A New Era For Public Housing Paul Karakusevic, Karakusevic Carson Architects
Working in Challenging and Unusual sites • Legible Urbanism • Hard Working Typologies • Appropriate Densities • Mixity • Local Power • Building for long term • Communities
Bacton Estate The London Borough of Camden
Client: London Borough of Camden Units and density: 293 homes, 155 dph, GIA 32,000m² (phase 1 67 homes, 134 dph, GIA 7,360m2) Tenure: 46% affordable, 54% private sale (phase 1 - 69% affordable, 31% private sale) Status: Phase 1 Completed 2016
.
Phase 1 Phase 2
EXISTING LAYOUT WITH DESIRE LINES
CREATING PRIVATE GARDENS AND SHARED COURTYARD AMENITY SPACE
MAXIMISING VIEWS TO ST. MARTIN’S CHURCH
PROTECTING SITE FROM NOISE & VIBRATION
NEW LANDSCAPING INTEGRATED INTO THE EXISTING PUBLIC REALM
LARGER BLOCKS DEFINING CORNERS AND EDGES
PROPOSED LAYOUT WITH DESIRE LINES
ACTIVE STREET FRONTAGES WITH MAXIMISED BUILDING ENTRANCES
PHASE 1B
PHASE 1A
0
10
30m
0
2
10m
Bacton Regeneration Phase 1
Bacton Regeneration Phase 1
Townhouse Plans 1:200 @ A4
Townhouse Sectional Perspective NTS @ A4
Dujardin Mews The London Borough of Enfield
Client: London Borough of Enfield Units and density: 38 homes - 48dph / 172hrh Tenure: 50% social & 50% intermediate Status: Completed 2017
.
Bacton Regeneration Dujardin Mews Phase 1
Dujardin Mews
Dujardin Mews Townhouse Plans
Dujardin Mews 1:200@A4
Dujardin M3ews
Karakusevic Carson Architects
3 Bed Townhouse - Axonometric View
0
Dujardin Karakusevic Carson Architects M3ews
Townhouse Plans 1:200@A4 1
5
Karakusevic Carson Architects
3 Bed Townhouse - Axonometric View
Kings Crescent Estate The London Borough of Hackney
Client: London Borough of Hackney Units and density: 765 dwellings: 490 new homes Refurbishment of 275 existing, 200dph Tenure: 50% affordable, 50% market sale Status: Phase 1 Completed 2017
.
The Colville Estate The London Borough of Hackney
Client: London Borough of Hackney Units and density: 925 homes to replace 438 existing - 225 dph, 670 hrh Tenure: 50% social rent /shared and 50% market sale Status: Phase 1 completed 2012 Phase 3 completed 2018 Phase 2 due 2019
.
Rd
De B ea
r ton
ate Rd
ppe
Southg
She
uvoir R d
Rosemary Gardens
Ne w
Ba
g rin
Regen t’s Can a
St
No r th Rd
Penn St
t eS
Place
Shoreditch Park
Bridpor t
l Poo
Hy
Shoreditch Park
de
Rd
l
Phase 1 Units and density: 41 homes 195 dph, 690 hrh Tenure: 100% social Status: Completed 2012
Phase 2 Units and density: 209 homes and retail 177 dph, 760 hrh Tenure: 54% social rent, 16% intermediate, 30% market sale Status: On site Due completion 2019
Phase 3 Units and density: 198 homes, 225 sqm cafĂŠ 440 dph, 1080 hrh Tenure: 100% market sale Cross subsidy for rest of development Status: Completed 2018
Thank you Paul Karakusevic, Karakusevic Carson Architects