The Aviation Magazine – No. 72 – 2021-01 to 03

Page 94

Tactical Considerations

Scooping Site Requirements The water source (or pickup lake) should be a minimum of one mile long , ¼ mile wide, free of obstructions, and at least six feet deep. The scooping path does not have to be straight, as the aircraft are somewhat maneuverable while scooping. Factors such as wind, elevation, and surrounding terrain will have a bearing on water source suitability. Less than a full load can be scooped on slightly smaller lakes. Both aircraft scoop at 80 kts, are on the water for about 15 seconds, and cover a distance of about 2,000 ft. Source: National Wildfire Coordinating Group - PMS 505 / NFES 2544

94

• Tank Configuration – The totaling 1,400 gallons, compartments totaling 1, dropped salvo, in trail, or sp load for both airtankers is wide. A trail drop is about 4

• Drop Height – Drop heigh depending on factors such direction of run (into wind v

• Clearance – When dropping must be moved at least 200 made 1000 ft or more in ad necessary except to confirm

Source: National Wildfire Coord


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.