1 2
P.L LEVEL
+67.20
ROOF LEVEL
+63.00
3 LEVEL 14
+58.80
LEVEL 13
+54.60
LEVEL 12
+50.40
LEVEL 11
+46.20
LEVEL 10
+41.70
LEVEL 9
+37.80
LEVEL 8
+33.60
LEVEL 7
+29.40
LEVEL 6
+25.20
LEVEL 5
+21.00
LEVEL 4
+18.80
LEVEL 3
+12.60
LEVEL 2
+8.40
LEVEL 1
+4.20
GROUND FLOOR
1. 2. 3. 4. 5.
Stair Case Core Lift Core Columns Refuse Basement
_ +0.0
4 BASEMENT FLOOR
-3.00
Axonometric Structural Diagram 5
1
1. Aluminium Framing Systyem 2. Electrial Hinging System 3. Aluminium Louvre
1
2
3
Axonometric Facade Systems Diagram
2
1
1. Aluminium Framing Systyem 2. Electrial Hinging System 3. Aluminium Louvre
2
Axonometric Facade Systems Diagram
3
2
open
Floors
open
close
close
2,4,6,8,10,12,14
open
open
close
close
Floors 1,3,5,7,9,11,13
Time over day light
9am
12am
3am
6pm
Louvre Movement Diagram
3
1. 2.
1
1
2
2
21 December
.
3pm
21 June
.
3pm
Open Louvers Partially Closed Louvers
Sunligh Diagram
4
1. 2. 3. 4. 5. 6. 7. 8. 9
3
Solar Panel Charge Controller Rainwater Collection Tank Geothermal Cooling & Heating Exchange Cooling Ventilation Heating Ventilation Geothermal Source Electrecity from Grid
1
5
7
6
8
Energy Diagram 4
2 9
5
t
e
t
s Di
f
to
ESTCODE
e
c an
Tr
ESTCODE
can be use for disable in case of fire
x
ESTCODE
ma
ESTCODE
m
l
e av
ESTCODE
20
LIFT
to
e
th
r Fi
i Ex
ESTCODE
ESTCODE
ESTCODE
ESTCODE
BCA Diagram EXIT
EXIT
6