AGENDA Main Campus Project Overview Team Introduction Design Presentation
Scheduling and Safety Presentation Q&A with notecards
Streetsboro Rd. – Route 303
Kirby Ln
Wiencek Rd
DEFER INTERMEDIATE 4-6 BECOMES 4-5
EXISTING MIDDLE SCHOOL
Annalane Dr PUBLIC PARK
EXISTING HIGH SCHOOL 9-12 BECOMES 6-8
CAMPUS ELEMENTARY SCHOOL 2-3 BECOMES PK-3
CAMPUS ELEM. SCOPE OF WORK Renovate Campus Elementary School • 77,800 square feet for Grades PreK-3 • New classroom space added • Renovation of building finishes to match new additions • New windows and roof • New heating system with air conditioning • Separation of bus and parent drop off
• New Playground location • Sustainably Designed (will be certified LEED Silver)
No Renovation of Defer Intermediate School • New grade configuration to accommodate Grades 4-5
TEAM INTRODUCTION Michael Daulbaugh, Superintendent
CAMPUS ELEMENTARY SCHOOL DESIGN PRESENTATION
SITE PLAN
SITE RENDERING
SITE RENDERING
EXTERIOR VIEW
EXTERIOR VIEW
ENTRY VIEW
NEW LOBBY VIEW
FLOOR PLAN
SECURITY PLAN
TYPICAL CLASSROOM
TYPICAL CLASSROOM
MEDIA CENTER
MEDIA CENTER
EXTENDED LEARNING AREA
ADMINISTRATION
STUDENT DINING
HAMMOND CONSTRUCTION • Construction Manager at Risk (CMR) • Manage Quality, Schedule & Costs • All Work Subcontracted to Hammond • Single Point of Contract Responsibility
CAMPUS ELEMENTARY PROJECT TIMELINE
PHASED CONSTRUCTION • Phasing Plan developed to enable execution of work while school remains operational
• Safety & Security of Students & Staff is Top Priority • Segregation of Construction (fences/barricades/working hours)
• Plan reviewed with Administration & Streetsboro Fire Dept. • Presentation to Campus ES Parents