya Sisal Board o Cotton Board of Kenya o Kenya Sugar Board o Kenya Plant Health Inspectorate Service o Pest Control Products Board o National Tea Zones Development Corporation
•
Research and Training Corporation (4) o Coffee Research Foundation o Tea Research Foundation o Kenya Agricultural Research Institute o Kenya Sugar Research Foundation
However, only a few of these receive funding from the Treasury as indicated in the table below.
51
Table 42: MOA – Proposed Transfers to State Corporations, 2006/07 – 2008/09 State Corporation Kenya Agricultural Research Institute PCPB KEPHIS Total for State Corporations Source: MOA
Proposed Allocations (Ksh) 2006/07 2007/08 2008/09 1,551,406,500 1,628,976,825 23,187,461 24,346,834 88,352,322 90,419,939 1,662,946,283 1,743,743,598
1,628,976,825 25,360,000 92,520,000 1,746,856,825
2. Livestock and Fisheries Development The following is the list of state corporations in the Ministry of Livestock and Fisheries Development: • • • •
Kenya Marine Fisheries Research Institute (KEMFRI) Kenya Dairy Board (KDB) Central Artificial Insemination Service (CAIS) Kenya Meat Commission (KMC)
Table 43: MOLFD – Proposed Transfers to State Corporations, 2006/07 – 2008/09 State Corporation KEMFRI KDB CAIS KMC TOTAL Source: MOLFD
2006/07 308,819,336 20,320,950 15,546,194 120,000,000 464,686,480
Proposed Allocations (Kshs) 2007/08 2008/09 308,819,336 308,819,336 20,320,950 20,320,950 15,546,194 15,546,194 120,000,000 120,000,000 464,686,480 464,686,480
3. Cooperatives Development and Marketing The Ministry has two state corporations, namely: The Cooperative College of Kenya and the New KCC Ltd that was recently acquired by Government on transitory arrangement. However, it is only the Cooperative College of Kenya that is supported through the GoK budget under the Ministry. The Ministry proposes to allocate the amounts indicated below to the college for the period 2006/07 to 2008/09 Table 44: MOCDM – Proposed Transfers to State Corporations, 2006/07 – 2008/09 State Corporation: Cooperative College of Kenya Recurrent Development Total Source: MOCDM
52
Proposed Allocations (Kshs) 2006/07 2007/08 60,894,143 66,983,557 52,000,000 63,000,000 112,894,143 129,983,557
2008/09 73,681,913 11,000,000 84,681,913
4. Lands The Ministry has no State Corporation attached to it. 5. Environment and Natural Resources There are two state corporations under the Ministry, namely: the National Environment Management Authority (NEMA), and the Kenya Forestry Research Institute (KEFRI). Below are the resource requirements for the two corporations for 2006/07 – 2008/09. Table 45: MENR – Proposed Transfers to State Corporations, 2006/07 – 2008/09 Head / Corporation 215-736 NEMA
211-646 Forestry Research Institute Headquarters
Activities Support to District Environmental Management Programme
Improvement of KEFRI Research and outstations
Proposed Allocations (Kshs) 2006/07 2007/08 2008/09 10,307,918.00 43,110,814.00 45,266,355.00
43,609,880.00
79,903,772.00
83,898,960.00
53,917,798.00
123,014,586.00
129,165,315.00
Forestry Research Environmental Project (FORREMS) Arid and semi-arid project (ARIDSAK) Agro forestry network for Eastern and Central Africa (AFRENA) Acacia Operation Support to Food Security Poverty Alleviation Tree seed Technology Improvement `Information Dissemination Strengthening the production and quality control of gums and resins Management and Control of prosopis
Total Source: MENR
6. Regional Development Authorities There are six Regional Development Authorities under the Ministry. They are: a) Kerio Valley Development Authority b) Tana & Athi Rivers Dev. Authority c) Lake Basin Dev. Authority d) Ewaso Ng’iro South Dev. Authority e) Coast Dev. Authority f) Ewaso Ng’iro North Dev. Authority The tables below show the proposed allocations to the RDAs for both recurrent and development expenditures.
53
Table 46: MRDA – Proposed Transfers to State Corporations (Recurrent), 2006/07 – 2008/09 Head
Authority 2006/07
455
707
989
992
993
994
Kerio Valley Development Authority Grants to Kerio Development Authority Tana & Athi Rivers Dev. Authority Grants to Tana & Athi Rivers Development Lake Basin Dev. Authority Grants to Lake Basin Development Authority Ewaso Ng’iro South Dev. Authority Grants to Ewaso Ng’iro South Development Coast Dev. Authority Grants to Coast Development Authority Ewaso Ng’iro North Dev. Authority Grants to Ewaso Ng’iro North Development
Total sub vote 093 Source: MRDA
Proposed Allocations (Kshs) 2007/08 2008/09
95,977,711
97,977,711
110,000,000
132,607,532
135,000,000
145,000,000
109,356,381
110,000,000
129,845,000
24,892,712
27,142,592
35,652,518
41,314,904
43,200,000
48,615,000
29,066,237
64,636,060
56,000,000
433,215,477
477,956,363
525,112,724
Table 47: MRDA – Proposed Transfers to State Corporations (Development), 2006/07 – 2008/09 Head
Proposed Allocations 2007/08 83,242,825
2008/09 85,870,120
455
KVDA
2006/07 75,035,000
707
TARDA
91,000,000
140,000,000
165,700,000
989
LBDA
38,045,000
45,117,250
54,668,200
992
ENSDA
42,380,000
51,410,500
53,166,250
993
CDA
83,540,000
110,220,600
120,320,600
994
ENNDA
462,000,000
749,080,000
935,680,000
Total
792,000,000
1,179,071,175
1,415,405,170
Source: MRDA
54
Authority
ANNEX III: LIST OF DEVELOPMENT PROJECTS AND PROPOSED ALLOCATION 1. Agriculture Table 48: MOA – Development Projects and Proposed Allocations Head
Activities
190 198 229 247 258 259 260 261 225 237 502 759 760 761 763 764 765 246
HQs Admin & Planning Serv Dev't Planning Services (ASCU) Agric Technology Dev. Stations Land Dev. and Machinery Services Embu Agric. Staff Training College Bukura Agric. College FTCs Kilifi Inst. Of Agriculture Integrated Dev. Progr. (ASPS) Hort Crop Prod Services Food Security programme (KSPFS) KARI (KAPP included) Soil & Water Mgt Research National Hort Research Prog. Veterinary Research Range and Arid Land Research Animal Prod Research National Agriculture and Livestock Extension Programme (NALEP) National Extension Project LVEMP
271 698 190
Status Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing 5% 5% 1% 61% 2.5% 25%
2.5%
Construction of Kilimo House Annex
190
98% 0%
260,017,972 141,780,000 257,029,213
287,022,258 144,615,600 258,828,418
287,022,258 144,615,600 258,828,418
500,000,000
200,000,000
-
250,000,000
-
-
185,000,000
185,000,000
185,000,000
5,579,964,539
5,432,576,072
5,505,403,953
0% Construction of KESREF office
246
Resource Requirements (Kshs) 2006/07 2007/08 2008/09 25,540,000 0 0 27,280,000 30,008,000 32,540,000 16,386,677 21,651,611 21,458,000 419,997,390 423,086,265 422,086,265 16,885,000 17,229,250 7,229,250 26,000,000 26,800,000 16,800,000 591,160,000 594,383,200 594,383,200 11,890,000 11,984,500 1,984,500 317,814,763 326,360,508 327,850,000 267,192,706 619,969,450 619,969,450 730,964,080 732,512,284 732,512,284 1,239,424,479 1,264,212,968 1,564,212,968 13,885,300 14,499,950 14,499,950 171,644,384 161,312,600 161,312,600 46,045,891 48,665,686 48,665,686 5,826,608 5,415,897 5,415,897 58,200,076 59,017,627 59,017,627
NALEP, GoK – construction of offices in districts and locations
0%
Total Source: MOA
2. Livestock and Fisheries Development Table 49: MOLFD (Livestock Production Department) – Development Projects and Proposed Allocations Sub-Vote191 Head ACTIVITIES
Proposed Allocations (Ksh) 2006/07
631 Monitoring and Evaluation of projects and programmes 224 Coordination and management of extension activities at the Province
232 Delivery and supervision of livestock extension services 266 Maintenance and management of livestock improvement farms
55
2007/08
2008/09
6,280,000
6,579,600
5,680,000
24,910,377
35,954,104
32,560,000
224,291,569
276,791,978
281,000,000
32,840,000
23,738,800
21,000,000
280 Monitoring of food security
26,420,000
76,869,400
76,830,000
291 Strengthening quality control for honey
35,202,340
35,566,504
34,356,00
407 Maintenance and commercialization of Animal production farms
21,770,000
20,593,900
18,000,000
408 Coordination of rural dairy services.
26,566,435
27,026,085
20,560,000
451 Coordination and Management of range areas and resources
16,261,352
15,559,647
15,560,000
462 Human resource development
4,815,000
5,152,050
6,420,000
463 Training of pastoralists at Narok P.T.C
4,926,000
4,060,820
3,820,000
465 Training of pastoralists at Griftu P.T.C
3 ,926,535
3,061,392
466 Training of pastoralists at Isiolo Mobile P.T.U
2,785,557
2,910,546
3,236,000
26,050,000
27,173,500
24,230,000
4,350,620
4,560,000
473 Dairy Training School – Naivasha 474 Livestock Sector Information Support Services
4,066,000
477 Coordination of Livestock Extension activities.
4,066,000
4,350,620
4,420,000
478 Quality control of livestock feeds, breeds, produce, products and inputs
3,424,000
3,663,680
3,556,000
543 Coordination of beekeeping services and promotion of honey refineries.
3,852,000
4,121,640
4,060,450
10,800,000
10,800,000
10,800,000
1,360,000,000
1,500,000,000
430,678,591
245,093,534
255,572,262
51,815,563
110,755,448
72,838,708
1,848,041,518
2,458,793,740
National Dairy Development Project 424 491 Smallholder Dairy Commercialization Programme 491 ASAL Based Rural Livelihoods Project
Total
2,691,573,114
Source: MOLFD Table 50: MOLFD (Veterinary Services Department) – Development Projects and Proposed Allocations Sub vote 193 Head
Activity
445 & 446
Meat Inspection and Hides and Skins Improvement
481 & 549
Veterinary Laboratory Services
2006/07 146,631,872
2007/08
2008/09
151,589,608 207,340,234 58,999,875
57,105,148 467, 468, 471 & 472
56
87,105,148
85,054,387
290
Training institutions. AHITI-Ndomba Nyahururu Kabete and MTI Athi River Artificial Insemination Services
98,340,590
45,813,586
66,629,017
55,813,586
426
Tick Control Services
54,983,417
56,859,251
64,983,417
145,054,387
447
Tsetse & Trypanosomes Control
431, 432, 437, 448, 551, 552 & 553 Total
Livestock Diseases Control (strengthening Animal Health Delivery Systems)
30,471,983
781,442,245
41,805,183
881,442,245
796,394,164
1,211,502,638
106,471,983
1,280,617,688
1,548,211,000
Source: MOLFD Table 51: MOLFD (Fisheries Department) – Development Projects and Proposed Allocations Head 534 532 533
Activity Improvement of landing sites Fish quality assurance Monitoring Control &Surveillance (MCS) Fish farming development
Sub vote 192 2006/07 314,000,000 117,500,000 423,800,000
2007/08 206,000,000 121,499,000 509,600,000
2008/09 326,374,960 181,499,000 396,225,040
43,500,000 898,800,000
73,875,960 910,974,960
113,875,960 1,017,974,960
537 Total Source: MOLFD
3. Cooperatives Development and Marketing Table 52: MOCDM – Development Projects and Proposed Allocations DISTRICT
2004/5
2005/6
2006/7
TOTAL COST
1,542,795.00
-
572,000.00
2,114,795.00
750,000.00
-
750,000.00
1,500,000.00
1.
Renovation of Office Buildings; Malindi
2.
Construction of Office Buildings Non Residential; Moyale
3.
Construction of Office Buildings Non Residential; Nyeri
1,500,000.00
-
1,200,000.00
2,700,000.00
4.
Construction of Office Buildings Non Residential Tharaka
1,000,000.00
-
500,000.00
1,500,000.00
5. 6.
Construction of Office Buildings Non Residential Siaya Construction of Office Buildings Non Residential Rachuonyo
-
2,500,000.00
2,500,000.00
1,200,000.00
900,000.00
-
2,100,000.00
7.
Construction of Office Buildings Non Residential Gucha
-
1,930,000.00
-
1,930,000.00
8.
Construction of Office Buildings Non Residential Koibatek
-
2,500,000.00
-
2,500,000.00
9. 10.
Construction of Office Buildings Non Residential Marakwet Construction of Office Buildings Non Residential Trans Mara
1,010,000.00
-
-
1,010,000.00
1,000,000.00
-
-
1,000,000.00
-
1,400,000.00
1,600,000.00
3,000,000.00
4,600,000.00
4,600,000.00
11. 12.
(Renovation of office building)Tana River Construction of Office Buildings Non Residential PCO North Eastern Province
-
13.
Construction of Office Buildings Non Residential Ijara
1,500,000.00
100,000.00
0
1,600,000.00
14.
Construction of Office Buildings Non Residential Teso
-
-
3,000,000.00
3,000,000.00
15.
(Renovation of office building)Butere Mumias
-
750,000.00
-
750,000.00
16.
Construction of Office Buildings Non Residential Bondo
1,200,000.00
400,000.00
530,000.00
2,130,000.00
17.
Construction of Office Buildings Non Residential Laikipia
1,150,000.00 1,500,000.00
183,000.00
2,833,000.00
18. 19.
Rehabilitation of office building: Nandi North Construction of Office Buildings Non Residential Nandi South
1,000,000.00
2,500,000.00
-
3,500,000.00
-
2,250,000.00
-
2,250,000.00
-
833,280.00
750,000.00
1,583,280.00
20.
57
(Renovation of office building)Kitui
21.
(Renovation of office building)PCO Nyanza
600,000.00
-
-
600,000.00
22.
(Renovation of office building)Kiambu
-
551,733.00
-
551,733.00
23.
(Renovation of office building)Thika
-
-
800,000.00
800,000.00
24.
(Renovation of office building)Turkana
-
-
300,000.00
300,000.00
25.
(Renovation of office building)PCO Coast
-
-
5,000,000.00
5,000,000.00
26.
(Renovation of office building)PCO Rift valley
-
-
1,000,000.00
1,000,000.00
27.
(Renovation of office building)Kakamega
-
500,000.00
-
500,000.00
28.
(Renovation of office building)Bungoma
-
-
2,660,000.00
2,660,000.00
29.
(Renovation of office building)Vihiga
1,500,000.00
-
500,000.00
2,000,000.00
30.
(Renovation of office building)Isiolo
31.
Construction of Office Buildings Non Residential Suba
32.
Construction of Office Buildings Non Residential Kericho
33.
Construction of Office Building Non Residential Mbeere
2,500,000.00
2,500,000.00
34. 35.
Construction of Office Building Non Residential Kwale Headquarters. General Planning & Administration Services(Renovation of office building)1 Cooperative College of Kenya Development Projects
1,052,000.00
1,052,000.00
36.
TOTAL
500,000.00
500,000.00
-
1,209,060.00
1,209,060.00
1,300,000.00
557,868.00
1,857,868.00
10,000,000.00 28,000,000.00
10,000,000.00 23,029,991.00
25,000,000.00 45,000,000.00 52,000,000.00 103,029,991.00
54,252,795.00
51,411,932.00 106,997,000.00 212,661,727.00
Source: MOCDM
4. Lands Table 53: MOL – Development Projects and Proposed Allocations Activities
Proposed Allocations (Ksh) 2006/2007
2007/2008
2008/09
20,000,000
50,000,000
50,000,000
Settlement Programme and provision of infrastructure 200,000,000
200,000,000
200,000,000
Integrated Land and Urban Sector Programmme
2,000,000
2,000,000
Provision of basic physical infrastructure settlement 25,000,000 schemes
25,000,000
30,000,000
Creation of National Spatial Data Infrastructure
150,000,000
100,000,000
150,000,000
Upgrading of Survey Plant and Equipment
50,000,000
50,000,000
50,000,000
Construction of New office Block for national 70,000,000 Cadastral Database and NSDI and Rehabilitation of District Registries Preparation of Structure, Regional and other land use 53,000,000 plan and standards Capacity Building through Kenya Institute of 104,000,000 Surveying and Mapping
70,000,000
70,000,000
52,000,000
52,000,000
104,000,000
107,000,000
Total Development
653,000,000
711,000,000
Modernization and Storage of land information
3,000,000
675,000,000
Source: MOL 1
Provisional Kshs. 15,000,000 is made in respect of construction of Prefab Offices for the new districts
58
5. Environment and Natural Resources Table 54: MENR – Development Projects and Proposed Allocations Head 210-670 Headquarters Administrative services 210-698 Lake Victoria Environmental Management Project 210-885 Central Planning and Project Monitoring Unit
211-646 Forestry Research Institute Headquarters
672-265 Mt. Elgon Forest Conservation Development Project 672-National Facility Programme 672-283 ArabukoSokoke Forest Conservation and Management 672-285 Aberdare Forest Resource and Wildlife 672-286 Forest Rehabilitation Environmental Management Strengthening 672-400 Construction of Building NonResidential 672-301 Information Communication Technology Capacity 675-400 Construction of Building Non-residential 681-430 Construction of Bridges, Ferries and Jetties 738 – 288 Drylands Forest Resource Conservation and Management 738-299 Intensified Social Forestry Project in semi-Arid lands
59
Activities Co-ordination of NEPAD Environment Activities Contributions to EAC Secretariat Implementation of LVEMP II
Proposed Allocations (Ksh) 2006/07 2007/08 2008/09 57,000,000 58,000,000.00 59,535,000 42,000,000
94,500,000.00
99,225,000
Data collection and Information dissemination on Water Weeds in the country Capacity building for officers involved in management of information and data. Developing Community Action Plans Improvement of KEFRI Research and outstations Forestry Research Environmental Project (FORREMS) Arid and semi-arid project (ARIDSAK) Agro forestry network for Eastern and Central Africa (AFRENA) Acacia Operation Support to Food Security Poverty Alleviation Tree seed Technology Improvement `Information Dissemination Strengthening the production and quality control of gums and resins Management and Control of prosopis
17,100,000
17,955,000.00
18,852,750
43,609,880
79,903,772.00
83,898,960
- Rehabilitation of Degrades sites, - Community sensitization, - Conservation and sustainable utilization of forest resource and - Development of ecosystem plan - Sensitization on PFM - Improved planning skills
22,555,000
51,324,000
53,890,200
1,500,000
1,575,000
1,653,750
6,800.000
7,140,000
7,497,000
17,000,000
50,702,688
53,237,822
- Rehabilitation of Degraded sites - Boundary realignment - Sensitizing the community - Fence construction within the forest boundary - Tree planting and rehabilitation of sites - Forest Guards training and Forest Policing - Promote agro forestry - Develop, guidelines and plans for participatory for management - Staff training and support to operation - To complete 4 district offices - Commence construction of KFS headquarters and renovation of district and conservancy offices - Establishment of database for Forest Department - Establishment of GIS database To renovate dormitories and convert them to barracks for paramilitary training of forest guards. Rehabilitation of forest roads for better access
Research studies Reforestation Dryland development Baseline survey Prepare Forest Extension guidelines Training of staff and farmers on better forestry
211-748 Forest Inspection Patrol Unit 938-261 Rehabilitation of Degraded sites in Turkana District 938-262 Development of Conservation and Demonstration Plots 212-692 Mineral Survey and Exploration
214-219 Department of Resource Survey and Remote Sensing 215-611 Climate Change enabling activities 215- 612 Institutional Strengthening to Management of Ozone Depleting Substances 215-702 Environment management and Protection 215-736 NEMA
management techniques Facilitate network among farmers Identify appropriate indigenous knowledge Training of Forest Guards, provision of uniforms, firearms and General Patrol of the Forest Community Training and Sensitisation on Environmental conservation Establishment of wood lots Rehabilitation of Turkwell river bank Support to Community Action Plan Rehabilitation of tree nurseries Woodlots establishment -Review and enactment of New Minerals and Mining Law - Carry out geological surveys and Mineral exploration in Western, Eastern, Rift Valley and Coast Provinces Modernize Dept’s laboratories Set up GIS-based Geoscientific database Rehabilitate disused Mines and Quarries Rehabilitate Madini House Conduct Geohazard mapping in Areas prone to geohazard in Central Kenya Replacement of field motor vehicles
10,000,000
10,500,000
11,025,,000
12,000,000
12,600,000
13,230,000
66,693,850
70,693,938
75,728,634
40,000,000
42,000,000
44,100,000
4,500,000.00
4,725,000.00
4,961,250
5,900,000
6,195,000
6,504,750
Community Development for Environmental Management Programme
88,033,352
92,435,020
97,056,771
Support to District Environmental Management Programme National Environment Action Plan Development and testing of tools for the implementation of environmental management and coordination Act Partnership in environment Law and institution in Africa (PADELA)
10,307,918
43,110,814
45,266,355
445,000,000
632,870,732
675,663,242
Environmental Information management system; Forest cover mapping Aircraft purchase Climate Change enabling activities Institutional Strengthening to Management of Ozone Depleting Substances
Total MENR
Source: MENR
6. Regional Development Authorities Table 55: MRDA – Development Projects and Proposed Allocations Name of the project
% Completed
1. TARDA (a) Thanantu Valley Irrigation Project (b) Catchment Conservation/Dam monitoring (c ) Tana Delta Rice Project (d) Kiambere Irrigation Project 2.CDA (a) Coastal Micro-Enterprise Development Programme (b) Fisheries Development (c) Coastal Marine Ngomeni/ Malindi Community
60
60%
Estimates cost to completion plus any pending bills 7.5 Million
Source of Funding GoK
80% 30% 70% 60%
85 Million 282,000 5 Million 34Million
KENGEN Japna Italy USAID
40% 40% (2005/06)
3Million 16.5Million 1Million
USAID USAID Italy
Name of the project
3. ENSDA (a) Horticultural Development (b) Water Supply Studies and Dev. (c) Livestock Development (i) Catchment conservation & Rehabilitation 4 .ENNDA (a) Natural Resource Studies & Development (b) Livestock Development (c ) Mineral Resource Survey (d) Dam Construction (e) Catchment Conservation & Rehabilitation Programme KVDA (a) Planning and feasibility studies (b) Catchment Conservation and dam construction (c) Chemelon integrated programme (d) Tot project (e) Construction of infrastructure (livestock, bee keeping and fisheries) (f) Kinyach/Arror project (g) Sigor Wei Wei integrated programme
Lake Basin Development Authority Effluent monitoring and health surveillance Kuja river multipurpose dam Regional Development Studies Tile and Bricks manufacture Construction of water supply and sewerage Catchment rehabilitation Water resource data base Flood control and drainage Sondu river Irrigation project Kimira/Oluoch Horticultural Development Source: MRDA
61
% Completed
Estimates cost to completion plus any pending bills 0.65Million
Source of Funding GoK
40% 45% 30% 20%
1.3Million 0.82Million 1.2Million 21 million
GoK GoK
30% 20% 15% -
10 million 0.29 million 5 million 4 million
ADB GoK ADB ADB
10%
162,400
GoK
7 million
KENGEN
0.43 million 1.1 million 0.60 million
GoK GoK GoK
1.1 million 35 million
GoK Italy
2.8 million
GoK
0.1 million 0.1 million 1 million
GoK GoK GoK
0.6 million 1.4 million
GoK GoK
0.5 million 0.7 million 0.38 million 0.84 million 1.4 million
GoK GoK GoK GoK GoK
30% 40% 30% Phase 1 and 2 completed. Phase 3 is 20% complete. 40% complete
30% complete 70% Complete
20%
ADB
ANNEX IV: LIST OF PENDING BILLS 1. Summary of Pending Bills for the Sector Table 56: Pending Bills for the ARD Sector MINISTRY Agriculture Livestock and Fisheries Development Lands Environment and Natural Resources Cooperative Development and Marketing Regional Development Authorities TOTAL
Amount in Kshs. 641,023,689.10 48,833,406.00 412,442,841.90 48,699,629.25 3,083,637.50 1,104,512,213.70 2,258,595,417.45
As reflected in the table above, the ministries in the Sector have over the years accumulated total pending bills of Ksh 2,258,595,417.45 (as at 31st December 2005). A brief description of the pending bills for each ministry is as indicated below. 2. Agriculture The Ministry of Agriculture has total pending bills of Kshs. 641 million mainly relating to accrued arrears of unremitted dues to International Organizations. The amount owed to International Organizations has accumulated over time due to arrears carried forward. The breakdown of the pending bills for the MOA is as follows: Table 57: MOA - Pending Bills
1 2 3 4 5
Description Desert locust central organization (DCLD) International Fund for Agricultural Dev. (IFAD) International Red Locust Central Org. (IRLCO) Common Fund Commodities (CFC) Food Agricultural Organization (FAO) Total
Amount in Kshs. 455,776,233.90 77,257.810.65 54.868,307.65 48,761,113.40 4,360,173.40 641,023,689.10
Source: MOA
There have also been other unpaid bills owed by the Ministry for various goods and services. These were forwarded to the Government Bill Verification Task Force but were not validated and are thus not payable. 3. Livestock and Fisheries Development The Ministry of Livestock and Fisheries Development had pending bills totalling to Kshs 48,833,406 as at 30th June 2005. Of these, Kshs 34,931,358 are related to the Development Vote with Kshs.13, 902,048 being under the Recurrent Vote. These Bills arose out of lack of liquidity (in case of 2004/05 transactions) and lack of provision (in cases carried forward from previous years). The Pending Bills are summarized in the table below.
62
Table 58: MOLFD – Pending Bills
Bill owed to Department Veterinary
Livestock Production
Fisheries
Telkom Private companies Officers per diem Telkom KLPC Staff per diem/air ticket Water Kenya Ports Authority Kenya Navy Private Companies/person
Amount
Total
1,248,000 5,930,024 35,024 4,753,649 243,050 1,189,085 227,797 5,957,296 28,291,034 6,830,280
7,213,048
6,689,000
34,931,358 48,833,406
Grand Total (MOLFD) Source: MOLFD
4. Cooperatives Development and Marketing The Ministry recently indicated in 2004/5 Appropriations Accounts outstanding bills of Kshs. 3,313,637.50. These are bills that were incurred on both utilities and development projects expenditure and were outstanding as at 31st December 2005.
1. 2. 3. 4.
Table 59: MOCDM - Pending Bills Payee 2003/04 FY Recurrent R22 Justus Kiago Outstanding Payments to Cooperative Tribunal Members Kenyatta International Con. Centre Pc Nairobi Area
2004/05 FY Amount 159,500.00
2005/06 FY Amount 30,000.00
40,000.00 2,391,019.70
5.
Kenya Tech Teachers College Sub-Total Development D22 6. Renovation of Machakos Office 7. Renovation of Bungoma Offices 7. M/S Syabon Construction Co. Ltd in respect to Renovation of Busia District Offices Sub-Total Grand Total Source: MOCDM
5. Lands Recurrent pending bills (None)
63
-
2,590,519.70
117,260.00 117,260.00
65,000.00 65,000.00
0 -
345,857.80
2,590,519.70
475,857.80 593,117.80
130,000.00 130,000.00
Table 60: MOL – Pending Bills (Development) Sub vote
Head
360-General
Project / Contractor
2001/ 2002
2002/ 03
2003/ 04
Amount
Amount
Amount
8,454,421
8,454,421
0
148,417,706.60
148,417,706.60
0
- Neliwa builders
116,652,801.79
116,652,801.79
0
- Jupiter Electrical
38,196,178.30
38,196,178.30
0
- Otieno Odongo & Partners
90,516,447.25
90,516,447.25
0
5,000,000
5,000,000
5,205,287
407,237,554.94
407,237,554.94
5,205,287
026- Headquarters KERICHO ARDHI HOUSE
Admin. &
- Neliwa builders
Planning
- Sigma Engineering DANDORA PROJECT
364- Lands
District Land
Department
Offices
INTECH EAST AFRICA
Total
Source: MOL
The pending bills have remained the same since 2003/04 and have not been paid as the Pending Bills Verification Task Force examined and disputed them. They however stand at levels reflected in the previous year. It is recommended that extra budget resources be provided to clear the pending bills and terminate the projects. 6. Environment and Natural Resources As at December 2005, the Ministry of Environment and Natural Resources had a total of pending bill amounting to Ksh 48,800,099.25. The pending bills are mainly from the recurrent vote amounting to Ksh 47,919,713.00 while the remaining balance of Ksh 880,386.25 is from the development vote. Most of these bills resulted from liquidity problems experienced at the end of the Financial Years. The table below gives the breakdown: Table 61: MENR – Pending Bills Head Item And Name Recurrent Vote(R21) 670 130 - Official Entertainment
64
Contractor Payee
Amount
Date
Garden Hotel
18,689.00
2/19/2000
191 - Monitoring and Evaluation Expenses
Sciencescope
3,600.00
3/26/2000
182-Payment of Rents and Rates-NonResidential
Kencom House Ltd.
3,317,593.00
4/1/2000
172- Purchase of uniforms and clothing
Sajtex Garments
5,750.00
1/25/2001
172- Purchase of uniforms and clothing
Sajtex Garments
4,750.00
1/25/2001
190- Miscellaneous other charges
National Social Security Fund
216,559.20
1/16/2001
Head Item And Name
Contractor Payee
190- Miscellaneous other charges
East African Elevators Co.
174-Purchase of Stationery
Uriati Enterprises
190- Miscellaneous other charges
M/s C. K. Patel Ltd.
Amount
Date
82,014.55
3/30/2001
4,500.00
6/25/2001
92,000.00
1/2/2002
Kenya Motors Garage
4,690.00
5/17/1999
100- Transport operating expenses
BOC Gases Kenya Ltd.
9,370.00
4/1/2000
100-Transport operation expenses
Kiambu Service Store
95,280.30
4/15/2002
Exel service station
48,000.00
4/18/2002
676 100- Transport operating expenses
679 100- Transport operating expenses
Sub-total
3,902,796.05
B. UTILITIES 670 121- Telephone expenses
Communication Commission of Kenya
190- Miscellaneous other charges
City Treasurer
121- Telephone expenses
Communication Commission of Kenya
141- Water and Conservancy expenses
Natural Water Conservation and Pipeline Corp.
152,779.00
8/8/2002
10,530.00
04/08/200
1,042,130.90
9/26/2001
73,500.00
3/27/2003
674 141- Water and Conservancy expenses
General Manager, Nakuru Municipality
440,279.90
3/30/2001
887 Water and Conservancy expenses
Nyahururu Municipal Council
100,470.00
27/2/2003
676 141- Water and Conservancy expenses
Nyeri Water and Sewerage Co. Ltd.
11,502.20
5/16/2000
121- Telephone expenses
M/s Telcom Kenya Ltd
76,729.95
6/12/2002
121- Telephone expenses
M/s Telcom Kenya Ltd
81,172.70
8/14/2002
140- Electricity Expenses
M/s Kenya Power and Lighting
42,655.20
6/5/2002
140- Electricity Expenses
M/s Kenya Power and Lighting
6,963.80
8/15/2002
50,287.40
4/23/1999
141,492.20
1/25/2003
679 140- Electricity Expenses 140- Electricity Expenses
Nyeri Water and Sewerage Co. Ltd. M/s Nakuru Water and Sewerage Sub-total
2,230,493.25
C. Inter-Government Bills 670
65
174- Purchase of Stationery
OI/C Supplies Branch
451,448.60
1/18/2000
Head Item And Name
Contractor Payee
Amount
Date
110- Travelling and Accommodation Expenses
P/S Foreign AffairsNairobi
29,920.00
6/5/2000
174- Purchase of Stationery
M/s supplies Branch (PWH)
566,519.50
6/15/2001
198-Compensation and Ex-gratia payments
Attorney General
3,934,418.70
6/15/2001
112- External Travelling and Accommodation Exp.
NEMA (Northline Travel)
178,485.00
6/14/2002
672
140- Electricity expenses
District Water Engineer
40,815.00
6/15/2001
676
121- Telephone expenses
Provincial Commissioner
68,776.50
6/5/2000
141- Water Conservancy expenses
Kitale Water Company Ltd
28,490.00
6/5/2000
141-Water Conservancy expenses
District Water Engineer
10,900.00
Jul-00
140- Electricity expenses
Provincial Commissioner-Nyeri
24,458.95
1/23/2001
141- Water Conservancy expenses
Provincial Commissioner-Nyeri
50,623.00
1/23/2001
141-Water Conservancy expenses
Provincial Commissioner-Nyeri
51,019.00
1/23/2001
140- Electricity expenses
Provincial Commissioner-Nyeri
30,672.70
8/13/2001
121- Telephone expenses
Provincial Commissioner
68,776.50
8/13/2001
121- Telephone expenses
Provincial Commissioner
68,776.50
5/7/2002
121- Telephone expenses
Provincial Commissioner
71,712.90
1/16/2003 8/11/2000
679
150- Purchase of supplies for production Supplies Branch
58,562.40
681
001- Personal Emoluments (Casual workers)
17,686.00
Road superintendent Sub-total
5,752,061.75
D. International Organizations 370-Regional Seas programme
D21
66
Development in nature
Regional Seas Programme
36,034,362
Sub-Total
36,034,362
Head Item And Name
Contractor Payee
611
301/2- Climate Change Enabling Activities
Trade Point Stationers
612
312/3- Institutional Strengthening to manage Ozone Depleting Substances
Telkom Kenya
676
220-6- Purchase of Plant and Equipment Supplies Branch
Amount
Date
21,932.00
6/29/2001
559,504.80
Apr-02
9,399.75
6/2/1998
100- Transport Operation Expenses
M/s Nyahururu Total Service Station
124,000.00
2/4/1998
672
285/3- Aberdare Forest Resource and Wildlife
M/s Njeru Building Contractors
144,549.70
4/4/2001
672
285/5 – Supplies and stationary
Kwanyaland Garage
21,000.00
14/6/2002
Sub-total TOTAL MENR
880,386.25 48,699,629.25
Source: MENR
7. Regional Development Authorities Table 62: MRDA – Pending Bills
1 2 3 4 5 6
Head/Regional Development Authority 989 LBDA 992 ENSDA 455 KVDA 994 Ewaso Ng'iro North Development Authority 707 TARDA 993 Coast Development Authority Total
Source: MRDA
67
Amount in Kshs. 875,269,513.25 6,585,177.00 21,907,454.10 1,224,551.10 178,422,030.32 21,103,488.00 1,104,512,213.77
ANNEX V: LIST OF COMPLETED PROJECTS IN THE SECTOR SINCE THE BEGINNING OF MTEF IN 2001/02 1. Agriculture o o o o o o
KEPHIS – Purchase of new office block at Karen. Grain Storage and Handling – payment of NCPB for commercialization completed. Agricultural Sector Support project (ASSP) Tissue Culture Project – Coffee research Foundation. NALEP Phase I National Extension Project (NEP)
2. Livestock and Fisheries Development MOLFD – List of Completed Projects Since 2002/03 Project Name 1. PACE (Pan African Control of Epizootics
Location
2. Small Holder Dairy Project
Narok, Nairobi, Machakos, Muranga, Nyeri, Kirinyaga, Nyandarua, Nakuru, Nakuru, Nandi, Kisii, Nyamira, Rachuonyo, Vihiga, Bungoma, Kakamega Busia, Bungoma, Teso Bondo, Siaya Lake Victoria Region, Kenya Sagana Fish Farm, Kirinyaga District Ndaragwa Trout Farm, Nyanadarua
3. Farming in Tsetse Control Areas (FITCA)
4. Lake Victoria Enviroment Management Programm (LVEMP) 5. Rehabilitation of Fish Ponds
6. Development of fish ponds Source: MOLFD
68
Countrywide
Year Started 2000/01
Year of
Total cost of the project
Completion (Original/Revised) Kshs. 2006
Source of Funds
Original 274,192,072
Revised -
EEC/EDF
1997
2005
3,000,000 421.5 M
421.5 M
GOK/VSDF DFID/GOK
1999
2004
320 M
320 M
EC/GOK
Jan. 2003
Dec. 2005
50,600,000
54,000,000
WORLD BANK
2000
2005
5,450,000
-
GOK
2000
2005
2,700,000
-
GOK
3. Cooperatives Development and Marketing Table 63: MOCDM – List of Completed Projects since 2002/03 (A) Programme/Activity
Expected output
Revised 2002/2003 Gross
Livestock Development Project (LDP)2:
Computerization of Agricultural Cooperatives and Emerging Producer Associations in Kenya - Pilot Project by FAO:3 Source: MOCDM
Increased milk production, streamlining of milk marketing through Cooperatives, Increased income, Empowerment of women farmers, Divesting equipment procurement to beneficiaries, Monitoring and evaluation. IT skill inventory established; Computer skills acquired; System developed & tested; Information needs identified; MIS developed and promoted
2003/2004 Donor
Net
48,000,000
-
13,000,000
1,300,000
Table 64: MOCDM – List of Completed Projects since 2002/03 (B) Project Name
Year Started
Year of Termination
Total costs of the project (Original/Revised)
Renovation of Office Buildings: Lamu District Renovations of Office Buildings/ Meru South (Chuka) Renovation of Office Buildings: Nyandarua District Renovation of Office Buildings: Vihiga District Renovation of Office Buildings: Bomet District Construction of Office Buildings: Nyando Districty Renovation of Office Buildings: Nakuru District Construction of Office Buildings: Suba District Renovation of Office Buildings: Embu District Renovation of Office Buildings: Kisumu Construction of Office Buildings: Narok District Renovation of Office Buildings: Kuria District
2002/2003
2004/2005
Original 500,000
2003/2004
2003/2004
200,000
2002/2003
2004/2005
353,000
2003/2004
2004/2005
700,000
Revised 650,000
630,000
Expend/Commit. As at 31/9/2003 Kshs. Millions Cumulative Expend/Commit Exp. Commitment 300,000 125,000
Allocation in 2003/04 (Kshs)
100,000
200,000
70,000
60,000
130,000
-
350,000
700,000
150,000
300,000
250,000
350,000 2003/2004
2004/2005
300,000
2003/2004
2004/5
2,425,000
325,000
650,000
2003/2004
2003/2004
700,000
350,000
700,000
2003/2004
2004/5
1,959,000
2003/2004
2003/2004
1,500,000
550,000
250,000
2003/2004
2003/2004
630,000
669.130
86,000
2004/5
2,500.000
3,770,000
2003/2004
500,000
1989/90
2003/2004
656,870
1,500,000
219,560
250,000
500,000
1,000,000
2,000,000
219,560
439120
2 Livestock Development Programme: This project was implemented successfully with other departments in MOLFD during 2000/01-2002/03 at a total cost of Kshs.117 million (GOK) and Kshs 856 Million (FINIDA). The project ended on 30th June 2003.
3 Computerization of Agricultural Co-Operatives and Emerging Producer Associations Project: Status: Inception stage on pilot basis – 19th January, 2004: Target: Tulaga Farmers Co-operative Society Ltd: Project Cost: Approximately Kshs.20 million with Kenya Government contribution of 24% and Food and Agricultural Organizations of 76%.
69
Construction of Cooperative College Seminar Center: Co-operative College of Kenya Rehabilitation of Water Supply System: Cooperative College of Kenya; Strategic Plan & Curriculum Development Project: Cooperative College of Kenya;
1997/98
2005/6
36,000,000
2,773,576.40
30,000,000
30,000,000
2003/4
2004/5
3,000,000
-
1,000,000
1,000,000
2003/2004
2005/6
8,400,000
600,000
7,800,000
8,400,000
Source: MOCDM
4. Lands • Drafting of the National Land Policy • Establishment of Land Boards and their training • Phase I of the Settlement Programme for the poor landless 5. Environment and Natural Resources The following are the projects that have been completed under the Ministry since 2001/02. • Karura Forest Product Project (1995-july 2002) • Strengthening of the production of quality gums and Resins (July,2003-May,20050 • Social Forestry Extension Model Development Project in semi- Arid Areas (july,1997November,200) • Integrated Natural Resource Management in Ukambani (INRMU), (2002/03-2004/05) • Forestry based resource planning and management (1999/2000-2001/02) • Social Forestry Model (SOFEM) • Mt. Elgon forest Conservation Development project 6. Regional Development Authorities • Implemented catchment conservation programmes covering Upper Turkwel (KVDA), Upper Masinga/ Kiambere(TARDA) and Mau Complex (ENSDA). • Trained communities in afforestation and management in Kwale, Kilifi and Mombasa (CDA). • ENNDA has successfully negotiated for financial support from ADB to facilitate conservation programmes covering natural resource catchment areas in the Northern ASAL parts of the country • Initiated long range integrated Regional Development master plan for mapping resources and integrated coastal area management covering Mombasa and Kwale with regard to landing scaping, establishing of market centre, fish landing sight and development of fish depot in Kwale. • Provided clean drinking water to the local communities in Mwingi District through the support of Italian government. • Constructed 25 demonstration water tanks for communities in Kwale districts CDA. • Constructed Kimao water dam in Baringo district, one water pans in East Pokot, two water pans in Koibatek and piped water supply in Keiyo and Chemeron KVDA.
70
• Promoted high quality and certified seed production where wei wei supplies over 2 million kilograms of seed to Kenya seed company KVDA. • 1,200 ha in seed bulking for cane by TARDA and • Grown cotton seed in parts of Nyanza and Western province LBDA.
71
ANNEX VI: LIST OF PROPOSED NEW PROJECTS IN THE SECTOR 1. Agriculture Table 65: MOA - Proposed Programmes (100% GoK funded) Current Projected Resource Requirements
190Construction of Kilimo House Annex 190Construction of KESREF office NALEP, GoK – construction of offices in 246 districts and locations
Total
2006/07
2005/06
2006/07
500,000,000 250,000,000
200,000,000 -
-
185,000,000 935,000,000
185,000,000 385,000,000
185,000,000 185,000,000
Source: MOA
-
-
Under head 190, Kshs. 500 million is for construction of Kilimo Annex while another Kshs. 250 million have been allocated in 2006/07 for construction of KESREF office block and equipping the laboratories Under head 246, additional funding will be for construction of offices at the districts and locations to facilitate access to extension staff. Table 66: MOA - Proposed Programmes (Donor Funded) Current Projected Resource Requirements 2006/07 2005/06 2006/07
Promoting Farmer Initiative through FFS (UNDP thr` FAO)
5,000,000 170,000,000
5,000,000 201,000,000
5,000,000 246,000,000
Training in Farm Management and Marketing in Kenya-TCP FAO
10,000,000
11,000,000
9,000,000
Development of Community Agriculture in ASAL Areas-JICA
28,000,000
31,000,000
32,000,000
98,000,000 79,000,000 86,000,000 5,000,000 481,000,000
101,000,000 81,000,000 89,000,000 5,000,000 524,000,000
101,000,000 82,000,000 92,000,000 0 567,000,000
Integrated Rural Development Project in the Baringo Area
Small Holder Horticulture Empowerment Project-JICA Grant Assistance for Under-privileged farmers-JICA Western Kenya Integrated Ecosystem Man. Project – WB HIV/AIDS studies to identify effective entry points for the Ministry Total Source: MOA
2. Livestock and Fisheries Development Table 67: MOLFD - Proposed Projects (Donor Funded)
Project/Programme 191 Small holder Dairy Commercialization Project (IFAD) 191 ASAL Based Livestock and
72
2006/07 200,472,099
Amount (Kshs) 2007/08 200,472,099
2008/09 200,472,099
599,685,760
600,000,000
600,000,000
Rural Livelihoods Support Project (ADB) 193 PATTEC Programme (ADB) Total Source: MOLFD
67,000,000 867,157,859
80,000,000 880,472,099
85,000,000 885,472,099
Table 68: MOLFD – Proposed Programmes (New 100% GoK)
Project/Programme 192 Construction of fisheries headquarters 193 Rehabilitation of buildings (Vet training institutions) 190 Refurbishment of buildings and machinery (KMC) Total MOLFD: Grand Total (Donor Funded and 100% GOK Programes) Source: MOLFD
2006/07 185,723,373
Amount (Kshs) 2007/08 185,723,373
2008/09 -
48,097,766
78,496,145
-
120,000,000
120,000,000
120,000,000
353,821,139
384,219,518
120,000,000
1,220,978,998
1,264,691,617
1,005,4
3. Cooperatives Development and Marketing Table 69: MOCDM – Proposed New Projects Head Activity Target 708/709 Construction/Renovation of Improved office Office Buildings accommodation for (Provinces/Districts) field staff 711 Construction of Buildings of Improving College Physical facilities Cooperative College of Kenya: Offices and Library 711 Construction of Buildings of Improving College Cooperative College Physical facilities of Kenya: Lecture Theatres 711 ICT Development & Improving Member empowerment Capacity building Total Source: MOCDM
73
Resource Requirements (Kshs) 2006/07 2008/09 2007/08
12,424,073 15,000,000
25,762,000 38,186,073 30,000,000 2,000,000
0
24,000,000 2,000,000
5,000,000
5,000,000 5,000,000
32,424,073
84,762,000 47,186,073
4. Lands Activity 1
Integrated Land and Urban Sector Programme
2
Institutional Review and reformation in the Land Sub sector Creation of National Spatial Data Infrastructure Construction of New office Block for national Cadastral Database and NSDI and Rehabilitation of District Registries Archiving of land records in District Land Registries
3 4
5 6
Preparation of Structure, Regional and other land use plan and standards Total
Resource Requirements (Kshs) 2006/2007 2007/2008 3,000,000 2,000,000
2008/09 2,000,000
200,000,000
220,000,000
300,000,000
150,000,000
100,000,000
150,000,000
70,000,000
70,000,000
70,000,000
40,000,000
45,000,000
45,000,000
53,000,000
52,000,000
52,000,000
516,000,000
489,000,000
619,000,000
Source: MOL
5. Environment and Natural Resources Table 70: MENR – Proposed Projects Head / Programme 2006/2007 National Facility Programme 690-Titanium Mining Monitoring 690-Geohazard Mapping 690-Environmental Engineering Geology 690- Geodatic Mapping & Research 690-Library &Archival Development 690- community development for Environment management Programme TOTAL Source: MENR
Resource Requirements (Kshs) 2007/2008 2008/09 7,500,000 7,500,000 5,000,000 5,000,000 10,000,000 15,000,000 15,000,000 4,500,000
7,500,000 5,000,000 20,000,000 3,000,000
12,500,000 15,000,000
6,000,000 4,000,000
4,000,000 3,500,000
100,000,000
150,000,000
170,000,000
165,000,000
192,000,000
213,000,000
6. Regional Development Authorities Table 71: MRDA – Proposed New Projects, 2006/07 - 2008/09 Project/Programme LBDA Kimira Oluch Smallholder Dev Project Effluent Monitoring and health surveillance Fish Cool Storage Facility
74
Resource Requirements (Kshs) 2006/07 2007/08 6,000,000 500,000 4 ,000,000
6,300,000 525,000 4,200,000
2008/09 10,000,000 2,251,000 4,425,000
ENSDA Horticultural Development Integrated Development Programme (Tea/Water Projects) TARDA Athi /river and Munyu Basin Studies High Grand Falls Reservoir Kiambere/Mwingi Water (Phase II) Mutonga/Grand Falls Project CDA Kwale Cashewnut Processing Project Malindi integrated social health development programmet Trans-boundary integrated water resource management programme ENNDA Dam construction Isiolo Abattoir Refugee impact mitigation programme ASAL research and training center project KVDA Wei Wei Project (Phase II) River Utilization Studies Dam construction and management Total
75
5,000,000 10,000,000
4,500,000 25,000,000
5,000,000 23,000,000
5,000,000
8,000,000
11,000,000
3,300,000 1,600,000 5,000,000
14,000,000 2,000,000 6,000,000
16,000,000 3,000,000 8,000,000
4,000,000 6,015,410
4,000,000 36,884,919
10,000,000 38,000,000
2,000,000
5,000,000
5,000,000
9,000,000 100,000,000 15,000,000 20,000,000
9,000,000 120,000,000 20,000,000 20,000,000
10,000,000 140,000,000 35,000,000 25,000,000
250,000 390,400 7,560,000 200,615,810
992,750 2,288,000 7,938,000 296,628,669
1,092,025 2,516,800 8,334,900 357,619,725