1 minute read
2SAFETY AND SECURITY
from Imagine FAQs
The students are currently walking over to First Orlando for chapel and large assemblies. While we have been blessed to be able to rent facilities from the church, the movement of students from the safe perimeter of our school campus to church facilities each week continues to be one of our largest safety and security concerns. Additionally, we will install a covered walkway to connect the Cramer Family Field House to the Natalie Thomas Student Center. This added safety feature will allow for students to travel to nearly all campus buildings safely under the covered walkways.
3fine Arts
With seating for just under 600, the Natalie Thomas Student Center will be the hub for campus-wide Fine Arts performances. With the installation of all of the needed audio visual equipment and staging, TFA will be able to host larger productions and elevate our Fine Arts Program.
4LOWER SCHOOL ATHLETICS & PE
The space will continue to function as a gym and serve the Lower School for their PE and Lower School Sports needs throughout the year.