![](https://assets.isu.pub/document-structure/230228030504-df9b9356fe8ae91a7047cfab73eb1e2c/v1/c013ae82a5527b5dd9524dfcdc194de5.jpeg?width=720&quality=85%2C50)
1 minute read
The national champion gets champion-level upgrades.
According to an OSU Athletics press release, upgrades will be underway for the Pedigo-Hull Equestrian Center as part of the estimated $325 million athletics vision plan, timeline unknown.
“Building off the historic 2021-22 season in which the program captured its eighth Big 12 Conference title and its first overall NCEA
Jaiden Daughty national championship, several updates to Pedigo-Hull Equestrian Center are planned,” OSU Athletics said in a press release.
A covered arena similar in both size and scope to the Atherton Family Arena will be added to the PedigoHull Equestrian Center.
“Currently the primary practice arena, the Atherton Family Arena is a 135x270 square foot covered arena.”
In 2021, a new multipurpose team building that includes a lounge with a study area and a fueling station was completed, these new upgrades will now add to Cowgirls facilities. sports.ed@ocolly.com
Adam Engel Editor-in-Chief
![](https://assets.isu.pub/document-structure/230228030504-df9b9356fe8ae91a7047cfab73eb1e2c/v1/da45358064692190049fcd919757ddee.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230228030504-df9b9356fe8ae91a7047cfab73eb1e2c/v1/8dd6a6027bcf7ad0e2959417d79ebfc9.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230228030504-df9b9356fe8ae91a7047cfab73eb1e2c/v1/d470a0a31a8168069569a227295fd382.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230228030504-df9b9356fe8ae91a7047cfab73eb1e2c/v1/b0f76783166ea9c2e9147dd8076a78a7.jpeg?width=720&quality=85%2C50)