MOVINGFORWARD T H E D O W N T O W N C H U R C H B U I L D I N G C A M PA I G N
projects The journey to our current home is a story of God's faithfulness and the hard labor of many. We want to improve our facility to meet the needs of our growing congregation. These are a few of the projects we’d like to begin with.
HVAC & insulation
Remodel bathrooms
When HVAC installers put in our two current units in the main multi-purpose room, they told us that two wouldn't be enough for the size of the space long-term. Adding an additional unit will take strain of the other units and insulating the ceiling will increase the flexibility of our facility.
While our current bathroom facilities are the best we've ever had, the walls need to be completely redone, the stalls need to be updated, and we'd like to make the bathrooms feel cleaner and more welcoming with some aesthetic touches (painting, improved lighting, etc).
Paint & signage
Classrooms/offices
Ceiling sprinklers
The old brick on the exterior of the building needs to be updated with some paint and we'll add some much-needed outdoor signage along East Locust and East 4th St.
Our expansion into the north side of the building will give us more room for our children’s ministries and office space. We’ll add closed circuit television for moms who are nursing and have small children.
The north side of the building needs a ceiling sprinkler system to get up to code. We already have a sprinkler system on the south end of the building (including our main multi-purpose room.)
MORE INFO AT WWW.THEDTC.ORG