P A S C A C K
V A L L E Y
•
D E C E M B E R
A&I
2 0 ,
2 0 2 1
GUTTERS
NJ LIC. # VH04645800
ial ent sid Re
OWNER OPERATED General & SUPERVISED Contracting 45yrs.
LLC.
ROOFING & SIDING
Exp.
Com me rcia l
Se a m l es s G u t t e r s • S i d i n g • A l l R e p a i r s
FL AT R OOF S P E C I ALI S T
Hillsdale: DMR pegs community center, field at $16M T O R C H D O WN • CO L D PR O C E SS • E PD M • B - D E C K I NG R E P AI R S
201. 481.1582 airoofingandguttersnj.com
tion at 7). On Dec. 14, both Lundy and councilman Anthony DeRosa again took exception to Ruoccoʼs early release, on Dec. 7, of the approximate $16 million estimate for a new community center and artificial turf field prepared by consultant DMR Architects. De Rosa called Ruoccoʼs early release “a violation of committee process and certainly our trust” and said that Ruoccoʼs action “must call into question my trust for the mayor.” Lundy said the Steering Committee and council now has the DMR Architectsʼ documents and the Steering Committee has plans to meet before year end. Ruocco said he did not feel any information provided by DMR Architects qualified under the stateʼs Open Public Records Act (OPRA) to be kept under wraps and said it was important to inform the public. He said so far the citizens advisory committee that he appointed to work with the Steering Committee had not been consulted or used as a focus group to advance the discussion about a community center or turf field. [Related: See John Ruocco in Letters, Page 2.] Also, Business Administrator Chris Tietjen, a Steering Committee member, said his notes said that members had agreed to wait until Dec. 14 to speak publicly about the DMR estimates following a tour of a similar facility that DMR had recommended. The mayor said he never agreed not to release the information, though he said the actual “draft documents” provided by DMR Architects to the Steering Committee for a Community Center and Turf Fields, were not publicly accessible via a public records, or OPRA request. Ruocco recently sent a letter to the stateʼs Government Records Council that handles complaints about the OPRA law after he and council members disagreed over whether a “draft” conditional redeveloperʼs agreement that was to be voted on that night should be released prior to a council vote and discussion. On Dec. 7, Ruocco said he did not believe the information provided by DMR should stay under wraps until the Dec. 14 meeting and provided it during his mayorʼs
FROM PAGE 1
report. Ruocco had subbed for councilman Zoltán Horváth during his absence at a Steering Committee meeting as an ex-officio member. However, council members, including Lundy and Anthony DeRosa, disagreed with Ruoccoʼs early information release, noting the committee agreed to wait until after members had toured a community center in Hackensack that DMR recommended as being similar to what was being proposed. DeRosa said the mayor said one thing during the committee meeting and did another in public while Lundy said the mayor was reporting on DMR so he could “skew it to your agenda and say things that you want to say.” Ruocco said he would report facts only, “no opinions will be released.” Replied Lundy: “Weʼll see.” Ruocco said preliminary “conservative estimates” from DMR put possible costs for a 21,000-squarefoot community/recreation center at about $11 million and for new artificial turf at Centennial Field at about $4.6 million. He noted DMR also provided estimates for field improvements at Memorial FIeld ($600,000) and at Beechwood Field ($100,000). He stressed that “no action” was taken on any of the options discussed by DMR. Ruocco said DMR showed a concept floor plan that provided a full-size regulation basketball court that can also be used as two halfcourts; two multipurpose rooms, each 1,300 square feet that can be combined into a 2,600 square foot room; and a third multipurpose room of 1,000 square feet. Moreover the plan includes a full-service kitchen, an administrative office, two restrooms, a mechanical room, and lobby space. He said DMR presented pictures of possible buildings, including how it might be placed on the Stonybrook Swim Club site or West commuter lot downtown. In addi-
tion, DMR showed how a new turf/soccer field would look at Centennial Field, and also how a regraded football field might appear at Memorial Field. A more formal presentation of DMR Architect options for a community center and turf field, along with elaboration on estimates, and Steering Committee opinions and recommendations, will likely occur over the next few months, officials said. At the meeting's end, Ruocco said he was “frankly disappointed” about certain council membersʼ reluctance to apprise residents about DMRʼs community center and turf field suggestions and possible costs. Ruocco said it was “frustrating” that the Steering Committee did not consult with the Citizens Advisory Committee — both committees he appointed — before initiating planning efforts with DMR Architects. He said itʼs “very frustrating” to realize council members prefer to keep information from the public rather than to share it. “Thatʼs not true,” interjected De Rosa twice. “Thatʼs not true at all,” added Lundy. When Ruocco objected to both speaking, noting he was doing his council commentary, DeRosa said, “that doesnʼt mean you can lie.” Lundy said, “And youʼre not council, youʼre the mayor; itʼs council commentary.” Pizzella attempted to intervene to calm matters. Ruocco then told Lundy she was “out of order” and Lundy replied, “Thank you.” That ended the back and forth among Ruocco, Lundy and DeRosa, but Ruocco added another caveat. He urged the council to “slow it down and think of all the residents who may not want to use a community center or an athletic field” and given that preliminary
PARK FLOORING Quality Workmanship at Reasonable Rates Floor Scraping • Refinishing • Staining Installation & Repairs Dustless 40 Years FREE ESTIMATES System
201-387-1377 Available Mitchell Park (201) 694-9011 Cellular • parkfloor@aol.com Experience
Mitchell Park (201) 694-9011 Cellular • parkfloor@aol.com
31
cost estimates “greatly exceeds” the $10 million originally estimated for both projects. Ruocco previously opposed the council when it allocated $500,000 in this yearʼs budget as a down payment needed for issuing bonds, noting the council had made no decisions yet about either project. After citing the nearly $16 million cost, Ruocco questioned the cost and tax increase likely, on top of a possible 2023 referendum to build a new George G. White Middle School that he said was estimated at $68 million. Given that tax hit, Ruocco said he would likely urge a referendum
on the community center and artificial turf projects. School officials have said that if the proposed site for a new middle school passes muster, the school board will consider a bond referendum in March 2023 to replace the nearly century-old building. School officials told Pascack Press that they anticipate a final replacement cost estimate by January 2022, though councilman DeRosa also told us that an estimate of $65 million to $75 million was discussed by the ad hoc committee looking into middle school replacement. DeRosa was a committee member.
KAPLAN LANDSCAPING LLC.
THIS AD. 10% OFF SNOW PLOWING SERVICES NEWWITHCLIENTS ONLY
Snow Plowing • De-Icing • Sidewalks • Emergency Service
EST. 2002 Commercial • Residential
LANDSCAPE SERVICE FOR 2022
201.775.0037
Call Estimates & & Consults! Consults! Call Now Now For For Free Free Estimates
TERMITE & PEST CONTROL “You’ve Seen Our Yellow Trucks”
CALL FOR A FREE INSPECTION & ESTIMATE
WINT E R IS HE RE ... www.twin-boropestcontrol.com
201-666-5000
WE MONITOR OUR EMPLOYEES HEALTH DAILY!
immy J the Junk Man
RESIDENTIAL & COMMERCIAL WE CLEAN OUT: Basements • Attics • Garages Fire Damage • Construction Debris • Hoarding Specialists FREE ESTIMATES
201-661- 4940
www.jimmythejunkmanwestwoodnj.com WE DO NOT TRANSPORT SOLID OR HAZARDOUS WASTE.
DECEMBER 20, 2021 • PASCACK VALLEY PRESS
r e t n i W
P R E S S