NATIONAL VETERANS MEMORIAL & MUSEUM THE PROJECT AT A GLANCE CONCRETE POUR SEQUENCES (scheduled to be complete in April)
GENERAL INFO The project team includes people from 20 states and 46 total veterans.
CUBIC YARDS OF CONCRETE IN BUILDING
This equates to 28 million pounds of concrete, which is equal in weight to over 1,100 OSU football teams and equivalent in length to 9 miles of a typical 2’x2’ concrete foundation.
AUGER
CAST PILES
TONS OF STRUCTURAL
TONS OF STEEL REINFORCING (REBAR)
STEEL IN BUILDING
There are 27 veterans working on the construction site alone. The number of people on average working on the construction site in a given week is 75 to 100. The concrete from the foundations from the previous facility was crushed and is being used on a daily basis for the construction of the new facility. The building features a fully custom curtain-wall glazing system.
325-FOOT-LONG MEMORIAL GROVE WATER FEATURE WALL
There are 21 different varieties of trees, including American Beech, American Legend, Ohio Buckeye and Red Sunset Maple to name a few.
TREES CUBIC YARDS OF TOP SOIL in the landscaped areas
CUBIC YARDS OF STRUCTURAL FILL (exclusive of the top soil)
The trees will be dug up, brought to the job site and maintained until the final planting in the spring of 2017.
CONCRETE POURS COMPLETE; INTERIOR CONSTRUCTION BEGINS
CONSTRUCTION BEGAN DEC 2015
THE CALIPER SIZE RANGES FROM
3.5
TO
INCHES
8
INCHES
BUILDING COMPLETE; EXHIBIT INSTALLATION BEGINS SPRING 2018
SPRING 2017
TIMELINE
MEMORIAL GROVE EARTHWORK BEGAN
BUILDING ENCLOSED & GLAZING COMPLETE
SUMMER 2016
SUMMER 2017
CONTACT AMY TAYLOR, CHIEF OPERATING OFFICER COLUMBUS DOWNTOWN DEVELOPMENT CORPORATION 614-545-3942, ATAYLOR@DOWNTOWNCOLUMBUS.COM
CONNECT
GRAND OPENING SUMMER 2018