PLAN NOW FOR PLANTING SEASON By Jennie Haskell, The Longleaf Alliance
Once you decide to establish longleaf pine, more decisions await. Luckily, being armed with information on quality seedlings and planting techniques will make some choices easier. Planting season may be several months away (December to March), but securing seedlings and contractors early will significantly benefit your establishment project.
a few chances in life to start a new forest, The Alliance encourages choosing the best seedlings available for your location. Investing in improved seedlings may pay off with improved form. Remember to order seedlings as early as possible - many nurseries have sold out of longleaf pine seedlings the last few years.
Choosing Seedlings A landowner must decide what type of seedling to plant and which planting method to use — planting with bareroot or containerized seedlings and to machine or hand plant? Because of easier handling and the longer planting window, most of the longleaf pine seedlings sold are containerized seedlings. However, machine planting bareroot seedlings can be very successful with proper seedling handling and an experienced planter. Site preparation, planting method, and cost may influence the choice of seedling type. Typically, containerized seedlings ($0.20) are twice the cost of bareroot seedlings ($0.10). Containerized seedlings can tolerate longer storage times and are easy to hand plant. However, bareroot seedlings are often the preferred seedling type when machine planting due to cost efficiency and limited need for personnel. Tree nurseries sell longleaf pine seedlings grown from natural seed sources and sometimes genetically improved selections. Ask about the seedlings’ seed source and their suitability for your location. Since most landowners only get
Preparing to Plant Seedling survival is dependent on the quality of the site preparation. Chemical application to control undesirable competing vegetation is typically done the summer before planting, sometimes followed by site-preparation burns. If using a machine planter such as a dozer, mechanical site preparation may not be necessary as a dozer with a v-blade on the front can remove debris and competing vegetation. On old field or pastures sites, subsoiling may be necessary to break up a hardpan or compacted soil, but it should be conducted in a dry summer period. Be sure to complete this at least three months before planting season to allow the soil to settle. When converting improved pastures or ag fields previously in leguminous crops, scalping can be an essential aid to successful restoration. If the site-prep isn’t sufficient to adequately control competition, waiting another year to get it right may be cheaper and easier than addressing problems while the young longleaf pine are growing.